Loading...
HomeMy WebLinkAbout19949 RES - 09/01/1987A RESOLUTION AUTHORIZING THE EXECUTION OF A CONTRACT WITH GOLDSTON ENGINEERING, INC. FOR THE DESIGN OF MUNICIPAL MARINA IMPROVEMENTS IN THE AREA NORTH OF THE PEOPLES STREET T -HEAD; AND APPROPRIATING $79,900. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI, TEXAS: SECTION 1. That the City Manager is hereby authorized to execute a contract with Goldston Engineering, Inc. for the design of Municipal Marina improvements in the area north of the Peoples Street T -Head, all as more fully set forth in the contract, a substantial copy of which is attached hereto and made a part hereof, marked Exhibit "A." SECTION 2. That there is hereby appropriated $79,900 from the No. 111 Economic Development Trust Fund applicable to Project No. 111-243.54, Design Engineering/Municipal Marina Improvements. ATTEST: y Secretary M�YOR d' THE CITY OF CORPUS CHRISTI, TEXAS APPROVED: Z4 DAY OF a., , 19,p7 -HAL GEORGE, CITY ATTORNEY 08P.020.01 19949 MICROFILMED CONTRACT FOR ENGINEERING SERVICES THE STATE OF TEXAS 5 COUNTY OF NUECES 5 The City of Corpus Christi, hereinafter called "City", and Goldston Engineering, Inc., hereinafter called "Engineer", agree as follows: I. SERVICES TO BE PERFORMED The Engineer hereby agrees, at his own expense, to perform all engineering services necessary to properly develop studies, designs, and plans and specifications for the installation of: A. a 15 foot wide boardwalk and 25'x60' sailing school deck along the north edge of the Peoples Street T -Head stem, B. approximately 30 20'x50' boat slips with finger piers adjacent to the boardwalk along with protection works consisting of approximately 450 feet of concrete sheet pile breakwater and improvements to and extension of the existing rock groin opposite Taylor Street, C. a 15 foot wide boardwalk along the seawall from the Peoples Street T -Head stem to the rock groin opposite Taylor Street, D. a 12'x250' lighted pier atop the existing Power Street Storm Sewer Outfall. II. SCOPE OF SERVICES Engineer's services under Section I will be those Basic Services which are in accordance with the Manual of Practice, General Engineering Services, as published in 1982 by the Texas Society of Professional Engineers and Consulting Engineers Council of Texas and will include the following: A. In the Preliminary Phase 1. Review of conceptual drawings associated with U.S. Army Corps of Engineers Permit No. 18089. 2. Prepare cost estimates for each phase of work. This cost estimate shall be used to establish the project budget. B. In the Design Phase 1. Furnish engineering data necessary for the City to prepare permits required by Local, State and Federal authorities, and advise the City regarding coordination of project with Federal agencies. A U.S. Army Corps of Engineers permit has been obtained for this work. 2. Preparation of detailed contract plans and specifications for construction; furnish all necessary plans, specifications and proposal documents to the City for advertising for bids. (The City estimates a maximum of 30 sets of advertising documents will be required.) Engineering Services Contract Goldston Engineering - Marina Improvements Page 1 of 5 3. Preparation of estimates of quantities and costs. 4. Assist the City in securing bids and prepare bid tabulation sheet. 5. Prepare bid tabulation, analyze bids and make recommendation concerning award of contract. 6. In the event the lowest bid exceeds the project budget cost, confer with City and make revisions as is necessary and satisfactory to the City for readvertising of the project for bids. In the event the requested revisions involve major changes in design concept, the provisions of Section V will apply. C. In the Construction Phase 1. Check shop and working drawings when required by contractor. 2. Attend the pre -construction conference. 3. Consultation with the City and advise during construction. 4. General observations of the work and interpretation of the plans and specifications by periodic visits (as distinguished from the continuous services of a resident project representative) to the site by a qualified inspector. Underwater Inspection Services shall be included as Special Services. Periodic visits shall mean a minimum of one project visit weekly of a two hour duration during the Construction Phase. In performing these services, the Engineer will endeavor to protect the City against defects and deficiencies in the work of the contractor, but he cannot guarantee the performance of the contractor nor be responsible for the actual supervision of construction operations or for the safety measures that the contractor takes or should take. 5. Preparation of change orders and monthly and final estimates for payments to the contractor, based on contractor's submittal. 6. Represent the City in interpreting and rendering decisions on the requirements of the contract documents and claims or disputes between the contractor and the City, to include any disputes or claims made by the City against the contractor within one year of the final inspection; instruct the contractor on behalf of the City (including preparation of supplementary drawings or instructions required to effectuate the intent of the contract documents). 7. Final inspection. 8. Revision of the construction drawings to show the project as actually constructed and the furnishing of "As -Built" reproducible drawings. Engineering Services Contract Goldston Engineering - Marina Improvements Page 2 of 5 D. Special Services This contract includes the furnishing of geotechnical services by the Engineer in order to properly design the facilities. City agrees to pay the Engineer a sum not to exceed Nine Thousand Nine Hundred Dollars ($9,900.00) for said services. Payment will be made on a monthly basis based on submitted invoices. Any sums rendered for Special Services is in addition to the basic fee as outlined in Section III, Paragraph A herein. E. Order of Services Engineer agrees to begin work immediately after written authorization from the City and to complete the Preliminary Phase within 10 calendar days after authorization. The Design Phase of Items A and B under Section I will be completed within 75 calendar days of written authorization by the City. The Design Phase of Items C and D of Section I will be completed within 45 calendar days of completion of the Design Phase of Items A and B. The Construction Phase of all items will be concurrent with the contruction contracts awarded for the work. III. FEE A. Fee for Basic Services The fee for performing the Basic Engineering Services will be as follows: The City will pay the Engineer a fixed' fee of Seventy Thousand Dollars ($70,000.00) providing for all services (except Special Services) in this Contract. This total fee shall be divided among the items described in Section I as follows: Item Total Fee A $18,000 B 23,000 C 13,000 D 16,000 Total $70,000 This fee will be full and total compensation for all services outlined in this Contract including additional work which may be added during construction by change order to existing contracted work provided that work specified by change order is in keeping with the original scope of work and is normal and incidental to the type of construction proposed. Fees for Special Services are outlined in Section II, Paragraph E, of this Contract. B. Payment of Fee for Basic Services The fee for Basic Services is to be due and payable as follows (said services listed above): Engineering Services Contract Goldston Engineering - Marina Improvements Page 3 of 5 1. In the Preliminary and Design Phase For services rendered under the Preliminary and Design Phase, as described above, a total amount equal to 85% of the fixed fee for work authorized by the City shall be due and payable. Payment may be made on a monthly basis, based on submitted invoices. 2. In the Construction Phase For services rendered under the Construction Phase, as described above, an amount equal to 15% of the fixed fee for those portions of the work covered by construction contracts shall be due and payable based on monthly estimates of work performed by the contractor. IV. TERMINATION OF CONTRACT The City may, at any time, with or without cause, terminate this Contract upon seven days written notice to the other the address of record. In this event, the Engineer shall be compensated for his services on all stages authorized as follows: A. If termination occurs prior to the final completion and approval of the drawings and specifications, the Engineer shall be paid a reasonable compensation for the services actually rendered by him in accordance with the above described schedule of fees and in proportion to the amount of work done on such stages or phases as has been authorized. B. If termination occurs after final completion and approval of the drawings and specifications, the fee of the Engineer shall be 85% of the fixed fee. D. If termination occurs after the letting of the contract but prior to final completion or acceptance by the City, the fee of the Engineer shall be computed in accordance with the provisions of Sections III and IV of this Contract to the date of termination. V. RENEGOTIATION In the event that the scope of the Engineer's services as outlined herein for the improvement project is determined, by the Engineer's Preliminary Phase work, to be substantially different from the description of services or construction budget contained herein, or if after receipt of bids the City requests revisions which involve major changes in design concepts, the fee set forth in this Contract shall be renegotiable only insofar as this Contract pertains to the project or projects so determined to be substantially different. Fees for projects determined to be substantially in accordance with descriptions and budgets contained herein shall not be renegotiable. VI. ENGINEER'S LIABILITY Acceptance and approval of the final plans by the City shall not constitute nor be deemed a release of the responsibility and liability of the Engineer, its employees, associates, agents and consultants, for the accuracy and competence of their designs, working drawings, and specifications or other Engineering Services Contract Goldston Engineering - Marina Improvements Page 4 of 5 documents and work, nor shall such approval be deemed to be an assumption of such responsibility by the City for any defect in designs, working drawings, and specifications or other documents prepared by the Engineer, its employees, subcontractors, agents and consultants. VII. OWNERSHIP OF DOCUMENTS Upon completion of the project (or upon termination of this Contract, if previously terminated), the Engineer shall furnish to the City, in a suitable container for filing, "record drawings", reproduced on linen or mylar drafting film from the original drawings, together with a correct and legible set of specifications. VIII. ASSIGNABILITY The Engineer shall not assign, transfer or delegate any of his obligations or duties in this Contract to any other person without the prior written consent of the City, except for routine duties delegated to personnel of the Engineer's staff. If the Engineer is a partnership, in the event of the termination of the partnership, this Contract shall inure to the individual benefit of such partner or partners as the City may designate. No part of the Engineer's fee may be assigned in advance of receipt by the Engineer without written consent of the City. IX. TECHNICAL ASSISTANCE AND CONSULTATIONS The City shall not pay the fees of expert or technical assistance and constants unless such employment, including the rate of compensation, has been approved in writing by the City. X. DISCLOSURE OF INTERESTS Engineer further agrees, in compliance with the City of Corpus Christi Ordinance No. 17112, to complete, as part of this Contract, the Disclosure of Interests form attached hereto. EXECUTED IN DUPLICATE, each of which shall be considered an original, this day of , 1987. ATTEST: CITY OF CORPUS CHRISTI By: City Secretary Craig A. McDowell, City Manager APPROVED: GOLDSTON ENGINEERING, INC. day of , 1987 By: Assistant City Attorney Engineering Services Contract Goldston Engineering - Marina Improvements Page 5 of 5 CITY OF CORPUS CHRISTI, TEXAS CERTIFICATION OF FUNDS (City Charter Article IV Section 21) August 21, 1987 I certify to the City Council that $ 79,900.00 , the amount required for the contract, agreement, obligation or expenditures contemplated in the above and foregoing ordinance is in the Treasury of the City of Corpus Christi to the credit of: Fund No. and Name Project No. Project Name No. 111 Economic Development Trust Fund 111-243.54 Design Engineering/ Municipal Marina Tmrc from which it is proposed to be drawn, and such Honey is not appropriated for any other purpose. r CO .uo--7 ' +� >1",2/2 2 e..5e6 54 7?d,ei ?c -d)— FIN 2-55 g42//6-2 Revised 7/31/69 s i OZ / , 19E7 Corpus Christi, Texas n day of The above resolution was passed by the following vote: Betty N. Turner David Berlanga, Sr. Leo Guerrero Frank Mendez Clif Moss Bill Pruet Mary Rhodes Mary Pat Slavik Linda Strong 99.066.01 19949 , 198_2