HomeMy WebLinkAbout17784 ORD - 08/17/1983• AN ORDINANCE AUTHORIZING THE EXECUTION OF CHANGE ORDER NO. 9 TO THE CONTRACT WITH W. T. YOUNG CONSTRUCTION COMPANY FOR THE SECOND PHASE OF THE EXPANSION AT THE BROADWAY WASTEWATER TREATMENT PLANT; APPROPRIATING $23,091.65; AND DECLARING AN EMERGENCY. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI, TEXAS: SECTION 1. That the City Manager be authorized to execute Change Order No. 9 to the contract with W. T. Young Construction Company for the second phase of the expansion at the Broadway Wastewater Treatment Plant; a copy of which change order is attached hereto and made a part hereof marked Exhibit "A". SECTION 2. That there is hereby appropriated $23,091.65 from the No. 250 Sanitary Sewer Bond Fund applicable to Project -No. 250-77-22, Broadway Wastewater Treatment Plant Phase II. SECTION 3. That upon written request of the Mayor or five Council members, copy attached, to find and declare an emergency due to the need to take immediate action to preserve and protect public property by expediting the construction of public improvements, such finding of an emergency is made and declared requiring suspension of the Charter rule as to consideration and voting upon ordinances or resolutions atthree regular meetings so that this ordinance is passed and shall take effe t upon first reading as an emergency measure this the f q+ day of , 1983. ATTEST: Secretary APPROVED:/5 AY OF AUGUST, 1983 2Bck,,qity Attorney MAYOR THE C OF CORPUS CHRISTI, TEXAS MICROFILMED -SEP 2 81984 CHANCE ORDER Engineering and Physical Development City of Corpus Christi, Texas 9 C-48-1216-05 Change Order No. Yruject Nu. Operating Department Wastewater Services Dace July 22, 1983 Broadway Wastewater Treatment Plant Improvements - Stage II Name of Project W.T. Young Construction Co., P.O. Box 9197, Corpus Christi, Texas 78469 Contractor CHANCE SEE ATTACHED SHEET FOR DESCRIPTION OF CHANGES 1. Repair and recondition existing chlorinator and instruments 2. Install a control valve in RFR blower discharge piping 3. Install concrete sidewalks at unit cost of $39.60/sq.yd. 4. Install asphalt paving at unit cost of $14.60/sq.yd. TOTAL ADDITIONAL Number of additional working days = 30 ADD DEDUCT $ 4,709.25 1,900.00 10,058.40 6,424.00 $23,091.65 Wby vas Chia change necessary? (If loft pff the lana a d specifications, explain vl}y.) Recondition inoperable instruments and rehabilitate a chlorinator which is in poor wor ing condition. Provide an automatic valve to prevent liquid from entering and "plugging" aeration equipment. Provide sidewalks tor easy operator access to treatment units. Provide an all- weather road into the plant and to equipment. Hew can similar changes be avoided in the future? Contract Price 3,525,175.30 This Change Order 23,091.65 New Contract Price 3,548,266.95 Funds Available CITY OF CORPUS CHRISTI, TEXAS By Director of Engineering & Physical Development APPROVED City Manager City Attorney ETHERIDGE & WEBB ENGINEERS, INC. Conetructrii Engineer CONTRACTOR W.T.YSUNG CONST. CO. By Title i-w{J.°pr ATTACHMENT TO CHANGE ORDER NO. 9 Have the existing chlorinator and instruments located in the old grit removal building repaired and reconditioned by the respective manufacturers' representatives to good working condition and in- stall the chlorinator in the new chlorine room and the instruments in the instrument panel in the new pump building. The chlorinator and instruments will be coated for protection from the plant envi- ronment. Five working days are allowed to complete this work. Should either the repaired chlorinator or instruments not be re- turned in good working condition to the Contractor, additional working days will be allowed. 2. Install a SST 2" control valve in the RFR blower discharge piping as shown on the attached drawing. The valve will normally be open and will automatically close to prevent lose of air through the 2" line should be blowers be stopped or should the air pressure drop and allow liquid to enter the air diffusers and/or air piping. Ten working days are allowed to complete this work in order to ob- tain the valve and necessary connecting piping pieces and to in- stall the valve. 3. Install 254 square yards of reinforced concrete sidewalks at e unit cost of $39.60 per square yard. Sidewalkstare,to. be Install- ed as described in the contract documents and located as shown on the attached drawing. Ten working days are allowed to complete this work. A large portion of the work is expected to require hand or manual handling of the concrete. 4. Install 440 square yards of asphalt paving at a unit cost of $14.60 per square yard. Asphalt paving is to be installed as de- scribed in the contract documents and alocated as shown on the at- tached drawing. Five working days are allowed to recondition the existing caliche and install the asphalt pavement. Total working days with these changes is 30 days Total working days with these changes added will now be 485 days. R- lie/MAP coppeR AIR SUPPLY LINE fliOt4 FIE4PER STL WALL SLEEVE E INSTALL MEW ZI/ SST - _ CONTKOL VALVE ANP NECE55ARY FITTIN65. VALVE To SE LOCATED -: f'R/OR TO WI AIR SUPPLY LINE. ////// ////// ,i • i N-....� 0 ES, 111 ` / kCp I eci — o o 2' t i. BLOWER D/SCF/. - .2'GLG BA GATE vAL.VE NEW Zii- VALVE-- i♦ / •- - �� _1 ROTARY TYPE BLOWE}4S �� . r Y 1. I d I,..-li-,i-- n =2: x /Ci�FLTiTEE- s /oFL6TfE • /NLET SILENCE- 111111 -j- = ')'j- 4E -- k N� _ lu ..... / / A//3/NTAKE- \ 1- `Nt E S - Z 2t6N j F x MIN. / 4414)4 W141;4;131V- imiscim ;0 ////////// ....L- D lie/MAP coppeR AIR SUPPLY LINE fliOt4 FIE4PER STL WALL SLEEVE E INSTALL MEW ZI/ SST - _ CONTKOL VALVE ANP NECE55ARY FITTIN65. VALVE To SE LOCATED -: f'R/OR TO WI AIR SUPPLY LINE. EXIsTI40 PAV'T. SAND FILTEt� BACKWASH DRAIN"LWH x LIFT nr STA. EXISTING CALIC.k6 FAV'T. TO BE SCARIFIED, CALICHE ADDED_WHER REQUIRED, COMPACTED -=: AWE) ASPHALT SUR•FA ED x PUMP BLDG. x AUTOMATIC BACKWASH SAND FILTERS x 0 W � STA /3A. '; 3URFACB • • ,9 f/L DIGESTER NO. 5 NTERMEDIA? HEAT EXCH. BLDG. CLAI�IFfEKS IDEMOLISH SLUDGE L__J LINE FILTERED WATER STER NO. 4 (OEMOL PUMP BLDG• 1� INTERMEDIATE CLARIFIER PUMP 4 BLOWER ROOM ;` VT - SAND FILTER BACKWASH DKP_EI°NgiL-lN SLUDGE PUMPS HEAT EXCH•ELDG. DEMOLISH FINAL. CLARIFIERS SLUDCTE L..INL'i NEW,- PUMP aC.oCi.' CITY OF OORPUS CHRISTI, TEXAS CE rIFICATION OF FUNDS (City Charter Article IV Section 21) August 8, 1983 I certify to the City Council that $ 23,091.65 , the amount required for ' the contract, agreement, obligation or expenditures contemplated in the above and foregoing ordinance is in the Treasury of the City of Corpus Christi to the credit of: Fund No. and Name No. 250 Sanitary Sewer Bond Fund Project No. 250-77-22 Project Name Broadway Wastewater Treatment Plant Phase II from which it is proposed to be drawn, and such money is not appropriated for any other purpose. . d" X11 I l , 19aD FIN 2-55 Revised 7/31/69 Corpus Christi, Texas /9 day of , 1983 TO THE MEMBERS OF THE CITY COUNCIL Corpus Christi, Texas For the reasons set forth in the emergency clause of the foregoing ordinance or resolution, an emergency exists requiring suspension of the Charter rule as to consideration and voting upon ordinances or resolutions at three regular meetings; I/we, therefore, request that you suspend said Charter rule and pass this ordinance or resolution finally on the date it is introduced, or at the present meeting of the City Council. Respectfully, Respectfully, Council Members The above ordinance was Luther Jones Betty N. Turner Jack K. Dumphy Bob Gulley Herbert L. Hawkins, Jr. Dr. Charles W. Kennedy Cliff Zarsky MAY passed THE CITY OF CORPUS CHRISTI, TEXAS by the following vote: