HomeMy WebLinkAbout15888 ORD - 11/19/1980jkh:11-19-80;lst
J
AN ORDINANCE
AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER
NO. 3 TO THE CONTRACT WITH M & M CONSTRUCTION COMPANY
FOR CONSTRUCTION OF THE PARKING LOT AND ACCESS ROAD AT
THE CORPUS CHRISTI INTERNATIONAL AIRPORT WHICH PROVIDE
FOR TWO HEADWALLS AND A CONCRETE FLUME ALONG THE ACCESS
ROAD, A COPY OF WHICH CHANGE ORDER IS ATTACHED HERETO
AND MADE A PART HEREOF, MARKED EXHIBIT "A"; APPROPRIATING
$2,500 OUT OF THE NO. 245 AIRPORT BOND FUND APPLICABLE TO
PROJECT NO. 245-77-2, MAIN PARKING LOT EXPANSION AND
ACCESS ROAD CONSTRUCTION (FAA PROJECT NO. ADAP6-48-0051-6);
AND DECLARING AN EMERGENCY.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI,
TEXAS:
SECTION 1. That the City Manager be and he is hereby authorized
to execute Change Order No. 3 to the contract with M & M Construction Company
for construction of the parking lot and access road at the Corpus Christi
International Airport which provides for two headwalls and a concrete flume
along the access road, a substantial copy of which Change Order No. 3 is
attached hereto and made a part hereof, marked Exhibit "A".
SECTION 2. That there is hereby appropriated out of the No. 245
Airport Bond Fund the sum of $2,500 applicable to Project No. 245-77-2,
Main Parking Lot Expansion and Access Road Construction (FAA Project No.
ADAP 6-48-0051-6).
SECTION 3. The necessity to authorize execution of the aforesaid
change order and the appropriation of said sums at the earliest practicable
date creates a public emergency and an imperative public necessity requiring
the suspension of the Charter rule that no ordinance or resolution shall be
passed finally on the date of its introduction but that such ordinance or
resolution shall be read at three several meetings of the City Council, and
the Mayor having declared that such emergency and necessity exist, having
requested the suspension of the Charter rule and that this ordinance be passed
finally on the date of its introduction and take effect and be in full force
and effect from and after its passage, IT IS ACCORDINGLY SO ORDAINED, this the
19 day of November, 1980.
ATTEST:
City" Secretary "
APPROVED: /� A990
J. BRUCE YC CK, CITY TOR(IEY
By
Assistant City / ney
15888
ITY OF CORPUS CHRISTI, TEXAS
MIC
SEP 2 71,984
CITY OF CORPUS CHRISTI, TEXAS
CERTIFICATION OF FUNDS
(City Charter Article IV Section 21)
November 12, 1980
I certify to the City Council that $ $2,500 , the amount required for
the contract, agreement, obligation or expenditures contemplated in the above
and foregoing ordinance is in the Treasury of the City of Corpus Christi to the
credit of:
Fund No. and Name
Project No.
No. 245 Airport Bond Fund
245-77-2
Project Name Main Parking Lot Expansion and Access Road
Construction
from which it is proposed to be drawn, and such money is not appropriated for any
other purpose.
O /s -o 74.4 /9 , 19Fa
Pe 1p
FIN 2-55
Revised 7/31/69
CHANGE ORDER
Engineering and Physical Development
City of Corpus Christi, Texas
Change Order No. 3 Project No.
Operating Department Airport Date October 22, 1980
Name of Project Parking Lot and Access Road
Contractor M & M Construction Company
CHANGE
Construct a T.H.D. CH -11 Type A
headwall at each end of the 18" 0
R.C.P. culvert beneath the road to
Dot Helicopter. Construct a con-
crete flume on the north side of
the culvert (see attached drawing).
ADD DEDUCT
$2,500.00
Why was this change necessary? (If left off the plans and specifications, explain why.)
Required to correct an erosion problem.
How can similar changes be avoided in the future?
Contract Price $774,813.87
This Change Order 2,500.00 -greg,c)�MLd-
New Contract Price 777,313.87 /� Construction Engineer
Funds Available Roge'14 Gras, P.E.
Lockwood, Andrews & Newnam, Inc.
:ITT ' US CHRISTI, T kAS L CONTRACTOR
By ct rl o71,7 n Edgine in & By
Physical Development
Title
OVER
City Manager
City Attorney
Director of Finance
Rev. 3/74
PROPOSED
(HOWL T.H.D.
! CH -11 TYPEA
18" RCP
A41
2o'
20'
le." RAP
�. 4'-o.
A J
PLAN
SCALE VV. p -o*
EL. 39.50
PROPOSED
FLUME
4'-O"
DOWEL FLUME
TO HEADWALL
EXIST. DITGH
EL. 3v.t o
ELEVATION
SECTION A- A
lQ1 l
Lockwood, Andrews
& Newnam, Inc.
Ergineenng-A cMtecture-Planning•Project Management
HEADWALLS AND FLUME
ACCESS ROAD
CORPUS CI-1R1ST‘ AIRPORT
Scale: A-$ SNOW N 10510: 10- SO J Drawn by: (..,\/1- 1 Checked by: 13 4 1 Approved by R Proj. no. t3- 3-010-000
Corpus Christ', Texas
iq dayo
TO THE MEMBERS OF THE CITY COUNCIL
Corpus Christi, Texas
For the reasons set forth in the emergency clause of the foregoing ordinance, a
public emergency and imperative necessity exist for the suspension of the Charter
rule or requirement that no ordinance or resolution shall be passed finally on
the date it is introduced, and that such ordinance or resolution shall be read
at three meetings of the City Council; I, therefore, request that you suspend
said Charter rule or requirement and pass this ordinance finally,on the date it
is introduced, or at the present meeting of the City Council.
Respectfully,
MAY
THE CI OF CORPUS CHRISTI, TEXAS
The Charter rule was suspend by the following vote:
Luther Jones
Edward L. Sample1j ,
Dr. Jack Best
David Diaz
Jack K. Dumphy
Betty N. Turner 1.
Cliff Zarsky
The above ordinance was pass_d by the following vote:
Luther Jones
Edward L. Sample
Dr. Jack Best
David Diaz
Jack K. Dumphy
Betty N. Turner
Cliff Zarsky
15888