HomeMy WebLinkAbout05235 ORD - 01/21/1959AN ORDINANCE � Z' 3
,APPROVING AND ADOPTING THE DIRECTOR OF PUBLIC
WORKS- WRITTEN STATEMENT AND REPORT OF THE
ESTIMATES OF THE VARIOUS COSTS FOR THE IMPROVE-
MENT OF THE PORTIONS OF ALAMEDA STREET FROM THE
SOUTHEAST BOUNDARY ,OF DODDRIDGE STREET TO THE
NORTHERLY BOUNDARY OF OSO GOLF COURSE, AVALON ;STREET
FROM THE SOUTHEAST BOUNDARY LINE OF EVERHART ROAD TO
THE SOUTHWEST BOUNDARY LINE OF AL'AM DA STREET,
EVERHART ROAD FROM ALAMEDA STREET TO AVALON STREET,
ROBERT DRIVE FROM THIRTY FEET SOUTH OF THE SOUTH
BOUNDARY LINE OF AVALON STREET TO FORTY FEET NORTH-
EAST OF THE NORTHEAST BOUNDARY LINE OF ALAMEDA STREET,4
AND AIRLINE ROAD FROM ONE HUNDRED TWENTY FEET NORTH
OF THE CENTERLINE OF ALAMEDA STREET TO ONE HUNDRED
TWENTY FEET SOUTH OF THE CENTERLINE OF ALAMEDA STREET,
AlD THE STATEMENTS OF THE NAMES OF THE APPARENT OWNERS,
DESCRIPTIONS AND NUMBER OF FRONT FEET OF ABUTTING
PROPERTY OF SAID STREETS WITHIN SAID LIMITS, DETERMIN-
ING AND FIXING THE PORTION OF SAID COSTS, AND THE RATE
THEREOF, TO BE PAID BY AND ASSESSED AGAINST SAID
ABUTTING PROPERTY, AND THE REAL AND TRUE OWNERS THEREOF,
AND THE PORTION THEREOF TO BE PAID BY THE CITY OF CORPUS
CHRISTI, TEXAS, DETERMINING THE NECESSITY OF LEVYING
AN ASSF'SSN[ETiT AGAINST SAID ,ABUTTING PROPERTY, AND THE
REAL AND TRUE OWNERS THEREOF FOR THE PART OF SAID COST
APPORTIONED THEM: ORDERING AND SETTING A HEARING TO BE
HELD AT 3:00 O'CLOCK P.M. ON THE 11th DAY OF FEBRUARY,
1959, IN THE COUNCIL CHAMBER OF THE CITY HALL IN CORPUS
CHRISTI AS THE TIME AMID PLACE FOR HEARING OF THE REAL
AM TRUE OWNERS OF SAID ABUTTING PROPERTY, AM ALL OTHERS
INTERESTED IN SAID PROPERTY OR IN SAID PROCEEDINGS CON-
CERNING SAID ASSESSM:NT$ AND PROCEEDINGS; DIRECTING THE
CITY SECRETARY TO GIVE NOTICE OF SAID HEARING AS RE'4UIREA
BY THE LAWS OF THE STATE OF TEXAS AM? THE CHARTER OF THE
CITY OF CORPUS CHRISTI, TEXAS, AND FURTHER, DIRECTING SAID
CITY :SECRETARY IN ADDITION TO THE CONTENTS OF THIS NOTICE
OF SAID HEARING AS RE- 1UIRED By I.", WHICH SHALL BE VALID
,AMID SUFFICIENT IN ITSELF, TO INCLUDE THEREIN A LIST OF THE
APPARENT OWNERS AND DESCRIPTION OF SAID ABUTTING PROPERTY
AS SET OUT IN SAID REPORT OF THE DIRECTOR OF PUBLIC WORKS
AMID PROVIDING THAT SAID LIST OF APPARENT OWNERS SHALL NOT
BE CONCLUSIVE OF SAID OWNERSHIP AND SHALL NOT LIMIT SAID
NOTICE TO SUCH OWNERS NAMED OR THE PROPERTIES DESCRIBED,
AND THE SAID NOTICE SHALL NEVERTHELESS BE DIRECTED TO
THE REAL AND TRUE OWNERS OF SAID ABUTTING PROPERTY,
WHETHER NAMEX) OR CORRECTLY NAMED OR NOT, AND DECLARING AN
EMERGENCY.
WHEREAS, the City Council of the City of Corpus Christi, Texas, heretofore
on the 21st day of January, 1959, by duly enacted ordinance determined the necessity
for and ordered the improvement of the portions of Alameda Street from the south-
east boundary of Doddridge Street to the northerly boundary of Oso Golf Course,
Avalon Street from the southeast boundary line of Everhart Road to the southwest
J-x I f1__�
' s
boundary line of Alameda Street, Everhart Road from Alameda Street to Avalon Street, Y
Robert Drive from 30 feet south of the south boundary line of Avalon Street to
40 feet Northeast of the northeast boundary line of Alameda Street, and Airline
Road from 120 feet north of the certerline of Alameda Street to 120 feet south of
the centerline of Alameda Street, a duly executed notice of said ordinance having
thereafter been filed in the name of the City with the County Clerk of Nueces
County, Texas; and
WHEREAS, Pursuant to the ordinance of January 21, 1959, above mentioned,
and after having advertised for and received bids on the construction of said
Improvements for the length of time and in the manner and form as required by the
Charter of said City and the laws of the State of Texas, having awarded a contract
for the construction of said improvements to Heldenfels Brothers, on its lowest
and most advantageous bid, and having duly and regularly made appropriation of
funds available for said purpose to cover the estimated cost to said City of said
improvements, all as provided by the Corpus Christi City Charter and by —laws and
the laws of the State of Texas, did execute heretofore on December 3, 19582 a
contract with Heldenfels Brothers, and the Performance Bond required by said contract
having been properly furnished and posted by said Heldenfels Brothers, and accepted
by said City Council as to form and amount as required by the Charter of the City
and the laws of the State of Texas; and
WHEREAS, The said City Council has caused the Director of Public Works to
Prepare and file estimates of the costs'of such improvements and estimates of the
amount per front foot proposed to be assessed against the property abutting said
streets to be improved, and the real and true owners thereof, and said Director of
Public Works has heretofore filed said estimates and a statement of other matters
relating thereto with said City Council, and the same having been received and
examined by said City Council; and,
WHEREAS, in accordance with said statement of estimates and other matters
prepared and filed by said Director of Public Works herein approved by said City
Council, the total estimated cost of the whole improvement of Alameda Street, Avalon
Street, Everhart Road, Robert Drive and Airline Road, within the limits above
—2—
defined, is $524,351.52; the estimated amount per front foot proposed to'be
assessed against each abutting property, and the real and true owners thereof, "
for curbs and gutters on said streets, within the limits above defined, is
$1.75725 per front foot; the estimated amount per square foot to be Assedsedtigainst
each abutting property, and the real and true owners thereof, for sidewalks on
said streets, within the limits above defined, is $0.43665 per square foot;
the estimated amount per square foot to be assessed against each abutting property,
and the real and true owners thereof, for driveways on said streets within the
limits above defined, is $0.7455 per square foot; the estimated amount per front
foot proposed to be assessed against each abutting property, zoned for one—
and two — family dwelling units, and the real and true owners thereof, for construction
of said pavement, curbs and gutters in place on Alameda Street, Avalon Street,
Everhart Road, Robert Drive and Airline Road, within the limits above defined, is
$5.95530 per front foot; the.total estimated amount per front foot proposed to be
assessed against each abutting property zoned or used for other than one— and two —
family dwelling units, and the real and true owners thereof, for construction of
said pavement, curbs, and gutters in place on Alameda Street, within the limits
above defined, is $10.96427 per front foot; the total amount per front foot pro-
posed to be assessed against each abutting property zoned or used for other than
one- and two - family dwelling units, and the real and true owners thereof, for
construction of said pavement, curbs, and gutters in place on Everhard Road and
Airline Road, within the limits above defined, is $8.01781 per front foot; the
total amount per front foot proposed to be assessed against each abutting property
zoned or used for other than one- and two - family dwelling units, and the real and
true owners thereof, for construction of said pavement, curbs, and gutters in
place on Avalon Street and Robert Drive, within the limits above defined, is
$5.9553 per front foot; the total estimated amount of the cost of said improve-
ments on Alameda Street, Avalon Street, Everhart Road, Robert Drive and Airline
Road, within the limits above defined, proposed to be assessed against the abutting
property, and the real and true owners thereof, is $238,622.76; the total estimated
—3—
amount of the cost of said improvements on Alameda Street, Avalon Street,
Everhart Road, Robert Drive and Airline Road, within the limits above defined,
proposed to be paid by the City of Corpus Christi, Texas, is $288,539.96.
WHEREAS, according to said written statement of said Director of Public
Works the names of the apparent owners of said abutting property and the number
of front feet owned by each, the description of their - property, the amount
proposed to be assessed against each abutting property and the real and true
owners thereof and other matters contained in said statements are as follows,
to —wit:
e
—4—
T : THE MAYOR AID CITY COUNCIL •
FROM: DRAHN JONES, DIRECTOR OF PUBLIC WORKS
Herewith are submitted ownership rolls, showing the names of the apparent property owners
abutting on the portions of Alameda Street from the southeast boundary of Doddridge
Street to the northerly boundary of Oso Golf Course, Avalon :Street from the southeast
boundary line of Everhart Road to the southwest boundary line of Alameda Street,Everhart
Road from Alameda Street to Avalon ,Street, Robert Drive from 30 feet south of the south
boundary line of Avalon Street to 40 feet northeast of the northeast boundary line of
Alameda Street, and Airline Road from 120 feet north of the centerline of Alameda Street
to 120 feet south of the centerline of Alameda Street, showing the number of front feet
owned by each, the description of their property, and the amount proposed to be assessed
against each abutting property and the real and true owners thereof, also hereafter set
out are the various estimates of costs and amounts of assessments:
Total estimated cost of whole improvements within the limits defined: '.$ 5242351,52,
Estimated amount per front foot proposed to be assessed against each
abutting property for curbs and gutters: $ 1,75725
Estimated amount per square foot proposed to be assessed against
each abutting property and the real and true owners thereof for
sidewalks: $ 0.43665
Estimated'amount per square foot to be assessed against each
abutting property and the real and true owners thereof for driveways: $ 0.7455
Estimated amount per front foot to be assessed against each abutting
property zoned for one— and two — family dwelling units and the real
and true owners thereof for construction of said pavement, curbs and
gutters in place on Alameda Street, Avalon Street, Everhart Road,
Robert Drive and Airline Road: $ 5.95530
Estimated amount per front foot to be assessed against each abutting
property zoned or used for other than one— and two — family dwelling
units and the real and true owners thereof for construction of said
pavement, curbs and gutters in place on Alameda: $, 10.96427
Estimated amount per front foot to be assessed against each abutting
property zoned or used for other than one— and two — family dwelling
units and the real and true owners thereof for construction of said
pavement, curbs and gutters in place on Everhart +Road and Airline
Road: t $ 8.01781
Estimated amount per front foot to be assessed against each abutting
property zoned or used for other than one— and two — family dwelling
units and the real and true owners thereof for construction of said
pavement, curbs and gutters in place on Avalon Street and Robert Drive: $ 5.9553.
Total amount to be assessed against private property owners: $ 235,811.56.
Total amount to be assessed against City as property owner: $ 2,811.20.
Total amount to be paid by the City of Corpus Christi: $ 288,539,96.
rahn Jones D rector of Public
Works
Approved:
City �F7 ian�ge r'
/T6M
Mo.
•3
10
maFr.MNARY PAVING ASSESSMENT Page 1
ySouthwest Side Alameda From Doddridge to North Boundary Line of Oso Golf Course
' fi
TYPE OF PAVEMENT 4" "Hot Mix Asphalt Base and Surface with 11" lime stabilized HELDENFEIS BROS. CONTRACTOR
CONTRACT DATE Dec. 3, 1958 clay base y S 4 ' Face to Face of Curb ROADWAY `
Not including sidewalk or driveways)
CONSTRUCTION COST $ 5.95530 Residential Rate Per Front Foot
(R -1 - R-2)
Assessment for-Curb & Gutter per Lineal Foot 1.75725 $10.96427 Business Rate Per Front Foot
Assessment for Sidewalk per Square Foot 0.43-665- (Other than R -1 & R -2)
Assessment for Concrete Driveway per Square Ft. 0.7755 BASED ON 64 FEET OF STREET WIDTH.
PROPERTY OWNER
NAME OF ADDITION
B
NO.
NO.
IENG
ABUT.
PROP.
TYPE
OF
ONING
OWNER_
SHIP
FROM ST
. OF
OV-
.MENTS
RATE
CHARG
FABLE
PAVING &
OURG &
GUTTER
WALK
sq.
FT.
WALK
ASSESS-
MENTS
RIVE
WAY
SQ.FT.
DRIVEWAY
SSES
FOR EXIS
ING
`C & G
TOTAL
ASSESSMENT
D O
D D R
I D
G E
Agnes, Pope, Haynes
Pope Place No.l
A
12
114
B -1
114
114
100%
1249.93
-
-
-
200.33
1049.60
Agnes, Pope, Haynes
Pope Place No.l
A
-
286
B-1
100¢
286
100%
3135478
1144
499.53
3635.31
J. E. Carroll
Pope Place No. 1
3
12
120
R -2
1 75
120
1 75%
1535.98
480
209.59
158.15
5$7.42
D E L
A I
E
D R
V E
A. B. McKenzie
Pope Place No. 1
7
13
117.5
R -1
75
5
75%
523.81
470
205.23
-
-
154.86
575 -la
��K4e .L. �i�Aards,et¢,r
Pope Place No- 1
7
14
117.5
R -1
75
5
k1177-5
75%
524.81
470
205.23
_
_
154.86
575.18
t
P L
A C E
Guy J. Brown
Pope Place No. 1
8
13
117.5
R -1
.75
75%
524.81
470
205.23
-
-
154.86
575.18
ar /s� X? M fche! /ref �X
Pope Place No. 1
8
14
117.5
R -1
75
117.5
75%
52L.81
470
205.23
_
_
154.86
575.18
C
A T A
L I
A
P L A C
E
Delbert Bowen
Pope Place No. 1
11
15
117.5
R -1
1 75
117.5
75%
524.81
470
205.23
-
-
1 154.86
575.18
A. M. Dampier,Jr.
Pope Place No. 1
11
16
117.5
R -1
75
117.5
75%
1524.81
470
205.23
-
-
154.86
575.18
P
E E
M A
N P
L A C
EL
C. White
Pope Place No. 2
12
15
119.
R -1
75
119.09
75%
531.92
476. 36
208.00
-
-
156.95
582.97
ITEN
No.
l2
'/3
r¢
/5
/6
/7
18
/9
M
PRELIMINARY PAVING ASSESSMENT -^ Page 2
<
Southwest Side Alameda from Doddridge to North Boundary line of Oso Golf Course
TYPE OF PAVEMENT 4" Hot. Mix Asphalt Base and Surface with 11" •lime stabilized clay base HELDE T�PEIS EROS. CONTRACTOR
CONTRACT DATE - - _ pEC `� - 19 ;8 6 �'� FFace to Face of Curb ROADWAY
ASSESSMENT RATE PAVEMENT AND CURB AND GUTTER
CONSTRUCTION COST (Not including sidewalk or driveways)
$ 5.95530 Residential Rate Per Front Foot
Assessment for Curb and Gutter per Lineal Foot 1.75725 (R -1 - R -2)
Assessment for Sidewalk per Square Foot $0.43665 $10.96427 Business Rate Per Front Foot
Assessment for Concrete Driveway per square Ft. 0.7F� 55 (Other than R -1 and R -2)
BASED ON 64 FEET OF STREET WIDTH.
BIK.
Q2H
TYPE
OWNER-
FT. OF
RATE
PAVING &
SIDEWD
SIDEWALK
DRIVE-
DRIVEWAY
TOTAL
PROPERTY OWNER
NAME OF ADDITION
N0.
NO.
ABUT.
OF
SHIP
OV-
HARG
CURB &
ASSESS-
WAY
ASSESS-
ASSESSMENT
PROP.
ONING
FROM S
.MENTS
ABLE
GUTTER
SQ.FP.
MENTS
SQ.FT.
MENT
L4r1/a" c.. a L,1,450-17
^- ' --
Pope Place No. 2
12
16
123
R -1
75
123
75%
549.38
492
214.83
-
764.21
P
S A
D E
A
-
Joe C. Tillman
Pope Place No. 2
14
15
123
R -1
75
123
759
549.38
492
214.83
-
-
764.21 -
Mark Pomerantz
Pope Place No. 2
14
16
123
R -1
-78
123
78%
571.35
492
214.83
-
m
786.18
S
N 11
A 11
0 N
I C A
P L
Pau/ N
Pope Place No. 2
15
1 14
123
R -1
78
123
78%
571.35
492
214.83
-
-
786.18"
Norman R. McAnally
Pope Place No. 2
15
15
123
R -1
75
123
75%1
549.38
492
214.83
_
764.21
B E
R M
J D A
William P. Hicks
Pope Place No. 2
16
13
123
R -1
80
123
80%
586.00
492
214.83
-
-
800.83
Perry M. McKinnan
Pope Place No. 2
16
1 14 1123
R -1
78
123 1
78%
571.35 1
492
214.83
-
786.18
W
I L
I A
M S
Gerald A. Lutz
Pope Place No. 2
17
13
123
R -1
75
123
75%
549.38
492
214.83
-
764.21
Edwin G. Danten
Pope Place No- 3
17
14
120.2
R -1
80
120.2
86%
572.66
480.80.
209.94
-
-
782.60 '
D R
I F T
W 0
D
Z_L A
lk. Groner 1
Pope Place No- 3
18
12
120.2
R -1 1
80
120.2
80%
572.66
480.80
209.94
-
-
782.60
w d
IiEM
No.
2/
22
23
24
25
26
07
28
29
PRELT4INARY PAVING ASSESSMENT Page 3
SOUTHWEST SIDE ALAMEDA FROM DODDRIDGE TO NORTH BOUNDARY LINE OF OSO GOLF COURSE
TYPE OF PAVEMENT 4" Rot Mix Asphalt Base and Surface with 11" lime stabilized clay base BELDENFELS BROS. CONTRACTOR
CONTRACT DATE I= 3 loss 6 ¢ 4dO Face to Face of Curb ROADWAY
ASSESSMENT RATE PAVEMENT AND CURB AND GUTTER
CONSTRUCTION COST (Not including sidewalk or driveways)
$ 5.95530 Residential Rate Per Front Foot
Assessment for Curb & Gutter per Lineal Foot $1-75725 ( R -1 - R -2)
Assessment for Sidewalk per Square Foot 0.43665 $10.96427 Business Rate Per Front Foot
Assessment for Concrete Driveway per Square Ft. -$0.7455 (Other than R -1 and R -2)
BASED 'ON 64 FEET OF STREET WIDTH,
Depth
Lin.
4 PavAssessment
PROPERTY OWNER
NAME OF ADDITION
Block
Lot
Ee3gth
Type
Owner-
t. of
Rate
Paving and
Sidewall
Sidewalk
rive-
Driveway
TOTAL
No.
No.
Abut.
of
ship
rove-
Curb and
Sq.Ft.
Assess-
way
Assess-
ASSESSMENT
Prop.
Zoning
from St.
ments
able
Gutter
-ment
S .Ft.
ment
Richard H. Godeke
Pope Place No. 3
18
13
120.2
R -1
80
120.2
0%
Ff L A
572.66
RE
480.80
209.94
782.60
DOLPHIN
R. M. Currie
Pope Place No. 3
19
11
121.3
R -1
80
121.3
0%
577.90
485.20
211,86
789.76
obby D. Horton
Pope Place No. 3
19
12
120.2
R -1
8o
120.2
0%
572.66
480.80
209.94
782.60
BAR
-
A C
- --
D A
--
P
-
A C E
- ^-
o/rtasG. ep an
efux
Pope Place No. 4
20
10
120.2
R -1
82.75
120.2
2.75
592.35
480.80
209.94
802.29
ichgrd W. Kincaid
Pope Place No. 4
20
11
120.2
R -1
1 82.75
120.2
2.75
592.35
480,80
209.94
802.29
C O R
L
L A
E
Charles J. Morahan
Pope Place No. 4
21
10
120.2
R -1
82.75
120.2
2.75
592.35
480.80
209.94
1
802.29
• R�.vsrs/e, -th, of ux
Pope Place No. 4
21
11
120.2
R -1
82.75
120.2
P2.75%
592.35
480,80
209.94
802.29
M
I R A V
AR
PL A
CE
,�9 %Pti � GAG /X4K
Pope Place No. 4
22
10
121
R -1
82.75
121
32-75%
596.29
484
211.34
1
807.63
Pope Place No. 4
22
ll
120.7
R -1
82.75
120.75
32-75%
595.06
483
210.90
805.96
AR M
- --
L
-
P L
--
C E
--
0
W. B. 11ope
orpus Christi
Ac. Tract
290
R -1
100
290
100%
1727.04
6o
506.51
2233.55
ITfIK
No.
31
3e
33
34
36
36
3?
38
39
40
4/
4e
43
44-
PR AIINARY PAVING ASSESSMENT Page 4
SOIMIWEST SIDE ALAMEDA FROM DODDRIDGE TO NORTH BOUNDARY T, OF OSO GOLF COURSE
TYPE OF PAVEMENT 4" Hot Mix Asphalt Base and Surface with II lime stabilized clay base P- L I > S 0 F M L L5 ISIZoZ. CONTRACTOR
CONTRACT DATE nEC 3 1958 RC Fp cs +a FtmcE op- Cup-& ROADWAY
ASSESSMENT RATE PAVEMENT AND CURB AND GUTTER
CONSTRUCTION COST (Not including sidewalk or driveways)
$ 5.95530 Residential Rate Per Front Foot
Assessment for Curb and Gutter per Lineal Foot 1. 5725 ( R -1 - R -2 )
Assessment for Sidewalk per Square Foot E.43655 $10.96427 Business Rate Per Front Foot
Assessment for Concrete Driveway per Square Ft. 0.7 55 (Other than R -1 and R -2)
BASED ON 64 FEET OF STREET WIDTH
PROPERTY OWNER
NAME OF ADDITION
31Dck
No.
Lot
No.
Tmgt-h
Abut.
Prop.
Type
-of
7miig
Depth
Owner-
ship
Erom St.
Lin.
ft. of
Improve-
ments
Pay.
iate
2orkp
able
kssessment
Paving and
Curb and
Gutter
Side
Sq.Ft.
Sidewalk
sess-
ment
Drive -
way
sq. ft
Driveway
Assess-
ment
TOTAL
ASSESSMENT
Pope Place No. 5
GxamTly Title & Trust Tr
Shopping Center
A
229.1
B -1
200
229.14
l00%
2512.35
916.56
400.22
2912.57
Pope Place No. 5
Title& TrustTr
Shopping Center
B
60
B -1
200
60
10
657-86
240
104.80
762.66
ja
Pope Place No. 5
Guaranty Title & Trus Tv
Shopping Center
C
145
B -1
150
145
100
1589.82
580
2 53.26
1843.08
V E R
I A R T
R 0
A D
Marston Rental Co.
Avalon Place
2
11
111.
B -1
135
111.78
100%
1225.59
307.12
134.10
592
441.34
1801.03
Marston Rental Co.
Avalon Place
2
1 10
50
B -1
1 135
50
100%
548.21
200
-87.33
635.54
Marston Rental Co.
Avalon Place
2
9
50
B -1
135
50
100%
548.21
200
87.33
635.54
C. T. Blasingame
Avalon Place
2
8
50
B -1
135
50
100%
548.21
200
8 -7.33
635.54
C. T. Blasingame
Avalon Place
2
7
50
B -1
135
50
100%i
548.21
200
87.33
635.54
I R . and
S.
m Ferris Sr.
Avalon Place
2 1
61
50
B -1 1
135
50 1100%
548.21 1
60
26.20
592
441.4
101
I. R. and
Sam Ferris Sr.
Avalon Place
2
5
50
B -1
135
50
100%
548.21
200
87.33
6 35.54
I. R. and
Sam Ferris Sr.
Avalon Place
2
4
50"
B -1
135
50
100%
548.21
200
87.33
635.54
T.M. Gannaway, Jr.
Avalon Place
2
3
50'
B -1
135
50
100%
548.21
60
_ -26..20
1592
441.34
1015.75
. Gannaway, Jr.
Avalon Place
2
2
50
B-1,
135
50
100
548.21
200
87.33
635.54
TIM
T.M. Gannaway, Jr.
Avalon Place
2
1
00
B -1
135
100
10o%
1o96.43
400
174.66
1271.09
0 B E
R T
D R I
V E
MEN
No.
45
46
47
48
49
.50
S/
6P
53
Page 5
r PRF,L,TMINARY PAVING ASSES,SMF'NT
Southwest Side Alameda From D-oddredge to North Boundary Line of Oso Golf Course
TYPE OF PAVEMENT 4" Hot Mix Asphalt Base and Surface with 11" lime stabilized clay base HELDENFELS BROS. CONTRACTOR
CONTRACT DATE nre q 1958 6 ¢ ' ace to Face of Curb ROADWAY
ASSESSM U RATE AND CURB AND GUTTER
CONSTRUCTION COST (Not including sidewalk or driveways)
5.95530 Residential Rate Per Front Foot
Assessment for Curb and Gutter per Lineal Foot 1.7572. 5 (R -1 R -2)
Assessment for Sidewalk per Square Foot 0. 3 5 $ 10.96427 Business Rate Per front Foot
Assessment for Concrete Driveway per Square Ft. 0.7455 ((Other than R -1 and R -2)
BASED ON 64 FEET OF STREET WIDTH.
ngth
Type
Depth
Lin.
a
.Assessmen
Drive-
Credit
Property Owner
Name of Addition
Blo
t
but.
of
Owner-
of
�!tpe
Paving an
idew
Sidewalk
way
Driveway
cisting
Total
No.
o.
rop.
ning
ship
rov-
harg
- Curb &
Sq. Ft.
ssessmen
Assess-
Curb
Assessment
from S
.ments
able
Gutter
Sq.Ft.
meat
& Gutter
AU
Turner Oil Co.
Avalon Place
1
n4.73
B -1
77
214.73
100%
2354.36 578.92
252.79
1192
888.64
3495.79
Z. C. Birnberr�
Alameda Park
1
11
57.0
B -1
117
57.01
l00%
625.07
228.04
99.57
-
724.64
A. J. Neff
Windsor Park 1
1
1
LOO. 15
B -1
180
100.15
100%i
1098.07
280.60
122.52
516
384.68
1605.27
Gu �.PLTaN
Windsor Park 1
1
1
00.1
B -1
180
100.13
100%
1097.85
400.52
174.89
-
-
1272.74
Fred Jones
Windsor Park 1
1
1 -C
1625
B_1
180
162.5
l00%
1781.69
490
213.96
692
515.89
2511.54
South Texas
Service Sta.Corp.
Windsor Park 1
1
1
180
B -1
180
180
100%
1973.57
112
48.90
1132
843.9
316.30
2550.08
W. J. Roberts
Windsor Park 1
1
1
90.7
B -1
180
90.70
100%
994.46
102.80
44.89
1117
832.72
1872.07
H A
R D 1
D R I V
E
Magnolia Pet.Co.
Windsor Park 1
9
1
43.9
B -1
180
143.15
l00%
1569.54
40
17.47
1482
llo4. 33
2691.34
Ind.Sch. Dist.
-Fart of Sec.
& Enc;nal Farm & G
o
irden
trac
bs 39
R.-1
775.7
397.0
100%
2364.25
1488"
649.74
457
-'34o.69
3354.68
B
E R
I D A
N
D R I V
E
17E
/1%b,
31i
.5B
55
6G
I
60!
6�I
62
63
64
PRELIM17aRY PAVING ASSESSMENT Page 6
Southwest Side Alameda from Doddridge to. North Boundary Line of Oso Golf Course •
TYPE OF -TAVIMAM 4 ", got Mix Asphalt Base and Surface with 11" lime stabilized clay base HEL NFESL EROS. CONTRACTOR
CONTRACT DATE December 3, 195 64 F+ act a of Curb ROADWAY
- ASSESSMENT '':M PAVEMENT ' :CM & GUTTER
80NSTAUMON COST (Not 3. luding sidewalk or driveways)
5.95530 Residentail Rate Per Front Foot
Assessment for Curb and Gutter per Lineal Foot $1.75725 R -1 - R -2)
Assessment for Sidewalk pe_r Square Foot . 3_ 5 $10. 6427 B4siness Rate Per Front Foot
Assessment for Concrete Driveway per Square Ft. P 7 75 5 Other than R -1 and R -2)
BASED ON,64�=T OF STREET WIM.
Depth
Lin.
%yay.
Assessment
Side
Sidewalk,
Drive
Driveway
Length
Type
Owner-
ft. of
Rate _
Paving &
walk -
Assess -
way
,A sz
Total Assessment
Property Owner
Name of Addition
Blk
of
Abut.
of
ship
Improv-
g
Curb &
Sq. Ft
went.
Sq.Ft.
meat
No.
No.
Pro i).
Zonim
from St
ments
able.
Gutter
Windsor Park
qt. rh1irnh
Windsor Park No.2
12
1
li6.5
R -1
100 1
116.5
loo
693.79
446
203,48
897.27
Jack L. Nixon
Windsor Park No-3
12
4o
116.5
R -1
64.5
116.5
64.5$
447.49
446
203.48-
-
-
650.97
C
XASI
DR I V
Heiman -Y. Rowe
Windsor Park No-3
13
1
116.5
R -1
64-5-
14.5
4.5
447.49
446
203.48
650.97
Norman L. R"ggly
Windsor Park No.4
13
40
116.5
R -1
64.5
116.5
64.5%
447.49
446
203.48
-
-
650.97
i
P
,•
N N I
I G T
C N D R I
1E
;7
Joe E. Brockett Jr.
Windsor Park No.3
16
1
116.5
R -1
64.5
116.5
64.5
447.49
446
203.48
-
-
650.97
Frank Cech
F.B.BeE.F.&G.Tract
Sect'
0.33
R -1
100
1300.33
100
7743.86
5121.32
2236.22
346
_257.94
10,238.02
- I R
L I N
E R O A D
4
r
(,uy arron, eta
Cullen Place
B
-
206
B -1
100
2b6
100%
2258.64
680
296.92
1202
896.09
3,451.65
I,
`G" ky Warren at al
. Cullen Place
A
-
315.48
B -1
100 1
315.48
100%
3-459.01
1261_92
551.02
-
-
4,010.03
Permanent Homes Inc
F. .&E.F.&G.Tract
ec,
14
13 -
.
413.
R -1
100
11+13.33
100
8416.80
5653.32
246$•52
-
-
10,885.32
Permanent ffome� T77
Cullen P-
N�:7
3CC
-IL
115
8
84
68
4o
215.79
-
-
1
E V E
R G R
E E N DR.
e
Cullen Place N.
1
1
1
R -1
85
135
8
68
0
235.79
919.16
Permanent Homes Inc
Cullen Place 'No.3
31
14
135
R -1
88
135
8
707.49
540
235.79
-
943.28
"I
34,867-77
MER
MO.
65
66
67
68
69
70
PRELIMINARY PAVING ASSESSMENT 7
SOUTHWEST SIDE ALAMEDA FROM DODDRIDGE TO NO= BOUNDARY LINE OF OSO GOLF COURSE
TYPE OF PAVEMENT 4" Hot Mix Asphalt Base & Surface with 11" lime stabilized clay base , BELDENFELS BROS. CONTRACTOR
CONTRACT DATE nrr.n im B ¢ Face to Face of Curb ROADWAY
ASSESSMENT RATE PAVEMENT AND CURB AND GUTTER
CONSTRUCTION COST (Not including sidewalk or driveways)
$ 5.95530 Residential Rate Per Front Foot
Assessment for Curb & Gutter per Lineal Foot 1.75725 ( R -1 - R -2)
Assessment for Sidewalk per Square Foot ; 3 5 $10.96427 Business Rate Per Front Foot
F`
Assessment for Concrete Driveway per Square t. P: 77 �5 (Other than R -1 and R -2)
BASED ON 64 FEET OF STREET WIDTH.
PROPERTY OWNER
NAME OF ADDITION
lock
No.
Lot
No.
ength
but.
rop.
Type
of
Depth
Owner-
ship
from St.
Lin.
ft. of
Improve-
ments
' Pav
ate
Charge
able
Assessment
Paving and
Curb and
Gutter
idemlk
Sq.Ft.
Sidewalk
Assess-
ment
Drive-
way
S .Ft.
Driveway'
Assess -
ment
TOTAL
ASSESSMENT
F I
I R F 3
E L D
D R
I V E
Permanent Homes, Inc.
Cullen Place No. 3
32
12
35
R -1
87.50
135
87-509
703.471
540
235-791
1 939.26
Permanent Homes, Inc.
Cullen Place No. 3
32
13.35
R -1
87.50
135
87.5
703.47
540
235.79
939.26
GREEN
W A Y
ER
I V E
Permanent Homes, Inc.
Cullen Place No. 3
33
13
35
R -1
80
135
80%
643.18
540
235.79
878.97
Harley G. olive
Cullen Place No. 3
33
14
35
R -1
83.70
135
83-700,
672.92
540
235.79
908.71
H A Z
D 0 VI
R I
R I V E
John H. Cain
Cullen Place No. 3
34
15
35
1 R -1
80
135
80%
643.18
540
235.79
878.97
Lindale Inc.
Parade Place
1
l.6
35.03
R -1
83.54
135.03
83.54
671.78
540.12
235.84
907.62
A R A
D E
D R I
V E
Lindale Inc.
Parade Place
2
16
34.46
R -1
86.50
134.46
86.50
692.65
537.84
234.85
927.50
ITEM
Alo.
7P
?3
74
75
76
V
78
79
so
81
PRELIMINARY PAVING ASSESSMENT 8
NORTHEAST SIDE ALA1,1EDA FROM DODDRME TO NORTH BOUNDARY LINE OF OSO GOLF COURSE
HELDENFELS BROS. CONTRACTOR
TYPE OF PAVEMENT 4" Hot Mix As halt Base and Surface with 11" lime stabilized clay base 4' Face to Face of Curb _ ROADWAY
CONTRACT DATE (!j �g ASSESSMENT RATE PAVEMENT AND CURB AND GUTTER
(Not including sidewalk or driveways)
CONSTRUCTION COST $5.95530 Residential Rate-Per Front Foot
- R -2)
Assessment for Curb and Gutter per Lineal Foot 1.75725 Business R
$10.96427 Business Rate Per Front Foot
Assessment for Sidewalk per Square Foot
P q 3 5 (Other than R -1 and R -2)
Assessment for Concrete Driveway per Square Ft. O. 5 BASED ON 64 FEEL 9F STREET wiDTH. -
Depth
Lin.
Pav
Assessment
Credit
TOTAL
enAt
Type
Owner-
ft. of
Rate
Paving and
3iaewaik
Sidewalk
Drive-
Driveway
for Ex_
ASSESSMENT
PROPERTY OWNER
NAME OF ADDITION
Block
Lot
Abut .
of
ship
Improv-
Chaxg
Curb and
Assess-
way
Assess-
isting
No.
No.
rop.
�S
from St
ments
able.
Gutter
S Ft.
4•
ment.
S Ft
9•
went
C.& G.
D 0 D D
RIDGE
ST.
W. R. Reid
Lamar Park No. 1
A
1190
1 B -1
1 190
10
208 .21
1 4.
Lamar Park Dev. Co.
ng
R,
Area
295
B -1
2
518.39
2716.o
Richard L. Hudson
" " "
1
1
120
R -1
115
120
10
4.64
D E L
A I N
E D R I VIE
D. V. Cows �-
" " " "
1
130
R -1
102.74
130
100%i
774.19
1 4o
17.47
274
204.27
995M
fir• C. O, lt/4'fSolx
FZed =Swevu
Lamar Park No. 2
6
26
130
R -1
126.24
130
100%
774.19
456
199.11
0
G R
A N T
P L A C E
L.H. & R.J. Beaman
" "
7
1
130
1 R -1
115.68
13o
jlo
4.19
444
1 .87
968.o6
Fred Heffington
7
28
1 1 O
R -1
102.8
1 o
10
4ag
520
227X6
1003 P5
C
T A L
I N A
P L A C E
I
W. Duffard
" ' "
10
1
130
R -1
107.39
130
10 0�
774.-ig
520
227.o6
1001.2
0. E. Strand¢
10
28
130
R -1
103.48
130
100,$
774.19
457.6
199.81
266.2
198.45
1172.45
P
E E R M
A N
L A E
A. A. Burke
"
11
1
130
R -1
93.69
130
193.6S%
436
190.38
358
266.89
]182.61
ITEM
No.
82
83
8¢
85
86
87
86
89
W
V
FRELIMINARY PAVING ASSESSMENT 9
NORTHEASE SIDE ALAMEDA FROM DODDRIDGE TO NORTH BOUNDARY LINE OF OSO GOLF COURSE
HELDENFELS BROS. CONTRACTOR
YPE OF PAVEMENT 4" Hot Mix Asphaltic Base and Surface with 11" lime stabilized clay base 6 4 ace to Pace Curb ROADWAY
CONTRACT DATE pEfc 3 1958 ASSESSMENT RATE PAVEMENT AND CURB AND GUTTER
(Not including sidewalk or driveways)
CONSTRUCTION COST $ 5.95530 Residential Rate Per front Foot
Assessment for Curb and Gutter per Lineal Foot $1.75725 (R -1 - R -2) $10.96427 Business Rate Per Front Foot
'
Assessment for Sidewalk per Square Foot 0. 5
(Other than R -1 and R -2)
Assessment for Concrete Driveway per Square Ft. 0.7
BASED ON 64 FEET OF STREET WIDTH.
Depth
..
av
Assessment
engt
Type
Owner-
Ft. Of
Rate
Paving and
Sidev4k
Sidewalk
Drive
Driveway
TOTAL
Bloc k
Lo
but.
of
ship
Improv
Ch
Curb and
Assess-
way
Assess-
ASSESSMENT
PROPERTY OWNER
NAME OF ADDITION
No
No
rap,
Zoning
from St
ments
able
Gutter
Sq. Ft
ment.
Sq.ft.
ment
Frank B. & Gladys
Bush Coughlin
Lamar Park No- 3
11
28
125
R -1
103.40
125
1006
744.41
420
183.39
341
254.22
1182.02
P A
A D E
A P
L A C E
Thomas F.
Fitzgerald
14
1
12
R -1
. k
125
6 .45
412
1.79.90
375
279-56
1158.91
Gene C. Crane
Lamar Park No. 4
14
28
125
R-1
93.4
125
.3
694-83
458.8
200.34
176.1
131.28
1026.45
SA I
I TA MONYI
CA PLACE
E. A. Williford
15
1 1
125
R -1
1 98.96
125
98.96f
736.67 ![
500
218.33
-
-
955.00
J. D. Tolle
Lamar Park No
15
28
125
R -1
112.24
125
loofa
744.41
500
218.33
-
962.74
B E It
M U D
P L
A C E
Elmer L. Bowden
" '
18
__1
125
R -1
84.49
125
84.4
628.95
500
218.33
1 -
-
847.28
Wm.H. Bloch
Lamar Park No. 6
18
28
120
R -1
93.26
120
93.'23
666.47
480
209.59
-
-
976.06
W I
1 L I A
I S,0
P L A C
ik�h5
Betty L.
