AN ORDINANCE
AUTHORIZING THE EXECUTION OF A CONTRACT WITH GEORGE S.
PORCHER LANDSCAPE ARCHITECT, INC. FOR THE PREPARATION OF A
LANDSCAPE & IRRIGATION MASTER PLAN AND PREPARATION OF DESIGN
PLANS AND SPECIFICATIONS FOR THE CORPUS CHRISTI
INTERNATIONAL AIRPORT; APPROPRIATING $39,500; AND DECLARING
AN EMERGENCY.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI,
SECTION 1. That the City Manager is hereby authorized to execute a
contract with George S. Porcher Landscape Architect, Inc. for the preparation
of a Landscape and Irrigation Master Plan and preparation of design plans and
specifications for the Corpus Christi International Airport, all as more fully
set forth in the contract, a substantial copy of which is attached hereto and
made a part hereof, marked Exhibit "A".
SECTION 2. That there is hereby appropriated $39,500 from the Airport
Bond Fund applicable to Project No. 245-85-2.2.
SECTION 3. That upon written request of the Mayor or five Council
members, copy attached, to find and declare an emergency due to the need of
executing the abovementioned contract at the earliest practicable date, such
finding of an emergency is made and declared requiring suspension of the Charter
rule as to consideration and voting upon ordinances or resolutions at three
regular meetings so that this ordinance is passed and shall take effect upon
first reading as an emergency measure this the 31st day of December, 1985.
ATTEST:
42 -.44,4 --City Secretary MAYOR
THE CITOF CORPUS CHRISTI, TEXAS
APPROVED: 3o vDAY OF DECEMBER, 1985
Assistant ty ttorney
04P.272.01
19136 MICROFILMED
•
J„,--kr/
•
AGREEMENT FOR LANDSCAPE ARCHITECTURAL SERVICES
THE STATE OF TEXAS §
COUNTY OF NUECES §
The City of Corpus Christi, hereinafter called "City" and George S.
Porcher Landscape Architects, Inc., hereinafter called "Landscape Architect",
agree as follows:
I. SERVICES TO BE PERFORMED
The Landscape Architect hereby agrees at his own expense to perform all
required work for a total landscaping plan for the Corpus Christi
International Airport, Corpus Christi, Texas.
II. SCOPE OF SERVICES
The scope of services for this project include, but is not limited to,
the following:
(a) Landscape Planting
(b) Landscape Irrigation Design
(c) Limited Consultation during the Preliminary Phase of the project
site graphics and site lighting.
1. The above services shall be provided as total site development for
the Corpus Christi International Airport. Reference: Exhibit 1
(see attached).
2. Landscape Architect will provide for a Master Plan Phase which will
include conceptual studies of the site; coordination of site
graphics; redevelopment of site lighting: budget analysis and
workshops with consultant architects and City's staff.
The Master Plan will be developed to include a phased implementation
program with cost estimates. The individual phases of the approved
master plan will be developed into working drawings, specifications
and cost estimates of all work.
Conceptual ideas will give consideration to the utilization of
existing vegetation; selection of indigenous plant material to the
Corpus Christi area; irrigation design with consideration to drought
conditions and utilization of significant site features.
Presentation of drawings will include section, elevations, and/or
sketches as required to convey an accurate understanding of the
concept.
The Landscape Architect has allocated a maximum of four meetings
(workshop, site analysis, City/Architect) during the Master Plan
Preliminary Phase of the project.
Airport Landscape Agreement
George S. Porcher
•
3. Landscape Architect will prepare, from the approved Master Plan,
concept construction documents for each phase which will include
construction drawings and specifications. Bid documents will be
developed as required by the City.
The completed drawing package will include plans for the individual
phased areas of the site. The drawings will reference the project
limits; sections and elevations; schedules for plant and irrigation
materials; dimensions and other required information pertinent to
the contractual plan documents. The specifications will be bound
and separate from the plan documents. The technical section of the
specifications shall describe the required materials and procedures
for proper construction. The general conditions will be furnished
by the City and included in the specifications. Landscape Architect
will provide cost estimates for each phase of the project.
4. Landscape Architect shall prepare addenda and clarification
documents as required during the bidding phase and shall assist the
City with review, evaluation of bids and recommendations for
awarding landscape construction contracts.
The City shall be responsible for advertising, printing, and the
release of plans and specifications for the solicitation of bids by
contractors.
5. Landscape Architect will make three scheduled visits to the
construction site during the first phase of the project and will be
available to provide his advise and consultation during the
Construction Phase of the project.
III. CITY FURNISHED ITEMS
City agrees to furnish Landscape Architect any plans and site development
related information currently in City files for use in this project. In the
event City provides original or record drawings to Landscape Architect, such
materials are to be returned to City before final payment is made.
IV. TRANSFER OF INTEREST
The Landscape Architect shall not assign or transfer any interest in this
agreement without prior written consent from the City.
V. ORDERLY RENDERING OF SERVICES
Landscape Architect agrees to furnish items to the Master Plan within
thirty (30) calendar days of date of execution of this agreement. Items
required for the Construction Documents will be submitted within thirty (30)
days of approval of previous phase.
Landscape Architect shall submit to the City six (6) copies of Master
Plan Phase submittals and one (1) loose leaf master set of final construction
specifications and one (1) mylar set of construction documents plans. City
shall retain exclusive use rights to these documents.
Airport Landscape Agreement
George S. Porcher
VI. COMPENSATION
The City agrees to pay the Landscape Architect for his professional
services and related work in this project a total fee of Thirty Nine Thousand,
Five Hundred Dollars ($39,500.00) for all services.
Upon completion of each of the tasks and approval of same by the City,
the Landscape Architect may be paid portions of the fee as follows:
(a) Conceptual Studies $10,000
(b) Master Plan Final 3,400
(c) Construction Documents 23,000
(d) Bidding Phase 800
(e) Construction Phase 2,300
Reimbursables are not provided for separately but are included in the
Basic Fee as an allowance not to exceed $1,650.00. Any additional
reimbursement will be made to the Landscape Architect only if requested or
directed by the City and approved in advance.
VII. CONTRACT TERMINATION
The City reserves the right to terminate this contract at any time, with
or without cause. In the event of such termination, the Landscape Architect
will be paid a sum proportionate to the state of completion of the phase of
work in which he is then engaged.
EXECUTED IN DUPLICATE, each of which shall be considered an original,
this the day of , 19
ATTEST: CITY OF CORPUS CHRISTI
By:
City Secretary Edward A. Martin, City Manager
APPROVED: GEORGE S. POACHER
LANDSCAPE ARCHITECTS, INC.
day of , 19
By: By:
Assistant City Attorney
APPROVED:
James K. Lontos, P.E.
Assistant City Manager
Airport Landscape Agreement
George S. Porcher
LA
LIMITS OF LANDSCAPE DEVELOPMENT
EXISTING BUILDING AREA - 1980
CORPUS CIIRISTI INTERNATIONAL. AIRPORT
EXHIBIT 1'
DATE: NOVEMBER 4, 1985
•
CITY OF CORPUS cHPISTI, TEXAS
CERTIFICATION OF FUNDS
(City Charter Article IV Section 21)
December 4, 1985
I certify to the City Council that $ 39,500.00 , the amount required for
the contract, agreement, obligation or expenditures contemplated in the above
and foregoing =finance is in the Treasury of the City of Corpus Christi to the
credit of:
Fund No. and Name 245 Airport Bond Fund
Project No.
Project Name
245-85-2.1
Landscaping Study
from which it is proposed to be drawn, and such money is not appropriated for any
other purpose.
FIN 2-55
/213/Ar
Revised ,7/31/69
oZ/ 3-) I
f8�
•
Corpus Christi, Texas
3/54 day of .O_PA4J61,r. 198g.
TO THE MEMBERS OF THE CITY COUNCIL
Corpus Christi, Texas
For the reasons set forth in the emergency clause of the foregoing ordinance
or resolution, an emergency exists requiring suspension of the Charter rule
as to consideration and voting upon ordinances or resolutions at three
regular meetings; I/we, therefore, request that you suspend said Charter rule
and pass this ordinance or resolution finally on the date it is introduced,
or at the present meeting of the City Council.
Respectfully, Respectfully,
Council Members
The above ordinance was
Luther Jones
Dr. Jack Best
David Berlanga, Sr.
Leo Guerrero
Joe McComb
Frank Mendez
Bill Pruet
Mary Pat Slavik
Linda Strong
MAYOR
THE CI OF CORPUS CHRISTI, TEXAS
passed y the following vote:
1
f.PJ
D,
19136