HomeMy WebLinkAbout09748 ORD - 05/13/1970BJW:5/13/70 TEXAS: AN ORDINANCE AUTHORIZING'THE ISSUANCE OF CHANGE ORDER NO. 1 IN THE AMOUNT OF $18,657.30 TO REDUCE SIZES AND GAGES OF CAS- INGS, ADDING ITEMS TO THE CONTRACT, REDUCING THE QUANTI- TIES ON CERTAIN ITEMS OF THE CONTRACT, PROVIDING STEEL WALL COLLARS ON STEEL PIPE, PROVIDING FLANGED ADAPTERS AND THICKENING WALLS OF VALVE VAULTS AT COLLARS, IN CONNECTION WITH THE LEOPARD STREET WATER TRANSMISSION LINE, ALL AS MORE FULLY DESCRIBED IN CHANGE ORDER NO.1, ATTACHED HERETO AND MADE A PART HEREOF; APPROPRIATING OUT OF NO. 202 WATER SYSTEM BOND FUND THE SUM OF $18,657.30 FOR PAYMENT OF CHANGE ORDER NO. 1 IN CONNEC- TION WITH PROJECT NO. 202 -68 -29.1, LEOPARD STREET WATER TRANSMISSION LINE; AND DECLARING AN EMERGENCY. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI, SECTION 1. AUTHORIZATION IS HEREBY GIVEN FOR THE ISSUANCE OF CHANGE ORDER N0. 1, IN THE AMOUNT OF $18,657.30 FOR THE REDUCTION OF SIZES AND GAGES OF CASINGS, ADDING ITEMS TO THE CONTRACT, REDUCING THE QUANTITIES ON CERTAIN ITEMS OF THE CONTRACT, PROVIDING STEEL WALL COLLARS ON STEEL PIPE, PROVIDING FLANGED ADAPTERS AND THICKENING WALLS OF VALVE VAULTS AT COLLARS, IN CONNECTION WITH THE LEOPARD STREET WATER TRANSMISSION LINE, PROJECT N0. 202 -68 -29.1. SECTION 2. THERE IS HEREBY APPROPRIATED OUT OF N0. 202 WATER SYSTEM BOND FUND THE SUM OF $18,657.30 FOR PAYMENT OF CHANGE ORDER NO. 1 OUTLINED ABOVE. SECTION 3. THE NECESSITY TO MAKE THE HEREINABOVE DESCRIBED APPROPRIATIONS AND TO AUTHORIZE THE CHANGE ORDER HEREIN SET FORTH SO THAT THE PROJECT MAY CONTINUE WITHOUT DELAY CREATES A PUBLIC EMERGENCY AND IM- PERATIVE PUBLIC NECESSITY REQUIRING THE SUSPENSION OF THE CHARTER RULE THAT NO ORDINANCE OR RESOLUTION SHALL BE PASSED FINALLY ON THE DATE OF ITS INTRODUCTION AND THAT SUCH ORDINANCE OR RESOLUTION SHALL BE READ AT THREE SEVERAL MEETINGS OF THE CITY COUNCIL, AND THE MAYOR HAVING DECLARED SUCH EMERGENCY AND NECESSITY TO EXIST, AND HAVING REQUESTED THE SUSPENSION OF THE CHARTER RULE AND THAT THIS ORDINANCE BE PASSED FINALLY ON THE DATE OF ITS INTRODUCTION AND TAKE EFFECT AND BE IN FULL FORCE AND EFFECT� FROM AND AFTER ITS PASSAGE, IT IS ACCORDINGLY SO ORDAINED, THIS THE /�T'v DAY OF MAY. 1970. ,y ATTEST - 0 THE CITY OF CORPUS CHRISTI, TEXAS CIT SECRET RY APPROVE OF MAY, 19 ITY ATTORNEY'p �'d QCs :hinge Order No. 1 CHANCE ORDER PUBLIC WORKS DEPARDfENT Engineering Division City of Corpus Christi, Texas Project No. 202 -68 -2901 )perating Department Water Date May 6, 1970 lame of Project LEOPARD STREET WATER TRANSMISSION LINE , ontractor BURTEX CONSTRUCTORS, INC. C i3A NCE 1, Reduce sizes and gages of casings as per attached, adding Pay Items 57 -61 incl, to contract, and reducing to zero the quantities on Pay Items 13 -16 Incl. 2. Provide steel wall collars on steel pipe as per attached list and Dwg. No, 6265C, adding Pay Items 63 -65 incl. to contract 3. Provide flanged adapters (Smith -Blair No, 913) as per attached list, adding Pay Item 62 to contract 4. Thicken walls of valve vaults at collars, Add: Item 24, 71 CY Class A Concrete @ $105, 00 Adds Item 25, 14.570 Lbs, Reinf. Steel @ $0.15 = Totals Net for this Change