HomeMy WebLinkAbout17697 ORD - 07/13/1983TEXAS: AN ORDINANCE APPROPRIATING $197,547.24 TO SUPPLEMENT $114,402.04 REMAINING FROM EXISTING CONTINGENCY APPROPRIATIONS TO VARIOUS PROJECTS AS SHOWN ON EXHIBITS "A" AND "B"; AUTHORIZING A REIMBURSEMENT OF $311,949.28 TO THE NO. 102 GENERAL FUND FOR ENGINEERING SERVICES; AND DECLARING AN EMERGENCY. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI, SECTION 1. That there is hereby appropriated $197,547.24 as follows: $ 11,593.73 out of the No. 209 Community Convention Bond Fund 133,194.73 out of the No. 220 Street Bond Fund 464.37 out of the No. 250 Sanitary Sewer Bond Fund 2,083.83 out of the No. 260 Fire Station Bond Fund 102.62 out of the No. 266 Police Bldg. Bond Fund 12,592.65 out of the No. 291 Park Bond Fund 647.97 out of the No. 295 Storm Sewer Bond Fund 3,534.12 out of the No. 152 Federal/States Grant Fund Activity 807.04, Code 502 6,185.50 out of the No. 152 Federal/States Grant Fund Activity 807.05, Code 502 27,147.72 out of the No. 152 Federal/States Grant Fund Activity 807.06, Code 502 to supplement $114,402.04 remaining from existing contingency appropriations to various projects as shown on the tabulations marked Exhibits "A" and "B", copies of which are attached hereto and made a part hereof. SECTION 2. That there is hereby authorized a reimbursement of $311,949.28 to the No. 102 General Fund for engineering services provided during February, March, and April, 1983 (third quarter). SECTION 3. That upon written request of the Mayor or five Council members, copy attached, to find and declare an emergency due to the need for c. efficient and effective administration of City affairs by appropriating the aforementioned amounts, such finding of an emergency is made and declared requiring suspension of the Charter rule as to consideration and voting upon ordinances or resolutions at three regular meetings so that this ordinance is 17697 SEP 2 81984 MICROFILMED passed and shall take effect upon first reading as an emergency measure this the 13th day of July, 1983. ATTEST: y Secretary MAYOR THE Y OF CORPUS CHRISTI, TEXAS APPROVED: (. DAY OF JULY, 1983 ENGINEERING REIMIBURSEMF.NTS FROM ROND FUND PROJECTS P00011A4,, MARCH AND AP1711., 1983 EXHIBIT °An PROJECT PAVING DESIGN SURVEY CONST. 1150 ACQ. SURD. OVERHEAD NO. PROJECT NAME 517.12 517.21 517.22 517.23 517.31 517.32 SUBTOTAL 475 TOTAL CONTINGENCY ALLOC. APPRO. 205 n.7ater System Bond Construction Fund 81-1 . 0. N. Stevens Plant -Expansion 6,677.39 6,677.39 3,138.37 9,815.76 9,815.76 81-5 Baldwin Blvd. Water Line 965.29 75.58 4 116 87 5,157.74 2,424.14 7,581.88 7,581.88 SUBTOTAL 205 965.29 75.58 10,794.26 11,835.13 5.562.51 17,397.64 17,397.64 ' -OVERHEAD 453.69 35.52 5,073.30 5,562.51 TOTAL 205 1,418.98 111.10 15,867.56 17,397.64 209 Community Convention Bond Fund 76.1.6 Convention Center Drainage Improvements 4.132.81 3,754.08 SUBTOTAL 209 4,132.81 3,754.08 OVERHEAD 1,942.42 1.764.42 TOTAL 209 6 075.23 5 518.50 7,886.89 3,706.84 11,593./3 7,886.89 3,706.84 11,593.73 3,/06.84 11,593.73 11,593.03 11,593.73 220 Street Bond Fund 77-2.14 Tracy Addition Street Improvements 2,955.83 2,234.78 13,402.21 77-2.15 Spohn Hospital Area Street Improvements 5,891.46 180.97 10,745.77 12,496.64 77-2.21 Bali Drive Street Improvements 1,310.88 2,913.49 4,848.67 77-2.23 Washington/Coles Phase III 926.64 77-10 Horne Rd: Columbia to Old Brownsville Rd. 1,483.91 77-11 Airline Rd: Williams to Holly Road 2,298.54 77-13 Ca1a11en Drive 69.81 77-14 McArdle Road: Ayers/Carroll Lane. 2,367.45 82-1 Tiger Lane: Weber/Flynn Parkway 124.04 82-2 Purdue Road: Waldron/Laguna Shore 2,526.21 205.18 203.74 82-7.1 Alameda/Woodlawn Estates 1,833.23 18,882.48 5,053.57 200.77 82-7.2 Glenmere: Ocean to Kentnor - 796.18 109.90 299.10 69.81 99.23 82-7.3 Leopard/Baldwin Arca 3,185.93 236.20 82-7.4 Lexington Center 23.62 82-7.5 Annaville Area No. 1 153.53 1,786.72 82-7.6 SPID - Ayers Area 135.00 3,724.23 941.59 82-7.7 Annavllle Area No. 2 5,037.79 82-7.8 Cole Street 32.16 82-7.10 Mc(orton Arca 1,846.94 69.81 82-7.11 Koolside Area 4,582.00 82-7.16 Clemmer/Nemee/Dillion 958.76 438.40 82-7.17 Dalraidx 723.89 82-7.18 Hollywood Terrace 248.01 82-12 .St. Peter Half Street Perk Paving 47.24 283.92 1,251.74 SUBTOTAL 220 16,705.03 33,819.39 35,497.47 32,138.80 2,077.20 _ • OVERHEAD 7,851.37 15,895.12 16,683.81 15,105.27 976.28 TOTAL 220 24,556.40 49,714.51 52,181.28 47 244.15 1 053.48 245 ' Airport Bond Fund 77-9, Romp Expansion/Safety Zone SUBTOTAL 245 OVERHEAD TOTAL 245 18,592.82 8,/38.63 27,331.45 27,331.45 29,314.84 13,777.98 43.092.82 43,092.82 43,092.82 9,073.04 4,264.33 13,337.37 9,155.77 4,181.60 4,181.60 926.64 435.52 1,362.16 1,362.16 1,483.91 697.44 2,181.35 2,181.35 2,181.35 2,298.54 1,080.31 3,378.85 3,378.85 69.81 32.81 102.62 102.62 2,367.45 1,112.70 3,480.15 3,480.15 124.04 58.30 182.34 182.34 2,935.13 1.379.51 4,314.64 4,314.64 25,970.05 12.205.92 38,175.97 38,175.97 38,175.97 1,374.22 645.88 2,020.10 2,020.10 3,422.13 1,608.40 5,030.53 5,030.53 23.62 11.10 34.72 34.72 1,940.25 911.92 2.852.17 2,852.17 4,800.82 2,256.39 7,057.21 7,057.21 5,037.79 2,367.76 7,405.55 7,405.55 32.16 15.12 47.28 47.28 1,916.75 900.87 2,817.62 2,817.62 4,582.00 2,153.54 6,735.54 6,735.54 1,397.16 656.67 2,053.83 2,053.83 723.89 340.23 1,064.12 1,064.12 248.01 116.56 364.57 364.57 1,582.90 743.96 2,326.86 2,326.86 120,237.97 56,511.85 176,749.82 43,555.09 87.631.74 133,194.73 56,511.85 176,749.82 107.00 4.295.83 4,402.83 2,069.33 6,472.16 6,472.16 107.00 4,295.83 4,402.83 2,060.33 6,472.16 6,472.16 50.29 2,019.04 2,069.33 157.29 6,314.07 6,472.16 250 Sanitary Sewer Bond Fund 77-12 Brookhaven/Five Points Phase II 157.27 4,024.35 2,593.56 77-14 Wastewater Maintenance Building 169.69 1,166.82 77-44 Ret10 Drive San. Sewer 52.08 263.82 82-6 S. 0807700 Phase I 1,551.55 1,046.60 1,114.91 1,154.46 SUBTOTAL 250 1,760.90 5,504.37 4,877.09 7,154.46 OVERHEAD 827.62 2,587.05 2,292.23 542.60 10111. 250 2,588.52 8,091.42 7,169.11 1.697.06 6,775.18 1,338.22 315.90 4,067.52 13,296.82 6,249.50 19,546.32 3,184.34 628.96 148.47 2.287.73 6,249.50 9,959.52 9,959.52 1,967.18 1,967.18 464.37 464.37 7,155.25 7,155.25 19,546.32 19,081.95 464,37 ENGINEERING REIMBURSEMENTS FROM BOND FUND PROJECTS FEBRUARY. MARCH AND APRIL, 1983 PAGE 2 PROJECT • PAVING DESIGN SURVEY CONST. LAND ACQ. SU011. OVERHEAD N0. PR07ECT NAME 517.12 517.21 517.22 517.23 517.31 517.32 SUBTOTAL 478 TOTAL CONTINGENCY AI.I.00. APPRO. • 260 Fire Station Bond Fund 659.28 640.19 82-2• give Points Fire Station 659.28 640.19 SUBTOTAL 260 OVERHEAD 309.86 300.89 TOTAL 260 969.14 941.08 118.10 1,417.57 666.26 2,083.83 2,083.83 118.10 1,417.57 666.26 2,083.83 55.51 666.26 173.61 2,083.83 264 Municipal Service Center Bond Fund 94.02 1,052.62 72-2 Heavy Equipment Building 94.02 1,052.62 SUBTOTAL 264 44.19 494.73 OVERHEAD TOTAL 264 138.21 1,547.35 266 Police Building Bond Fund 77-1 Construction of Additional Space SUBTOTAL 266 OVERHEAD - TOTAL 266 1,146.64 1,146.64 538.92 1,885.56 538.92 1,685.56 1,685.56 538.92 1,685.56 1,685.56 69.81 69.81 32.81 102.62 1U2.62 69.81 32.81 102.62 102.62 69.81 32.81 102.62 32.81 291 Park Bond Fund 1,776.37 1,619.66 77-2.1 Surfside Park Parking Lot575.25 873.17 77-3.2 Bayfront Parks (Hurricane Allen) 75.25 1,227.38 77-6 Park Maintenance Building 3,265.43 77-7.3 Calallen H.S./Parker Park 5,170.40 82-6 St. Andrews Park SUBTOTAL 291 6,946.77 2,278.25 5,365.98 OVERHEAD 3,266.98 1,070.78 2.522.01 TOTAL 291 10,211.75 3.349.03 7,887.99 295 Storm Sewer Bond Fund 70-66 Staples/Wooldridge Outfall 562.03 460.57 69.80 77-5 Las Palmas: Laguna Shore to Madre 104.71 77-6 Glenoak Drive Extension 133.59 679.37 684.23 82-1 Clarkwood Drainage Laterals 180.97 82-6 Minor Storm Sewers 189 97 82-7 Flynn Parkway SUBTOTAL 295 1,136.41 1,139.94 858.74 00E011140 534.11 535.77 403.61 TOTAL 295 1,670.52 1,675.71 1,262.35 - SUBTOTAL ALL BOND FUNDS OVERIIEAD ALL BOND FUNDS TOTAL ALL BON0 FUNDS 16,705.03 7,851.37 24,556.40 45,288.04 21,285.38 66,573.42 49,469.63 23.250.72 72,720.35 63,207.29 29,707.42 92,914.71 3,396.03 1,448.42 1,310.72 3,265.43 5,170.40 14,591.00 6,857.77 21.448.77 1,596.13 4,992.16 4,992.16 4,992.16 680.76 2,129.18 2,129.18 616.04 1,926.76 1,926.76 1,534.75 4,800.18 4,800.18 7,600.49 2.430.09 7,600.49 6,857.77 21,448.77 8,856.12 4,992.16 12,592.65 193.12 193.12 90./7 283.89 283.89 1,092.40 513.43 1,605.83 1,605.83 104.71 49.21 153.92 153.92 1,497.19 703.67 2.200.86 2,200.86 266.03 180.97 85.06 266.03 381.94 259.82 122.12 381.94 647.97 193.12 3,328.21 1,564.26 4,892.47 4,244.50 90.77 1,564.26 283.89 4,892.47 178,212.87 83,160.05 261,972.92 101,293.02 104,217.63 160,679.90 83,760.05 261,972.92 .1,542.88 1,665.16 5,208.04 PROJECT • 110. PROJECT NAME • ENGINEERING REIMBURSEMENT FROM COMMUNITY DEVELOPMENT BLOCK GRANT PROJECTS PAGE 3 FEBRUARY, MARCH AND APRIL, 1983 PAVING DESIGN SURVEY CONS!. 1.AN11 ACQ. 5000. 090011EAD 517.12 517.21 517.22 517.23 517.31 517.32 SUBTOTAL 4$2 TOTAL CONTINGENCY ALLO APPRO. 6th SEAR PROGRAM 162-152-807.04-502 Main Drive Drainage 2.109.65 294.51 2,404.16 1,129.96 3.534.12 SUBTOTAL 618 YEAR 2,109.65 294.51 2,404.16 1,129.96 3,534.12 OVERHEAD 991.54 138.42 1,129.96 TOTAL 6TH YEAR 3.101.19 432.93 3.534.12 7th YEAR PROGRAM 3.534.12 162-152-807.05-502 Greenwood Park Grade and F111 648.49 648.49 304.79 953.28 Pedestrian Crossing Peoples/Shoreline 826.33 826.33 388.38 1,214.71 Portable Classrooms NCCM 654.20 189.88 347.16 1,191.24 559.88 1,751.12 1,751.12 Timon/Surfside Connection 1,980.60 206.62 545.78 2,733.00 1,284.51 4,017.51 Water Distribution System (HU Park Area) 1,624.76 1,927.13 3,057.72 6,609.61 3,106.52 9,716.13 9,716.13 SUBTOTAL 7114 YEAR 5,734.38 396.50 2,274.29 3,603.50 12,008.67 5,644.08 17,652.75 11,467.25 OVERHEAD 2,695.15 186.36 1,068.92 1,693.65 5,644.08 TOTAL 7TH YEAR 8,429.53 582.86 3,343.21 5,297.15 17,652.75 6th YEAR PROGRAM 162-152-807.06-502 Broadmoor Park III Storm Sever 1,879.29 421.50 Turman School Phase 1 4,418.28 George Evans School Phase 1 33.75 8,479.26 447.05 Spohn Arca Streets Phase 11 67.50 2,147.66 483.55 Zavala Center Expansion 860.59 SUBTOTAL BTB YEAR 101.25 17,785.08 1,352.10 OVERHEAD 47.58 8,358.99 635.49 TOTAL 8TH YEAR 148.83 26,144.07 1,987.59 SUBTOTAL ALL 0011G OVERHEAD ALL C000 'TOTAL ALL COW 256.26 256.26 120.44 376.70 90.00 90.00 42.30 132.30 2,300.79 4,418.28 9,050.06 2,698.71 1,116.85 19,584.69 9.204.80 28,789.49 1,081.37 2,076.59 4,253.53 1,268.39 524.92 9,204.80 3,382.16 6,494.87 13,303.59 3,967.10 1,641.77 28,789.49 953.28 1,214.71 4,017.51 6,185.50 3,382.16 6,494.87 13,303.59 3,967.10 1,641.77 1,641.77 27,147.72 101.25 25,629.11 2,043.11 2,530.55 47.59 12,045.68 960.26 1,189.36 148.84 37,674.79 3.003.37 3,719.91 3,603.50 1,693.65 5,297.15 90.00 33,997.52 15,978.84 49,976.36 13.109.02 36,867.34 42.30 15.978.84 132.30 49.916.36 CITY OF CORPUS CHRISTI, TEXAS CERTIFICATION OF FUNDS (City Charter Article IV Section 21) June 29, 1983 I certify to the City Council that $ 160,679.90 , the amount required for the contract, agreement, obligation or expenditures contemplated in the above and foregoing ordinance is in the Treasury of the City of Corpus Christi to the credit of: Fuad No. and Name Various Project No. Various - See Below Project Name Engineering reimbursement to the 102 General Fund for work performed on various bond fund projects during Fphrnary, Marrh and April, 1981 (3rd quarter) from which it is proposed to be drawn, and such money is not appropriated for any other purpose. No. 209 $ 11,593.73 220 133,194.73 250 464.37 260 2,083.83 266 102.62 291 12,592.65 295 647.97 $160,679.90 1 1:S4 FIN 2-55 Revised 7/31/69 , 19 F'3 D1re for hof 'a.nance , CITY OF CORPUS CHRISTI, TEXAS CERTIFICATION OF FUNDS (City Charter Article IV Section 21) July 13, 1983 I certify to the City Council that $ 3,534.12 , the amount required for the contract, agreement, obligation or expenditures contemplated in the above and foregoing ordinance is in the Treasury of the City of Corpus Christi to the credit of: Fund No. and Name Project No. Project Name No. 362 weder.'11/GtitPq G''apt Fund Dept. 152. Artivity 807 ma, rodp 802 - Engineering xeimburaempnt to the No 102 General Fund dor work performed on the listed ro'-ct 'n t Block Grant program. (3rd quarter) 82-83 February, March and April, 1983,, from which it is proposed to be drawn, and such money is rot appropriated for any other purpose. Main Drive Drainage $3,534.12 FIN 2-55 Revised 7/31/69 if Revised 4'7 .'177•S0 LP. 7/i3! Itil26_43_, 19�7 CITY OF CORPUS CHRISTI, TEXAS CERTIFICATION OF FUNDS (City Charter Article IV Section 21) July 13, 1983 I certify to the City Council that $ 6,1A, qn , the amount required for the contract, agreement, obligation or expenditures contemplated in the above and foregoing ordinance is in the Treasury of the City of Corpus Christi to the credit of: Fund No. and Name Project No. Project Name from which it is proposed to other purpose. -4,070,0 Greenwood park Grade & Fill 8m30, QOD up pedestrian Crossing Peoples/Shoreline 1f7,15-aty Timon/Surfside Connection FIN 2-55 Revised 7/31/69 La -7/1143 a 7-1,3 -,e13 No. 162 Federal/Staten (:rant Fund Dept. 152, Activity 807.05, Code q02 Engineering reimbursements to the Nn 10, General Fund for work performed on the listed proiects in the 7th Year community feveloment Block Grant Program. (3rd quarter) 82-83 February, March and April, P1, 1x998 .. ated for any be drawn, and such money $ 953.28 1,214.71 4,017.51 $6,185.50 CITY OF CORPUS CHRISTI, TEXAS CERTIFICATION OF FUNDS (City Charter Article IV Section 21) June 29, 1983 I certify to the City Council that $27,147.72 , the amount required for the contract, agreement, obligation or expenditures contemplated in the above and foregoing ordinance is in the Treasury of the City of Corpus Christi to the credit of: Fund No. and Name No. 162 Federal/States Grant Fund Project NO. Dept. 152, Activity 807.06, Code 502 Project Name Engineering reimbursements to the No. 102 General Fund for work performed on various projects as listed in the 8th Year Community Development Block Grant Program. (3rd Quarter) 82-83 February, March and April 1983. from which it is proposed to be drawn, and such money is no appropriated for any other purpose. iSk+O00•O Broadmoor Park III Storm Sewer $ 3,382.16 92A,Ob1.3$ Furman School Phase I 6,494.87 652,0514,sa George Evans School Phase I 13,303.59 353,-iba 5s Spohn Area Street Phase II 3,967.10 $27,147.72 FIN 2-55 Revised 7/31/69 /13 icS3 1A3/4e3 L 1 19f4 Corpus, JChristi, Te ./Z day of , 198P TO THE MEMBERS OF THE CITY COUNCIL Corpus Christi, Texas For the reasons set forth in the emergency clause of the foregoing ordinance or resolution, an emergency exists requiring suspension of the Charter rule as to consideration and voting upon ordinances or resolutions at three regular meetings; I/we, therefore, request that you suspend said Charter rule and pass this ordinance or resolution finally on the date it is introduced, or at the present meeting of the City Council. Respectfully, Respectfully, MAYO Council Members THE ITY OF CORPUS CHRISTI, TEXAS The above ordinance was passed the following vote: Luther Jones Betty N. Turner Jack K. Dumphy 40Fir Bob Gulley 47:/_ Herbert L. Hawkins, Jr. Dr. Charles W. Kennedy Cliff Zarsky 17697