Loading...
HomeMy WebLinkAbout18701 ORD - 02/19/198501.017 01 AN ORDINANCE AUTHORIZING THE EXECUTION OF AN AMENDMENT TO THE CONTRACT WITH COTTEN/LANDRETH ARCHITECTS FOR DESIGN AND ENGINEERING WORK ON THE WEST CONCOURSE E%TENSION AND 000160OM AT CORPUS CHRISTI INTERNATIONAL AIRPORT WHICH PROVIDES FOR AN EXPANDED SCOPE OF WORK AND ADDITIONAL ARCHITECTURAL FEES, APPROPRIATING $210,000, AND DECLARING AN EMERGENCY. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI, TEXAS: SECTION 1 That the City Manager is hereby authorized to execute an amendment to the contract with Cotten/Landreth Architects for design and engineering work on the West Concourse Extension and Holdroom at Corpus Christi International Airport authorized by Ordinance No. 18096, passed and approved February 22, 1984, which amendment provides for a expanded scope of work and additional architectural fees, all as more fully set forth in the architectural contract agreement, a substantial copy of which is attached hereto and made a part hereof, marked Exhibit .A.. SECTION 2. That there is hereby appropriated $210,000 out of the No. 245 Airport Bond Fund. SECTION 3 That upon written request of the Mayor or five Council members, copy attached, to find and declare an emergency due to the need of executing the abovementioned architectural contract agreement at the earliest practicable date, such finding of anemergency a made and declared requiring suspension of the Charter rule as to consideration and voting upon ordinances o resolutions at three regular meetings so that this ordinance is passed and shall take effect upon first reading as an emergency measure this the 19th day of February, 1985. ATTEST cA�g Li Oty 8 TY AARY 1085 ByAssi st ty Attarne cC h8YON ' . THE OF CORPUS CHRISTI, TEXAS 18701' APENDMENT TO T. AGREEMENT POR ARCHITECTURAL SERV/CES ON TEE CORPUS CHRISTI INTERNATIONAL AIRPORT TEE STA. OF AS 4 COUNTY OF NeEces Cotten/Landreth Architects,ti , hereinaftertcalled following am February 22, which was authorizedbyCorpushChristi aCity Cowell byd passage 4of ordinance No. 18096. Article I, SERVICES TO BE PERFORMED, t rt t of work theaWest Concourse Extension ent is hereby amended to add hfollowing Extension and Boldroom work oftheoriginal contract. (A)BEETsconsists of heating, ventilating and air conditioning the thex Building to Gate Nes. 1 and 2. This isa FAA Grant assisted project. (e) EXPANSION TO TERMINAL BUILDING. This project provides for expanding the terminal in a tester), direction to approximately twice Its Present size to vide for additional ticket counters, office space, public opera ons a - areas, approximately d50 percent, generally With ithe pproposed 1985 Terminal Expansion a dainythe RalphBurkeAssociates Airport Master Plan Study dated February, 1984, prepared for the City of Corpus Christi. This is a FAA Grant assisted project (C) 5 weproject consists of expanding the service court area immediately s uthoft expansion to improve circulation. This is a FAA Grant assisted project (D)AIR CONDITIONING ABSORPTION UNIT REproject consists of the replacement of the existing Teter/Terminal Buildings A/CabSerption unit only. (E) EAST CONCOURSE EVAC SYSTEM. The project consists of heating, ventilating and air conditioning the East concourse. This is a FAA grant assisted project. (F) Project a sq . of roofing replacement to the Terminal Building, Concourses and Teter (G) AIRPORT GRAPHICS. Pro,ect consist of the design of an integrated direction,exterior and interior' graphics system to provade for i ation/in£ormatio , and traffic control This is a FAA Grant assisted project. Article III, Sectson H, Cost Estimates, of the aforesaid agreement is hereby deleted and replaced the fel/owing. CCIA OO//L a h Architects F0etal Agreement 1) The desagn of each project shall be such that the cost thereof wall rot exceed the amount allocated