HomeMy WebLinkAbout17767 ORD - 08/10/1983AN ORDINANCE
AUTHORIZING THE ACCEPTANCE OF THE PROPOSAL OF BLACK AND
VEATCH CONSULTING ENGINEERS FOR PREPARATION OF AN UPDATE
TO THE 1982 WATER MASTER PLAN; APPROPRIATING $18,500 FOR
THIS UPDATE; AND DECLARING AN EMERGENCY.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI,
TEXAS:
SECTION 1. That _the City Manager be authorized to accept the
proposal of Black and Veatch Consulting Engineers for preparation of an
update to the 1982 Water Master Plan, a copy of which proposal is attached
hereto and made a part hereof, marked Exhibit "A".
SECTION 2. That there is hereby appropriated $18,500 out of the
No. 205 Water Construction Bond Fund applicable to Project No. 205-81-3,
Water Distribution System Master Plan. j.
SECTION 3. That upon written request of the Mayor or five Council'
members, copy attached, to find and declare an emergency due to the need to
authorize the aforemetioned master plan update at the earliest practicable
date, such finding of an emergency is made and declared requiring suspension
of the Charter rule as to consideration and voting upon ordinances and
resolutions at three regular meetings so that this ordinance is passed and
shall take effect upon first reading as an emergency measure this the /04-4---
day
O'day of August, 1983.
ATTEST:
APPROVED: /O DAY OF AUGUST, 1983
14-
d'. Bruc/G e Ayco
ck,Ci tyy Attorney
MAYO
/;11!I
THE CI" OF CORPUS CHRISTI, TEXAS
17767
SEP 2 81984
MICROFILMED
A
BLACK. &, VEATCH
CONSULTING ENGINEERS
KANSAS CITY. MISSOURI
DALLAS OFFICE
5728 L0J FREEWAY. SUITE 300
TEL. 1214 386.0001
Corpus Christi, Texas
Water Distribution Master
Plan Update
Mr. Paul Werner
Department of Public Utilities
Water Superintendent
Post Office Box 9097
Corpus Christi, Texas 78408
Dear Mr. Werner:
MAILING ADDRESS
POST OFFICE BOY. 402004 .
DALLAS, TEXAS 75240
May 16, 1983
In response to your request, we propose to conduct a Water Distribution
Master Plan Update. The update will include a reevaluation of the
Master Plan recommended improvements for three rapidly growing portions
of the service area, the Oso Creek area; Mustang and Padre Island;
and the Five Points area.
The proposed engineering services will include the following tasks:
o Metered Usage Data (pertains to the three areas
of rapid growth).
Collect and review recent usage data. Compare to Master
Plan data.
Revise projected growth patterns and water demand projections
where necessary.
Review projections with City Staff.
o Update Distribution System Model (in three areas of growth).
Make 1983 piping and valve changes.
Expand model to include smaller piping where necessary.
Revise distribution system map and computer grid map.
o Computer Analysis.
Edit data files for demand and system changes.
Base year 1982.
Design years 1987, 1992, 2002.
Review results with City Staff.
ATTACHMENT 5.1
BLACK & VEATCH
+tr: P:nil Werner
Corpus Christi, Texas
o Master Plan Update Report.
Prepare Report (separate from Master Plan).
Revise recommended improvements map:
Moy 16, 1983
We anticipate the work tasks listed above will require 33-46 man days
depending on the level of effort you desire. It appears to us a minimum
of 33 man days will be necessary to accomplish the above tasks. However,
allocating a maximum level of effort of 46 man days will be desirable
primarily because it will allow you more flexibility in selecting al-
ternatives to be evaluated during the Master Plan Update.
We propose to perform these services as additional work under Section VIII
of the existing Contract for Engineering Services for the Water Distribution
:.aster Plan. Compensation would be on a cost plus basis as described
in Contract Section II.
The maximum compensation for minimum level of effort previously described
(including two trips to Corpus Christi for meetings with City Staff) will
be $12,500 or $18,500 for the maximum level of effort (including one
additional trip to Corpus Christi).
Upon your written authorization to proceed, including selection of level
of effort desired, we will immediately begin work. We will submit fifty
(50) copies of the Master Plan Update Report within ninety days after
written authorization to proceed is received (only sixty (60) days
will he required, if minimum level of effort is selected).
We appreciate the opportunity to be of continued service to the City of
Corpus Christi.
ATTEST:
Very truly yours,
BLACK & VEATCH
/
Gary R. Talmage
CITY OF CORPUS CHRISTI
Bill G. Read, City Secretary Edward A. Martin, City Manager
APPR�ED:
l0 day of
J. BRUCE AYCOCK, Ci
B
APPROVED:
James K. Lontos, P.E.,
'Assistant City Manager
BLACK & VEATCH CONSULTING ENGINEERS
CITY OF CORPUS CHRISTI, TEXAS
CERTIFICATION OF FUNDS
(City Charter Article IV Section 21)
August 4, 1983
I certify to the City Council that $ 18,500 , the amount required for
the contract, agreement, obligation or expenditures contemplated in the above
and foregoing ordinance is in the Treasury of the City of Corpus Christi to the
credit of:
Fund N. and Name No. 205 - Water Construction Bond Fund
Project No. 205-81-3
Project Name Water Distribution System Master Plan
from which it is proposed to be drawn, and such Honey is not appropriated for
other purpose.
FIN 2-55
Revised 7/31/69
194.1
any
Corpus Christi, Te
/b day of
, 1983
TO THE MEMBERS OF THE CITY COUNCIL
Corpus Christi, Texas
For the reasons set forth in the emergency clause of the foregoing ordinance
or resolution, an emergency exists requiring suspension of the Charter rule
as to consideration and voting upon ordinances or resolutions at three
regular meetings; I/we, therefore, request that you suspend said Charter rule
and pass this ordinance or resolution finally on the date it is introduced,
or at the present meeting of the City Council.
Respectfully, Respectfully,
MAYOR
THE CI OF CORPUS CHRISTI, TEXAS
Council Members
The above ordinance was passed
Luther Jones
Betty N. Turner
Jack K. Dumphy
Bob Gulley
Herbert L. Hawkins, Jr.
Dr. Charles W. Kennedy
Cliff Zarsky
the following vote:
17767