Loading...
HomeMy WebLinkAbout05235 ORD - 01/21/1959AN ORDINANCE � Z' 3 ,APPROVING AND ADOPTING THE DIRECTOR OF PUBLIC WORKS- WRITTEN STATEMENT AND REPORT OF THE ESTIMATES OF THE VARIOUS COSTS FOR THE IMPROVE- MENT OF THE PORTIONS OF ALAMEDA STREET FROM THE SOUTHEAST BOUNDARY ,OF DODDRIDGE STREET TO THE NORTHERLY BOUNDARY OF OSO GOLF COURSE, AVALON ;STREET FROM THE SOUTHEAST BOUNDARY LINE OF EVERHART ROAD TO THE SOUTHWEST BOUNDARY LINE OF AL'AM DA STREET, EVERHART ROAD FROM ALAMEDA STREET TO AVALON STREET, ROBERT DRIVE FROM THIRTY FEET SOUTH OF THE SOUTH BOUNDARY LINE OF AVALON STREET TO FORTY FEET NORTH- EAST OF THE NORTHEAST BOUNDARY LINE OF ALAMEDA STREET,4 AND AIRLINE ROAD FROM ONE HUNDRED TWENTY FEET NORTH OF THE CENTERLINE OF ALAMEDA STREET TO ONE HUNDRED TWENTY FEET SOUTH OF THE CENTERLINE OF ALAMEDA STREET, AlD THE STATEMENTS OF THE NAMES OF THE APPARENT OWNERS, DESCRIPTIONS AND NUMBER OF FRONT FEET OF ABUTTING PROPERTY OF SAID STREETS WITHIN SAID LIMITS, DETERMIN- ING AND FIXING THE PORTION OF SAID COSTS, AND THE RATE THEREOF, TO BE PAID BY AND ASSESSED AGAINST SAID ABUTTING PROPERTY, AND THE REAL AND TRUE OWNERS THEREOF, AND THE PORTION THEREOF TO BE PAID BY THE CITY OF CORPUS CHRISTI, TEXAS, DETERMINING THE NECESSITY OF LEVYING AN ASSF'SSN[ETiT AGAINST SAID ,ABUTTING PROPERTY, AND THE REAL AND TRUE OWNERS THEREOF FOR THE PART OF SAID COST APPORTIONED THEM: ORDERING AND SETTING A HEARING TO BE HELD AT 3:00 O'CLOCK P.M. ON THE 11th DAY OF FEBRUARY, 1959, IN THE COUNCIL CHAMBER OF THE CITY HALL IN CORPUS CHRISTI AS THE TIME AMID PLACE FOR HEARING OF THE REAL AM TRUE OWNERS OF SAID ABUTTING PROPERTY, AM ALL OTHERS INTERESTED IN SAID PROPERTY OR IN SAID PROCEEDINGS CON- CERNING SAID ASSESSM:NT$ AND PROCEEDINGS; DIRECTING THE CITY SECRETARY TO GIVE NOTICE OF SAID HEARING AS RE'4UIREA BY THE LAWS OF THE STATE OF TEXAS AM? THE CHARTER OF THE CITY OF CORPUS CHRISTI, TEXAS, AND FURTHER, DIRECTING SAID CITY :SECRETARY IN ADDITION TO THE CONTENTS OF THIS NOTICE OF SAID HEARING AS RE- 1UIRED By I.", WHICH SHALL BE VALID ,AMID SUFFICIENT IN ITSELF, TO INCLUDE THEREIN A LIST OF THE APPARENT OWNERS AND DESCRIPTION OF SAID ABUTTING PROPERTY AS SET OUT IN SAID REPORT OF THE DIRECTOR OF PUBLIC WORKS AMID PROVIDING THAT SAID LIST OF APPARENT OWNERS SHALL NOT BE CONCLUSIVE OF SAID OWNERSHIP AND SHALL NOT LIMIT SAID NOTICE TO SUCH OWNERS NAMED OR THE PROPERTIES DESCRIBED, AND THE SAID NOTICE SHALL NEVERTHELESS BE DIRECTED TO THE REAL AND TRUE OWNERS OF SAID ABUTTING PROPERTY, WHETHER NAMEX) OR CORRECTLY NAMED OR NOT, AND DECLARING AN EMERGENCY. WHEREAS, the City Council of the City of Corpus Christi, Texas, heretofore on the 21st day of January, 1959, by duly enacted ordinance determined the necessity for and ordered the improvement of the portions of Alameda Street from the south- east boundary of Doddridge Street to the northerly boundary of Oso Golf Course, Avalon Street from the southeast boundary line of Everhart Road to the southwest J-x I f1__� ' s boundary line of Alameda Street, Everhart Road from Alameda Street to Avalon Street, Y Robert Drive from 30 feet south of the south boundary line of Avalon Street to 40 feet Northeast of the northeast boundary line of Alameda Street, and Airline Road from 120 feet north of the certerline of Alameda Street to 120 feet south of the centerline of Alameda Street, a duly executed notice of said ordinance having thereafter been filed in the name of the City with the County Clerk of Nueces County, Texas; and WHEREAS, Pursuant to the ordinance of January 21, 1959, above mentioned, and after having advertised for and received bids on the construction of said Improvements for the length of time and in the manner and form as required by the Charter of said City and the laws of the State of Texas, having awarded a contract for the construction of said improvements to Heldenfels Brothers, on its lowest and most advantageous bid, and having duly and regularly made appropriation of funds available for said purpose to cover the estimated cost to said City of said improvements, all as provided by the Corpus Christi City Charter and by —laws and the laws of the State of Texas, did execute heretofore on December 3, 19582 a contract with Heldenfels Brothers, and the Performance Bond required by said contract having been properly furnished and posted by said Heldenfels Brothers, and accepted by said City Council as to form and amount as required by the Charter of the City and the laws of the State of Texas; and WHEREAS, The said City Council has caused the Director of Public Works to Prepare and file estimates of the costs'of such improvements and estimates of the amount per front foot proposed to be assessed against the property abutting said streets to be improved, and the real and true owners thereof, and said Director of Public Works has heretofore filed said estimates and a statement of other matters relating thereto with said City Council, and the same having been received and examined by said City Council; and, WHEREAS, in accordance with said statement of estimates and other matters prepared and filed by said Director of Public Works herein approved by said City Council, the total estimated cost of the whole improvement of Alameda Street, Avalon Street, Everhart Road, Robert Drive and Airline Road, within the limits above —2— defined, is $524,351.52; the estimated amount per front foot proposed to'be assessed against each abutting property, and the real and true owners thereof, " for curbs and gutters on said streets, within the limits above defined, is $1.75725 per front foot; the estimated amount per square foot to be Assedsedtigainst each abutting property, and the real and true owners thereof, for sidewalks on said streets, within the limits above defined, is $0.43665 per square foot; the estimated amount per square foot to be assessed against each abutting property, and the real and true owners thereof, for driveways on said streets within the limits above defined, is $0.7455 per square foot; the estimated amount per front foot proposed to be assessed against each abutting property, zoned for one— and two — family dwelling units, and the real and true owners thereof, for construction of said pavement, curbs and gutters in place on Alameda Street, Avalon Street, Everhart Road, Robert Drive and Airline Road, within the limits above defined, is $5.95530 per front foot; the.total estimated amount per front foot proposed to be assessed against each abutting property zoned or used for other than one— and two — family dwelling units, and the real and true owners thereof, for construction of said pavement, curbs, and gutters in place on Alameda Street, within the limits above defined, is $10.96427 per front foot; the total amount per front foot pro- posed to be assessed against each abutting property zoned or used for other than one- and two - family dwelling units, and the real and true owners thereof, for construction of said pavement, curbs, and gutters in place on Everhard Road and Airline Road, within the limits above defined, is $8.01781 per front foot; the total amount per front foot proposed to be assessed against each abutting property zoned or used for other than one- and two - family dwelling units, and the real and true owners thereof, for construction of said pavement, curbs, and gutters in place on Avalon Street and Robert Drive, within the limits above defined, is $5.9553 per front foot; the total estimated amount of the cost of said improve- ments on Alameda Street, Avalon Street, Everhart Road, Robert Drive and Airline Road, within the limits above defined, proposed to be assessed against the abutting property, and the real and true owners thereof, is $238,622.76; the total estimated —3— amount of the cost of said improvements on Alameda Street, Avalon Street, Everhart Road, Robert Drive and Airline Road, within the limits above defined, proposed to be paid by the City of Corpus Christi, Texas, is $288,539.96. WHEREAS, according to said written statement of said Director of Public Works the names of the apparent owners of said abutting property and the number of front feet owned by each, the description of their - property, the amount proposed to be assessed against each abutting property and the real and true owners thereof and other matters contained in said statements are as follows, to —wit: e —4— T : THE MAYOR AID CITY COUNCIL • FROM: DRAHN JONES, DIRECTOR OF PUBLIC WORKS Herewith are submitted ownership rolls, showing the names of the apparent property owners abutting on the portions of Alameda Street from the southeast boundary of Doddridge Street to the northerly boundary of Oso Golf Course, Avalon :Street from the southeast boundary line of Everhart Road to the southwest boundary line of Alameda Street,Everhart Road from Alameda Street to Avalon ,Street, Robert Drive from 30 feet south of the south boundary line of Avalon Street to 40 feet northeast of the northeast boundary line of Alameda Street, and Airline Road from 120 feet north of the centerline of Alameda Street to 120 feet south of the centerline of Alameda Street, showing the number of front feet owned by each, the description of their property, and the amount proposed to be assessed against each abutting property and the real and true owners thereof, also hereafter set out are the various estimates of costs and amounts of assessments: Total estimated cost of whole improvements within the limits defined: '.$ 5242351,52, Estimated amount per front foot proposed to be assessed against each abutting property for curbs and gutters: $ 1,75725 Estimated amount per square foot proposed to be assessed against each abutting property and the real and true owners thereof for sidewalks: $ 0.43665 Estimated'amount per square foot to be assessed against each abutting property and the real and true owners thereof for driveways: $ 0.7455 Estimated amount per front foot to be assessed against each abutting property zoned for one— and two — family dwelling units and the real and true owners thereof for construction of said pavement, curbs and gutters in place on Alameda Street, Avalon Street, Everhart Road, Robert Drive and Airline Road: $ 5.95530 Estimated amount per front foot to be assessed against each abutting property zoned or used for other than one— and two — family dwelling units and the real and true owners thereof for construction of said pavement, curbs and gutters in place on Alameda: $, 10.96427 Estimated amount per front foot to be assessed against each abutting property zoned or used for other than one— and two — family dwelling units and the real and true owners thereof for construction of said pavement, curbs and gutters in place on Everhart +Road and Airline Road: t $ 8.01781 Estimated amount per front foot to be assessed against each abutting property zoned or used for other than one— and two — family dwelling units and the real and true owners thereof for construction of said pavement, curbs and gutters in place on Avalon Street and Robert Drive: $ 5.9553. Total amount to be assessed against private property owners: $ 235,811.56. Total amount to be assessed against City as property owner: $ 2,811.20. Total amount to be paid by the City of Corpus Christi: $ 288,539,96. rahn Jones D rector of Public Works Approved: City �F7 ian�ge r' /T6M Mo. •3 10 maFr.MNARY PAVING ASSESSMENT Page 1 ySouthwest Side Alameda From Doddridge to North Boundary Line of Oso Golf Course ' fi TYPE OF PAVEMENT 4" "Hot Mix Asphalt Base and Surface with 11" lime stabilized HELDENFEIS BROS. CONTRACTOR CONTRACT DATE Dec. 3, 1958 clay base y S 4 ' Face to Face of Curb ROADWAY ` Not including sidewalk or driveways) CONSTRUCTION COST $ 5.95530 Residential Rate Per Front Foot (R -1 - R-2) Assessment for-Curb & Gutter per Lineal Foot 1.75725 $10.96427 Business Rate Per Front Foot Assessment for Sidewalk per Square Foot 0.43-665- (Other than R -1 & R -2) Assessment for Concrete Driveway per Square Ft. 0.7755 BASED ON 64 FEET OF STREET WIDTH. PROPERTY OWNER NAME OF ADDITION B NO. NO. IENG ABUT. PROP. TYPE OF ONING OWNER_ SHIP FROM ST . OF OV- .MENTS RATE CHARG FABLE PAVING & OURG & GUTTER WALK sq. FT. WALK ASSESS- MENTS RIVE WAY SQ.FT. DRIVEWAY SSES FOR EXIS ING `C & G TOTAL ASSESSMENT D O D D R I D G E Agnes, Pope, Haynes Pope Place No.l A 12 114 B -1 114 114 100% 1249.93 - - - 200.33 1049.60 Agnes, Pope, Haynes Pope Place No.l A - 286 B-1 100¢ 286 100% 3135478 1144 499.53 3635.31 J. E. Carroll Pope Place No. 1 3 12 120 R -2 1 75 120 1 75% 1535.98 480 209.59 158.15 5$7.42 D E L A I E D R V E A. B. McKenzie Pope Place No. 1 7 13 117.5 R -1 75 5 75% 523.81 470 205.23 - - 154.86 575 -la ��K4e .L. �i�Aards,et¢,r Pope Place No- 1 7 14 117.5 R -1 75 5 k1177-5 75% 524.81 470 205.23 _ _ 154.86 575.18 t P L A C E Guy J. Brown Pope Place No. 1 8 13 117.5 R -1 .75 75% 524.81 470 205.23 - - 154.86 575.18 ar /s� X? M fche! /ref �X Pope Place No. 1 8 14 117.5 R -1 75 117.5 75% 52L.81 470 205.23 _ _ 154.86 575.18 C A T A L I A P L A C E Delbert Bowen Pope Place No. 1 11 15 117.5 R -1 1 75 117.5 75% 524.81 470 205.23 - - 1 154.86 575.18 A. M. Dampier,Jr. Pope Place No. 1 11 16 117.5 R -1 75 117.5 75% 1524.81 470 205.23 - - 154.86 575.18 P E E M A N P L A C EL C. White Pope Place No. 2 12 15 119. R -1 75 119.09 75% 531.92 476. 36 208.00 - - 156.95 582.97 ITEN No. l2 '/3 r¢ /5 /6 /7 18 /9 M PRELIMINARY PAVING ASSESSMENT -^ Page 2 < Southwest Side Alameda from Doddridge to North Boundary line of Oso Golf Course TYPE OF PAVEMENT 4" Hot. Mix Asphalt Base and Surface with 11" •lime stabilized clay base HELDE T�PEIS EROS. CONTRACTOR CONTRACT DATE - - _ pEC `� - 19 ;8 6 �'� FFace to Face of Curb ROADWAY ASSESSMENT RATE PAVEMENT AND CURB AND GUTTER CONSTRUCTION COST (Not including sidewalk or driveways) $ 5.95530 Residential Rate Per Front Foot Assessment for Curb and Gutter per Lineal Foot 1.75725 (R -1 - R -2) Assessment for Sidewalk per Square Foot $0.43665 $10.96427 Business Rate Per Front Foot Assessment for Concrete Driveway per square Ft. 0.7F� 55 (Other than R -1 and R -2) BASED ON 64 FEET OF STREET WIDTH. BIK. Q2H TYPE OWNER- FT. OF RATE PAVING & SIDEWD SIDEWALK DRIVE- DRIVEWAY TOTAL PROPERTY OWNER NAME OF ADDITION N0. NO. ABUT. OF SHIP OV- HARG CURB & ASSESS- WAY ASSESS- ASSESSMENT PROP. ONING FROM S .MENTS ABLE GUTTER SQ.FP. MENTS SQ.FT. MENT L4r1/a" c.. a L,1,450-17 ^- ' -- Pope Place No. 2 12 16 123 R -1 75 123 75% 549.38 492 214.83 - 764.21 P S A D E A - Joe C. Tillman Pope Place No. 2 14 15 123 R -1 75 123 759 549.38 492 214.83 - - 764.21 - Mark Pomerantz Pope Place No. 2 14 16 123 R -1 -78 123 78% 571.35 492 214.83 - m 786.18 S N 11 A 11 0 N I C A P L Pau/ N Pope Place No. 2 15 1 14 123 R -1 78 123 78% 571.35 492 214.83 - - 786.18" Norman R. McAnally Pope Place No. 2 15 15 123 R -1 75 123 75%1 549.38 492 214.83 _ 764.21 B E R M J D A William P. Hicks Pope Place No. 2 16 13 123 R -1 80 123 80% 586.00 492 214.83 - - 800.83 Perry M. McKinnan Pope Place No. 2 16 1 14 1123 R -1 78 123 1 78% 571.35 1 492 214.83 - 786.18 W I L I A M S Gerald A. Lutz Pope Place No. 2 17 13 123 R -1 75 123 75% 549.38 492 214.83 - 764.21 Edwin G. Danten Pope Place No- 3 17 14 120.2 R -1 80 120.2 86% 572.66 480.80. 209.94 - - 782.60 ' D R I F T W 0 D Z_L A lk. Groner 1 Pope Place No- 3 18 12 120.2 R -1 1 80 120.2 80% 572.66 480.80 209.94 - - 782.60 w d IiEM No. 2/ 22 23 24 25 26 07 28 29 PRELT4INARY PAVING ASSESSMENT Page 3 SOUTHWEST SIDE ALAMEDA FROM DODDRIDGE TO NORTH BOUNDARY LINE OF OSO GOLF COURSE TYPE OF PAVEMENT 4" Rot Mix Asphalt Base and Surface with 11" lime stabilized clay base BELDENFELS BROS. CONTRACTOR CONTRACT DATE I= 3 loss 6 ¢ 4dO Face to Face of Curb ROADWAY ASSESSMENT RATE PAVEMENT AND CURB AND GUTTER CONSTRUCTION COST (Not including sidewalk or driveways) $ 5.95530 Residential Rate Per Front Foot Assessment for Curb & Gutter per Lineal Foot $1-75725 ( R -1 - R -2) Assessment for Sidewalk per Square Foot 0.43665 $10.96427 Business Rate Per Front Foot Assessment for Concrete Driveway per Square Ft. -$0.7455 (Other than R -1 and R -2) BASED 'ON 64 FEET OF STREET WIDTH, Depth Lin. 4 PavAssessment PROPERTY OWNER NAME OF ADDITION Block Lot Ee3gth Type Owner- t. of Rate Paving and Sidewall Sidewalk rive- Driveway TOTAL No. No. Abut. of ship rove- Curb and Sq.Ft. Assess- way Assess- ASSESSMENT Prop. Zoning from St. ments able Gutter -ment S .Ft. ment Richard H. Godeke Pope Place No. 3 18 13 120.2 R -1 80 120.2 0% Ff L A 572.66 RE 480.80 209.94 782.60 DOLPHIN R. M. Currie Pope Place No. 3 19 11 121.3 R -1 80 121.3 0% 577.90 485.20 211,86 789.76 obby D. Horton Pope Place No. 3 19 12 120.2 R -1 8o 120.2 0% 572.66 480.80 209.94 782.60 BAR - A C - -- D A -- P - A C E - ^- o/rtasG. ep an efux Pope Place No. 4 20 10 120.2 R -1 82.75 120.2 2.75 592.35 480.80 209.94 802.29 ichgrd W. Kincaid Pope Place No. 4 20 11 120.2 R -1 1 82.75 120.2 2.75 592.35 480,80 209.94 802.29 C O R L L A E Charles J. Morahan Pope Place No. 4 21 10 120.2 R -1 82.75 120.2 2.75 592.35 480.80 209.94 1 802.29 • R�.vsrs/e, -th, of ux Pope Place No. 4 21 11 120.2 R -1 82.75 120.2 P2.75% 592.35 480,80 209.94 802.29 M I R A V AR PL A CE ,�9 %Pti � GAG /X4K Pope Place No. 4 22 10 121 R -1 82.75 121 32-75% 596.29 484 211.34 1 807.63 Pope Place No. 4 22 ll 120.7 R -1 82.75 120.75 32-75% 595.06 483 210.90 805.96 AR M - -- L - P L -- C E -- 0 W. B. 11ope orpus Christi Ac. Tract 290 R -1 100 290 100% 1727.04 6o 506.51 2233.55 ITfIK No. 31 3e 33 34 36 36 3? 38 39 40 4/ 4e 43 44- PR AIINARY PAVING ASSESSMENT Page 4 SOIMIWEST SIDE ALAMEDA FROM DODDRIDGE TO NORTH BOUNDARY T, OF OSO GOLF COURSE TYPE OF PAVEMENT 4" Hot Mix Asphalt Base and Surface with II lime stabilized clay base P- L I > S 0 F M L L5 ISIZoZ. CONTRACTOR CONTRACT DATE nEC 3 1958 RC Fp cs +a FtmcE op- Cup-& ROADWAY ASSESSMENT RATE PAVEMENT AND CURB AND GUTTER CONSTRUCTION COST (Not including sidewalk or driveways) $ 5.95530 Residential Rate Per Front Foot Assessment for Curb and Gutter per Lineal Foot 1. 5725 ( R -1 - R -2 ) Assessment for Sidewalk per Square Foot E.43655 $10.96427 Business Rate Per Front Foot Assessment for Concrete Driveway per Square Ft. 0.7 55 (Other than R -1 and R -2) BASED ON 64 FEET OF STREET WIDTH PROPERTY OWNER NAME OF ADDITION 31Dck No. Lot No. Tmgt-h Abut. Prop. Type -of 7miig Depth Owner- ship Erom St. Lin. ft. of Improve- ments Pay. iate 2orkp able kssessment Paving and Curb and Gutter Side Sq.Ft. Sidewalk sess- ment Drive - way sq. ft Driveway Assess- ment TOTAL ASSESSMENT Pope Place No. 5 GxamTly Title & Trust Tr Shopping Center A 229.1 B -1 200 229.14 l00% 2512.35 916.56 400.22 2912.57 Pope Place No. 5 Title& TrustTr Shopping Center B 60 B -1 200 60 10 657-86 240 104.80 762.66 ja Pope Place No. 5 Guaranty Title & Trus Tv Shopping Center C 145 B -1 150 145 100 1589.82 580 2 53.26 1843.08 V E R I A R T R 0 A D Marston Rental Co. Avalon Place 2 11 111. B -1 135 111.78 100% 1225.59 307.12 134.10 592 441.34 1801.03 Marston Rental Co. Avalon Place 2 1 10 50 B -1 1 135 50 100% 548.21 200 -87.33 635.54 Marston Rental Co. Avalon Place 2 9 50 B -1 135 50 100% 548.21 200 87.33 635.54 C. T. Blasingame Avalon Place 2 8 50 B -1 135 50 100% 548.21 200 8 -7.33 635.54 C. T. Blasingame Avalon Place 2 7 50 B -1 135 50 100%i 548.21 200 87.33 635.54 I R . and S. m Ferris Sr. Avalon Place 2 1 61 50 B -1 1 135 50 1100% 548.21 1 60 26.20 592 441.4 101 I. R. and Sam Ferris Sr. Avalon Place 2 5 50 B -1 135 50 100% 548.21 200 87.33 6 35.54 I. R. and Sam Ferris Sr. Avalon Place 2 4 50" B -1 135 50 100% 548.21 200 87.33 635.54 T.M. Gannaway, Jr. Avalon Place 2 3 50' B -1 135 50 100% 548.21 60 _ -26..20 1592 441.34 1015.75 . Gannaway, Jr. Avalon Place 2 2 50 B-1, 135 50 100 548.21 200 87.33 635.54 TIM T.M. Gannaway, Jr. Avalon Place 2 1 00 B -1 135 100 10o% 1o96.43 400 174.66 1271.09 0 B E R T D R I V E MEN No. 45 46 47 48 49 .50 S/ 6P 53 Page 5 r PRF,L,TMINARY PAVING ASSES,SMF'NT Southwest Side Alameda From D-oddredge to North Boundary Line of Oso Golf Course TYPE OF PAVEMENT 4" Hot Mix Asphalt Base and Surface with 11" lime stabilized clay base HELDENFELS BROS. CONTRACTOR CONTRACT DATE nre q 1958 6 ¢ ' ace to Face of Curb ROADWAY ASSESSM U RATE AND CURB AND GUTTER CONSTRUCTION COST (Not including sidewalk or driveways) 5.95530 Residential Rate Per Front Foot Assessment for Curb and Gutter per Lineal Foot 1.7572. 5 (R -1 R -2) Assessment for Sidewalk per Square Foot 0. 3 5 $ 10.96427 Business Rate Per front Foot Assessment for Concrete Driveway per Square Ft. 0.7455 ((Other than R -1 and R -2) BASED ON 64 FEET OF STREET WIDTH. ngth Type Depth Lin. a .Assessmen Drive- Credit Property Owner Name of Addition Blo t but. of Owner- of �!tpe Paving an idew Sidewalk way Driveway cisting Total No. o. rop. ning ship rov- harg - Curb & Sq. Ft. ssessmen Assess- Curb Assessment from S .ments able Gutter Sq.Ft. meat & Gutter AU Turner Oil Co. Avalon Place 1 n4.73 B -1 77 214.73 100% 2354.36 578.92 252.79 1192 888.64 3495.79 Z. C. Birnberr� Alameda Park 1 11 57.0 B -1 117 57.01 l00% 625.07 228.04 99.57 - 724.64 A. J. Neff Windsor Park 1 1 1 LOO. 15 B -1 180 100.15 100%i 1098.07 280.60 122.52 516 384.68 1605.27 Gu �.PLTaN Windsor Park 1 1 1 00.1 B -1 180 100.13 100% 1097.85 400.52 174.89 - - 1272.74 Fred Jones Windsor Park 1 1 1 -C 1625 B_1 180 162.5 l00% 1781.69 490 213.96 692 515.89 2511.54 South Texas Service Sta.Corp. Windsor Park 1 1 1 180 B -1 180 180 100% 1973.57 112 48.90 1132 843.9 316.30 2550.08 W. J. Roberts Windsor Park 1 1 1 90.7 B -1 180 90.70 100% 994.46 102.80 44.89 1117 832.72 1872.07 H A R D 1 D R I V E Magnolia Pet.Co. Windsor Park 1 9 1 43.9 B -1 180 143.15 l00% 1569.54 40 17.47 1482 llo4. 33 2691.34 Ind.Sch. Dist. -Fart of Sec. & Enc;nal Farm & G o irden trac bs 39 R.-1 775.7 397.0 100% 2364.25 1488" 649.74 457 -'34o.69 3354.68 B E R I D A N D R I V E 17E /1%b, 31i .5B 55 6G I 60! 6�I 62 63 64 PRELIM17aRY PAVING ASSESSMENT Page 6 Southwest Side Alameda from Doddridge to. North Boundary Line of Oso Golf Course • TYPE OF -TAVIMAM 4 ", got Mix Asphalt Base and Surface with 11" lime stabilized clay base HEL NFESL EROS. CONTRACTOR CONTRACT DATE December 3, 195 64 F+ act a of Curb ROADWAY - ASSESSMENT '':M PAVEMENT ' :CM & GUTTER 80NSTAUMON COST (Not 3. luding sidewalk or driveways) 5.95530 Residentail Rate Per Front Foot Assessment for Curb and Gutter per Lineal Foot $1.75725 R -1 - R -2) Assessment for Sidewalk pe_r Square Foot . 3_ 5 $10. 6427 B4siness Rate Per Front Foot Assessment for Concrete Driveway per Square Ft. P 7 75 5 Other than R -1 and R -2) BASED ON,64�=T OF STREET WIM. Depth Lin. %yay. Assessment Side Sidewalk, Drive Driveway Length Type Owner- ft. of Rate _ Paving & walk - Assess - way ,A sz Total Assessment Property Owner Name of Addition Blk of Abut. of ship Improv- g Curb & Sq. Ft went. Sq.Ft. meat No. No. Pro i). Zonim from St ments able. Gutter Windsor Park qt. rh1irnh Windsor Park No.2 12 1 li6.5 R -1 100 1 116.5 loo 693.79 446 203,48 897.27 Jack L. Nixon Windsor Park No-3 12 4o 116.5 R -1 64.5 116.5 64.5$ 447.49 446 203.48- - - 650.97 C XASI DR I V Heiman -Y. Rowe Windsor Park No-3 13 1 116.5 R -1 64-5- 14.5 4.5 447.49 446 203.48 650.97 Norman L. R"ggly Windsor Park No.4 13 40 116.5 R -1 64.5 116.5 64.5% 447.49 446 203.48 - - 650.97 i P ,• N N I I G T C N D R I 1E ;7 Joe E. Brockett Jr. Windsor Park No.3 16 1 116.5 R -1 64.5 116.5 64.5 447.49 446 203.48 - - 650.97 Frank Cech F.B.BeE.F.&G.Tract Sect' 0.33 R -1 100 1300.33 100 7743.86 5121.32 2236.22 346 _257.94 10,238.02 - I R L I N E R O A D 4 r (,uy arron, eta Cullen Place B - 206 B -1 100 2b6 100% 2258.64 680 296.92 1202 896.09 3,451.65 I, `G" ky Warren at al . Cullen Place A - 315.48 B -1 100 1 315.48 100% 3-459.01 1261_92 551.02 - - 4,010.03 Permanent Homes Inc F. .