Loading...
HomeMy WebLinkAbout19435 ORD - 08/12/1986AGREEMENT THE STATE OF TEXAS § COUNTY OF NUECES § THIS AGREEMENT is entered into between the City of Corpus Christi, Texas, hereinafter referred to as "City", and Koch Gathering Systems, Inc., hereinafter referred to as "Owner". WHEREAS, the City desires to construct a drainage channel across the west part of the west 3/4 of Survey No. 406 of 480 acres patented by the State of Texas to J. W. Stevens by Patent 101, Volume 35, dated October 4, 1907, and a portion of Survey 404 patented to Charles Land, Abstract 975 for Nueces County and being a part of Share No. 3 and Share No. 4; and WHEREAS, the Owner has one 8 -inch and one 6 -inch pipeline intersecting the drainage channel route requiring adjustment for construction of the drainage channel; NOW, THEREFORE, the City and the Owner agree as follows: 1. The Owner will stake the location of its pipeline(s) where they intersect the channel route. The City will provide survey staking of the channel right-of-way. The City will also provide on-site elevations of channel flowline at each pipeline crossing location. 2. The City will provide Owner thirty (30) calendar days advance notice to proceed with the necessary adjustments. Owner may commence adjustments any time within the 30 day notification period. Owner shall notify City a minimum of seventy-two (72) hours in advance of commencing actual adjustment to allow for survey staking of channel right-of-way and flowline elevations. 3. The Owner shall, within the time period stipulated above, proceed with the necessary adjustments and prosecute such work diligently to completion in such a manner as will not result in an avoidable interference or delay in City's construction of the drainage channel or other pipeline adjustments. 4. Owner shall prepare and submit to the City a diagram restricting the area within which all the adjustment construction shall take place. The City and Owner shall mutually agree to the designated work area, and City shall provide ingress and egress locations and pay for surface damages within the designated work area. The Owner agrees, upon completion of adjustments, to restore as near as practical those areas disturbed during construction and the surface and contour to as good a condition and contour as existed prior to construction. The Owner agrees to pay for surface damages outside of the designated work area. 5. The Owner will perform all work required for the adjustment to the pipelines with the exception of drainage channel right-of-way and elevation AGREEMENT - Pipeline Adjustment Koch Gathering Systems, Inc. Page 1 of 3 staking, The Cit drainage City shall set control points hall and elevation along the right-of-way line. The Owner points seta by the City. Any stakes and/or control stakes and control area that protect all stakes a destroyed by Owner shall be Points outside axpense. reset bythe work the City at the Owner's e6. All adjustment work shall be in compliance Department of Transportation and Texas regulations. rwith applicable U,g, Railroad commission rules and 7. The Owner shall perform expose, support, and adjustall excavation around expose, the pipelines below pipelines theeroy proposedd concretehaThe Owner shall prepare foundation, the flowlide of slab over pipelines. backfill, and place protective 8. The City agrees to reimburse work, less salvage Owner 100$ the administrative less g cost. Actualof actual cost d accomplish cost, overhead cost consists of (1) direct Percentage and method of application ' and (3) payroll burden.e cost, are detailed for administrative overhead and payroll burdensue be on the estimate attached. Said reimbursement paid within thirty (30) days Payroll properly itemized and certified Y after receiptto Owner properly to the effectndthat and accompanied byP of ao final billingC Engineer said adjustments certification from the City In accordance with]ustments have been fully Construction En City standard accomplished and Engineer on site verify practice, the labor shall have a construction procedures. to materials and labor and inspect 9. The owner agrees that any excavated adjustments after the areas have been bed windrowed material remaining from thel and remain on site. restored as previously described shall 10. The Owner agrees that all debris, cable, machine timbers will be removed and disposed of by the embedded or buried parts, skids and in the proposed channel right-of-wayOwner and face not d left 11. or adjacent lands. In making the adjustments its employees and/or contractors, to its pipelines under its em any and all Owner agrees that this Agreement by damages or lawsuits,. demands, it shall indemnify city negligence opersona/ injuries byliabilities, losses or claims other actionable third parties which for conducted under this A act or omission may fris from anyo theof drainage Agreement. City agrees that aitashall result o its operation of 4 channel contemplated under this Agreement, ' upif excavation er against any and all damages to its pipeline and appurtenances may arise fromyindemnify Owner employees or contractors negligent act PPurtheances thereto, in the excavation of such of theaCitwhich such drainage channel its agents, 12. owner agrees that an adjustments or relocations any future pipeline construction right-of-way shall of existing pipelinesor repairs, channel. be so located ascrossing the channel Owner will provide Citynotseve to interfere with the drainage of any work within the channel right-of-wayand (d) calendar days any emergency work within the Y advance notice channel right-of-way. notice as soon as possible of AGREEMENT - Pipeline Adjustment Koch Gathering Systems, Inc. Page 2 of 3 13. This Agreement shall be executed in duplicate, each shall be considered an original, and shall become effective and be binding upon and inure to the benefit of the parties hereto and their respective heirs, successors and assigns from and after the date of execution. EXECUTED IN DUPLICATE, this day of ATTEST: CITY OF CORPUS CHRISTI By: City Secretary Craig McDowell, City Manager APPROVED: day of , 19 Assistant City Attorney APPROVED: KOCH GATHERING SYSTEMS, INC. James K. Lontos, P.E. Assistant City Manager THE STATE OF TEXAS 5 COUNTY OF NUECES S By: / Title: hi/ , 1986. This instrument was acknowledged before me on , 1986, by Craig McDowell as City Manager for the City of Corpus Christi, Texas. Notary Public in and for the State of Texas k THE STATE OF 'ems 5 COUNTY OF rt� This instrument � wasyacknowledged before me on id , 1986, by • ra.W4- as /�Le.�.+�...,i' of Koch Gathering Systems, Inc. AGREEMENT - Pipeline Adjustment Koch Gathering Systems, Inc. Page 3 of 3 Notary Pubic in ah$ for t e State of 4aexas EDITH J. CHAPMAN NOTARY POUR STATE OF KANSAS �,, Mr Ap,L. Eq. Barbara Urban City of Corpus Christi Dept. of Engineering P.O. Box 9277 Corpus Christi, Tx. 78469-9277 011 KOC FI Gathering Systems Inc. • Subsidiary of Koch Industries, Inc. July 1, 1 Subject: McNorton Drainage Channel - Pipeline Adjustments Attached is the executed pipeline agreement in regard to the above 9 C---- ed drainage channel. Our construction schedule would allow this project to begin in mid August, and be completed by the end of August. The designated work area for the 6" pipeline adjustment will require an area of 465 ft. in length by 70 ft. in width, and for the 8" line also being 70 ft. in width by 530 ft. in length. The following is a breakdown of the estimated cost for the adjustment: MATERIALS Pipe - 165' - 6 5/8" od., 0.280"wt, X-42 @ 6.38/ft. $1,053 Pipe - 230' - 8 5/8" od., 0.322"wt, X-42 @ 9.31/ft. 2,141 Weld Ells (4 - 6",45°,3R & 4 - 8",45°,3R Std. Wt.) 924 Transition Nipples ( 2 - 6" & 2 - 8") 200 Concrete - 20 yds. 30002 @ $45/yd. 900 Misc. Matls. 250 Tax 273 $5,741 CONTRACT LABOR Trachoe 50 hrs x $65/hr $3,250 Sidebooms (2) @ 50 hrs x $50/hr 5,000 Welders (2) @ 40 hrs x $48/hr 1,840 Vacuum trucks (2) 30 hrs x $40/hr 2,400 Hydrostatic Testing (2) @ $1,050 ea. 2,100 Hauling Trucks 30 hrs x $45/hr 1,350 Radiographic Inspection 600 Foreman 50 hrs x $20/hr 1,000 Laborers (4) @ 50 hrs x $12/hr 2,400 $21,940 COMPANY LABOR & MISC Inspector 50 hrs x $15/hr $ 750 Engineer Tech 50 hrs x $15/hr 750 Administrative Overhead 4% x $29,181 1,167 Payroll Burden on Company Labor 19% x $1,500 285 $2,952 TOTAL PROJECT COST $.30,633 If I can be of further assistance please contact at 289-1492. ThankYou John R. Hutsell Post Office Box 4825 • Corpus Christi, TX 78409 • Telephone 512/289-1492 Post Office Box 2256 • Wichita, Kansas 67201 • Telephone 316/832-5500 CITY OF CORPUS CHRISTI, TMS CERTIF(City mer�ION OF FUNDS ter Article 1V Section 21) Jul 28, 1986c -- I certify to the City Council il that $ .30,633.00 l"gq the �ntraCt, iexpend nt, obligation or the amount regihe a forf and foregoing oordinanceordinanceis in the Treasury contemplated in the boveCD z' credit of: of the City of Corpus Christi o to the Thud No. and Name 162 Federal/States Project No, 162-152- 807.07 Project NameMcNorton Drain a. e Outf_ i from which is ropoSed it p to be drawn, and such money is not appropriated ani' or purpose. 19 7 �i Director or F, 4() i PIN 2-55 ,Revised 7/31/69 4/31, Corpus Christi, Texas ./R day of TO THE MEMBERS OF THE CITY COUNCIL Corpus Christi, Texas For the reasons set forth in the emergency clause of the foregoing ordinance or resolution, an emergency exists requiring suspension of the Charter rule as to consideration and voting upon ordinances or resolutions at three regular meetings; I/we, therefore, request that you suspend said Charter rule and pass this ordinance or resolution finally on the date it is introduced, or at the present meeting of the City Council. Respectfully, Respectfully, Council Members The above ordinance Luther Jones Dr. Jack Best David Berlanga, Sr. Leo Guerrero Joe McComb Frank Mendez Bill Pruet Mary Pat Slavik Linda Strong MAYOR was passed THE CITY 9f CORPUS CHRISTI, TEXAS by the following vote: 19435