HomeMy WebLinkAbout18573-A ORD - 11/29/1984AN ORDINANCE
AMENDING THE CODE OF ORDINANCES BY DELETING SECTION 53-195,
PROCEDURE FOR COVERING PARKING METERS AND ESTABLISHING
CHARGES DURING CONSTRUCTION OR REPAIR OF BUILDINGS AND
SECTION 53-196, PROCEDURES FOR RENDERING CURB SPACE
UNUSABLE, ESTABLISHING CHARGES DURING CONSTRUCTION OR REPAIR
OF BUILDINGS, AND SUBSTITUTING THEREFOR A NEN SECTION
53-195, PROCEDURES FOR OCCUPANCY OF PUBLIC RIGHT-OF-WAY
(COVERING OF PARKING METERS AND RENDERING OF CURB SPACE
UNUSABLE AND ESTABLISHING CHARGES DURING CONSTRUCTION OR
REPAIR OF BUILDINGS.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI,
TEXAS:
SECTION 1. That the Code of Ordinances be amended by deleting
Section 53-195, Procedure for Covering Parking Meters and Establishing Charges
During Construction or Repair of Buildings, and Section 53-196, Procedure for
Rendering Curb Space Unusable, Establishing Charges During Construction or
Repair of Buildings, in their entirety and substituting therefor a new Section
53-195, Procedures for Occupancy of Public Right -of -Nay (Covering of Parking
Meters and Rendering of Curb Space Unusable) and Establishing Charges During
Construction or Repair of Buildings, to read as follows.
Sec. 53-195. Procedures for Occupancy of Public
Right -of -Way (Covering of Parking Meters and Rendering of
Curb Space Unusable) and Establishing Charges During
Construction or Repair of Buildings
When coverage of parking meters is required or public
right-of-way is rendered unusable for the express use of
contractors for the erection, construction or repair of
buildings, on those arterial and collector through streets
s defined in Section 53-251 of the City Code and upon all
streets in the Central Business District, the following
procedure and charges shall apply
1. There shall be a permit fee/service charge of $25.00
for use of parking lanes and loading zones
and $35.00
for use of traffic lanes, sidewalks -and alleys levied
against the contractor. Such charge will be used to
offset the cost in preparation of street closure a
meter rental permits, the covering of parking meters,
preparation of a traffic handling plan, and secretarial
time for processing of billings.
For occupancy of parking lanes* and curbside loading
zones, assessment of charges of 1.356/sq ft/ day
18573 IF
(minimum charge of $2.25/day) for occupancy of metered
parking spaces, 0.65/sq ft/day (minimum charge of $1.00
day) for o cupancy of unmetered parking spaces, and
1.22/sq ft/day (minimum charge of $2.00/day) for
occupancy of commercial loading zones. Charges would
be based on the width of right-of-way occupied from the
barricading equipment or barriers in the roadway to the
face of curb or edge of pavement (in the case
of
curbless streets) For temporary restrictionsand
reservation of parking at meter spaces which are to be
hooded, noe than five (5) metered spaces would be
permitted to be hooded at any one time by an applicant.
Such parking reservation would be expressly limited to
bulk loading/unloading activities and parking of
construction vehicles integral to the construction
activities. *"Parking lane" in this case shall be
defined as any portion of the paved street totally
dedicated for curbside parking, measured from the face
of curb to a point 8 ft into the street from the face
of the curb.
3 For occupancy of traffic lane and sidewalk./alley
space, there would be anassessed charge of 1.55/sq
ft/day (minimum charge of $500/day and 0 35/sq ft/day
(minimum charge of $2.00/day), respectively Charges
would be based on the width of right-of-way occupied in
the traffic lane or between the face of the curb
edge of pavement) and right-of-way line (property
line). In the case of alley space, if all or part of
the alleyway is blocked such as to prevent any vehicle
the contractor would be assessed for the full
right-of-way of the alleyway *"Sidewalk" in this case
shall be defined as any portion of the street between
the curb or the lateral line of the roadway and the
adjacent property line, all or a part of which is
intended for the use of pedestrians.
A contractor shall be limited to no greater than
one-third (1/3) of the paved width of any street
adjacent to the building for which a construction
permit has been issued, accordance with the
provisions of Section 2101.1n of the Building Cade.
Rofgv time for eed1oeighof c8)e c000000ous any hurs period
occupancy of exceedingthe street in excess
of the one-third
width maximum limit shall bedirected to the City
Council for consideration of approval.
5 Charges for metered parking space occupancya re
applicable to weekdays only. Assessments applicable to
o upancy of unmetered parking spaces will be assessed
for construction occupancy of metered parking spaces on
weekends. Any fraction of a day shall be charged as a
full day.
6. Whenever parking meters and their
supportpipe ut
removed, there will be a charge of do00first for the first
meter removed and $4.00 for each additional meter.
All of the above charges shall be collected by the
Division of Traffic Engineering and paid in full before
the penult 1s issued or amended, based upon the planned
duration of the construction project. At the
discretion of the Traffic Engineer, monthly payments
may be paid by the Contractor if the construction
project is planned for duration beyond one month. When
the right-of-way space covered under the permit is not
occupied for the full period of time for which the
permit 1s issued and for which the fees have been paid,
the City will refund a portion of the fees paid to
cover the unoccupied period of time on the following
bases:
The City will refund to the applicant on a daily
basis for the number of days the space covered by
the permit was not occupied; provided the charge
for the unoccupied days was paid in advance when
the permit was issued or mended and that there
are no other payments due the City
No refunds shall be made until the occupied space
is totally cleared in full compliance with the
conditions set in the permit.
8. The Traffic Engineer may revoke a permit issued
hereunder if any of the permit holder's barricading,
signing, channelization,w e
ing other traffic
control procedures or the traffic control equipment
used at the construction site do not comply with the
requirements of the City's "Manual on Uniform
Barricading Standards or Practices" or with those
special requirements imposed by the Director or Traffic
Engineering, provided, that the permit holder, or
person
named a responsible for the activity in the
permit, shall first be notified of the failure a
defect and be given a
e onable time, such length of
time to be determinedby the Director of Traffic
Engineering and not to exceed twenty-four (24) hours,
to correct same before such permit is revoked.
At least forty-eight (48) hours advance notice
shall be
provided to the Department of TrafficEngineering
before issuance of permit
That the foregoing ordinance �WIq�read fore, first time and p ed to its
nd reading on this the'"/�il. day of `�µ``rr r.[,r�v✓ 19 by the
following vote
Luther Jones /..: Leo Guerrero
Betty N. Turner / Dr. Charles W. Kennedy
David Berlanga Sr. / Joe McComb
Welder Brown / Frank Mendez
Mary Pat Blavik
That the foregoing ordinance read for dq time and qa�s ed to its
third reading on this the day of /.fatten A/w , 19 , by the
following vote. /
Luther Jones
Betty N. Turner
David Berlanga, Sr. a
Welder Brawn
Or. Charles W. Kennedy
Joe McComb
Frank Mendez
Mary Pat Slav,.
That the fare$$��((g ordln ma 1 d far the [herd timeend passed finally
on this the .�yMt day of psU bea 10599, by the followsnr 00te
Luther Jones/ Leo Guerrero
Betty N. Turner / , . Dr. Charles W. Kennedy
David Berlanga, Sr. Joe McComb
Welder Brown �.. Frank Mendez
-�j Mary Pat Slavik
PASSED AND APPROVED, this the ayday of )i/QaM)4LV , 19
MAYOR j7/
THE CI i' DF CORPUS CHRISTI, TEXAS
ATTEST
Ciileetary
APPR VEO I
OAY OF ,tsve.wir r Istel
J BRUCE YCOCK, CITY ATTORNEY
BYAsty Attorney 18573of