HomeMy WebLinkAbout16108 ORD - 03/11/1981AN ORDINANCE
AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 1
TO THE CONTRACT WITH B & E CONSTRUCTION COMPANY FOR IMPROVE-
MENTS TO TIMBERGROVE LANE WHICH PROVIDES FOR THE EXTENSION
OF WHITE OAK AND BIRDWOOD LANES; APPROPRIATING $8,354.23 OUT
OF THE NO. 220 STREET BOND FUND APPLICABLE TO PROJECT NO.
220-77-2.18, TIMBERGROVE LAND IMPROVEMENTS; AND DECLARING
AN EMERGENCY.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI,
TEXAS:
SECTION 1. That the City Manager be and he is hereby authorized to
execute Change Order No. 1 to the contract with B & E Construction Company for
improvements to Timbergrove Lane which provides for the extension of White Oak
and Birdwood Lanes, all as more fully set forth in said Change Order, a sub-
stantial copy of which is attached hereto and made a part hereof, marked Exhibit
SECTION 2. That there is hereby appropriated out of the No. 220 Street
Bond Fund the sum of $8,354.23 applicable to Project No. 220-77-2.18, Timbergrove
Lane Improvements.
SECTION 3. The necessity to authorize execution of the aforesaid change
order and the appropriation of said sums at the earliest practicable date creates
a public emergency and an imperative public necessity requiring the suspension of
the Charter rule that no ordinance or resolution shall be passed finally on the
date of its introduction but that such ordinance or resolution shall be read at
three several meetings of the City Council, and the Mayor, having declared that
such emergency and necessity exist, having requested the suspension of the Charter
rule and that this ordinance be passed finally on the date of its introduction and
take effect and be in full force and effect from and after its passage, IT IS
ACCORDINGLY SO ORDAINED, this the /% day of March, 1981.
ATTEST:
APPROVED // DAY OF MARCH, 1981:
J. BRUCE AYCOCK, CITY ATTORNEY
MAYOR
THE TY OF CORPUS CHRISTI, TEXAS
ns
,SEP Z7 1984
CITY OF CORPUS CHRISTI, TEXAS
CERTIFICATION OF FUNDS
(City Charter Article IV Section 21)
March 6, 1981
I certify to the City Council that $ 8,35+•23
, the amount required for
the contract, agreement, obligation or expenditures contemplated in the above
and foregoing ordinance is in the Treasury of the City of Corpus Christi to the
credit of:
Fund No. and Name No. 220 Street Bond Fund
Project No.
220-77-2.18
Project Name
Timbergrove Lane Improvements
fxvm which it is proposed to be drawn, and such Honey is not appropriated for any
other purpose.
FIN 2-55
Revised 7/31/69
g_A---'I„ /, 19,p/
TO THE MEMBERS OF THE CITY COUNCIL
Corpus Christi, Texas
For the reasons set forth in the emergency clause of the foregoing ordinance, a
public emergency and imperative necessity exist for the suspension of the Charter
rule or requirement that no ordinance or resolution shall be passed finally on
the date it is introduced, and that such ordinance or resolution shall be read
at three meetings of the City Council; I, therefore, request that you suspend
said Charter rule or requirement and pass this ordinance finally,on the date it
is introduced, or at the present meetingof the City Council.
Respectfully,
MAYOR
THE CIT F CORPUS CHRISTI, TEXAS
The Charter rule was suspende, by the following vote:
Luther Jones
Edward L. Sample
Dr. Jack Best
Jack K,: -Dumphy
Leopoldo Luna
Betty N.' Turner
Cliff Zarsky
The above ordinance
Luther Jones
Edward L. Sample
Dr. Jack Best
Jack K. Dumphy
Leopoldo Luna.
Betty N. Turner
Cliff Zarsky
was
passed by
the
following
vote:
CHANGE ORDER
Engineering and Physical Development
City of Corpus Christi, Texas
Change Order No.
Operating Department Engineering and Physical Dev,.
Name of Project Timbergrove Lane Street Improvements
Contractor
Project No.
220-77-2.18
Date February 23; 1981
B & E Construction
Unit
Bid Item Description Unit Birdwood White Oak Cost Add
1. Street Excavation SY 244.6 i- 110.5 @ $3.60 $1,278.36
2. 8" Base Caliche SY 244_6 `-L 110.5 @ 6.00 2,130.60
3. 12" Type 'D' Hot Mix • SY 202.4 - 91.4 @ 3.70 1,087.06
4. Prime Coat GAL 30.4 1 13.7 @ 1.00 44.10
5. 6" Std. & Reverse
Curb & Gutter LF 151.}- --,-- 68.6 @ 6.50 1,432.60
6. Concrete Sidewalk SF 607-2 ÷ 274.2 @ 1.90 1,674.66
7. Concrete Driveway SF - 117.3 @ 2.64 310.85
SUBTOTAL $7,958.23
12. 18" R.C.P._at
Fleetwood LF 24 @- 16.50 396.00
TOTAL $8,354.23
Why was this change necessary? (If left -off the plans and specifications, explain why.)
Length of pavement curb and gutter and sidewalk was increased at the request of abutting
property owners. Eighteen inch R.C.P. at Fleetwoodis-requiredto intercept -ditch flow which
cannot be diverted into inlets by overland flow.
How can similar changes be avoided in the future?,
Contract Price $206,998.00
This Change Order.
New Contract Price
Funds Available
8,354.23
215,352.23 Construction Engineer
CITY OF CORPUS CHRISTI, TEXAS
By
Director of Engineering & Physical Development
APPROVED
City Manager
City Attorney
Director of Finance
CONTRACTOR
By
Title
I1 — Timbergra e Larne
2"G
f8
2"G
Curb Inlet
T C. 68.00
Inv. C.3.53
Prop. IB" C 1?
Pitch Interceptor
Inv. D.S-=63.70
Inv. U. 5,-. Ft
Minus O.
Curb Inlet
T. C.. C923.00
Inv. G..3_35
k'egrade Around Prop.
18" K.. c. r. on 3oth
Sides of Streef
Prop_ 18" 12.C.P
Ditch Interceptor
Inv. 1D.5_, C'3.50
tiJ Inv. i1. 5- = [ Ditch
Minus 0.5'
G I-IAMGE ORDER 01
EXHIBIT "A"
TIMBERGKOVE LAAJE
STREET IMPROVEMENTS