HomeMy WebLinkAbout17784 ORD - 08/17/1983• AN ORDINANCE
AUTHORIZING THE EXECUTION OF CHANGE ORDER NO. 9 TO THE
CONTRACT WITH W. T. YOUNG CONSTRUCTION COMPANY FOR
THE SECOND PHASE OF THE EXPANSION AT THE BROADWAY
WASTEWATER TREATMENT PLANT; APPROPRIATING $23,091.65;
AND DECLARING AN EMERGENCY.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI,
TEXAS:
SECTION 1. That the City Manager be authorized to execute Change
Order No. 9 to the contract with W. T. Young Construction Company for the
second phase of the expansion at the Broadway Wastewater Treatment Plant; a
copy of which change order is attached hereto and made a part hereof marked
Exhibit "A".
SECTION 2. That there is hereby appropriated $23,091.65 from the
No. 250 Sanitary Sewer Bond Fund applicable to Project -No. 250-77-22,
Broadway Wastewater Treatment Plant Phase II.
SECTION 3. That upon written request of the Mayor or five Council
members, copy attached, to find and declare an emergency due to the need to
take immediate action to preserve and protect public property by expediting
the construction of public improvements, such finding of an emergency is made
and declared requiring suspension of the Charter rule as to consideration and
voting upon ordinances or resolutions atthree regular meetings so that this
ordinance is passed and shall take effe t upon first reading as an emergency
measure this the f q+ day of , 1983.
ATTEST:
Secretary
APPROVED:/5 AY OF AUGUST, 1983
2Bck,,qity Attorney
MAYOR
THE C OF CORPUS CHRISTI, TEXAS
MICROFILMED
-SEP 2 81984
CHANCE ORDER
Engineering and Physical Development
City of Corpus Christi, Texas
9 C-48-1216-05
Change Order No.
Yruject Nu.
Operating Department
Wastewater Services Dace July 22, 1983
Broadway Wastewater Treatment Plant Improvements - Stage II
Name of Project
W.T. Young Construction Co., P.O. Box 9197, Corpus Christi, Texas 78469
Contractor
CHANCE
SEE ATTACHED SHEET FOR DESCRIPTION OF CHANGES
1. Repair and recondition existing chlorinator and instruments
2. Install a control valve in RFR blower discharge piping
3. Install concrete sidewalks at unit cost of $39.60/sq.yd.
4. Install asphalt paving at unit cost of $14.60/sq.yd.
TOTAL ADDITIONAL
Number of additional working days = 30
ADD DEDUCT
$ 4,709.25
1,900.00
10,058.40
6,424.00
$23,091.65
Wby vas Chia change necessary? (If loft pff the lana a d specifications, explain vl}y.)
Recondition inoperable instruments and rehabilitate a chlorinator which is in poor wor ing
condition. Provide an automatic valve to prevent liquid from entering and "plugging" aeration
equipment. Provide sidewalks tor easy operator access to treatment units. Provide an all-
weather road into the plant and to equipment.
Hew can similar changes be avoided in the future?
Contract Price
3,525,175.30
This Change Order 23,091.65
New Contract Price 3,548,266.95
Funds Available
CITY OF CORPUS CHRISTI, TEXAS
By
Director of Engineering & Physical Development
APPROVED City Manager
City Attorney
ETHERIDGE & WEBB ENGINEERS, INC.
Conetructrii Engineer
CONTRACTOR W.T.YSUNG CONST. CO.
By
Title
i-w{J.°pr
ATTACHMENT TO CHANGE ORDER NO. 9
Have the existing chlorinator and instruments located in the old
grit removal building repaired and reconditioned by the respective
manufacturers' representatives to good working condition and in-
stall the chlorinator in the new chlorine room and the instruments
in the instrument panel in the new pump building. The chlorinator
and instruments will be coated for protection from the plant envi-
ronment. Five working days are allowed to complete this work.
Should either the repaired chlorinator or instruments not be re-
turned in good working condition to the Contractor,
additional working days will be allowed.
2. Install a SST 2" control valve in the RFR blower discharge piping
as shown on the attached drawing. The valve will normally be open
and will automatically close to prevent lose of air through the 2"
line should be blowers be stopped or should the air pressure drop
and allow liquid to enter the air diffusers and/or air piping.
Ten working days are allowed to complete this work in order to ob-
tain the valve and necessary connecting piping pieces and to in-
stall the valve.
3. Install 254 square yards of reinforced concrete sidewalks at e
unit cost of $39.60 per square yard. Sidewalkstare,to. be Install-
ed as described in the contract documents and located as shown on
the attached drawing. Ten working days are allowed to complete
this work. A large portion of the work is expected to require
hand or manual handling of the concrete.