Order ADD DEDUCT 5,124.20 11,158.0( 2,983.00 7,455, 0 2,185.50 23, 781, 5 3,124.20 18, 657.3 any was this change necessary? (If left off the plans and specifications, explain why,) PP s were based on the use of DuctUe Pine. Contract was awarded on basis of steel pipe, This allows use of smaller casings but requires adapters for flexibility and wall collars and thicker v,a of vaults to esastt ®aspe.at,a�e- stresses. Sow can similar changes be avoided in the future? Include additional alternate items in plans and specifications 3ontract Price 30125,628.50 this Change Order + 18,,_657.30 Assistant Director of Public Works iew Contract Price '144-285-80 REAGAN & McCAUGHAN \mount Appropriated 3, 225, 000, 00 onsulting xStEngineer ,ITY OF CORPUS CHRISTI, TEXAS ay. Director of Public Works 1PPROVED City Manager City Attorney Director of Finance CONTRACTOR BURTEX CONSTRUC TORS, INC By— Cs Title Ager-��e.vr NOTE: Contractor, please sign one copy and return it to the Director of Public Works. CHANGE ORDER NO. 1 ESTIMATED COSTS FOR REVISIONS AT VALVE VAULTS New Item 62. Adapters 19 Ea. @ $157. 00 $ 2, 983. 00 New Item 63. Wall Collars on 36" Pipe, 6 Ea. @ $323. 00 1,938.00 New Item 64. Wall Collars on 4211 x 36" Reducers 5 Ea. @ $348. 00 1,740.00 New Item 65. Wall Collars on 48" x 36" Reducers 20 Ea. @ 374. 00 7,480.00 Not new Item. Concrete Class "A" 71 C. Y. @ $105. 00 7,455.00 Not new Item. Reinforcing Steel 14,570 Lbs. @ $0.15 2,185.50 CHANGE ORDER NO. 1 PROPOSED REVISIONS AT VALVE VAULTS' Note: D. S. designates downstream side or on side of increasing stationing. U.S. designates upstream side, or on side of decreasing stationing. - -- -Wall Collars--- - Line Approx. Valve Adapters Size Pipe Estimated Addn. No. Station Size No. Loca. No. Loca. or Reduc. Concrete Steel A 0+ 70 36" 0 1 DS 36" Pipe 2.3 470 A - 24" 0 0 0 0 A 19+ 45 36" 1 US 1 US 36" Pipe 2.3 470 B In Exist. Line 36" 0 0 0 0 B 0+ 11 36" 1 DS 1 DS 48" x 36" 2.3 470 B 9+ 20 36" 0 0 0 0 B 9+ 50 36" 0 0 0 0 B 55 + 80 36" 1 DS 1 DS 48" x 36" Z. 3 470 B 99+ 00 36" 1 DS 2 48" x 36" 4.6 940 B 148+ 20 36" 1 DS 2 48" x 36" 4.6 940 B 196 + 60 36" 1 DS 2 48" x 36" 4.6 940 B 250+ 72 36" 1 DS 2 48" x 36" 4.6 940 B 291 + 90 36" 1 US 2 48" x 36" 4.6 940 B 335 + 30 36" 1 DS 2 48" x 36" 4.6 940 B 391 + 05 36" 1 DS 2 48" x 36" 4.6 940 B 453 + 60 36" 1 DS 2 48" x 36" 4.6 940 B 512 + 55 36" 1 DS 2 48" x 36" 4.6 940 B 542+ 07 36" 1 DS 1 DS 42" x 36" Z. 3 470 C 1 + 37 36" 1 DS 1 DS 36" Pipe Z. 3 470 C 62+24 36" 1 DS 2 36" Pipe 4.6 940 C 112 + 40 36" 1 US 1 US 36" Pipe Z. 3 470 In Omaha 30" 0 0 0 0 In Omaha 30" 0 0 0 0 In Omaha 24" 0 0 0 0 D 53 + 10 36" 1 DS 2 42" x 36" 4. 6 940 D 81 + 57 36" 1 US 1 US 42" x 36" 2.3 470 Relocation 48" 36" 0 0 Relocation 48" 36" 0 0 D 0+ 30 36" 1 DS 1 DS 42" x 36" 2.3 470 Note: D. S. designates downstream side or on side of increasing stationing. U.S. designates upstream side, or on side of decreasing stationing. CHANGE ORDER NO. 1 PROPOSED CHANGES IN CASING SIZES AND GAGES --- - - - - -- Reduce Contract-- - - - - -- - - - - - -- -Add to Contract--- - - - - -- Reduc. Savings Starting Length Item Unit New Unit in Unit to Line Station (L. F. No. Size Gage & Type Price Item Size Gage & Type Price Price City B 14+ 06 90 13 72" 10 Ga. L. P. $97.00 57 60" 10 Ga. L. P. $91.50 $5. 50 $ 495.00 C 32+40 70 16 60" 12 Ga. L. P. 82.50 58 54" 12 Ga. L. P. 80. 00 2.50 175.00 C 33+ 57 140 16 60" 10 Ga. CMP 82.50 59 54" 10 Ga. CMP 80.70 1.80 252. 00 C 35+54 70 16 60" 12 Ga. L. P. 82. 50 58 54" 12 Ga. L. P. 80. 00 2.50 175.00 D 40+77 80 14 66" 10 Ga. CMP 69.50 61 54" 12 Ga. CMP 63, 10 6.40 512.00 D 42+79 83 14 66" 10 Ga. CMP 69.50 61 54" 12 Ga. CMP 63. 10 6.40 531. 20 D 44+20 130 15 66" 8 Ga. CMP 10 Ga. CMP in Open Cut 47.00 60 54" in Open Cut 43. 00 4.00 520. 00 D 53+ 53 35 14 66" 10 Ga. CMP 69.50 61 54" 12 Ga. CMP 63. 10 6.40 224. 00 D 54+20 60 14 66" 10 Ga. CMP 69.50 61 54" 12 Ga. CMP 63. 10 6.40 384.00 D 55+ 00 120 14 66" 10 Ga. CMP 69.50 61 54" 12 Ga. CMP 63, 10 6.40 768.00 D 56+ 50 40 14 66" 10 Ga. CMP 69.50 61 54" 12 Ga. CMP 63. 10 6.40 256. 00 D 62+64 ' 130 14 66" 10 Ga. CMP 69.50 61 54" 12 Ga. CMP 63. 10 6.40 832, 00 $5, 124, 20 NOTES: (1) This Change eliminates Pay Items 13 -16 incl. and adds Pay Items 57 -61 inclusive. (2) Casings on Lines C & D are all in or crossing Padre Island Drive and the new sizes and gages have been approved by the State Highway Department provided the water lines are installed at the same flow line elevations as proposed, except that the casing on Line C starting at Station 33 + 57 shall be laid level with the top of the casing at Elevation 20. 5 or below. Casing on Line B is at Missouri Pacific Railroad Crossing. CITY OF CORPUS CHRISTI, TEXAS ' CERTIFICATION of FUNDS (City Charter Article IV Section 21) May 8, 1970 I certify to the City Council that $ , 18,658. , the amount required for the contract, agreement, obligation or expenditures contemplated in the above and foregoing ordinance is in the Treasury of the City of Corpus Christi to the credit of; Fund No. and Name 202 Water System Bond Fund Project No. 202 -68 -29.1 Project Name 1+8" Transmission Main from Calallen from which it is proposed to be drawn, and such money is not appropriated for any other purpose. FIN 2 -55 Revised 7 -31 -69 Direct or Finance Corpus Christi, Texas �- day of 1�® TO THE MEMBERS OF THE CITY COUNCIL Corpus Christi, Texas For the reasons set forth in the emergency clause of the foregoing ordinance, a public emergency and imperative necessity exist for the suspen- sion of the Charter rule or requirement that no ordinance or resolution shall be passed finally on the date it is introduced, and that such ordinance or resolution shall be read at three meetings of the City Council; I, therefore, request that you suspend said Charter rule or requirement and pass this ordi- nance finally on the date it is introduced, or at the present meeting of the City Council. Respectfully, MAYOR THE CITY OF CORPUS CHRISTI, TEXAS The Charter rule was suspended by the following vote: Jack R. Blackmon Gabe Lozano, Sr. V. A. "Dick "Bradley. Jr. Eduardo E. de Ases Ken McDaniel W. J. "Wrangler" Roberts Ronnie Sizemore The above ordinance was passed by the following vote: Jack R. Blackmon Gabe Lozano, Sr. V. A, "Dick" Bradley, Jr. Eduardo E. de Ases Ken McDaniel W. J. " Wrangler" Roberts r Ronnie Sizemore Cc- ��yler r: