RESOLUTION
AUTHORIZING AMENDMENT NO. 1 TO THE ENGINEERING
SERVICES CONTRACT WITH ORIGINAL JOINT VENTURE OF
MUNROE AND BASS, INC., ASSOCIATED ENGINEERS AND
SURVEYORS, AND WELSH ENGINEERING PROVIDING FOR
REDESIGN SERVICES OF OFF-SITE CHANNEL "A" FOR A FEE OF
$28,000, AND FOR CONSTRUCTION PHASE SERVICES FOR A FEE OF
$165,940.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF CORPUS
CHRISTI, TEXAS:
SECTION 1. That the City Manager or his Designee be authorized to execute
Amendment No. 1 to Engineering Services Contract with original joint venture of Munroe
and Bass, Inc., Associated Engineers and Surveyors, and Welsh Engineering providing for
redesign services of off-site Channel "A" for a fee of $28,000, and for construction phase
services for a fee of $165,940, a substantial copy of which is attached hereto and made a
part hereof, marked Exhibit "A".
AI I'EST: THE CITY OF CORPUS CHRISTI
111-t4.4S
Armando Chapa, City S retary MAYO , MA RHODES
APPROVED: J 6 DAY OF Oc,iolv-. , 1992
JAMES R. BRAY, JR., CITY ATTORNEY
By: , f Lao*
r
Assistant
AG5000.235.ajr
ity Attorney
021511
liteli4u4ED
AMENDMENT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES
STATE OF TEXAS §
COUNTY OF NUECES §
Whereas the City of Corpus Christi ("City") entered into that certain contract for
engineering services with a joint venture comprised of Munroe and Bass, Inc., Associated
Engineers and Surveyors, and Welsh Engineering ("original joint venturers") dated
September 22, 1988 for the reconstruction and widening of Waldron Road, from South
Padre Island Drive to Purdue Road, and with related sanitary sewer, water and drainage
improvements, said contract hereinafter referred to as "original contract";
WHEREAS Murray Bass, Jr., Consulting Engineers, Inc., is the successor firm to
Munroe and Bass, Inc., and;
WHEREAS Welsh Engineering and Murray Bass, Jr., Consulting Engineers, Inc.
have merged together to form a new engineering firm called Bass & Welsh Engineering,
Inc., and;
WHEREAS the joint venture of Bass & Welsh Engineering and Associated
Engineers and Surveyors ("Engineers") are successors in interest and obligations of original
joint venturers under said original contract;
NOW, therefore, and in consideration of the fees to be paid by City to Engineers as
described below, City and Engineers agree that Engineers are to perform and complete all
remaining work not accomplished and completed by original joint venturers under said
original contract and City and Engineers agree to the following changes to said original
contract:
II. SCOPE OF SERVICES
A. Under II. "Scope of Services" of said original contract delete sub -paragraph
C.4 and substitute the following:
Part A - General Construction Surveying Services
C.4 Provide all of the surveying services as follows:
Amendment No. 1 to Contract for Engineering Services
Joint Venture - Munroe & Bass, Inc., Associated Engineers
& Surveyors and Welsh Engineering
October 22, 1992; Page 1 of 6
i
a. Recover or re-establish all centerline control data used in the
preparation of the plans and specifications as required. Provide bench
marks at 500' intervals. Provide right-of-way line stakes at 100'
intervals (accuracy +/-0.2 feet).
b. Survey and stake all sanitary sewer gravity and force mains on an
offset line at 100' on centers with horizontal and vertical control.
Survey, stake and provide horizontal and vertical control for all
manholes, lift station, and force main fittings.
c. Survey and stake all waterline improvements on an offset line with
stakes a minimum of 100' on centers with horizontal and vertical
control and stake location, horizontal and vertical, of all fire hydrants,
valves and fittings.
d. Survey and stake all storm sewer improvement pipes and concrete -
lined channels on an offset at 50' intervals, and open channels on an
offset at 100' intervals with horizontal and vertical control. Survey and
stake all inlets and manholes with horizontal and vertical control.
Survey and stake bridges and box culverts with the centerline axis in
both directions and a bench mark at the site.
e. Survey and stake street improvements rough -cut stakes on one side of
street at 100' on center with horizontal and vertical control. Survey and
verify top of subgrade at the 1/4 points and centerline prior to
stabilization or placement of concrete pavement. For the construction
of the curb and gutter, survey and stake a line of stakes 3' behind each
curb at 50' on center, plus grade breaks with horizontal and vertical
control. Survey and stake the radius point for all curb returns and
points of curvature for driveways, at the curb line.
It is the intent of this paragraph to require Engineers to provide all the construction
survey services described in Item A-12. Construction Staking, of the project's Special
Provisions of the Specifications for the completion of the project.
Part B - Pipeline Related Construction Surveying Services
The Engineers, in conjunction with petroleum pipeline adjustments, shall
stake, on the ground, all of the pipelines at right-of-way line crossings of
Waldron Road and offsite drainage channels on an on-call basis as requested
by the contractor. The purpose of this is so that the contractor can locate and
expose for pipeline company to test and isolate approximately 47 petroleum
pipelines from the several rights-of-way, prior to contractor removal.
Amendment No. 1 to Contract for Engineering Services
Joint Venture - Munroe & Bass, Inc., Associated Engineers
& Surveyors and Welsh Engineering
October 22, 1992; Page 2 of 6
Part C - Final Survey Services
Engineers shall survey the entire project after all work is completed to obtain
the following "As -built" information, and verify final project quantities.
a. Manholes (Sanitary and Storm Sewer). Elevation of rim and
invert.
b. Measure driveways, sidewalk, curb and gutter, pavements and
pavement markings.
c. Locate all fire hydrants and waterline valves.
d. Locate all Force Main Valves.
B. Under II. "SCOPE OF SERVICES" of said original contract, delete from
sub -paragraph C.5., the following: "Day -to -Day inspection services shall be
provided by the City as is customary for infrastructure construction which will
be maintained by the City.", and add the following to said sub -paragraph C.5:
Full -Time Resident Services
Engineers shall provide full-time resident inspection services for the project
duration. The City reserves the right to approve the Engineers' resident
inspection personnel but such approval shall not be unduly withheld. At a
minimum, resident inspection personnel shall have significant experience in
street, drainage, water and wastewater construction comparable to size and
scope of project. Engineers shall:
1. Provide full-time resident inspection personnel and services for all
phases of inspection at all times the contractor is actively working on
the project, provide detailed daily reports of construction activity, and
mark up project plan prints with as -built changes and notes.
2. Supervise and direct the work of field staking and inspection.
3. Normal day-to-day detailed coordination with Engineering and
respective City utilities staff and with the testing laboratory as needed.
4. Testing services are not included. It is contemplated that the City will
engage and pay directly a commercialtesting laboratory for such tests
as are not the responsibility of the construction contractor.
Amendment No. 1 to Contract for Engineering Services
Joint Venture - Munroe & Bass, Inc., Associated Engineers
& Surveyors and Welsh Engineering
October 22, 1992; Page 3 of 6
r
C. Under II. "SCOPE OF SERVICES" of said original contract, add paragraph
H. Channel "A" Re -Alignment, as follows:
H. Channel "A" Re -Alignment Redesign Services
Re -design offsite drainage Channel "A" (as designated in the preliminary
engineering report submitted to the City under said original contract and in
the construction plans as originally submitted such that offsite drainage
Channel "A" would begin at Waldron Road, thence extending in a
southeasterly direction parallel to Graham Road to the northwest boundary
line of Lot 10, Section 55, Flour Bluff and Encinal Farm and Garden Tracts
(Exxon Company, U.S.A.) at the easternmost corner of Wranosky Park;
thence along, adjacent to and northwest of said northwest boundary line of
said Lot 10; thence southwest of, adjacent to and generally parallel with the
southwest boundary line of Gateway Park residential subdivision, crossing
Laguna Shores Road to the Laguna Madre.
1. Preliminary Work
A. Preliminary Cost Estimate on re-routing Channel "A" to the
north.
B. Hydraulics calculations.
C. Bridge and right-of-way sizing calculations.
D. Preparation of metes and bounds descriptions for re-route and
drawings associated herewith.
E. Corps of Engineers permit amendment application,
correspondence and site visits with Corps of Engineers and
governmental agencies.
F. Preparation of exhibits for negotiations with pipeline
companies.
G. Meetings, correspondence and site visits with City with regard
to Corps of Engineers permit.
H. Boundary surveying for metes and bounds descriptions.
Amendment No. 1 to Contract for Engineering Services
Joint Venture - Munroe & Bass, Inc., Associated Engineers
& Surveyors and Welsh Engineering
October 22, 1992; Page 4 of 6
i
2. Design Work
A. Preparation of construction plans for re-routing offsite drainage
Channel "A" and wastewater force main.
B. Re-siting lift station and design of access road through
Wranosky Park and extension of culvert and waterline in
Wranosky Park.
C. Re -design the Laguna Shores Road drainage crossing for offsite
channel "A".
D. Topographic survey along the new route to Channel "A".
E. Negotiations, meetings and correspondence with Reynolds,
Exxon and Petrotex with regard to locating pipelines and
adjustments therefor and for negotiating contracts between the
City and pipeline companies for construction adjustment work.
Provide survey field work as required to tie in pipelines for
agreements.
III. FEE
Under III. FEE, of said original contract add paragraph C. Fee and Payment This
Amendment.
C. Fee and Payment This Amendment
1. Part A. General Construction Surveying Services: The fee for general
construction surveying services shall be a fixed fee of $33,120. Payment
shall be made based on the percentage completion of the construction
contract.
Part B. Pipeline Related Construction Surveying Services: The fee for
pipeline related construction surveying services shall be $255 per
pipeline crossing actually staked on the ground, not to exceed a total
sum of $12,000. Payment shall be made based on the actual pipeline
crossings actually staked on the ground according to invoices submitted
on a monthly basis as work progresses.
Part C. Final Survey Services: The fee for final survey services shall
be a fixed fee of $8,500. Payment shall be made upon completion and
acceptance of the construction contract.
Amendment No. 1 to Contract for Engineering Services
Joint Venture - Munroe & Bass, Inc., Associated Engineers
& Surveyors and Welsh Engineering
October 22, 1992; Page 5 of 6
2. The fee for full-time Resident Inspection Services shall be a fixed fee
of $112,320. Payment shall be made based on percentage completion
of the construction contract.
3. The fee for Channel "A" Re -Alignment Redesign Services shall be a
fixed fee of $28,000. Payment shall be made within two weeks of date
hereof.
Said fees shall be in addition to the $6,000 fee as described in Paragraph "E". Special
Services, of said original contract and in addition to the $335,000 fee described under
Section III. FEE, of said original contract.
All other terms and conditions of said original contract not specifically addressed
herein, shall remain in full force and effect.
EXECUTED IN DUPLICATE, each of which shall be considered an original, this
day of , 1992.
ATTEST CITY OF CORPUS CHRISTI
APPROVED:
3 day of L.' Jo l u , 1992
Byk %) LW.Cr* n C 1
Alison Gallaway, Asst. City Attorney
Amendment No. 1 to Contract for Engineering Services
Joint Venture - Munroe & Bus, Inc., Associated Engineers
& Surveyors and Welsh Engineering
October 22, 1992; Page 6 of 6
r
By:
Juan Garza, City Manager
BASS & WE
By
M ay Bass, Jr., P.E., President
o urray Bass, Jr., Consulting
Engineers, Inc., Partner of Bass
& Welsh Engineering
ENGIN
By:
Nixon M. Welsh, P.E., Partner of
Bass & Welsh Engineering
Associated Engineers and Surveyors
Billy Settles, P.E.
By:
Corpus Christi, Texas
day of •1 i1
�., , 19 7-1
The above resolution was passed by the following vote:
Mary Rhodes
Cezar Galindo
Leo Guerrero
Betty Jean Longoria
Edward A. Martin
Joe McComb
Dr. David McNichols
Clif Moss
Mary Pat Slavik
066
r
•
021511