HomeMy WebLinkAbout020188 RES - 02/02/1988A RESOLUTION
AUTHORIZING THE EXECUTION OF AN AGREEMENT WITH CORPUS
CHRISTI JUNIOR COLLEGE DISTRICT RELATIVE TO STREET SYSTEM
IMPROVEMENTS SURROUNDING THE DEL MAR COLLEGE EAST CAMPUS,
INCLUDING IMPROVEMENTS TO NAPLES AND EDWARDS STREETS AND THE
REALIGNMENT OF KOSAR STREET; AND APPROPRIATING $19,873.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI,
TEXAS:
SECTION 1. That the City Manager is hereby authorized to execute an
agreement with Corpus Christi Junior College District relative to street system
improvements surrounding the Del Mar College East Campus, including improvements
to Naples and Edwards Streets and the realignment of Kosar Street all as more
fully set forth in the agreement, a substantial copy of which is attached hereto
and made a part hereof, marked Exhibit A.
SECTION 2. That there is hereby appropriated $19,873 from the No. 295
Storm Sewer Bond Fund as the City's participation in underground storm sewer
work associated with the Edwards Street improvements, applicable to Project
No. 295-88-44-2.1, Del Mar Storm Sewer Construction.
ATTEST:
City Secretary M
APPROVED: X764 DAY OF,1714.
HAL GEORGE, CITY ATTORNEY
Assistant City Attorne
205RP070.res
THE CITY OF CORPUS CHRISTI, TEXAS
, 19ff
noise MICROFILMED
AGREEMENT
THE STATE OF TEXAS §
COUNTY OF NUECES §
This agreement is entered into by and between the City of Corpus Christi,
Texas, hereinafter called "City" and the Corpus Christi Junior College
District, hereinafter called "College", and relates improvements to the street
system surrounding Del Mar College East Campus.
WHEREAS, the College has embarked upon a major expansion and improvement
program for Del Mar College East Campus which will impact the traffic volumes
and circulation patterns on the City streets surrounding the campus, and
WHEREAS, the City and College desire to implement improvements to the
street system surrounding the campus;
NOW, THEREFORE, the City and College agree as follows:
1. The desired improvements and their order of priority are:
a. The installation of an underground storm sewer line from the
existing system within the abandoned Shely Street right-of-way,
along the abandoned Lewis Street right-of-way to the
intersection of Lewis and Edwards Streets,
b. Edwards Street, Ayers Street to Naples Street. Reconstruct to
a 40' back to back of curb cross-section with sidewalks on both
sides of the street,
c. Naples Street, Edwards Street to Kosar Street. Reconstruct to
a 40' back to back of curb cross-section with sidewalks on both
sides of the street,
d. Realign Kosar Street, from Naples Street to S. Staples Street,
to provide smoother access to the College from Staples,
all as shown on Exhibit "A" attached hereto and made a part hereof.
2. The City and College desire that the improvements be constructed and
completed in conjunction with the major improvements to the East Campus of the
College currently- under construction or commencing construction during 1988.
Therefore, time is of the essence for the completion of the improvements in
accordance with the following completion schedule:
a. Storm sewer extension in abandoned Lewis Street right-of-way to be
completed by December 31, 1988.
b. Edwards Street improvements to be completed by December 31, 1989.
c. Naples Street improvements to be completed by December 31, 1989.
d. Realignment of Kosar Street to be completed by December 31, 1990.
Should this completion schedule not be met through no fault of
either party, the completion dates shall be re-established by mutual consent
of both parties.
Agreement
Corpus Christi Junior College District
Page 1 of 3
iwa4
3. The estimated cost of these improvements, including engineering,
construction and contract administration is as shown on Exhibit "B" attached
hereto and made a part hereof.
4. Due to the College's completion schedule for the parking lots
adjacent to Lewis Street, the storm sewer along the abandoned Lewis Street
right-of-way must be installed prior to the completion of the parking lots and
the Edwards Street improvements. The College will include this work with the
parking lot construction. The cost of this work has been established at
$18,573.00 for the construction, and $1,300.00 for engineering services.
5. The cost of the improvements to Edwards and Naples shall be
apportioned as shown on Exhibit "C", attached hereto and made a part hereof.
In summary, the City will pay the costs associated with utility adjustments
and installation of the storm drainage system; the City will assess abutting
property owners other than the College a proportionate share of the cost of
pavement, curb and gutter, sidewalks and driveways in accordance with the
current assessment policies and ordinances of the City; and the College shall
pay remaining costs as set forth in Exhibit "C".
6. The total estimated cost for the realignment of Kosar Street is
$213,000. The City has allocated a total of $200,000. The College's
estimated share of the cost of this realignment is $13,000.
7. Except for the storm sewer extensions along the abandoned Lewis
Street right-of-way, the City will prepare, or cause to be prepared, the
detailed plans and specifications for the work, receive bids, award the
contract and provide construction inspection and contract administration
services. The College will prepare, or cause to be prepared, the detailed
plans and specifications for the storm sewer extension, acceptable to the City
and will cause the work to be performed in conjunction with other work being
performed by the College.
8. The estimates and apportionment of costs shown herein and on
Exhibits "B" and "C" are approximate and shall be adjusted to reflect actual
construction costs, assessments and administrative costs incurred as
calculated upon completion and acceptance of the work. In the event that the
total of the low bid received plus estimated related expenses (engineering,
testing, construction inspection, legal advertising, etc.) is ten percent
(10%) or greater than the estimated costs shown herein and on Exhibits "B" and
"C", no further work will proceed unless this agreement is amended by mutual
consent of both parties. Expenses incurred up to the receipt of bids shall be
pro -rated based upon each parties estimated percentage contribution to the
project. For the purposes of this calculation, the City's percentage
contribution shall include the property owner assessments.
9. The College shall, prior to the award of any contract for
construction of Edwards Street, Naples Street or the realignment of Kosar
Street, remit to the City its estimated share of the funding for that phase of
the work. The City shall, prior to the award of any contract or issuance of
any change order for the construction of the storm sewer extension in the
abandoned Lewis Street right-of-way remit to the College the total estimated
cost of such work.
Agreement
Corpus Christi Junior College District
Page 2 of 3
10. The College and the City enter into this agreement pursuant to
Article 4413 (32c), Interlocal Cooperation Act, as amended. Neither party
shall be responsible to the other for personal injuries, losses, claims, or
demands caused by the acts or omissions, if any, of such party or its agents,
employees, invitees, or subcontractors. The liability, if any, of either
party shall be that prescribed by the laws of the State of Texas.
11. The Agreement shall become effective and shall be binding upon and
shall inure to the benefit of the parties hereto. This Agreement is solely
for the benefit of the College and the City, and is not for the benefit of any
third party.
EXECUTED IN DUPLICATE, this the
day of , 1988.
ATTEST: CITY OF CORPUS CHRISTI
By:
City Secretary Craig A. McDowell, City Manager
APPROVED: CORPUS CHRISTI JUNIOR COLLEGE DISTRICT
By:
day of , 1988
By:
Assistant City Attorney Howard E. Barth, President
Board of Regents
Agreement
Corpus Christi Junior College District
Page 3 of 3
DEL MAR •COLLEGE
EXHIBIT "A"
LEGEND
EDWARDS STREET ( b )
NAPLES STREET ( c )
Pc/ /
W.00j KOSAR ST. REALIGNMENT (d)
EXHIBIT B
ESTIMATED COST OF IMPROVEMENTS
A. Storm Sewer Extension along abandoned Lewis Street Right -of -Way
Storm Sewer L.S.
Engineering Services
Total and City Share
$ 18,573
1,300
$ 19,873
B. Edwards Street - Ayers Street to Naples Street - 1,320 L.F.
Pavement 6,000 S.Y. @ 20.00 = $120,000
Curb & Gutter 2,650 L.F. @ 6.00 15,900
Sidewalk 10,600 S.F. @ 2.50 26,500
Driveways 4,000 S.F. @ 3.00 12,000
Storm Sewer 18" RCP 600 L.F. @ 22.00 13,200
15" RCP 200 L.F. @ 18.00 3,600
10 Inlets @ 1,000.00 10,000
Utility Adjustments and Relocations 35,000
Subtotal $236,200
Engineering & Contingencies 35,800
TOTAL $272,000
C. Naples Street - Edwards Street to Kosar Street - 1,320 L.F.
Pavement 6,000 S.Y. @ 20.00 = $120,000
Curb & Gutter 2,650 L.F. @ 6.00 15,900
Sidewalk 10,600 S.F. @ 2.50 26,500
Driveways 2,500 S.F. @ 3.00 7,500
Storm Sewer 24" RCP 350 L.F. @ 30.00 10,500
15" RCP 400 L.F. @ 18.00 7,200
17 Inlets @ 1,000.00 17,000
Utility Adjustments and Relocations 35,000
Subtotal $239,600
Engineering & Contingencies 35,400
TOTAL $275,000
D. Kosar Street Realignment
A. Right of Way Acquisition $110,000
B. Construction
Pavement 3,000 S.Y. @ 20.00 = $ 60,000
Curb & Gutter 1,200 L.F. @ 6.00 7,200
Sidewalk 6,000 S.F. @ 2.50 15,000
Driveways 400 S.F. @ 3.00 1,200
Storm Sewer
Pipe 18" 100 L.F. @ $22.00 2,200
Inlets 4 Each @ 1,000.00 4,000
Subtotal $ 89,600
Engineering & Contingencies 13,400
TOTAL $103,000
TOTAL A & B $213,000
EXHIBIT C
ESTIMATED APPORTIONMENT OF COSTS
I. Edwards Street - Ayers to Naples
City $ 71,166.80
Assessments 28,875.50
College 171,957.70
Total $272,000.00
II. Naples Street - Edwards to Kosar
City $ 80,385.00
Assessments 6,950.00
College 187,665.00
Total $275,000.00
III. Kosar Street Realignment
City and Assessments
College
$200,000.00
13,000.00
Total $213,000.00
CITY OF CORPUS CHRISTI, TEXAS
CERTIFICATION OF FUNDS
(City Charter Article IV Section 21)
January 27, 1988
I certify to the City Council that $ 19,873.00 , the amount required for
the contract, agreement, obligation or expenditures contemplated in the above
and foregoing ordinance is in the Treasury of the City of Corpus Christi to the
credit of:
Fund No. and Name No. 295 Storm Sewer Bond Fund
Project No. 295-88-44-2.1
Project Name Del Mar Storm Sewer Constr,ncttnn
from which it is proposed to be drawn, and such money is not appropriated for any
other purpose.
Director
FIN 2-55
Revised 7/31/69
/9} g7 I oP C 7//
eS3
inance
99.066.01
Corpus Christi, Texas
br10L- day of
The above resolution was passed by the following vote:
Betty N. Turner
David Berlanga, Sr.
Leo Guerrero
Cl if Moss
Bill Pruet /} ,
Mary Rhodes
Frank Schwing, Jr.
Mary Pat Slavik C
Linda Strong alcatn,t;
20188
, 1981