for Its construction, furthersere, it as understogd that project cost Includes architectural fees, construction cost, contingencies, and all other costs related to the proaect. Project cost allocated to each ProJeet as as follow. - (a) West 0010 -purse Extenslon and Holdroom 11,160,210 (a) West Concourse 6000 305688 66,000 (0) Expanslon to Terminal Dueldeng 1,125,000 (d) Servace COurt Expanslon 52,000 (e) Air ConditIoning Absorption Unit Replacement 135,000 (6) East Concourse HVAC System 332,455 (l) Roofing Replacement 354,166 (h) Airport GraphIcs 203,000 2) 100000500 50811 psovade cost estimates through each phase of the desIgn of a project but does not guarantee the accuracy of such estimates, however, it is understood that If the project e,ceeds available funds, the City wall have the raght to regUire Architect to make revaslons to the ConstructIon Documents so as to brang the cost wathan the project funds at no additional fee Astacle /II, Section I, Order of Servaces, of the aforesaid agreement Is hereby deleted. and replaced with the following. 1) Approval 02 6008 amendment by City shall constitute automatic approval for Architect to begin the Schematic Design Phase of the work outlened In Contract IA. as andlcated herean Architect will not proceed to each following phase until approval of the completed phase and a wrItten notice by the City to proceed has been Issued. 2) 600000800 50811 provide the Architectural Services for the total project 12 000 (2) separate sets of 000800900000 0000!88605 and wIttun a tame frame as follohs La) CONTRACT 10consIsts of 608 011101100 prodects: VMST CONCOURSE EXTE1S/ON AND HOLDROOM, WEST CONCOURSE HVAC SYSTEM, EAPANSION TO Team:NAL BUILDING, sBreVICR °BURT ExPANS/Oti, AIR CONDITIONING ABSORPTION .IT REPLACENENT, EAST CONCOURSE HVAC SYSTEM, and ROOFING REPLACE/SNP. Time frame. Schematic Design, 45 dayS; DeSIgn Development, 60 days, ConstructIon Documents, 150 days fb) CONTRACT 8011consest of the AIRPORT GRAPHICS 0603e01. Tame frame Schematic Design, 14 days, Desagn Development, 21 days, ConstructIon Doeverers., 60 days. Article III of the aforesaid agreement is hereby amended to add the followang paragraph - a Collaboration with Energy Consultant The City may emplOy an Energy Consultant to develop energy coneervataon recommendataor for this project and to direct -the CCIA Amendment to Architectural Agreement Cotten/Landreth Arcaltects Page 2 of 4 Archotect as to Incluslon of the approved Energy Consultant recommendatoons on the overall desogn of the protect. The Archotect twill not be a party to the Coty - Energy Consultant contract, but will work woth and consult woth the Energy Consultant in the Prosecutoon of ttms work. Artocle IV, FEE, of the aforesaod agreement os hereby deleted and replaced wath the followong A. Fees for Basic Servoces The City woll pay the Archotect a foxed fee of Two Hundred Forty -Uone Thousand Dollars and no/100 ($260,000.00) of whoch $78,050.00 os allocated for the West Concourse and Holdroom progect, $6,416.00 for the West Concourse HVAC System progect, $83,344 00 for the Expansion to Termonal Buoldong, $3,390.00 for the Servoce Court Expansion project, $9,855.00 is allocated for the Air Condotoonong Absorption Unot Replacement pro5ect, $29,639.00 for the East Concourse HVAC System pro5ect, $23,506.00 for the Roofing Replacement protect, and $16,000.00 for Graphocs. These fees woll be full and total compensation for all servoces outlined includong addotoonal work whoch may be added durong constructIon by change order to existong contracted work provoded that work specified by change order is on keepong woth the oraginal scope of work and os normal and oncodental to the type of construction proposed B. Payments to the Archotect 1. Upon completoon of the Schematoc Desogn Phase(s) and approval of the same by the Coty, the Archatect woll be paid a sum equal to fifteen (15) percent of the Basle Fee for that Contract ,t" and BB" kork as approproate. 2. Upon completoon of the Design Development Phase and approval of the same by the Coty, the Archotect woll be pa', a sum equal to tuenty (20) percent of the Basoc Fee for that Contract .A" and .8" sock as approproate. 3. Upon completoon of the Construction Documents Phase and acceptance and approval of the same by the Coty, the Archotect woll be weld a sum equal to fortY (40) Percent of the 2220 F02. 000C207 may authorose monthly payments durong thos phase upon evodence of suotable work progress of each contract by the Archotect. 4. Upon receopt of hods and award of a constructoon contract for each contract, the 0121001 0011 be pard a sum equal to flys) (5) percent of the Basic Fee for that Contract 5. For the constrnction phase of each contract, the Archotest woll be Rood a sum equal to twenty (20) 7000005 0! the Basle Fee for that Contract (8A. or .13n) 'rhos amount to be pood on monthly Installments whoch shall be determaned on the basos of the ratoo of the monthly construeCoon estomate to the total contract price. Fonal payment for each contract woll not be made to the Archotect until the condotoons of Artocle III, sectoon F are met. 6 In regard to the Archotect's fee, the rattles further agtee- Do deductoons shall be made from the Architect's fee on account of penalty, loquodated damages, or other sum withheld from payments. to the Contractor. CCIA Amendment to Architectural Agreement Cotten/Landreth 8rchotects Page 3 of 4 Artrcle VI, RENEGOTIATION, of the origrnal agreement is hereby amended to add the following paragraph /n the event that the Schematre Design, Design peveloPment or the Constructron Document Phase of a proDect Is delayed by the Crty for pore than twelve (12) months, the fees Berta...9 to the affeetea Imodeet 0. prosects shall be renegotrable. All other ter. and conditrons of the original contract, executed by the Mhy and the Archrtect, not specrfically addressed herein, shall remarn rn full force and effect. In dupIrcate, each CITY OF CORPUS CHRISTI Crty Secretary Edward A Maxtrn, City Manager APPROVED. day of 1,84 J. AMC. AYCOCK, CITY ATTORNEY Assrstant Crty Attorney APPROVED COTTEN/KUMMER APCNITECTS, INC. By. Assrs.ant Crty Manage. CCIA Amendment to Architectural Agreement Cotten/Landreth Archrtects Page 4 of 4 Cordon E. Landreth Corpus Christi, Texas _t±4 day of �� 198 b TO THE MEMBERS OF THE CITY COUNCIL Corpus Christi, Texas For the reasonsset forth in the emergency clause of the foregoing ordinance or resolution,emergency exists requiring suspension of the Charter rule s to consideration and voting upon ordinances or solutions at three regular meetings, 1/0e, therefore, request that you suspend said Charter rule and pass this ordinance or resolution finally on the date it is introduced, or at the present meeting of the City Council. Respectfully, Respectfully, Council Members MAYOR THE CITY OF CORPUS CHRISTI, TEXAS The above ordinance was passed by the fallowing vote. Luther Janes (/),�t(/� Betty N Turner (//�/1/ David Berlanga, Sr. (/�//f/7 Welder Brown °;j{ Leo Guerreio De Charles W Kennedy Joe McComb �///!��{i�+ FranM Mende. �v/''""77C(/("" Mary Pat Slavik (211/ 18701 CITY OP CORPUS CHRISTI, TEXAS C018r0201001 CO' 10 Se (City Charm Art.le 1v 5ecfiOn 21) November 21, 1984 I certify to the City Council. that $ 210,000 . the amount required for the contract, mi 0010, obligation or expenditure mntsoiat¢1 in the above and foregoing ordinance as in the Treasury of the City of Corpus Cnriati to the Nit of, Fuld No. and Nao No. 245 Airport Bond Fund Pmlect Ni. Project Name 245-82-1 1 Concourse and Noldroom from which it is proposed to to drawn, and such moray is not 81,4rvpriated for any Other purpose. 3g1 9 i FIN 2-55 Revised 7/31/69 LII o 7 B 2--/q4) alt 1/