HomeMy WebLinkAbout16108 ORD - 03/11/1981AN ORDINANCE AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 1 TO THE CONTRACT WITH B & E CONSTRUCTION COMPANY FOR IMPROVE- MENTS TO TIMBERGROVE LANE WHICH PROVIDES FOR THE EXTENSION OF WHITE OAK AND BIRDWOOD LANES; APPROPRIATING $8,354.23 OUT OF THE NO. 220 STREET BOND FUND APPLICABLE TO PROJECT NO. 220-77-2.18, TIMBERGROVE LAND IMPROVEMENTS; AND DECLARING AN EMERGENCY. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI, TEXAS: SECTION 1. That the City Manager be and he is hereby authorized to execute Change Order No. 1 to the contract with B & E Construction Company for improvements to Timbergrove Lane which provides for the extension of White Oak and Birdwood Lanes, all as more fully set forth in said Change Order, a sub- stantial copy of which is attached hereto and made a part hereof, marked Exhibit SECTION 2. That there is hereby appropriated out of the No. 220 Street Bond Fund the sum of $8,354.23 applicable to Project No. 220-77-2.18, Timbergrove Lane Improvements. SECTION 3. The necessity to authorize execution of the aforesaid change order and the appropriation of said sums at the earliest practicable date creates a public emergency and an imperative public necessity requiring the suspension of the Charter rule that no ordinance or resolution shall be passed finally on the date of its introduction but that such ordinance or resolution shall be read at three several meetings of the City Council, and the Mayor, having declared that such emergency and necessity exist, having requested the suspension of the Charter rule and that this ordinance be passed finally on the date of its introduction and take effect and be in full force and effect from and after its passage, IT IS ACCORDINGLY SO ORDAINED, this the /% day of March, 1981. ATTEST: APPROVED // DAY OF MARCH, 1981: J. BRUCE AYCOCK, CITY ATTORNEY MAYOR THE TY OF CORPUS CHRISTI, TEXAS ns ,SEP Z7 1984 CITY OF CORPUS CHRISTI, TEXAS CERTIFICATION OF FUNDS (City Charter Article IV Section 21) March 6, 1981 I certify to the City Council that $ 8,35+•23 , the amount required for the contract, agreement, obligation or expenditures contemplated in the above and foregoing ordinance is in the Treasury of the City of Corpus Christi to the credit of: Fund No. and Name No. 220 Street Bond Fund Project No. 220-77-2.18 Project Name Timbergrove Lane Improvements fxvm which it is proposed to be drawn, and such Honey is not appropriated for any other purpose. FIN 2-55 Revised 7/31/69 g_A---'I„ /, 19,p/ TO THE MEMBERS OF THE CITY COUNCIL Corpus Christi, Texas For the reasons set forth in the emergency clause of the foregoing ordinance, a public emergency and imperative necessity exist for the suspension of the Charter rule or requirement that no ordinance or resolution shall be passed finally on the date it is introduced, and that such ordinance or resolution shall be read at three meetings of the City Council; I, therefore, request that you suspend said Charter rule or requirement and pass this ordinance finally,on the date it is introduced, or at the present meetingof the City Council. Respectfully, MAYOR THE CIT F CORPUS CHRISTI, TEXAS The Charter rule was suspende, by the following vote: Luther Jones Edward L. Sample Dr. Jack Best Jack K,: -Dumphy Leopoldo Luna Betty N.' Turner Cliff Zarsky The above ordinance Luther Jones Edward L. Sample Dr. Jack Best Jack K. Dumphy Leopoldo Luna. Betty N. Turner Cliff Zarsky was passed by the following vote: CHANGE ORDER Engineering and Physical Development City of Corpus Christi, Texas Change Order No. Operating Department Engineering and Physical Dev,. Name of Project Timbergrove Lane Street Improvements Contractor Project No. 220-77-2.18 Date February 23; 1981 B & E Construction Unit Bid Item Description Unit Birdwood White Oak Cost Add 1. Street Excavation SY 244.6 i- 110.5 @ $3.60 $1,278.36 2. 8" Base Caliche SY 244_6 `-L 110.5 @ 6.00 2,130.60 3. 12" Type 'D' Hot Mix • SY 202.4 - 91.4 @ 3.70 1,087.06 4. Prime Coat GAL 30.4 1 13.7 @ 1.00 44.10 5. 6" Std. & Reverse Curb & Gutter LF 151.}- --,-- 68.6 @ 6.50 1,432.60 6. Concrete Sidewalk SF 607-2 ÷ 274.2 @ 1.90 1,674.66 7. Concrete Driveway SF - 117.3 @ 2.64 310.85 SUBTOTAL $7,958.23 12. 18" R.C.P._at Fleetwood LF 24 @- 16.50 396.00 TOTAL $8,354.23 Why was this change necessary? (If left -off the plans and specifications, explain why.) Length of pavement curb and gutter and sidewalk was increased at the request of abutting property owners. Eighteen inch R.C.P. at Fleetwoodis-requiredto intercept -ditch flow which cannot be diverted into inlets by overland flow. How can similar changes be avoided in the future?, Contract Price $206,998.00 This Change Order. New Contract Price Funds Available 8,354.23 215,352.23 Construction Engineer CITY OF CORPUS CHRISTI, TEXAS By Director of Engineering & Physical Development APPROVED City Manager City Attorney Director of Finance CONTRACTOR By Title I1 — Timbergra e Larne 2"G f8 2"G Curb Inlet T C. 68.00 Inv. C.3.53 Prop. IB" C 1? Pitch Interceptor Inv. D.S-=63.70 Inv. U. 5,-. Ft Minus O. Curb Inlet T. C.. C923.00 Inv. G..3_35 k'egrade Around Prop. 18" K.. c. r. on 3oth Sides of Streef Prop_ 18" 12.C.P Ditch Interceptor Inv. 1D.5_, C'3.50 tiJ Inv. i1. 5- = [ Ditch Minus 0.5' G I-IAMGE ORDER 01 EXHIBIT "A" TIMBERGKOVE LAAJE STREET IMPROVEMENTS Scat¢: t 20' \\'‘ i 14. k<I'l ,\:. - 1.‘ &: r 1 1, Z ,trC:4