&E.F.&G.Tract ec, 14 13 - . 413. R -1 100 11+13.33 100 8416.80 5653.32 246$•52 - - 10,885.32 Permanent ffome� T77 Cullen P- N�:7 3CC -IL 115 8 84 68 4o 215.79 - - 1 E V E R G R E E N DR. e Cullen Place N. 1 1 1 R -1 85 135 8 68 0 235.79 919.16 Permanent Homes Inc Cullen Place 'No.3 31 14 135 R -1 88 135 8 707.49 540 235.79 - 943.28 "I 34,867-77 MER MO. 65 66 67 68 69 70 PRELIMINARY PAVING ASSESSMENT 7 SOUTHWEST SIDE ALAMEDA FROM DODDRIDGE TO NO= BOUNDARY LINE OF OSO GOLF COURSE TYPE OF PAVEMENT 4" Hot Mix Asphalt Base & Surface with 11" lime stabilized clay base , BELDENFELS BROS. CONTRACTOR CONTRACT DATE nrr.n im B ¢ Face to Face of Curb ROADWAY ASSESSMENT RATE PAVEMENT AND CURB AND GUTTER CONSTRUCTION COST (Not including sidewalk or driveways) $ 5.95530 Residential Rate Per Front Foot Assessment for Curb & Gutter per Lineal Foot 1.75725 ( R -1 - R -2) Assessment for Sidewalk per Square Foot ; 3 5 $10.96427 Business Rate Per Front Foot F` Assessment for Concrete Driveway per Square t. P: 77 �5 (Other than R -1 and R -2) BASED ON 64 FEET OF STREET WIDTH. PROPERTY OWNER NAME OF ADDITION lock No. Lot No. ength but. rop. Type of Depth Owner- ship from St. Lin. ft. of Improve- ments ' Pav ate Charge able Assessment Paving and Curb and Gutter idemlk Sq.Ft. Sidewalk Assess- ment Drive- way S .Ft. Driveway' Assess - ment TOTAL ASSESSMENT F I I R F 3 E L D D R I V E Permanent Homes, Inc. Cullen Place No. 3 32 12 35 R -1 87.50 135 87-509 703.471 540 235-791 1 939.26 Permanent Homes, Inc. Cullen Place No. 3 32 13.35 R -1 87.50 135 87.5 703.47 540 235.79 939.26 GREEN W A Y ER I V E Permanent Homes, Inc. Cullen Place No. 3 33 13 35 R -1 80 135 80% 643.18 540 235.79 878.97 Harley G. olive Cullen Place No. 3 33 14 35 R -1 83.70 135 83-700, 672.92 540 235.79 908.71 H A Z D 0 VI R I R I V E John H. Cain Cullen Place No. 3 34 15 35 1 R -1 80 135 80% 643.18 540 235.79 878.97 Lindale Inc. Parade Place 1 l.6 35.03 R -1 83.54 135.03 83.54 671.78 540.12 235.84 907.62 A R A D E D R I V E Lindale Inc. Parade Place 2 16 34.46 R -1 86.50 134.46 86.50 692.65 537.84 234.85 927.50 ITEM Alo. 7P ?3 74 75 76 V 78 79 so 81 PRELIMINARY PAVING ASSESSMENT 8 NORTHEAST SIDE ALA1,1EDA FROM DODDRME TO NORTH BOUNDARY LINE OF OSO GOLF COURSE HELDENFELS BROS. CONTRACTOR TYPE OF PAVEMENT 4" Hot Mix As halt Base and Surface with 11" lime stabilized clay base 4' Face to Face of Curb _ ROADWAY CONTRACT DATE (!j �g ASSESSMENT RATE PAVEMENT AND CURB AND GUTTER (Not including sidewalk or driveways) CONSTRUCTION COST $5.95530 Residential Rate-Per Front Foot - R -2) Assessment for Curb and Gutter per Lineal Foot 1.75725 Business R $10.96427 Business Rate Per Front Foot Assessment for Sidewalk per Square Foot P q 3 5 (Other than R -1 and R -2) Assessment for Concrete Driveway per Square Ft. O. 5 BASED ON 64 FEEL 9F STREET wiDTH. - Depth Lin. Pav Assessment Credit TOTAL enAt Type Owner- ft. of Rate Paving and 3iaewaik Sidewalk Drive- Driveway for Ex_ ASSESSMENT PROPERTY OWNER NAME OF ADDITION Block Lot Abut . of ship Improv- Chaxg Curb and Assess- way Assess- isting No. No. rop. �S from St ments able. Gutter S Ft. 4• ment. S Ft 9• went C.& G. D 0 D D RIDGE ST. W. R. Reid Lamar Park No. 1 A 1190 1 B -1 1 190 10 208 .21 1 4. Lamar Park Dev. Co. ng R, Area 295 B -1 2 518.39 2716.o Richard L. Hudson " " " 1 1 120 R -1 115 120 10 4.64 D E L A I N E D R I VIE D. V. Cows �- " " " " 1 130 R -1 102.74 130 100%i 774.19 1 4o 17.47 274 204.27 995M fir• C. O, lt/4'fSolx FZed =Swevu Lamar Park No. 2 6 26 130 R -1 126.24 130 100% 774.19 456 199.11 0 G R A N T P L A C E L.H. & R.J. Beaman " " 7 1 130 1 R -1 115.68 13o jlo 4.19 444 1 .87 968.o6 Fred Heffington 7 28 1 1 O R -1 102.8 1 o 10 4ag 520 227X6 1003 P5 C T A L I N A P L A C E I W. Duffard " ' " 10 1 130 R -1 107.39 130 10 0� 774.-ig 520 227.o6 1001.2 0. E. Strand¢ 10 28 130 R -1 103.48 130 100,$ 774.19 457.6 199.81 266.2 198.45 1172.45 P E E R M A N L A E A. A. Burke " 11 1 130 R -1 93.69 130 193.6S% 436 190.38 358 266.89 ]182.61 ITEM No. 82 83 8¢ 85 86 87 86 89 W V FRELIMINARY PAVING ASSESSMENT 9 NORTHEASE SIDE ALAMEDA FROM DODDRIDGE TO NORTH BOUNDARY LINE OF OSO GOLF COURSE HELDENFELS BROS. CONTRACTOR YPE OF PAVEMENT 4" Hot Mix Asphaltic Base and Surface with 11" lime stabilized clay base 6 4 ace to Pace Curb ROADWAY CONTRACT DATE pEfc 3 1958 ASSESSMENT RATE PAVEMENT AND CURB AND GUTTER (Not including sidewalk or driveways) CONSTRUCTION COST $ 5.95530 Residential Rate Per front Foot Assessment for Curb and Gutter per Lineal Foot $1.75725 (R -1 - R -2) $10.96427 Business Rate Per Front Foot ' Assessment for Sidewalk per Square Foot 0. 5 (Other than R -1 and R -2) Assessment for Concrete Driveway per Square Ft. 0.7 BASED ON 64 FEET OF STREET WIDTH. Depth .. av Assessment engt Type Owner- Ft. Of Rate Paving and Sidev4k Sidewalk Drive Driveway TOTAL Bloc k Lo but. of ship Improv Ch Curb and Assess- way Assess- ASSESSMENT PROPERTY OWNER NAME OF ADDITION No No rap, Zoning from St ments able Gutter Sq. Ft ment. Sq.ft. ment Frank B. & Gladys Bush Coughlin Lamar Park No- 3 11 28 125 R -1 103.40 125 1006 744.41 420 183.39 341 254.22 1182.02 P A A D E A P L A C E Thomas F. Fitzgerald 14 1 12 R -1 . k 125 6 .45 412 1.79.90 375 279-56 1158.91 Gene C. Crane Lamar Park No. 4 14 28 125 R-1 93.4 125 .3 694-83 458.8 200.34 176.1 131.28 1026.45 SA I I TA MONYI CA PLACE E. A. Williford 15 1 1 125 R -1 1 98.96 125 98.96f 736.67 ![ 500 218.33 - - 955.00 J. D. Tolle Lamar Park No 15 28 125 R -1 112.24 125 loofa 744.41 500 218.33 - 962.74 B E It M U D P L A C E Elmer L. Bowden " ' 18 __1 125 R -1 84.49 125 84.4 628.95 500 218.33 1 - - 847.28 Wm.H. Bloch Lamar Park No. 6 18 28 120 R -1 93.26 120 93.'23 666.47 480 209.59 - - 976.06 W I 1 L I A I S,0 P L A C ik�h5 Betty L. " " " 19 1 12 R -1 88.21 125 188.21, 656.64 500 218.33 874.9 Allen Wood Lamar Park No. 7 19 29 134 R -1 1 96.18 134 196.18 6 767-53 ✓ 6 '234.04 1001.57 nn DO L PHI P LACE L & Gussie Kac Leca i 1 22 1 1 1 194 R- _ - 44 11 it1o. 92 99 95 96 97 98 99 /00 /OI EMIMIUARY PAVING ASSESSMENT r 10 NORTHEASE .SIDE ALADI nA FROM DODDRIDGE TO NORTH BOUNDARY LINE -OF OSO GOLF COURSE HELDENFFS,S BROS. CONTRACTOR TYPE OF PAVEMENT 4" Hot Mix As alt Base and Surface with 11" lime stabilized clay Vase 6 4' Face to Face Curb ROADWAY CONTRACT DATE C 3 1958 ASSESSMENT RATE PAVEMENT AND CURB AND GUTTER (Not including sidewalk or driveways) CONSTRUCTION COST 5.95530 Residential Rate Per Front Foot Assessment for Curb and Gutter per Lineal Foot 1. 5 (R -1 - R -2) $10.96427 Business Rate Per Front Foot Assessment for Sidewalk per Square Foot 0. 3 5 _5 (Other than and R -2) Assessment for Concrete Driveway per Squart Ft. 0-.775 BP4ID ON 64 FEET OF STREET WIDTH. Depth Lin. Pay. Assessmen Drive- Lengtt Type Owner- ft. of Rate, Paving an Sidew Sidewalk way Driveway TOTAL PROPERTY OWNER NAME OF ADDITION Block Lot Abut. of ship rov- harg Curb and Assess- Assess- ASSESSMENT No. No. -prop. Zoning from :k ments ble'. Gutter So. Ft ment. s . ft ment Robert L. Hugheg Lamar Park No. 8 22 2.6 R -1 90.25 132.6 0.25 .68 53o.4 231.6o 944.28 A R A U D P L A C IE Robert A. Guttman " " " 23 1 132-58 R -1 191-36 2. 8 1. 0. 2- 2 1. 6 -- -- 2 8 fflce esTer Lamar Park No. 9 23 2 2 R -1 8 - 2 :8 668.3 28 230.55 -- -- 898.74 O R A P A C E " 24 1 32 R -1 85 32 85 668.19 528 230.55 -- -- 898.74 .5AaAks Leroy Sees 24 2 R -1 8 2 8 668. _ 28 2 0. -- - 898.74 IRA qAR FLA C-E or " 25 1 36 1 R -i 90 m6 901A 728. 44 2 .94 -- - p,(j OQUe �a rP r W) 11 .07 QJ 707 V07 AR 517A rn I ARM EL ].LACE City of W. E. Pope Con pus Christi 170.14 Ac. Tract -- 75 R-1 100 -- -- Carmelite Sisters -- 8 4978.97 EVER A R R O A D Landsman Realty Co. ,7cwn n%vn>YY Sho Center _ _ fl - 86. B-1 -- 686.0 l0 22.48 2324.36 1014. 1881 1402.2 0 � �� �i/ �O. Tcrvn .i Ceunt�•y n . SR oPpinG �+rfBY J /TENT A/o. /02 /03 /0¢ /05 106 /07 /OB 109 //O I PRELIMINARY PAVING ASSESSMENT NORTHEAST SIDE ALAMEDA FROM DODDRIDGE TO NORTH BOUNDARY T. OF OSO GOLF COURSE TYPE OF PAVEMENT 4" Hot Mix As halt Base and Surface with 11" lime stabilized cl base HFI,DENFELS BROS. CONTRACTOR CONTRACT DATE December 3, 1958 ¢ Face to Face of Curb ROADWAY ASSESSMENT RATE PAVEMENT AND CURB AND GUTTER (Not including sidewalk or driveways) CONSTRUCTION COST 5.95530 Residential Rate Per Front Foot (R -1 - R -2) Assessment for Curb and Gutter per Lineal Foot $1.757.25 $10-96427 Business Rate Per Front Foot Assessment for Sidewalk per Square Foot $0.43665 (Other than R -1 and R -2) Assessment for Concrete Driveway per Square Ft. 0.7 55 BASED ON 64 FEET OF STREET WIDTH. Depth Lin. %Pay. Assessment Side 0 Sidewalk Drive- Driveway h Type Owner- ft. of Rate Paving and Assess- way Assess- TOTAL PROPERTY OWNER NAME OF ADDITION Blocs Lot Abut. of ship Improv- curb and Sq. Ft. went. sq. ft. ment ASSESSMENT No. No. Prop. ning from St ments able. Rutter A. D. Campbell Campbell Sub' d. 6 -C 40.02 B -1 148.58 140.02 100% 1,535.22 56G.o8 244.56 -_ _- 1,779.78 oh,z H, afi`NSOh Alameda •W • z 81.84 B 341 81.84 10O% 897.32 327.36 142.94 __ __ 1,040.26 Estates No. 1 2 of -1 r Estates No. 1 2 of�5 81.84 B -1 315 81.84 10 8 6 1.42. 94 -- __ 1 040.26 0. S. Wyatt, Jr. Alameda Estates No. 1 2 1 C 6.16 B -1 1372 126.16 i00% 1,383.25 504.64 220-35 1 603.60 O: S. W tt Jr. Alameda Estates No. 1 2 B 24.24 B -1 400 124.24 loot 1 62.20 4q6.96. 217.00 1,579.20 Alameda Paul g Howard Estates No. 1 2 A 23.60 R -1 420 12 .60 loo96 716. 08 446.40 19 .92 205 152.8 1 o83.83 A. S. Heizer Alameda Estates No. 1 I 2 F-.w--, 2 -A 175.20 R -1 100 75.2 10 447.84 300.8 131.34 -- 579.18 rrancas Julia West Alameda Estates No. 1 2 E.2 2 -A 65.04 R -1 130 65.o4 10 8 7. 212.16 92.64, 205 152.83 6-,12.80 R. C. Littleton Alameda E %^ 1 50.0 R -1 100 150.0 10 �' 893.30 600 261.99 -- -- 1,155.29 E L D N I R I E Chas. L. Casale EAstates No. 1 1 2 14o R -1 270.34 140 10 833.74 560 244.52 - 1,078.26 Alameda Mr's. Lula Hood Estates No. 1 1 1 1 6 R -1 1270.4 165 10 82.62 660 288.ig 1,270.81 ask tnja�,, /�vai✓ fT F.B.& E.F. & G.Tra Lots 14,15 & 16 Se is .I IM20 R -1 100 1.20 ioo96 10,190.71 6844.80 2988.74 =- - 1-1' 1 79.49 Reid Brookdale C 350 R -1 390 350 100 2,084.36 1400 611.31 -- _= 2,695.67 17EM A/o. //s /16 169 /ZO /22 /23 /24 les PRELIS1131ARY PAVING ASSESSMENT 12 NORTHEAST SIDE ALAMEDA FROM DODDRIDGE TO NORTH BOUNDARY LINE OF OSO GOLF COURSE �sw�u�er.s• a'QOS. CONTRACTOR TYPE OF PAVEMENT 4" Hot Mix Asphalt Base and Surface with 11" lime stabilized clay base 4 64 Face to Face of Curb ROADWAY CONTRACT DATE DE 3 19 _ ASSESSMENT RATE PAVEMENT AND CURB AND GUTTER (Not including sidewalk or driveways) CONSTRUCTION COST Assessment for Curb and Gutter per Lineal Foot $1.75725 $ 5.95530 Residenntial Ratte2Per Front Foot )Front Assessment for Sidewalk per Square Foot Oa 3 5 $10.96427 Business Rate Per mot Assessment for Concrete Driveway per Square Ft. 7 55 (Other tban.R -1 and R -2) BASED ON 64 FEET OF STREET WID'iB. Depth Lin. Pau Assessment Len Type Owner- ft. of Rate Paving a ide Sidewalk Drive- Driveway TOTAL PROPERTY OWNER NAME OF ADDITION Bloc t Abut. of ship Improv- Char Curb and Assess- way Assess- ASSESSMENT No. No. Prop. irg irom'+5t menu able. Gutter Sq. Ft went. s ft ment Joint Board of Christ n Churches Brookdale A 275.7 R -1 390 2 5. O 1642.2 ll0 .0 481.66 -- -- 212 T¢ma;rc -o Cor� B 12M.li$ B -1 158 12M.A 10 9,26o.39 44.6 237.82 1202 1 8 6.0 4. go A I R L I N E R 0 A D Brentwood Humble Oil Corp. Community Center 1 150 B-i 1,14 150 10 1-.644.64 0 12 6 Croc. Co. r " 0 125 R -1 1 80 125: 80% 1 595.53 500 218.33 -- -- 813.86 PAL0MAI 31T REE g R 0 Best 0 2 R -1 8.48" 259.75 1 546,81? -- -- Jack Ryan Trustee F.B.&E.F.BG. Tracts 15 16 1696.54 R -1 100 16 90.,54 10 10 10 .40 6786.19 � 18 1 ii,o66.58 %ack %�yan,%rus7ed c W4$. 1 F.B.&E.F.&G. Tracts f134 .&L R -1 I loo 415.61, 1'O 2 . qc)4.19 1742.44 60.84 - -- .0 jonns 200 Methodist Church F.B.&E.F.BdG.Tracts 15 of 20006 R -1 100 1 1 191 . 42 800.2 349.42 -- -- 1-.-54o.84 DE RIVE r200.o6 Montclair No. 2 3 ]&32 21.5A9T R -1 77.90 T�9_ .84 860.3 3 5.68 1 3 3.52 C L I R D R I 7E H. Thomas John 11,1ontclair No.2 2 32 41.4 R -1 0 41.4 192-30 16 .40 264.7o ITEM N0. 126 le? /28 /'�,9 /30 /3/ /32 /33 /34 /35 136 137 PRELI[•IINARY PAVING ASSESSMENT 13 SOUTHWEST SIDE AVALON FROM EVERHART TO ALAMEDA BELDENFELS BROS. CONTRACTOR TYPE OF PAVEMENT V Hot Mix A phalt Base and Surface with I lime stabilized clay base O' Face to Face of Curb ROADWAY CONTRACT DATE 3 195g ASSESSMENT RATE PAVEMENT AND CURB AND GUTTER (Not including sidewalk or driveways) CONSTRUCTION COST $5.95530 ResidentaiI Rate Per Front Foot (R -1 - R -2) Assessment for Curb and Gutter per Lineal Foot $1.75725 $5.95530. Business Rate Per Front Foot Assessment for Sidewalk per Square Foot o.43665 (Other than R -1 and R -2) Assessment for. Concrete Driveway per Square Ft. 0. 55 BASED ON 30 FEET OF STREET WIDTH. Depth Lin. % Pau Assessment ive- engt Type Owners ft. of Rate Paving and Side Sidewalk qay Mriveway TOTAL PROPERTY OWNER NAME OF ADDITION Block Lot but. of ship Improv- Chmge Curb and Assess- Assess-, ASSESSMENT No. No. Pro fromSt ments able. Gutter S . Ft. ment. s . ft ment IICIrjgS � �c'¢i -Q re Alameda Park 6 1 6o R -1 130 _6o,' 100% 357.32 228 99.56 456.88 Miller 6 2 1 60 I R -1 130 1 6o 100% 357.32 196 1 85.58 - -- 442.90 Willie R. Mills 6 3 6o R -1 130 60 - 100% 357.32 196 .85.58 -- -- 442.90 6 4 60 R -1 150 6o 100% 357.32 228 99.56 -- -- 456.88 S A M S T R E E T John H. Manes 5 1 60 R -1 130 -60 10 357.32 228 99.56 456.88 James T. T lor.5r " " 5 2 60 R-1 130 60 100 357.32 196 1 85.58 442.90 Curtis Greer 5 3 6o R -1 130 6o 100% 357.32 196 85.58 442.90 Lee Roy Cole 4 5 4 59 R -1 130 59 100% 351.36 176 76.85 -- - 428.21 Williard R. Wilder " " 5 1 5 1 66 R -1 •130 - 66 100% 393.05 220 96.06 -- -- y 489.11 R O B 3 R T IL A N E N. O. Simmons 1 22 '4 Lumber & Su INe, " " 1 6 B -1 120 236 10 3-4o5.45 44 412.20 1,817.65 Ted M. Anderson " " 1 57 B -1 120 57 100% 339.45 228 99-56 439-01 ift. Falk 1 1 IS110 I BO. B -1 1 120 280.0 1 1 667.66 1120.12 48 .10 2,156.76 / TtA7 Alo. 138 "140 14/ !42 /43 PRELIIM ARY PAVING ASSESSMENT 14 NORTBEASE SIDE AVALON FROM EVERRART TO ALAMEDA NELDENFELS BROS. CONTRACTOR TYPE OF PAVEMENT 4" Rot Mix Asphalt Base and Surface with 11" lime stabilized clay base 30' Face to Face of Curb ROADWAY CONTRACT DATE nFr g 1q_rR ASSESSMENT RATE PAVEMENT AND CURB AND GUTTER (Not including sidewalk or driveways) CONSTRUCTION COST $5.95530 Residential Rate Per Front Foot Assessment for Curb and Gutter per Lineal Foot $1.75785 (R -1 - R-?_� $5.95530 Business Rate Per Front Foot Assessment for Sidewalk per Square Foot $0.4585 (Other than R -1 and R -2) Assessment for Concrete Driveway per Square Ft. 0.7 55 BASED ON 30 FEET OF STREET WIDTH. PROPERTY OWNER NAME OF ADDITION Bloc No. Lot o. 6e Amt' Prop. °f Zonis Depth Owner- ship from %. Lin. ft. of Improv- ylents Pav Rate Ch able. Assessment Paving an Curb and Gutter Side Sq. Ft. Sidewalk Assess- went. rive- ay sq. ft Driveway Assess- went TOTAL ASSESSMENT M. G. Frich Avalon Place 2 C 113.4 B -1 80 - 13.41 100%i 675.39 405, 177.12 109 81.26 933.77 r ,7`r-� M• i9/�' "�' " 2 1 B 1 55 B -1 1 162. 1 2 4 220 6.06 -- -- 6 P¢ /yhs $e %e u K 2 A B -1 1 1022 55 10 27.54 220 96.o6 L. P. Fritz " " 2 2 -A 145 B -1 160 145.6o 10 867, O 22 8 Ga ° '* B -1 103 .71 141.12 10 840.41 524.4 8 22 .O1 91 67.84 1,137.26 Turner 011 Co. 1 All 99.5 B -1 74.69 199.51 10 1 188.14 658.04 287.33 321 239-31 1,714.78 17,--Ag No. 144 145 146 147 148 PRELIMINARY PAVING ASSESSMENT 15 SOUTH SIDE_F'V'R uffiZ RD. FROM ALAMEDA TO AVALON HELDENFELS BROS. CONTRACTOR TYPE OF PAVEMENT- 4" Hot Mix Asphalt Base and Surface with 11" lime stabilized clay base Face to Face of Curb ROADWAY CONTRACT DATE I . i lq;8 ASSESSMENT RATE PAVEMENT AND CURB AND GUTTER CONSTRUCTION COST _ (Not including sidewalk or driveways) 0 55 Residential Rate Per Front Foot (R -1 - R-2) Assessment for Curb and Gutter Per Lineal Foot $1-75725 $8.01781 Business Rate Per Front Foot Assessment for Sidewalk per Square Foot 0. 3 5 (Other than R -1 and R -2) , Assessment for Concrete Driveway per Square Ft. 0.7 55 BASED ON FEET OF STREET WIDTH PROPERTY OWNER NAME OF ADDITION Bloc Lot No, eigth Abut. Prop. Type of onisg Depth Owner- ship from%. Lin. ft. of Improv ments Pay. [Charge te le. Assessment Paving and Curb and Gutter Sidewalk Sq. Ft Sidewalk Assess- ment. Drive- way sq. ft Driveway Assess- ment Credit for Ex- isting C.0. TOTAL ASSESSMENT Marston Rental Co. Avalon Place 2 11 141 B -1 82. 141.1 10 1132.03 64. 246.60 13 8.6 John Mendleski " 2 E 10403 B -1 113.4 104.0 10 834.09 416.1 181.7o 1 1 1015.79 Herbert Esse 2 D 60 B -1 113.4 60 10 481.07 240 104.80 585&7 M. G. Frich " 2 C 80 B -1 11-3-41 80 100 641..42 320 139-73 -- 104.80 676-95 VAL D N S T R E E T �e /�a5 � �B264K Alameda Park 6 1 17 R -1 60 17 6od 6o.74 68 29.69 -- -- 0.4 ITEi+; No, /4y /50 /5/ PRELIMINARY PAVING ASSESSMENT 16 NORTH SIDE EVERHART RD. FROM AI AMEDA TO AVALON HELDENFELS BROS. CONTRACTOR TYPE OF PAVEMENT 4" Hot Nir�Asphalt Base and Surface with 11" lime stabilized clay base 44' Face to Face of Curb ROADWAY CONTRACT DATE �E -C ASSESSMENT RATE PAVEMENT AND CURB AND GUTTER (Not including sidewalk or driveways) CONSTRUCTION COST $5.95530 Residential Rate Per Front Foot (R -1 - R-2) Assessment for Curb and Gutter per Lineal Foot $1.75725 $8.01781 Business Rate Per Front Foot Assessment for Sidewalk per Square'.Foot 0.+3 5 (Other than R -1 and R -2) Assessment for Concrete Driveway per Square Ft. 0.7 55 BASED ON 44 FEET OF STREET WIDTH. PROPERTY OWNER NAME OF ADDITION Bloc No, Lot o Le Abut. Prop. Type of Zonine Depth Ormer- -ship from Lin. ft. of Improv ments k Pay. Rate harg able Assessmen Paving - Curb and Gutter idew sq. ft, Sidewalk Assess- went. Drive way sq. ft Driveway Assess- ment TOTAL ASSESSMENT Tr Pope Place No. 5 C 14 B -1 __ 1,415.84 D 365 B -1 100 365 10 2926.50 146o 637.51 -- -- 3,564.ol Jack Ryan T rustee PE PLACE, GIr(irS 36 1 8o R -1 loo¢ 8o 10 476.42 320 139.73 -- -- 616.15 1TE/17 A/o. 152 /53 /54 iss 166 157 PRELIMINARY PAVING ASSESSMENT Page 17 ROBERT DR. FROM 301 SOUTH OF SOUTH R.O.W. LINE OF AVALON.ST. TO 40' N.E. of N.E. R.O.W. LINE OF ALAMEDA ST. ._ .. 4" ..,..E OF PAVEMENT "15!! Hot Mix Asphalt Base and Surface w1tH it" 1..Irt£ STA4t� -1ZEa BELDENFELS BROS. CONTRACTOR CONTRACT DATE Dec. 3 195 ZLAY gpsf 301 Face to Face of Curb ROADWAY ASSESSMENT RATE PAVEMENT AND CURB AND GUTTER (Not including sidewalk or driveways) $5.9553 Residential Rate Per Front Foot Assessment for Curb and Gutter per Lineal Foot $1.75725 (R -1 - R -2) Assessment for Sidewalk per Square Foot Ft. 0. 5 $5.9553 Business Rate Per Front Foot Assessment for Concrete Driveway per Square 0.77 3 55 (Other than R -1 and R -2) BASED ON 30 FEET OF STREET WIDTH PROPERTY OWNER NAME OF ADDITION lock No. Lot No. ength b ut. ro Type of oni Depth Owner- ship from Lin. ft. of Improve ments Pav ate able Assessment Paving .and Curb and Gutter Sidewalk Sq. Ft. Sidewalk Assess- ment Drive- way iSci.Ft. Driveway Assess - meat TOTAL ASSESSMENT Willard R. Wilder Alameda Park 5 5 23 R -1 65 23 659 89.03' 89.03 N. 0. Simmons jug Alameda Park 1 1 2011 B -1 100/ 1 20 100% 119.11 1 119.11 A V A L C N E T R I E T T. M. Jr. Avalon Place 2 1 03.71 B -1 100/ 103.71 1O0%i 617.62 414.84 181.14 798.76 Turner Oil Co. Avalon Place 1 All 07.39 B -1 100/ 107.38 100% 639.48 429.52 187.55 827.03 A L A MT DA E, T R I E T fi-ltt 0,7 C o • Shoppi Center B 11 B -1 100/ 11 100$ 65.51 65.51 A. D. Campbell Campbell 6 -C 1 3 B -1 100 37 100 220.35 220.35 /Ten A/o. /58 /s9 166 Page 18 PRELIMINARY PAVING ASSESSMENT AMINE RD. FROM 120! NORTH OF,THE CENTERLINE OF ALAMEDA ST. TO 120' SOUTH OF THE CENTERLINE OF ALAMEDA ST. INYPE OF PAVEMENT 4"A-T M,Y. ASPRNI _r 6NSS -- AA JO SyP- r-AGV- WI-rli It" )-imp- HELDENFELS BROS. CONTRACTOR 'CONTRACT DATE December 3, 195b eAST-f 'Face to Face of Curb ROADWAY ASSESSMENT RATE PAVEMENT AND CURB AND GUTTER CONSTRUCTION COST (Not including sidewalk or driveways) $ 5.9553 Residential Rate Per Front Foot Cost of Curb and Gutter per Lineal Foot $1.75725 (R -1 - R -2) Cost of Sidewalk per Square Foot 0. 36� $ 8.01781 Business Rate Per Front Foot Cost of Concrete Driveway per Square Ft. 0-7455 (Other than R -1 and R -2) BASED ON 44 FEET OF STREET WIDTH. PROPERTY OWNER NAME OF ADDITION 3lock No. Lot No. engt Abut. Prop. Type of oni Depth er- 3hip Crom St Lin. ft. of Improve - ments % Pav Rate C able Assessment Paving and Curb and Gutter Sideelk Sq. Ft. Sidewalk Assess- ment Drive- way Sq.Ft. Driveway Assess- ment TOTAL ASSESSMENT 7F,v rookdale 13 18 B -1 18 l00% 144-32 601 448.05 1 592.37 Humble 011 & n Co, Brentwood Com- nit Center 7 6 B- 3 7 6 10 609.35 601 448.05 1,057.4o Frank Cech .B.&E.,F&G Tract 3ec.2 7 43 R -1 100 43 100%i 256.08 256.08 Total Assessments $238,622.76 Assessed to Tity as Pr p. own r 2,811.20 Total Assess d to Priv to Pro Owners $235,811.56 Total Contract $524,3 1.52 ts1 Assessments Private Prop. Owner t •56 City Portion of Cc ritract Cost $;!88,5 9.96 r NOW, THEREFORE+, BE IT ORDAINED SY THE CITY COUNCIL OF THE CITY OF CORPUS a CHRISTI, TEXAS: SECTIONGI. That the written statement and report of the Director of Public Works heretofore filed with the City Council, showing the estimated total cost of the whole 4mprovement of said Alameda Street, Avalon Street, Everhart Road, Robert Drive and Airline Road, within the limits,above defined; the estimated amount per front foot proposed to be assessed against the abutting property, and the real and true owners thereof, on said streets for construction of curbs and gutters; the estimated amount per square foot to be assessed against the abutting property, and the real and true owners thereogf, for sidewalks on said.Alameda;Street, Avalon Street, Everhart Road, Robert Drive and Airline Road, within the limits above defined; the estimated amount per square foot to be assessed against the abutting property, and the real and true owners thereof for driveways on said Alameda Street, Avalon Street, Everhart Road, Robert Drive and ;Airline Road, within the limits above defined; the estimated amount per front foot to be assessed against each abutting property, and the real and true owners thereof, for construction of said pavement, curbs and gutters in place on said Alameda Street, Avalon ;Street; Everhart Road, Robert Drive and Airline Road, within the limits defined; the total estimated amount of the cost of said improvements on said streets, within the limits defined, pro- posed to be paid by the City of Corpus Cbristi, Texas; the names of the apparent owners of the property abutting on said streets, within the limits defined, with the number of front feet owned by each and the description of the property, and other matters relative thereto, having been received and examined by the City Council, said report is hereby in all things approved and adopted. SECTION 2. That it is hereby found and determined that the total estimated cost of the whole improvement of ?Alameda Street, Avalon Street, Everhart Road, Robert Drive and Airline Road, within the limits above defined, is $524,351.52; the _ estimated amount per front foot proposed to be assessed against each abutting property, and the real and true owners thereof, for curbs and gutters on Alameda Street, Avalon Street, Everhart Road, Robert Drive and Airline Road, within the limits above defined, is $1.75725 per front foot; the estimated amount per square foot to be assessed against each abutting property, and the real and true owners thereof, for sidewalks on Alameda Street, Avalon Street, Everhart Road, Robert Drive and Airline Road, with. in the limits above defined, is $0.43665 per square foot; the estimated amount per square —5- • foot to be assessed against each abutting property, and the real and true T owners thereof, for driveways on Alameda Street, Avalon Street, Everhart Road, Robert Drive and Airline Road, within the limits above defined, is $0.7455 per square foot;the estimated amount per front foot proposed to be assessed against each abutting property zoned for one— and two — family dwelling units and the real and true owners thereof, for construction of said pavement, curbs and gutter`s in place on Alameda Street, Avalon Street, Everhart Road, Robert Drive and Airline Road, within the limitV above defined, is $5.95530 per front foot; the total estimated amount per front foot to be assessed against each abutting property zoned or used for other than one— and two — family dwelling units and the real and true owners thereof, the construction of said pavement, curbs, and gutters, in place on Alameda Street, within the limits above defined, 1s'$10.96427 per front ' foot;the total amount per front foot proposed to be assessed against each abutting property zoned or used for other than one— and two - family dwelling units, and the real and true owners thereof, for construction of said pavement, curbs, and gutters in place on Everhart Road and Airline Road, within the limits above defined, is $8.01781 per front foot; the total amount per front foot proposed to be assessed against each abutting property zoned or used for other than one— and two — family dwelling units, and the real and true owners thereof, for construction of said pavement, curbs, and gutters in place on Avalon Street and Robert Drive, within the limits above defined, is $5.9553 per front foot; the total estimated amount of the cost of said improvements on Alameda Street, Avalon Street, Everhart Road, Robert Drive and Airline Road, within the limits above defined, proposed to be assessed against the abutting property, and the real and true owners thereof, is $238,622.76; the total estimated amount of the cost of said improvements on Alameda Street, Avalon Street,` Everhart Road, Robert Drive and Airline Road; within the limits above defined, proposed to be paid by the City of Corpus Christi, Texas,' is $288,539.96, r , 1 ,SECTION 3. That a portion of the cost of said improvements shall be paid and defrayed by the City of Corpus Christi, Texas, and that a portion of the —6— cost of said improvements shall be paid by and assessed against the property abutting upon said streets, within the limits above defined, and against the real and true owners thereof, in accordance with, and in the manner provided by, the Charter of the City of Corpus Christi, Texas, and by the Acts of the 40th Legislature of the State of Texas, First Called Session, Chapter 106, and known and shown as Artiole 1105—b of Vernon$s Annotated Civil Statutes of Texas, and that the total cost of said improvements shall be and are hereby apportioned ' between said parties and shall be paid and defrayed as follows: (a), The cost of constructing, reconstructing or repairing said i ' Improvements within the area between and under rails, tracks, double tracks, turn- outs, and switches', and two feet on each side thereof, of any railway, street railway or interurban, using, occupying or crossing such streets or portions thereof hereby ordered and approved, shall be paid by the respective owners thereof and + assessed against such railway, street railway, or interurban, and its roadbed,' ties, rails, fixtures, rights and franchises, and the real and true owners thereof, in the manner provided by the terms of the City Charter of the City of Corpus Christi, Texas, and by said Acts of the 40th Legislature of the State of Texas, (1927), above identified; r (b) The City of Corpus Christi shall pay the whole cost of construction, ' reconstruction or repair of the curbs, gutters and sidewalks, within the inter- sections of said streets with other streets and alleys and shall pay not less than one —tenth (1 /10th) of the total remaining cost of said improvements on said streets, exclusive of the cost of the curbs, gutters and sidewalks, in front of the " respective properties abutting upon said streets,,said costs being in the amounts as hereiribefore set out in Section 2 hereof, (c) Thel,property abutting upon said streets, within the limits above defined, zoned for,one— and two — family dwelling units, and the real and true owners thereof, shall be assessed and pay for eighty (80 1/6) percent of the total cost of construction, reconstruction or repairing, as the case may be, of sidewalks, curbs ' and gutters in front of their respective property, and shall be assessed and pay eighty (8094) percent of the cost of an equivalent thirteen and one —half (13p) foot of pavement width abutting their respective property, exclusive of the amount —7— s +� y therein specified to be paid by any railway, street railway, or interurban, as set out in Sub- section (a) above, and by the City of Corpus Christi as set out in Sub - section (b) above, and exclusive of the cost of any storm sewers, but in- elusive of the costs of all incidentals and appurtenances. The property abutting upon said streets, within the limits above defined, zoned or used °for other than one- or two - family dwelling units, and the real and true owners thereof, shall be assessed and pay eighty (80 %) percent of the entire costs of the sidewalks, curbs and gutters abutting their respective property, and shall be assessed and pay forty (40 %) percent of the entire cost of the pavement abutting their respective property, and exclusive of the amount therein specified to be paid by any railway; street railway, or interurban, as set out in Sub - section (a) above, and by the City of Corpus Christi as set out.in Eub- section (b) above, but inclusive of the costs of all incidentals and appurtenances. However, the total costs to be assessed against and paid by abutting property, and the real and true owners thereof, shall not in any case exceed nine - tenths (9 /10ths) of the total cost of said improvements on the streets upon which they abut, exclusive of the cost of curbs, 'gutters and side- walks, said costs being at,the rate of, and in the amounts as hereinabove set out in Section 2 hereof. ' The amounts payable by the abutting property and the real and true owners thereof shall be assessed against such abutting property, and the real and true owners thereof, and shall constitute a first and prior lien upon such abutting property and a personal liability of the real and true owners thereof; provided, however, that no amount shall be assessed against such abutting property, or the real and true owners thereof, in excess of the benefits to said property in the enhanced value thereof by reason of said improvements on the streets upon which it abuts, and that said cost which may be assessed against such property and its real and true owners shall be in accordance with the FRONT FOOT RULE OR PLAN in proportion as the frontage °of such property is to the frontage to be improved, provided that, if it shall appear at the hearing on special benefits, hereinafter provided for, that the application of such rule or plan will result in inequality _g_ or injustice then such rule of apportionment shall be applied as will in the judgment of the City Council produce substantial justice and equality between respective parcels of property and the real and true owners thereof, considering the special benefits in enhanced value to be received and burdens imposed, all in accordance with and as provided for in said City Charter and the said Acts of the 40th Legislature of the State of Texas, First Called Session, Chapter 106, as hereinabove identified.$ That the amounts payable by the real and true owners of said abutting property shall be paid and become payable in five (5) equal installments, the first of which shall be due and payable twenty (20) days after the date said improvements are completed and accepted by the said City Council, and the remaining four (4) installments to be due and payable, respectively, one (1), two (2), three (3), and four (4) years from and after the date of such acceptance and bearing interest at the rate of five (57.) per cent per annum from said date of acceptance, payable annually; provided, however, that the owners of said property shall have the privilege of paying any one, or all, of such installments at any time before maturity thereof by paying the totaD amount of principal due, together with interest accrued, to the date of payment; further, that if default be made in payment of any such installments of principal or interest promptly as same matures, then'at the" option of the Contractor or assigns the entire amount of the assessment upon which such default is made shalB be and become due and payable together with reasonable attorney's fees and collection costs, if incurred. SECTION 4, That a hearing be given to•the real and true owners and all owning or claiming any interest in any property abutting upon said portions "of said streets, within the limits above defined, and to all others owning, claiming or interested in said property, or any of said matters as to the assessments and to the amount to be assessed against each parcel of property and the real and true owners thereof, and as to the special benefits to said property to be received from said improvements, if any, or concerning any error, invalidity, irregularity or deficiency in any proceedings or contract with reference thereto, or concerning —9— • 1. Y 1 any matter or thing connected therewith, which hearing shall be held by the City Council of said City in the Council Chamber of the City Ball of the City of } Corpus Christi, Texas, at 3:00 o'clock P.M. on the 11th day of February, A. D., 1959, at which time all persons, firms, corporations, or estates, owning or claim- ing any such abutting property, or any interest therein, and their agents or attorneys, or persons interested in said proceedings are notified to appear and to be heard in person or by counsel and may offer evidence; and said hearing'sball be adjourned from day to day and from time to time and kept open until all persons, evidence and protests have been duly heard; and the City Secretary of the City of Corpus Christi, Texas, is hereby directed to give notice of said hearing by publication in the CORPUS CHRISTI TIMES, the official newspaper of the City of Corpus Christi, which is a newspaper of general circulation in the City of Corpus Christi, Texas; and said notice shall be published at least three times in said newspaper before the date set for said hearing, the first of which publications shall be at least ten days prior to the date of said hearing, and such notice by publication shall be valid and sufficient without any further form of notice, as provided for and in accordance with the terms and provisions of said City Charter and of Chapter 106 of the Acts of the First Called Session of the 40th 'Legislature of "the State of Texas, known and shown as Article 1105 —b of Vernon's Annotated Civil Statutes of Texas; however, said City 'Secretary is further directed, in addition to the contents of the notice of said hearing as required by law, which shalllbe for all purposes valid and sufficient in itself, to include therein the list of the names of the apparent owners, and the descriptions of said abutting property'as setlout In said Director of Public Works' report, provided, however, that the said list of apparent owners and property descriptions so included in said Notice, shall merely be cumulative of and in addition to the requirements of said Notice as provided by the Laws of the State of Texas, and the Charter of the City of Corpus Christi, Texas, and shall not in any manner be conclusive of the real and true owners or of the correct descriptions of said abutting property nor limit said notice to the properties described or to such apparent owners named therein, but —10— a. said Notice shall nevertheless,be directed to the real and true owners of said abutting property, whether named or correctly named therein or not, and °to all' others claiming, owning; or interested in any manner in any of said abutting property on said streets within the limits above' defined.' SECTION 5. That following such hearing as above provided, assessments will be levied against said abutting property and the real and true owners thereof for that portion of the costs of said improvements hereinabove determined to be payable by said abutting property and the real and true owners thereof, and which assessment shall be a first and prior lien upon said abutting property and a personal liability and charge against the real and true owners thereof. In levying said assessments, if the name of the owner be unknown, it shall be sufficient to so state the fact, and if saidtabutting property be owned by an estate or by any firm or corporation, it shall be sufficient to so state the fact, and it shall not be necessary to give the correct name of any such owner, and no error or mistake in attempting to name any such owner or in describing any of said property shall invalidate any assessment or certificate issued in evidence thereof, but neverthe- less the real and true owner of said abutting property shall be liable and the ' assessment'against said property shall be valid whether or not such owner be named or correctly named, or said property correctly described. SECTION 6. The fact that Alameda Street, Avalon Street, Everhart Road, Robert Drive and Airline Road, within the limits above defined, are badly in need at this time of permanent street improvements, and the further fact that the present condition of said portions of said streets are dangerous to the health and public welfare of the inhabitants of the City of Corpus Christi, due to the conditions and increase of traffic along said portions of said streets creates a public emergency and public imperative necessity requiring the suspension of the Charter rule that no ordinance or resolution shall be passed finally on the date It is introduced and that'such ordinance or resolution shall be read at three several meetings of the City Council; and the Mayor having declared that such public emergency and imperative necessity exist, and having requested that such —11— Charter rule be suspended, and that this ordinance be passed finally on the date of its introduction and take effect and be in full force and effect from and after its passage, IT Is ACCOrMINGLY SO OFMAINFR. PASSED AM APPROVED this o` J day of � i , A. D • , 1959. ATTEST: eity 5 retary APPROVEI? As TO LEGAL FORM: O City 1 orney Mayor City of Corpus Christi,Texas -12- CORPUS CHRISTI,TEXAS % 1959 TO THE MEMBERS OF THE CITY COUNCIL CORPUS CHRISTI, TEXAS GENTLEMEN: FOR THE REASONS SET FORTH IN THE EMERGENCY CLAUSE OF THE FOREGOING ORDINANCE, A PUBLIC EMERGENCY AND IMPERATIVE NECESSITY EXIST FOR THE SUSPENSION OF THE CHARTER RULE OR REQUIREMENT THAT NO ORDINANCE SHALL BE PASSED FINALLY ON THE DATE IT IS INTRODUCED AND THAT SUCH ORDINANCE OR RESOLUTION SHALL BE READ AT THREE MEETINGS OF THE CITY COUNCIL; I, THEREFORE, HEREBY REQUEST THAT YOU SUSPEND SAID CHARTER RULE OR REQUIREMENT AND PASS THIS ORDINANCE FINALLY ON THE DATE IT IS INTRO - DUCEDI OR AT THE PRESENT MEETING OF THE CITY COUNCIL. RESPECTFULLY, MAYOR THE CITY OF CORPUS CHRISTI) TEXAS THE CHARTER RULE WAS SUSPENDED BY THE FOLLOOWIN,IG VOTE: FARRELL D. SMITH W. J. ROBERTS � -- -�l(J� B. E. BIGLER MANUEL P. MALDONADO CHARLIE J. J. RILLS / G ARTHUR R. JAMES- - - ---` ODELL INGLE THE ABOVE ORDINANCE WAS PASSED BY THE FOLLOWING VOTE: FARRELL D. SMITH W. J. ROBERTS B. E. BIGLER MANUEL P. MALDONADO Iy"J CHARLIE J. AILLS J ARTHUR R. JAMES ODELL INGLE f'