" " "
19
1
12
R -1
88.21
125
188.21,
656.64
500
218.33
874.9
Allen Wood
Lamar Park No. 7
19
29
134
R -1 1
96.18
134
196.18
6 767-53 ✓
6
'234.04
1001.57
nn
DO
L PHI
P LACE
L & Gussie
Kac Leca
i 1
22
1 1 1
194
R-
_
-
44 11
it1o.
92
99
95
96
97
98
99
/00
/OI
EMIMIUARY PAVING ASSESSMENT r 10
NORTHEASE .SIDE ALADI nA FROM DODDRIDGE TO NORTH BOUNDARY LINE -OF OSO GOLF COURSE
HELDENFFS,S BROS. CONTRACTOR
TYPE OF PAVEMENT 4" Hot Mix As alt Base and Surface with 11" lime stabilized clay Vase 6 4' Face to Face Curb ROADWAY
CONTRACT DATE C 3 1958 ASSESSMENT RATE PAVEMENT AND CURB AND GUTTER
(Not including sidewalk or driveways)
CONSTRUCTION COST
5.95530 Residential Rate Per Front Foot
Assessment for Curb and Gutter per Lineal Foot 1. 5 (R -1 - R -2)
$10.96427 Business Rate Per Front Foot
Assessment for Sidewalk per Square Foot 0. 3 5
_5 (Other than and R -2)
Assessment for Concrete Driveway per Squart Ft. 0-.775
BP4ID ON 64 FEET OF STREET WIDTH.
Depth
Lin.
Pay.
Assessmen
Drive-
Lengtt
Type
Owner-
ft. of
Rate,
Paving an
Sidew
Sidewalk
way
Driveway
TOTAL
PROPERTY OWNER
NAME OF ADDITION
Block
Lot
Abut.
of
ship
rov-
harg
Curb and
Assess-
Assess-
ASSESSMENT
No.
No.
-prop.
Zoning
from :k
ments
ble'.
Gutter
So. Ft
ment.
s . ft
ment
Robert L. Hugheg
Lamar Park No. 8
22
2.6
R -1
90.25
132.6
0.25
.68
53o.4
231.6o
944.28
A R A
U D
P L A C IE
Robert A. Guttman
" " "
23
1
132-58
R -1 191-36
2. 8
1.
0. 2-
2 1. 6
--
--
2 8
fflce esTer
Lamar Park No. 9
23
2
2
R -1
8
-
2
:8
668.3
28
230.55
--
--
898.74
O R A
P
A C E
"
24
1
32
R -1
85
32
85
668.19
528
230.55
--
--
898.74
.5AaAks
Leroy Sees
24
2
R -1
8
2
8
668. _
28
2 0.
--
-
898.74
IRA
qAR
FLA C-E
or
"
25
1
36
1 R -i
90
m6
901A
728.
44
2 .94
--
-
p,(j OQUe �a rP r
W)
11 .07
QJ
707
V07 AR
517A rn
I
ARM
EL ].LACE
City of
W. E. Pope
Con pus Christi
170.14 Ac. Tract
--
75
R-1
100
--
--
Carmelite Sisters
--
8
4978.97
EVER
A R
R O A D
Landsman Realty Co.
,7cwn n%vn>YY
Sho Center
_ _
fl
-
86.
B-1
--
686.0
l0
22.48
2324.36
1014.
1881
1402.2
0
� �� �i/ �O.
Tcrvn .i Ceunt�•y
n
.
SR oPpinG �+rfBY
J
/TENT
A/o.
/02
/03
/0¢
/05
106
/07
/OB
109
//O
I PRELIMINARY PAVING ASSESSMENT
NORTHEAST SIDE ALAMEDA FROM DODDRIDGE TO NORTH BOUNDARY T. OF OSO GOLF COURSE
TYPE OF PAVEMENT 4" Hot Mix As halt Base and Surface with 11" lime stabilized cl base HFI,DENFELS BROS. CONTRACTOR
CONTRACT DATE December 3, 1958 ¢ Face to Face of Curb ROADWAY
ASSESSMENT RATE PAVEMENT AND CURB AND GUTTER
(Not including sidewalk or driveways)
CONSTRUCTION COST
5.95530 Residential Rate Per Front Foot
(R -1 - R -2)
Assessment for Curb and Gutter per Lineal Foot $1.757.25 $10-96427 Business Rate Per Front Foot
Assessment for Sidewalk per Square Foot $0.43665 (Other than R -1 and R -2)
Assessment for Concrete Driveway per Square Ft. 0.7 55 BASED ON 64 FEET OF STREET WIDTH.
Depth
Lin.
%Pay.
Assessment
Side 0
Sidewalk
Drive-
Driveway
h
Type
Owner-
ft. of
Rate
Paving and
Assess-
way
Assess-
TOTAL
PROPERTY OWNER
NAME OF ADDITION
Blocs
Lot
Abut.
of
ship
Improv-
curb and
Sq. Ft.
went.
sq. ft.
ment
ASSESSMENT
No.
No.
Prop.
ning
from St
ments
able.
Rutter
A. D. Campbell
Campbell Sub' d.
6 -C
40.02
B -1
148.58
140.02
100%
1,535.22
56G.o8
244.56
-_
_-
1,779.78
oh,z H, afi`NSOh
Alameda
•W • z
81.84
B
341
81.84
10O%
897.32
327.36
142.94
__
__
1,040.26
Estates No. 1
2
of
-1
r
Estates No. 1
2
of�5
81.84
B -1
315
81.84
10
8
6
1.42. 94
--
__
1 040.26
0. S. Wyatt, Jr.
Alameda
Estates No. 1
2 1
C
6.16
B -1
1372
126.16
i00%
1,383.25
504.64
220-35
1 603.60
O: S. W tt Jr.
Alameda
Estates No. 1
2
B
24.24
B -1
400
124.24
loot
1 62.20
4q6.96.
217.00
1,579.20
Alameda
Paul g Howard
Estates No. 1
2
A
23.60
R -1
420
12 .60
loo96
716. 08
446.40
19 .92
205
152.8
1 o83.83
A. S. Heizer
Alameda
Estates No. 1
I
2
F-.w--,
2 -A
175.20
R -1
100
75.2
10
447.84
300.8
131.34
--
579.18
rrancas Julia
West
Alameda
Estates No. 1
2
E.2
2 -A
65.04
R -1
130
65.o4
10
8 7.
212.16
92.64,
205
152.83
6-,12.80
R. C. Littleton
Alameda
E
%^
1
50.0
R -1
100
150.0
10 �'
893.30
600
261.99
--
--
1,155.29
E L D
N I
R I
E
Chas. L. Casale
EAstates No. 1
1
2
14o
R -1
270.34
140
10
833.74
560
244.52
-
1,078.26
Alameda
Mr's. Lula Hood
Estates No. 1
1
1 1
6
R -1
1270.4
165
10
82.62
660
288.ig
1,270.81
ask tnja�,, /�vai✓ fT
F.B.& E.F. & G.Tra
Lots 14,15 & 16 Se
is
.I
IM20
R -1
100
1.20
ioo96
10,190.71
6844.80
2988.74
=-
-
1-1' 1 79.49
Reid
Brookdale
C
350
R -1
390
350
100
2,084.36
1400
611.31
--
_=
2,695.67
17EM
A/o.
//s
/16
169
/ZO
/22
/23
/24
les
PRELIS1131ARY PAVING ASSESSMENT 12
NORTHEAST SIDE ALAMEDA FROM DODDRIDGE TO NORTH BOUNDARY LINE OF OSO GOLF COURSE
�sw�u�er.s• a'QOS. CONTRACTOR
TYPE OF PAVEMENT 4" Hot Mix Asphalt Base and Surface with 11" lime stabilized clay base 4 64 Face to Face of Curb ROADWAY
CONTRACT DATE DE 3 19 _ ASSESSMENT RATE PAVEMENT AND CURB AND GUTTER
(Not including sidewalk or driveways)
CONSTRUCTION COST
Assessment for Curb and Gutter per Lineal Foot $1.75725 $ 5.95530 Residenntial Ratte2Per Front Foot
)Front
Assessment for Sidewalk per Square Foot Oa 3 5 $10.96427 Business Rate Per mot
Assessment for Concrete Driveway per Square Ft. 7 55 (Other tban.R -1 and R -2)
BASED ON 64 FEET OF STREET WID'iB.
Depth
Lin.
Pau
Assessment
Len
Type
Owner-
ft. of
Rate
Paving a
ide
Sidewalk
Drive-
Driveway
TOTAL
PROPERTY OWNER
NAME OF ADDITION
Bloc
t
Abut.
of
ship
Improv-
Char
Curb and
Assess-
way
Assess-
ASSESSMENT
No.
No.
Prop.
irg
irom'+5t
menu
able.
Gutter
Sq. Ft
went.
s ft
ment
Joint Board of
Christ n Churches
Brookdale
A
275.7
R -1
390
2 5.
O
1642.2
ll0 .0
481.66
--
--
212
T¢ma;rc -o Cor�
B
12M.li$
B -1
158 12M.A
10
9,26o.39
44.6
237.82
1202
1 8 6.0
4. go
A I R L
I N E
R 0 A D
Brentwood
Humble Oil Corp.
Community Center
1
150
B-i
1,14
150
10
1-.644.64
0
12
6
Croc. Co.
r
"
0
125
R -1
1 80
125:
80%
1 595.53
500
218.33
--
--
813.86
PAL0MAI
31T REE
g
R 0 Best
0
2
R -1
8.48"
259.75
1 546,81?
--
--
Jack Ryan Trustee
F.B.&E.F.BG. Tracts
15
16
1696.54
R -1
100
16 90.,54
10
10 10 .40
6786.19
� 18
1
ii,o66.58
%ack %�yan,%rus7ed
c
W4$.
1
F.B.&E.F.&G. Tracts
f134
.&L
R -1
I loo
415.61,
1'O
2 . qc)4.19
1742.44
60.84
-
--
.0
jonns
200
Methodist Church
F.B.&E.F.BdG.Tracts
15
of
20006
R -1
100
1
1 191 . 42
800.2
349.42
--
--
1-.-54o.84
DE
RIVE
r200.o6
Montclair No. 2
3
]&32
21.5A9T
R -1
77.90
T�9_
.84
860.3
3 5.68
1 3 3.52
C L
I R D R I
7E
H. Thomas John
11,1ontclair No.2
2
32
41.4
R -1
0
41.4
192-30
16
.40
264.7o
ITEM
N0.
126
le?
/28
/'�,9
/30
/3/
/32
/33
/34
/35
136
137
PRELI[•IINARY PAVING ASSESSMENT 13
SOUTHWEST SIDE AVALON FROM EVERHART TO ALAMEDA
BELDENFELS BROS. CONTRACTOR
TYPE OF PAVEMENT V Hot Mix A phalt Base and Surface with I lime stabilized clay base O' Face to Face of Curb ROADWAY
CONTRACT DATE 3 195g ASSESSMENT RATE PAVEMENT AND CURB AND GUTTER
(Not including sidewalk or driveways)
CONSTRUCTION COST $5.95530 ResidentaiI Rate Per Front Foot
(R -1 - R -2)
Assessment for Curb and Gutter per Lineal Foot $1.75725 $5.95530. Business Rate Per Front Foot
Assessment for Sidewalk per Square Foot o.43665 (Other than R -1 and R -2)
Assessment for. Concrete Driveway per Square Ft. 0. 55 BASED ON 30 FEET OF STREET WIDTH.
Depth
Lin.
% Pau
Assessment
ive-
engt
Type
Owners
ft. of
Rate
Paving and
Side
Sidewalk
qay
Mriveway
TOTAL
PROPERTY OWNER
NAME OF ADDITION
Block
Lot
but.
of
ship
Improv-
Chmge
Curb and
Assess-
Assess-,
ASSESSMENT
No.
No.
Pro
fromSt
ments
able.
Gutter
S . Ft.
ment.
s . ft
ment
IICIrjgS � �c'¢i -Q re
Alameda Park
6
1
6o
R -1
130
_6o,'
100%
357.32
228
99.56
456.88
Miller
6
2
1 60 I
R -1
130 1
6o
100%
357.32
196
1 85.58
-
--
442.90
Willie R. Mills
6
3
6o
R -1
130
60 -
100%
357.32
196
.85.58
--
--
442.90
6
4
60
R -1
150
6o
100%
357.32
228
99.56
--
--
456.88
S A M
S T R
E E T
John H. Manes
5
1
60
R -1
130
-60
10
357.32
228
99.56
456.88
James T. T lor.5r
" "
5
2
60
R-1
130
60
100
357.32
196
1 85.58
442.90
Curtis Greer
5
3
6o
R -1
130
6o
100%
357.32
196
85.58
442.90
Lee Roy Cole
4
5
4
59
R -1
130
59
100%
351.36
176
76.85
--
-
428.21
Williard R. Wilder
" "
5
1 5
1 66
R -1
•130 -
66
100%
393.05
220
96.06
--
--
y
489.11
R O B 3
R T
IL A N E
N. O. Simmons
1 22
'4
Lumber & Su INe,
" "
1
6
B -1
120
236
10
3-4o5.45
44
412.20
1,817.65
Ted M. Anderson
" "
1
57
B -1
120
57
100%
339.45
228
99-56
439-01
ift.
Falk
1 1
IS110
I BO.
B -1
1 120
280.0
1
1 667.66
1120.12
48 .10
2,156.76
/ TtA7
Alo.
138
"140
14/
!42
/43
PRELIIM ARY PAVING ASSESSMENT 14
NORTBEASE SIDE AVALON FROM EVERRART TO ALAMEDA
NELDENFELS BROS. CONTRACTOR
TYPE OF PAVEMENT 4" Rot Mix Asphalt Base and Surface with 11" lime stabilized clay base 30' Face to Face of Curb ROADWAY
CONTRACT DATE nFr g 1q_rR ASSESSMENT RATE PAVEMENT AND CURB AND GUTTER
(Not including sidewalk or driveways)
CONSTRUCTION COST $5.95530 Residential Rate Per Front Foot
Assessment for Curb and Gutter per Lineal Foot $1.75785 (R -1 - R-?_�
$5.95530 Business Rate Per Front Foot
Assessment for Sidewalk per Square Foot $0.4585 (Other than R -1 and R -2)
Assessment for Concrete Driveway per Square Ft. 0.7 55 BASED ON 30 FEET OF STREET WIDTH.
PROPERTY OWNER
NAME OF ADDITION
Bloc
No.
Lot
o.
6e
Amt'
Prop.
°f
Zonis
Depth
Owner-
ship
from %.
Lin.
ft. of
Improv-
ylents
Pav
Rate
Ch
able.
Assessment
Paving an
Curb and
Gutter
Side
Sq. Ft.
Sidewalk
Assess-
went.
rive-
ay
sq. ft
Driveway
Assess-
went
TOTAL
ASSESSMENT
M. G. Frich
Avalon Place
2
C
113.4
B -1
80 -
13.41
100%i
675.39
405,
177.12
109
81.26
933.77
r
,7`r-� M• i9/�'
"�' "
2
1 B
1 55
B -1
1 162.
1
2 4
220
6.06
--
--
6
P¢ /yhs $e %e u K
2
A
B -1
1 1022
55
10
27.54
220
96.o6
L. P. Fritz
" "
2
2 -A
145
B -1
160
145.6o
10
867, O
22
8
Ga
° '*
B -1
103 .71
141.12
10
840.41
524.4 8
22 .O1
91
67.84
1,137.26
Turner 011 Co.
1
All
99.5
B -1
74.69
199.51
10
1 188.14
658.04
287.33
321
239-31
1,714.78
17,--Ag
No.
144
145
146
147
148
PRELIMINARY PAVING ASSESSMENT 15
SOUTH SIDE_F'V'R uffiZ RD. FROM ALAMEDA TO AVALON
HELDENFELS BROS. CONTRACTOR
TYPE OF PAVEMENT- 4" Hot Mix Asphalt Base and Surface with 11" lime stabilized clay base Face to Face of Curb ROADWAY
CONTRACT DATE I . i lq;8 ASSESSMENT RATE PAVEMENT AND CURB AND GUTTER
CONSTRUCTION COST _ (Not including sidewalk or driveways)
0
55 Residential Rate Per Front Foot
(R -1 - R-2)
Assessment for Curb and Gutter Per Lineal Foot $1-75725 $8.01781 Business Rate Per Front Foot
Assessment for Sidewalk per Square Foot 0. 3 5 (Other than R -1 and R -2) ,
Assessment for Concrete Driveway per Square Ft. 0.7 55 BASED ON FEET OF STREET WIDTH
PROPERTY OWNER
NAME OF ADDITION
Bloc
Lot
No,
eigth
Abut.
Prop.
Type
of
onisg
Depth
Owner-
ship
from%.
Lin.
ft. of
Improv
ments
Pay.
[Charge te
le.
Assessment
Paving and
Curb and
Gutter
Sidewalk
Sq. Ft
Sidewalk
Assess-
ment.
Drive-
way
sq. ft
Driveway
Assess-
ment
Credit
for Ex-
isting
C.0.
TOTAL
ASSESSMENT
Marston Rental Co.
Avalon Place
2
11
141
B -1
82.
141.1
10
1132.03
64.
246.60
13 8.6
John Mendleski
"
2
E
10403
B -1
113.4
104.0
10
834.09
416.1
181.7o
1
1 1015.79
Herbert Esse
2
D
60
B -1
113.4
60
10
481.07
240
104.80
585&7
M. G. Frich
"
2
C
80
B -1
11-3-41
80
100
641..42
320
139-73
--
104.80
676-95
VAL
D N S
T R E E T
�e /�a5 � �B264K
Alameda Park
6
1
17
R -1
60
17
6od
6o.74
68
29.69
--
--
0.4
ITEi+;
No,
/4y
/50
/5/
PRELIMINARY PAVING ASSESSMENT 16
NORTH SIDE EVERHART RD. FROM AI AMEDA TO AVALON
HELDENFELS BROS. CONTRACTOR
TYPE OF PAVEMENT 4" Hot Nir�Asphalt Base and Surface with 11" lime stabilized clay base 44' Face to Face of Curb ROADWAY
CONTRACT DATE �E -C ASSESSMENT RATE PAVEMENT AND CURB AND GUTTER
(Not including sidewalk or driveways)
CONSTRUCTION COST $5.95530 Residential Rate Per Front Foot
(R -1 - R-2)
Assessment for Curb and Gutter per Lineal Foot $1.75725 $8.01781 Business Rate Per Front Foot
Assessment for Sidewalk per Square'.Foot 0.+3 5 (Other than R -1 and R -2)
Assessment for Concrete Driveway per Square Ft. 0.7 55 BASED ON 44 FEET OF STREET WIDTH.
PROPERTY OWNER
NAME OF ADDITION
Bloc
No,
Lot
o
Le
Abut.
Prop.
Type
of
Zonine
Depth
Ormer-
-ship
from
Lin.
ft. of
Improv
ments
k Pay.
Rate
harg
able
Assessmen
Paving
- Curb and
Gutter
idew
sq. ft,
Sidewalk
Assess-
went.
Drive
way
sq. ft
Driveway
Assess-
ment
TOTAL
ASSESSMENT
Tr
Pope Place No. 5
C
14
B -1
__
1,415.84
D
365
B -1
100
365
10
2926.50
146o
637.51
--
--
3,564.ol
Jack Ryan T rustee
PE PLACE, GIr(irS
36
1
8o
R -1
loo¢
8o
10
476.42
320
139.73
--
--
616.15
1TE/17
A/o.
152
/53
/54
iss
166
157
PRELIMINARY PAVING ASSESSMENT Page 17
ROBERT DR. FROM 301 SOUTH OF SOUTH R.O.W. LINE OF AVALON.ST. TO 40' N.E. of N.E. R.O.W. LINE OF ALAMEDA ST. ._ ..
4"
..,..E OF PAVEMENT "15!! Hot Mix Asphalt Base and Surface w1tH it" 1..Irt£ STA4t� -1ZEa BELDENFELS BROS. CONTRACTOR
CONTRACT DATE Dec. 3 195 ZLAY gpsf 301 Face to Face of Curb ROADWAY
ASSESSMENT RATE PAVEMENT AND CURB AND GUTTER
(Not including sidewalk or driveways)
$5.9553 Residential Rate Per Front Foot
Assessment for Curb and Gutter per Lineal Foot $1.75725 (R -1 - R -2)
Assessment for Sidewalk per Square Foot Ft. 0. 5 $5.9553 Business Rate Per Front Foot
Assessment for Concrete Driveway per Square 0.77 3 55 (Other than R -1 and R -2)
BASED ON 30 FEET OF STREET WIDTH
PROPERTY OWNER
NAME OF ADDITION
lock
No.
Lot
No.
ength
b ut.
ro
Type
of
oni
Depth
Owner-
ship
from
Lin.
ft. of
Improve
ments
Pav
ate
able
Assessment
Paving .and
Curb and
Gutter
Sidewalk
Sq. Ft.
Sidewalk
Assess-
ment
Drive-
way
iSci.Ft.
Driveway
Assess -
meat
TOTAL
ASSESSMENT
Willard R. Wilder
Alameda Park
5
5
23
R -1
65
23
659
89.03'
89.03
N. 0. Simmons
jug
Alameda Park
1
1
2011
B -1
100/ 1
20
100%
119.11
1
119.11
A
V A L C
N E
T R I
E T
T. M.
Jr.
Avalon Place
2
1
03.71
B -1
100/
103.71
1O0%i
617.62
414.84
181.14
798.76
Turner Oil Co.
Avalon Place
1
All
07.39
B -1
100/
107.38
100%
639.48
429.52
187.55
827.03
A L A MT
DA E,
T R I
E T
fi-ltt 0,7 C o •
Shoppi
Center
B
11
B -1
100/
11
100$
65.51
65.51
A. D. Campbell
Campbell
6 -C
1 3
B -1
100
37
100
220.35
220.35
/Ten
A/o.
/58
/s9
166
Page 18
PRELIMINARY PAVING ASSESSMENT
AMINE RD. FROM 120! NORTH OF,THE CENTERLINE OF ALAMEDA ST. TO 120' SOUTH OF THE CENTERLINE OF ALAMEDA ST.
INYPE OF PAVEMENT 4"A-T M,Y. ASPRNI _r 6NSS -- AA JO SyP- r-AGV- WI-rli It" )-imp- HELDENFELS BROS. CONTRACTOR
'CONTRACT DATE December 3, 195b eAST-f 'Face to Face of Curb ROADWAY
ASSESSMENT RATE PAVEMENT AND CURB AND GUTTER
CONSTRUCTION COST (Not including sidewalk or driveways)
$ 5.9553 Residential Rate Per Front Foot
Cost of Curb and Gutter per Lineal Foot $1.75725 (R -1 - R -2)
Cost of Sidewalk per Square Foot 0. 36� $ 8.01781 Business Rate Per Front Foot
Cost of Concrete Driveway per Square Ft. 0-7455 (Other than R -1 and R -2)
BASED ON 44 FEET OF STREET WIDTH.
PROPERTY OWNER
NAME OF ADDITION
3lock
No.
Lot
No.
engt
Abut.
Prop.
Type
of
oni
Depth
er-
3hip
Crom St
Lin.
ft. of
Improve -
ments
% Pav
Rate
C
able
Assessment
Paving and
Curb and
Gutter
Sideelk
Sq. Ft.
Sidewalk
Assess-
ment
Drive-
way
Sq.Ft.
Driveway
Assess-
ment
TOTAL
ASSESSMENT
7F,v
rookdale
13
18
B -1
18
l00%
144-32
601
448.05
1 592.37
Humble 011 &
n Co,
Brentwood Com-
nit Center
7 6
B- 3
7 6
10
609.35
601
448.05
1,057.4o
Frank Cech
.B.&E.,F&G Tract
3ec.2
7
43
R -1
100
43
100%i
256.08
256.08
Total
Assessments
$238,622.76
Assessed
to
Tity as Pr
p. own
r
2,811.20
Total
Assess
d to Priv
to Pro
Owners
$235,811.56
Total Contract
$524,3
1.52
ts1 Assessments
Private Prop. Owner
t
•56
City Portion of Cc
ritract Cost
$;!88,5
9.96
r
NOW, THEREFORE+, BE IT ORDAINED SY THE CITY COUNCIL OF THE CITY OF CORPUS
a
CHRISTI, TEXAS:
SECTIONGI. That the written statement and report of the Director of
Public Works heretofore filed with the City Council, showing the estimated total
cost of the whole 4mprovement of said Alameda Street, Avalon Street, Everhart Road,
Robert Drive and Airline Road, within the limits,above defined; the estimated amount
per front foot proposed to be assessed against the abutting property, and the real
and true owners thereof, on said streets for construction of curbs and gutters;
the estimated amount per square foot to be assessed against the abutting property,
and the real and true owners thereogf, for sidewalks on said.Alameda;Street, Avalon
Street, Everhart Road, Robert Drive and Airline Road, within the limits above
defined; the estimated amount per square foot to be assessed against the abutting
property, and the real and true owners thereof for driveways on said Alameda Street,
Avalon Street, Everhart Road, Robert Drive and ;Airline Road, within the limits above
defined; the estimated amount per front foot to be assessed against each abutting
property, and the real and true owners thereof, for construction of said pavement,
curbs and gutters in place on said Alameda Street, Avalon ;Street; Everhart Road,
Robert Drive and Airline Road, within the limits defined; the total estimated amount
of the cost of said improvements on said streets, within the limits defined, pro-
posed to be paid by the City of Corpus Cbristi, Texas; the names of the apparent
owners of the property abutting on said streets, within the limits defined, with
the number of front feet owned by each and the description of the property, and
other matters relative thereto, having been received and examined by the City Council,
said report is hereby in all things approved and adopted.
SECTION 2. That it is hereby found and determined that the total estimated
cost of the whole improvement of ?Alameda Street, Avalon Street, Everhart Road,
Robert Drive and Airline Road, within the limits above defined, is $524,351.52; the _
estimated amount per front foot proposed to be assessed against each abutting
property, and the real and true owners thereof, for curbs and gutters on Alameda Street,
Avalon Street, Everhart Road, Robert Drive and Airline Road, within the limits above
defined, is $1.75725 per front foot; the estimated amount per square foot to be assessed
against each abutting property, and the real and true owners thereof, for sidewalks
on Alameda Street, Avalon Street, Everhart Road, Robert Drive and Airline Road, with.
in the limits above defined, is $0.43665 per square foot; the estimated amount per square
—5-
•
foot to be assessed against each abutting property, and the real and true T
owners thereof, for driveways on Alameda Street, Avalon Street, Everhart Road,
Robert Drive and Airline Road, within the limits above defined, is $0.7455 per
square foot;the estimated amount per front foot proposed to be assessed against
each abutting property zoned for one— and two — family dwelling units and the real
and true owners thereof, for construction of said pavement, curbs and gutter`s in
place on Alameda Street, Avalon Street, Everhart Road, Robert Drive and Airline
Road, within the limitV above defined, is $5.95530 per front foot; the total
estimated amount per front foot to be assessed against each abutting property
zoned or used for other than one— and two — family dwelling units and the real and
true owners thereof, the construction of said pavement, curbs, and gutters, in
place on Alameda Street, within the limits above defined, 1s'$10.96427 per front '
foot;the total amount per front foot proposed to be assessed against each abutting
property zoned or used for other than one— and two - family dwelling units, and the
real and true owners thereof, for construction of said pavement, curbs, and gutters
in place on Everhart Road and Airline Road, within the limits above defined, is
$8.01781 per front foot; the total amount per front foot proposed to be assessed
against each abutting property zoned or used for other than one— and two — family
dwelling units, and the real and true owners thereof, for construction of said
pavement, curbs, and gutters in place on Avalon Street and Robert Drive, within
the limits above defined, is $5.9553 per front foot; the total estimated amount
of the cost of said improvements on Alameda Street, Avalon Street, Everhart Road,
Robert Drive and Airline Road, within the limits above defined, proposed to be
assessed against the abutting property, and the real and true owners thereof, is
$238,622.76; the total estimated amount of the cost of said improvements on
Alameda Street, Avalon Street,` Everhart Road, Robert Drive and Airline Road; within
the limits above defined, proposed to be paid by the City of Corpus Christi, Texas,'
is $288,539.96, r , 1
,SECTION 3. That a portion of the cost of said improvements shall be
paid and defrayed by the City of Corpus Christi, Texas, and that a portion of the
—6—
cost of said improvements shall be paid by and assessed against the property
abutting upon said streets, within the limits above defined, and against the
real and true owners thereof, in accordance with, and in the manner provided by,
the Charter of the City of Corpus Christi, Texas, and by the Acts of the 40th
Legislature of the State of Texas, First Called Session, Chapter 106, and known
and shown as Artiole 1105—b of Vernon$s Annotated Civil Statutes of Texas, and
that the total cost of said improvements shall be and are hereby apportioned '
between said parties and shall be paid and defrayed as follows:
(a), The cost of constructing, reconstructing or repairing said i '
Improvements within the area between and under rails, tracks, double tracks, turn-
outs, and switches', and two feet on each side thereof, of any railway, street
railway or interurban, using, occupying or crossing such streets or portions thereof
hereby ordered and approved, shall be paid by the respective owners thereof and +
assessed against such railway, street railway, or interurban, and its roadbed,'
ties, rails, fixtures, rights and franchises, and the real and true owners thereof,
in the manner provided by the terms of the City Charter of the City of Corpus
Christi, Texas, and by said Acts of the 40th Legislature of the State of Texas,
(1927), above identified; r
(b) The City of Corpus Christi shall pay the whole cost of construction, '
reconstruction or repair of the curbs, gutters and sidewalks, within the inter-
sections of said streets with other streets and alleys and shall pay not less
than one —tenth (1 /10th) of the total remaining cost of said improvements on said
streets, exclusive of the cost of the curbs, gutters and sidewalks, in front of the "
respective properties abutting upon said streets,,said costs being in the amounts
as hereiribefore set out in Section 2 hereof,
(c) Thel,property abutting upon said streets, within the limits above
defined, zoned for,one— and two — family dwelling units, and the real and true owners
thereof, shall be assessed and pay for eighty (80 1/6) percent of the total cost of
construction, reconstruction or repairing, as the case may be, of sidewalks, curbs '
and gutters in front of their respective property, and shall be assessed and pay
eighty (8094) percent of the cost of an equivalent thirteen and one —half (13p)
foot of pavement width abutting their respective property, exclusive of the amount
—7—
s +�
y
therein specified to be paid by any railway, street railway, or interurban, as
set out in Sub- section (a) above, and by the City of Corpus Christi as set out in
Sub - section (b) above, and exclusive of the cost of any storm sewers, but in-
elusive of the costs of all incidentals and appurtenances. The property abutting
upon said streets, within the limits above defined, zoned or used °for other than
one- or two - family dwelling units, and the real and true owners thereof, shall be
assessed and pay eighty (80 %) percent of the entire costs of the sidewalks, curbs
and gutters abutting their respective property, and shall be assessed and pay forty
(40 %) percent of the entire cost of the pavement abutting their respective property,
and exclusive of the amount therein specified to be paid by any railway; street
railway, or interurban, as set out in Sub - section (a) above, and by the City of
Corpus Christi as set out.in Eub- section (b) above, but inclusive of the costs of
all incidentals and appurtenances. However, the total costs to be assessed against
and paid by abutting property, and the real and true owners thereof, shall not in
any case exceed nine - tenths (9 /10ths) of the total cost of said improvements on
the streets upon which they abut, exclusive of the cost of curbs, 'gutters and side-
walks, said costs being at,the rate of, and in the amounts as hereinabove set out
in Section 2 hereof. '
The amounts payable by the abutting property and the real and true owners
thereof shall be assessed against such abutting property, and the real and true
owners thereof, and shall constitute a first and prior lien upon such abutting
property and a personal liability of the real and true owners thereof; provided,
however, that no amount shall be assessed against such abutting property, or the
real and true owners thereof, in excess of the benefits to said property in the
enhanced value thereof by reason of said improvements on the streets upon which it
abuts, and that said cost which may be assessed against such property and its real
and true owners shall be in accordance with the FRONT FOOT RULE OR PLAN in
proportion as the frontage °of such property is to the frontage to be improved,
provided that, if it shall appear at the hearing on special benefits, hereinafter
provided for, that the application of such rule or plan will result in inequality
_g_
or injustice then such rule of apportionment shall be applied as will in the
judgment of the City Council produce substantial justice and equality between
respective parcels of property and the real and true owners thereof, considering
the special benefits in enhanced value to be received and burdens imposed, all
in accordance with and as provided for in said City Charter and the said Acts
of the 40th Legislature of the State of Texas, First Called Session, Chapter 106,
as hereinabove identified.$
That the amounts payable by the real and true owners of said abutting
property shall be paid and become payable in five (5) equal installments, the first
of which shall be due and payable twenty (20) days after the date said improvements
are completed and accepted by the said City Council, and the remaining four (4)
installments to be due and payable, respectively, one (1), two (2), three (3), and
four (4) years from and after the date of such acceptance and bearing interest at
the rate of five (57.) per cent per annum from said date of acceptance, payable
annually; provided, however, that the owners of said property shall have the
privilege of paying any one, or all, of such installments at any time before maturity
thereof by paying the totaD amount of principal due, together with interest accrued,
to the date of payment; further, that if default be made in payment of any such
installments of principal or interest promptly as same matures, then'at the" option
of the Contractor or assigns the entire amount of the assessment upon which such
default is made shalB be and become due and payable together with reasonable
attorney's fees and collection costs, if incurred.
SECTION 4, That a hearing be given to•the real and true owners and all
owning or claiming any interest in any property abutting upon said portions "of
said streets, within the limits above defined, and to all others owning, claiming
or interested in said property, or any of said matters as to the assessments and
to the amount to be assessed against each parcel of property and the real and true
owners thereof, and as to the special benefits to said property to be received from
said improvements, if any, or concerning any error, invalidity, irregularity or
deficiency in any proceedings or contract with reference thereto, or concerning
—9—
•
1. Y 1
any matter or thing connected therewith, which hearing shall be held by the City
Council of said City in the Council Chamber of the City Ball of the City of }
Corpus Christi, Texas, at 3:00 o'clock P.M. on the 11th day of February, A. D.,
1959, at which time all persons, firms, corporations, or estates, owning or claim-
ing any such abutting property, or any interest therein, and their agents or
attorneys, or persons interested in said proceedings are notified to appear and
to be heard in person or by counsel and may offer evidence; and said hearing'sball
be adjourned from day to day and from time to time and kept open until all persons,
evidence and protests have been duly heard; and the City Secretary of the City
of Corpus Christi, Texas, is hereby directed to give notice of said hearing by
publication in the CORPUS CHRISTI TIMES, the official newspaper of the City of Corpus
Christi, which is a newspaper of general circulation in the City of Corpus Christi,
Texas; and said notice shall be published at least three times in said newspaper
before the date set for said hearing, the first of which publications shall be at
least ten days prior to the date of said hearing, and such notice by publication
shall be valid and sufficient without any further form of notice, as provided for
and in accordance with the terms and provisions of said City Charter and of Chapter
106 of the Acts of the First Called Session of the 40th 'Legislature of "the State
of Texas, known and shown as Article 1105 —b of Vernon's Annotated Civil Statutes
of Texas; however, said City 'Secretary is further directed, in addition to the
contents of the notice of said hearing as required by law, which shalllbe for all
purposes valid and sufficient in itself, to include therein the list of the names
of the apparent owners, and the descriptions of said abutting property'as setlout
In said Director of Public Works' report, provided, however, that the said list of
apparent owners and property descriptions so included in said Notice, shall
merely be cumulative of and in addition to the requirements of said Notice as
provided by the Laws of the State of Texas, and the Charter of the City of Corpus
Christi, Texas, and shall not in any manner be conclusive of the real and true
owners or of the correct descriptions of said abutting property nor limit said
notice to the properties described or to such apparent owners named therein, but
—10—
a.
said Notice shall nevertheless,be directed to the real and true owners of said
abutting property, whether named or correctly named therein or not, and °to all'
others claiming, owning; or interested in any manner in any of said abutting
property on said streets within the limits above' defined.'
SECTION 5. That following such hearing as above provided, assessments
will be levied against said abutting property and the real and true owners thereof
for that portion of the costs of said improvements hereinabove determined to be
payable by said abutting property and the real and true owners thereof, and which
assessment shall be a first and prior lien upon said abutting property and a
personal liability and charge against the real and true owners thereof. In levying
said assessments, if the name of the owner be unknown, it shall be sufficient to
so state the fact, and if saidtabutting property be owned by an estate or by any
firm or corporation, it shall be sufficient to so state the fact, and it shall not
be necessary to give the correct name of any such owner, and no error or mistake
in attempting to name any such owner or in describing any of said property shall
invalidate any assessment or certificate issued in evidence thereof, but neverthe-
less the real and true owner of said abutting property shall be liable and the '
assessment'against said property shall be valid whether or not such owner be named
or correctly named, or said property correctly described.
SECTION 6. The fact that Alameda Street, Avalon Street, Everhart Road,
Robert Drive and Airline Road, within the limits above defined, are badly in need
at this time of permanent street improvements, and the further fact that the
present condition of said portions of said streets are dangerous to the health
and public welfare of the inhabitants of the City of Corpus Christi, due to the
conditions and increase of traffic along said portions of said streets creates a
public emergency and public imperative necessity requiring the suspension of the
Charter rule that no ordinance or resolution shall be passed finally on the date
It is introduced and that'such ordinance or resolution shall be read at three
several meetings of the City Council; and the Mayor having declared that such
public emergency and imperative necessity exist, and having requested that such
—11—
Charter rule be suspended, and that this ordinance be passed finally on the date
of its introduction and take effect and be in full force and effect from and
after its passage, IT Is ACCOrMINGLY SO OFMAINFR.
PASSED AM APPROVED this o` J day of � i , A. D • ,
1959.
ATTEST:
eity 5 retary
APPROVEI? As TO LEGAL FORM:
O
City 1 orney
Mayor
City of Corpus Christi,Texas
-12-
CORPUS CHRISTI,TEXAS
% 1959
TO THE MEMBERS OF THE CITY COUNCIL
CORPUS CHRISTI, TEXAS
GENTLEMEN:
FOR THE REASONS SET FORTH IN
THE EMERGENCY CLAUSE OF THE
FOREGOING ORDINANCE, A PUBLIC EMERGENCY
AND IMPERATIVE NECESSITY EXIST
FOR THE SUSPENSION OF THE CHARTER RULE
OR REQUIREMENT THAT NO ORDINANCE
SHALL BE PASSED FINALLY ON THE DATE IT
IS INTRODUCED AND THAT SUCH
ORDINANCE OR RESOLUTION SHALL BE READ AT THREE MEETINGS OF THE CITY
COUNCIL; I, THEREFORE, HEREBY REQUEST THAT YOU SUSPEND SAID CHARTER RULE
OR REQUIREMENT AND PASS THIS ORDINANCE
FINALLY ON THE DATE IT IS INTRO -
DUCEDI OR AT THE PRESENT MEETING OF THE
CITY COUNCIL.
RESPECTFULLY,
MAYOR
THE CITY OF CORPUS CHRISTI) TEXAS
THE CHARTER RULE WAS SUSPENDED
BY THE FOLLOOWIN,IG VOTE:
FARRELL D. SMITH
W. J. ROBERTS
� -- -�l(J�
B. E. BIGLER
MANUEL P. MALDONADO
CHARLIE J. J. RILLS
/ G
ARTHUR R. JAMES-
- - ---`
ODELL INGLE
THE ABOVE ORDINANCE WAS PASSED
BY THE FOLLOWING VOTE:
FARRELL D. SMITH
W. J. ROBERTS
B. E. BIGLER
MANUEL P. MALDONADO
Iy"J
CHARLIE J. AILLS
J
ARTHUR R. JAMES
ODELL INGLE
f'