4. Install 440 square yards of asphalt paving at a unit cost of
$14.60 per square yard. Asphalt paving is to be installed as de-
scribed in the contract documents and alocated as shown on the at-
tached drawing. Five working days are allowed to recondition the
existing caliche and install the asphalt pavement.
Total working days with these changes is 30 days
Total working days with these changes added will now be 485 days.
R-
lie/MAP coppeR
AIR SUPPLY LINE
fliOt4 FIE4PER
STL WALL SLEEVE
E
INSTALL MEW ZI/ SST - _
CONTKOL VALVE ANP
NECE55ARY FITTIN65.
VALVE To SE LOCATED
-: f'R/OR TO WI AIR SUPPLY
LINE.
//////
//////
,i
• i
N-....�
0 ES,
111
` /
kCp
I
eci
—
o
o
2' t i. BLOWER D/SCF/.
- .2'GLG BA GATE vAL.VE
NEW Zii- VALVE--
i♦
/
•-
-
��
_1
ROTARY TYPE
BLOWE}4S ��
.
r Y
1. I
d
I,..-li-,i--
n
=2:
x
/Ci�FLTiTEE-
s
/oFL6TfE
• /NLET SILENCE-
111111
-j-
=
')'j-
4E
-- k N�
_ lu ..... /
/
A//3/NTAKE-
\
1-
`Nt
E S
-
Z
2t6N j
F
x
MIN.
/
4414)4 W141;4;131V-
imiscim
;0
//////////
....L- D
lie/MAP coppeR
AIR SUPPLY LINE
fliOt4 FIE4PER
STL WALL SLEEVE
E
INSTALL MEW ZI/ SST - _
CONTKOL VALVE ANP
NECE55ARY FITTIN65.
VALVE To SE LOCATED
-: f'R/OR TO WI AIR SUPPLY
LINE.
EXIsTI40 PAV'T.
SAND FILTEt�
BACKWASH
DRAIN"LWH
x
LIFT
nr STA.
EXISTING CALIC.k6 FAV'T. TO BE SCARIFIED,
CALICHE ADDED_WHER REQUIRED, COMPACTED -=:
AWE) ASPHALT SUR•FA ED
x
PUMP
BLDG.
x
AUTOMATIC BACKWASH
SAND FILTERS
x
0
W �
STA
/3A. ';
3URFACB •
• ,9
f/L
DIGESTER
NO. 5
NTERMEDIA?
HEAT EXCH. BLDG.
CLAI�IFfEKS IDEMOLISH
SLUDGE L__J
LINE
FILTERED WATER
STER NO. 4 (OEMOL
PUMP
BLDG• 1�
INTERMEDIATE
CLARIFIER
PUMP 4
BLOWER ROOM ;`
VT -
SAND FILTER
BACKWASH
DKP_EI°NgiL-lN
SLUDGE
PUMPS
HEAT EXCH•ELDG.
DEMOLISH
FINAL. CLARIFIERS
SLUDCTE L..INL'i
NEW,-
PUMP
aC.oCi.'
CITY OF OORPUS CHRISTI, TEXAS
CE rIFICATION OF FUNDS
(City Charter Article IV Section 21)
August 8, 1983
I certify to the City Council that $ 23,091.65 , the amount required for
' the contract, agreement, obligation or expenditures contemplated in the above
and foregoing ordinance is in the Treasury of the City of Corpus Christi to the
credit of:
Fund No. and Name No. 250 Sanitary Sewer Bond Fund
Project No. 250-77-22
Project Name Broadway Wastewater Treatment Plant Phase II
from which it is proposed to be drawn, and such money is not appropriated for any
other purpose.
. d"
X11 I l , 19aD
FIN 2-55
Revised 7/31/69
Corpus Christi, Texas
/9 day of
, 1983
TO THE MEMBERS OF THE CITY COUNCIL
Corpus Christi, Texas
For the reasons set forth in the emergency clause of the foregoing ordinance
or resolution, an emergency exists requiring suspension of the Charter rule
as to consideration and voting upon ordinances or resolutions at three
regular meetings; I/we, therefore, request that you suspend said Charter rule
and pass this ordinance or resolution finally on the date it is introduced,
or at the present meeting of the City Council.
Respectfully, Respectfully,
Council Members
The above ordinance was
Luther Jones
Betty N. Turner
Jack K. Dumphy
Bob Gulley
Herbert L. Hawkins, Jr.
Dr. Charles W. Kennedy
Cliff Zarsky
MAY
passed
THE CITY OF CORPUS CHRISTI, TEXAS
by
the following vote: