HomeMy WebLinkAbout021931 RES - 05/17/1994A RESOLUTION
AUTHORIZING THE CITY MANAGER TO EXECUTE AN AGREEMENT FOR
FINANCING OF PHASE II OF THE TRANS -TEXAS STUDY WITH THE
PORT OF CORPUS CHRISTI AUTHORITY WHEREIN THE PORT
AUTHORITY AGREES TO PAY ON BEHALF OF THE CITY OF CORPUS
CHRISTI THE $211,800 INTEREST-FREE LOAN FROM THE TEXAS
WATER DEVELOPMENT BOARD IF THE CITY DOES NOT INITIATE
PROJECTS THAT WOULD REQUIRE REPAYMENT OF THE LOAN PRIOR
TO THE 20 YEAR TERM OF THE LOAN.
WHEREAS, present water supplies are insufficient to meet the
future needs of Corpus Christi and its service area; and
WHEREAS, the health, welfare, and economic prosperity of our
citizens depends upon acquiring adequate water supplies; and
WHEREAS, the City of Corpus Christi (the "City") and the Port
of Corpus Christi Authority (the "Port") previously shared costs of
the completion of Phase I of the Trans -Texas Water Program, South
Central Study - Corpus Christi Area; and
WHEREAS, the Port wishes to assist the City in obtaining
completion of Phase II of said study.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF CORPUS CHRISTI, TEXAS:
The City Manager is hereby authorized to execute the Agreement
For Financing Of Phase II Of The Trans -Texas Study, attached as
Exhibit A and incorporated herein.
APPROVED THIS 12TH DAY OF MAY 1994.
JAMES R. BRAY JR., CITY ATTORNEY
\ord\94035. aar
MAYOR
THE C F CORPUS CHRISTI
ULi 931
AGREEMENT FOR FINANCING OF PHASE II
OF THE TRANS -TEXAS STUDY
WHEREAS, the City of Corpus Christi, Texas ("City") is
proposing to enter into an agreement with the Lavaca-Navidad River
Authority ("LNRA") entitled "Amendment No. 1 To Joint Sponsorship
Agreement" (the "Phase II Agreement"), a substantial copy of which
is attached as Exhibit A and incorporated herein; and
WHEREAS, said agreement would enable completion of Phase II of
the Trans -Texas Water Program, South Central Study - Corpus Christi
Area, which is essential to obtaining an adequate long-term water
supply for the Corpus Christi area, through a $600,000 grant and a
$211,800 interest-free loan from the Texas Water Development Board;
and
WHEREAS, an adequate long-term water supply is indispensable
to carrying out the lawful purposes of the Port of Corpus Christi
Authority ("Port").
NOW, THEREFORE, THE CITY AND THE PORT AGREE AS FOLLOWS:
1. In consideration of the City entering into the Phase II
Agreement, the Port agrees to pay on behalf of the City, the
interest-free loan referred to in part 2.c. of the Phase II
Agreement at the time such loan becomes due and payable. Provided
however, that if the City implements a project identified by the
Trans -Texas Study as provided in part 4.c. of the Joint Sponsorship
Agreement between the City and LNRA, the City will repay the loan
as part of the project costs, and the Port will have no further
obligation
2. This Agreement shall be effective upon signing by both
parties.
ATTEST: CITY OF CORPUS CHRISTI
City Secretary Juan Garza, City Manager
Date
APPROVED: l a DAY OF / l A� , 1994
JAMES R. BRAY JR., CITY ATTORNEY
\contract\026.skp
`ATTEST: PORT OF CORPUS CHRISTI AUTHORITY
Name Name
Title Title
Date
\contract\026. skp
r
AMENDMENT NO. 1 TO JOINT SPONSORSHIP AGREEMENT
WHEREAS, Lavaca-Navidad River Authority and the City of Corpus Christi entered
an Agreement for Joint Sponsorship of the Regional Study to Evaluate Alternatives for
Transporting Water To Corpus Christi on September 22, 1992 (Joint Sponsorship
Agreement);
WHEREAS, funding provided in the Joint Sponsorship Agreement enabled
completion of Phase I and part of Phase II of the Trans -Texas Water Program, South
Central Study — Corpus Christi Area;
WHEREAS, the parties are desirous of extending the Joint Sponsorship Agreement
to complete Phase II of the Trans -Texas Water Program, South Central Study -- Corpus
Christi Area, including significant expansion of its scope;
NOW, THEREFORE, for and in consideration of the foregoing and mutual benefits
and obligations provided herein, Lavaca-Navidad River Authority and the City of Corpus
Christi (the Parties) do hereby contract and amend the Joint Sponsorship Agreement as
follows:
1. The scope of services shall include Phase II services as set out in
Attachment A, which is attached hereto and incorporated for all purposes.
2. Funding for Phase II of the Study is as follows:
a. Initial funding for the Study will be provided by a $600,000.00 grant
from the Texas Water Development Board (TWDB) to Lavaca-
Navidad River Authority (LNRA) and a $211,800.00 interest free
loan.
b. This Study is entirely contingent upon receipt of the TWDB grant and
loan described above.
c. The TWDB loan will be repaid by future payments to LNRA of
$211,800.00 from Corpus Christi. Such future payments will be
made from City water system revenues and not represent a
commitment of future tax revenues. Payment from the City shall be
due upon the same schedule that payments are made under the
Joint Sponsorship Agreement.
d. This Agreement adds $211,800.00 to the total financial commitment
made by the City of Corpus Christi in the Joint Sponsorship
Agreement.
3. The obligations of the parties set forth herein are in addition to those
Eft. A (To c-;M.R»c;1 A1rt)
described in the Joint Sponsorship Agreement. Except as expressly
modified or supplemented herein, all provisions of the Joint Sponsorship
Agreement remain in full force and effect and are applicable to this
Amendment No. 1 of the Joint Sponsorship Agreement.
IN WITNESS WHEREOF, The Parties hereto have caused this Amendment No.
1 to the Joint Sponsorship Agreement to be executed by their duly authorized
representatives as of the date written above.
ATTEST:
Denise Ryan, Diror of Adm.
ATTEST:
Armando Chapa, City Secretary
LAVACA-NAVIDAD RIVER AUTHORITY
Emmett Gloyna, General Manager
CITY OF CORPUS CHRISTI
Juan Garza, City Manager
APPROVED: 1 DAY OF talay 19 q t .
Jimn ray, City Attorney
pwin6u\contractcorpus.0
Scope of Work for
South Central Texas Study
Corpus Christi Study Area
Trans -Texas Water Program
(2/24/94)
PHASE 11
Phase II of the Trans -Texas Water Program will examine in more detail the water supply
alternatives identified during Phase I and will result in a recommended plan of action for
meeting water demands in the planning area. The scope of work for this phase will focus
on better definition of the benefits of each alternative, better definition of environmental
impact, more refined estimates of capital and O&M costs, financing and pricing alternatives,
legal and institutional arrangements for implementation of recommended alternatives, and
development of an implementation plan. It is anticipated that during the Phase II process,
preferred alternatives will be selected by the appropriate Policy Management Committee.
In Phase 11, particular emphasis will be placed on the completion of engineering and
environmental studies necessary to proceed with permit applications at the State level
including water rights applications. The implementation planning will provide an initial
schedule and comprehensive list of activities for the remainder of the program, and establish
costs and legal/institutional issues with enough detail to allow project sponsors to make
decisions to proceed with individual projects. The Phase II work will, to the extent possible,
follow the requirements of the pending TNRCC Regulatory Guidance Document. A
preliminary outline of this document is included as Attachment 1. Phase II includes the
following major work elements:
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION
2/24/94
1 ENGINEERING STUDIES
2 ENVIRONMENTAL ANALYSES
3 PUBLIC INVOLVEMENT
4 PRE -APPLICATION PERMITTING AND REGULATORY AGENCY
COORDINATION
5 COST ESTIMATES AND FINANCING ALTERNATIVES
6 IMPLEMENTATION PLANNING
7 REPORTS AND MEETINGS
Phase II - Scope of Work
AH-stgh...t•-t
4
r
SECTION 1 - ENGINEERING STUDIES
Task Description Budget
1.1 Population, Water Demand, and Water Supply Projections $12,000
A technical memorandum will be prepared summarizing the 50 -year
in -basin supply and demand situation for the Lavaca-Navidad River
Basin. The Policy Management Committee decided to continue to use
the Texas Water Development Board (TWDB) Phase I population and
water demand projections for the Phase II Study, since new TWDB
projections are not available.
TWDB will prepare written documentation of its high and low
population and water demand projections, with conservation, for
inclusion as an Appendix. A comparison of past projections of
population with actual census results will be prepared by TWDB.
1.2 Water Supply Alternative Analysis
1. Modification of Choke Canyon/Lake Corpus Christi (CC/LCC)
Reservoir Operating Policy (N-1).
1. Develop a yield curve using a range of target operating
levels with lowest level selected based on water quality
and operational concerns.
2. Investigate cost and feasibility of lowering the water
intake levels in Lake Corpus Christi as well as costs of
any structural modifications of spillways and/or outlet
works necessary to make releases to the estuary at lower
reservoir levels.
$28,500
2/24/94 2 Phase II - Scope of Work
3. Provide graphic comparisons of monthly changes in lake
levels for various target operating levels.
4. Incorporate most recent sedimentation survey data and
sedimentation rates for calculation of future system
yield.
5. Use the current TNRCC interim order for estuary
releases.
6. Provide salinity statistics changes for operation of
CC/LCC at lowest and highest target operating levels
both with and without return flows from imported water
sources.
7. Prepare environmental studies in accordance with
Section 2.
8. Prepare cost and financing analysis in accordance with
Section 5.
9. Prepare implementation plan and consider revisions to
the City's CC/LCC Operating Ordinance.
2. Diversion from Nueces River to Choke Canyon Reservoir (N-2)
1. Analyze benefit of operating the diversion during
average years to produce an economical supply, even
though firm yield is not significant. Compare average
unit cost of this water supply with costs of pumping
imported water.
2. Show graphically any changes in monthly river flows
downstream of diversion location considering the Trans -
Texas Environmental Criteria.
3. Prepare environmental studies in accordance with
Section 2.
4. Prepare cost and financing analysisin accordance with
Section 5.
5. Prepare long-range implementation plan, if alternative
proves feasible.
$7,000
2/24/94 3 - Phase II - Scope of Work
3. R&M Reservoir (N-3)
1. Expand cost estimate to include potential mineral rights,
hazardous waste sites, and other potential project costs.
2. Perform alternative yield analysis for R&M both as a
new reservoir under the Trans -Texas criteria (for various
trigger levels) and operated as a third reservoir under
the interim order.
3. Perform comparison of salinity variations in estuary with
and without the project. Consideration will be given to
the TNRCC's five percent yield reservation.
4. Update environmental mitigation costs in accordance
with Section 2.
$15,500
4. Purchase of Existing Water Rights in Nueces Basin (N-4). $5,000
1. Expand Phase I report to include an analysis of how the
yield of CC/LCC System would be affected if some
portion of un -utilized Nueces River Basin irrigation
water rights could be purchased. In addition, summary
tables of significant fresh water rights in adjacent coastal
basins will be included based on data furnished by the
TNRCC.
5. Pipeline from Choke Canyon Reservoir to Lake Corpus Christi $2,000
(N-5) and pipeline from Lake Corpus Christi to Calalien Dam
(N-6).
Carry forward the Phase I work into the Phase II report
addressing review comments received in Phase I.
6. Industrial Water Use Evaluation
1. Describe and characterize industrial water use by major
industries of the City of Corpus Christi water service
area. This description will include a summation of raw
and treated water consumption, internal reuse, and
NPDES discharges.
$34,000
2/24/94 - 4 - Phase II - Scope of Work
2. Quantify water quality and quantity constraints for the
different categories of industrial use such as power
generation, petroleum refining, petrochemical, food
processing, and metals production from surveys of local
industry.
3. Describe economic and technical constraints and
environmental effects (estuary and other) that local area
industries would face under a variety of alternative
qualities of water. This work element would address
existing technology which is currently being used to
satisfy cooling process, power generation, and other
water needs. In addition, it would address technology
required to use water resources such as brackish
groundwater, seawater, and reclaimed water (treated
municipal wastewater) to accomplish this in order to
offset use of existing freshwater.
4. Describe industrial water conservation that occurred
during the 1984 drought and in recent years and describe
potential industrial plant modifications for changes in
technology which could be employed to further reduce
water consumption for local area industries. Any unique
opportunities for water conservation and reuse, such as
San Patricio MWD's study of industrial use of municipal
effluent project presently under study, will be identified.
5. Consider environmental effects of industrial
conservation, reuse, or use of brackish water.
7. Desalinization (L-1) $65,000
1. Develop costs for a conceptualized desalination
treatment plant with a sea water source to assess the
technical, economic and institutional feasibility of the
design and construction. This would include determining
2/24/94 - 5 - Phase II - Scope of Work
nominal capacity and processes to achieve the benefits
and economies of scale; selecting a likely suitable site;
assessment as to the preferred means of water
production; conceptual designs for sea water intake and
discharge system; anticipated product water quality; on-
site storage requirements; product water delivery system;
permitting requirements; financial plan and analysis; and
conclusions and recommendations. Work under this task
will be performed by Naismith Engineering, Inc.
2. Public involvement to include developing a Citizens
Advisory Committee with varied representation to obtain
broad public input throughout the entire process.
3. Prepare environmental studies including permitting
requirements in accordance with Section 2.
4. Prepare cost and financing analysis in accordance with
Section 5.
8. Local Groundwater - Gulf Coast Aquifer (L-2) $39,300
1. Expand the Phase I report to include further
investigation of the available groundwater resources
from the existing City of Corpus Christi well field
located in the vicinity of Lake Corpus Christi and the
Nueces River. This work element will identify current
water quality and quantity parameters and will evaluate
cost and feasibility of a system to collect the available
groundwater in order to satisfy a portion of the
industrial water needs.
2. Expand the Phase I report to include further
investigation of available groundwater in the area north
and west of the City of Sinton in San Patricio County in
order to satisfy either municipal or industrial water
needs within portions of the Corpus Christi water service
area. This analysis will include evaluation of
infrastructure needs required to deliver water resources
2/24/94 - 6 - Phase II - Scope of Work
from a well field which was evaluated in the Reed and
Associates Study commissioned by the City of Corpus
Christi in the Mid 1980's. Additionally, the potential
feasibility of utilising the Gulf Coast Aquifer for storage
and recover of treated water will be investigated at a
reconnaissance level.
9. Use of Groundwater from Campbellton Wells - Carrizo Aquifer
(L-3)
1. Incorporate findings of the West Central Study Area
Report, which is addressing pumping water from San
Antonio River near Falls City into Choke Canyon
Reservoir, and consider possibly blending with well
water from Campbellton.
2. Address water quality issues in environmental section.
10. Municipal Wastewater Reuse
1. Provide updated status of local reuse plans for all four
of the City of Corpus Christi's wastewater plants and
other significant wastewater plants in the Corpus Christi
service area.
2. Provide estimation of yield recovered from City of
Corpus Christi pilot reuse project (Rincon diversion)
currently being planned for construction.
3. Potential for additional wastewater flows from imported
water is to be calculated and tabulated.
4. Provide discussion/analysis of potential conflict between
consumptive wastewater reuse (advanced conservation)
and diversion/discharge of effluent to meet estuarine
inflow requirements.
5. Prepare environmental studies in accordance with
Section 2.
6. Prepare cost and financing analysis in accordance with
Section 5.
$7,500
$15,500
2/24/94 - 7 - Phase II - Scope of Work
rs
11. Goliad Reservoir (G-1)
The West Central Study contains a more detailed assessment of
this reservoir. Incorporate findings of West Central Study Area
Report into Phase II report and update pipeline costs for
delivery to the Corpus Christi service area and update
implementation considerations.
12. Diversion from the Guadalupe and San Antonio Rivers
(includes McFaddin Reservoir) GS -1
The West Central Study contains a more detailed assessment of
this reservoir. Incorporate findings of West Central Study Area
Report into Phase II report and update pipeline costs for
delivery to the Corpus Christi service area and update
implementation considerations.
13. Lake Texana Pipeline to Corpus Christi (LN -1)
1. Proceed with preliminary permitting activities and
conduct a pre -application meeting with TNRCC/TPWD
staff.
2. Fully develop a conceptual project definition, including
a specific pipeline route for presentation to regulatory
agencies.
3. Consider oversizing pipeline to possibly convey
additional water from other sources in future. Prepare
cost estimates showing how TWDB fmancial
participation could affect costs. Also consider options
for the pipeline terminus to supply various municipal
water treatment plants located within the Corpus Christi
service area.
4. Perform hydraulic analysis to determine pipeline, pump
station, and storage requirements for the recommended
project.
$6,000
$6,000
$136,000
2/24/94 - 8 - Phase II - Scope of Work
5. Calculate salinity statistics for Nueces Estuary based on
return flow component resulting from this project both
with and without reuse of return flows. Using data from
previous studies, show the impacts on the salinity of
Lavaca Bay.
6. Consider timing and costs of water plant
improvements/expansion needed at Corpus Christi O.N.
Stevens plant and other municipal water treatment
plants.
7. Prepare environmental studies in accordance with
Section 2.
8. Prepare cost and financing analysis in accordance with
Section 5.
14. Palmetto Bend (Stage II) Reservoir (LN -2)
Carry forward the Phase I work into the Phase II report
addressing review comments received in Phase I.
15. Diversion from Lavaca River to Lake Texana (LN -3)
Carry forward the Phase I work into the Phase II report
addressing review comments received in Phase I.
16. Purchase and Diversion of Garwood Water Rights to Corpus
Christi through Lake Texana (C-1)
1. Include same work elements (Nos. 1 through 8) as in
Item 13. Lake Texana Pipeline to Corpus Christi.
2. Perform analyses of the effects upon quantities of water
available to the existing water rights of the City of
Austin, with and without an agreed to subordination of
the proposed 35,000 acre-foot Garwood transfer, and
with subordination of a part of the proposed 35,000 acre-
foot transfer. For information purposes, perform
analyses of the effects upon quantities of water available
$1,000
$1,000
$59,500
2/24/94 - 9 - Phase II - Scope of Work
to Corpus Christi and Austin with the proposed 35,000
acre-foot transfer having a 1993 priority date.
17. Accelerated Conservation
The following accelerated/increased water conservation
measures (also known as Best Management Practices or BMP's)
will be evaluated with respect to potential additional water
savings potential as well as the likely costs of such measures:
a. Residential plumbing retrofit
b. Incentive programs for toilet replacement
c. Incentive programs for water -conserving
landscaping
d. Landscaping standards for new development
e. Implementing a water audit program for large
landscaped areas
f. Implementing a water audit program for
industrial users
g. Cost -based rate structures that encourage
conservation for industrial, commercial, and/or
residential users
h. Special local projects such as the San Patricio
County M.W.D.'s water conservation and reuse
project (Industrial Supply) currently under study
and other special projects such as industrial water
conservation projects identified in Item 6 -
Industrial Water Use Evaluation.
18. Groundwater Recharge and Recovery (Carrizo/Wilcox)
1. Provide discussion of issues regarding conversion of
surface water to groundwater using aquifer storage and
recovery techniques.
$19,000
$17,000
2/24/94 - 10 - Phase II - Scope of Work
2. Discussion is to be general and on a state-wide basis
regarding concepts, technical feasibility, and regulatory
issues.
3. To the extent possible, incorporate the findings of the
West Central Study on use of the Carrizo/Wilcox
Aquifer.
4. See Item 8 for discussion of Gulf Coast Aquifer.
19. Dredging Lake Corpus Christi $24,000
1. The analysis will include estimation of increased yield,
environmental effects, and costs.
2. Consider long-term maintenance dredging to offset
sedimentation rate vs. accelerated dredging to create
additional storage volume.
3. Identify possible disposal areas and discuss
environmental and permitting considerations for
wetlands, caliche pits, uplands spreading on
farms/ranches, and upland storage ponds.
4. Consider possible effects on seepage/leakage out of the
reservoir and estimate corresponding changes in
reservoir yield.
20. Purchase of Colorado River Water $7,000
1. The potential purchase of Colorado River water from
LCRA for delivery to Lake Texana will be considered.
2. The analysis will include estimation of the increased
yield, environmental effects and costs.
21. Purchase of Brazos River Water $7,000
1. The potential purchase of Brazos River water from
BRA's Allens Creek Project for delivery to either the
Colorado River or Lake Texana will be considered.
2/24/94 - 11 - Phase II - Scope of Work
2. The analysis will include estimation of the increased
yield, environmental effects, and costs.
2/24/94 - 12 - Phase II - Scope of Work
SECTION 2 - ENVIRONMENTAL ANALYSIS
Task Description Budget
2.1 Environmental Analysis $132,000
The environmental portion of the Phase II Trans -Texas Water Program
studies for the South Central Region will undertake the additional
studies and activities needed to further evaluate the environmental
implications of alternatives identified in Phase I. The focus of Phase
II activities will be the development of an integrated water supply
project through a comprehensive, site specific evaluation of the system
components, including environmental factors often excluded from
conventional engineering and financial analyses. The results of the
Phase II studies will be used to review, update, and expand the draft
document produced in Phase I. The primary work products of the
environmental analysis task will include: 1) the environmental analysis
subsections for each alternative will be carried forward and expanded
in Phase II as discussed in Section 1 above, 2) supporting data and
analyses in appropriate formats (e.g., appendices, technical
memoranda, supplemental reports), 3) an updated evaluation matrix
to summarize and rank potential impacts, refute permitting issues and
project development schedules, and to identify specific mitigation
needs and probable costs, and 4) an Environmental Considerations
Summary that will present a focused discussion of the alternatives,
their mitigation liabilities, and recommended actions. This information
will be used in subsequent phases to prepare Environmental
Assessment Reports to support state and federal permit applications
for alternatives that may be selected for implementation during the
Phase II process. It is anticipated that additional work needs will be
identified during Phase II analysis process and that these would be
addressed in later phases.
2/24/94 - 13 - Phase II - Scope of Work
Environmental tasks will be performed by Paul Price Associates, Inc.
in conjunction with Dr. Terry Whitledge at the UT Marine Science
Institute. Paul Price and Dr. Whitledge will participate in the periodic
progress meetings, as necessary, and will direct preparation of the work
products described above.
2/24/94 - 14 - Phase II - Scope of Work
SECTION 3 - PUBLIC INVOLVEMENT
Task Description Budget
3.1 Public Involvement $69,500
A program will be developed and implemented to facilitate the two-
way flow of information between the PMC, project staff, and project
sponsors and the citizenry in the Study Area. Components of the
public involvement program will include:
1. Information dissemination: malting project materials available
for public review and comment; designing and publishing a
project newsletter; increasing the public's general awareness of
the Study; developing a speakers bureau for invitations to
address public groups on Trans -Texas topics; identifying critical
information needs in the general public and designing methods
to meet those needs; and working with educational institutions
to promote use of project information in classroom setting.
2. Media relations: coordinating the release of news items and
information to radio, TV and newspaper; generating coverage
of events/issues related to Trans -Texas; and monitoring news
coverage on Trans -Texas issues.
3. Focus Groups: establishing focus groups, or utilizing existing
organizations, neighborhood groups, associations, etc., to review
and comment on issues related to water resources management
in the Study area.
4. Desalination Citizens Advisory Committee: establishing and
coordinating a special focus group/advisory committee to
participate in the evaluation of the technical, economic,
environmental and institutional feasibility of the design and
construction of a desalination facility in the Corpus Christi area.
2/24/94 - 15 - Phase 11 - Scope of Work
5. Governmental Affairs Coordination: coordinating and
facilitating contacts between Study sponsors and state and
federal elected officials; maintaining a contact list and log;
disseminating information to be elected officials; and
responding to requests for information.
2/24/94 - 16 - Phase II - Scope of Work
SECTION 4 - PRE -APPLICATION PERMITTING AND REGULATORY AGENCY
COORDINATION
Task Description Budget
4.1 Regulatory Agency Coordination $17,000
Coordination meetings with state, federal, and local agencies
participating in the Policy and Technical Advisory Committees will be
held to allow review of the alternatives and to discuss issues and
concerns of each group. Coordination will occur regarding project
approach, environmental concerns, design considerations, fiscal
requirements, costs, service area/regional utility concerns and water
rights issues. During Phase II it is anticipated that three PMC
meetings and three TAC meetings, similar to the Phase I meeting
format, will occur.
On-going coordination will be maintained with TNRCC, TPWD, COE,
and CCC to assist the project sponsors with project conceptualization,
preliminary permitting requirements, environmental concerns, water
rights issues, and project approach. It is anticipated that in Phase II,
two meetings will be held with representatives of all four of these
agencies present.
4.2 Pre -Application Meetings $3,000
A pre -application meeting with the TNRCC will be held during the
Phase II work effort as part of the requirement of the Regulatory
Guidance Document (see Attachment No. 1). The purpose of the
meeting will be to identify specific information requirements necessary
for a permit application. TPWD and TWDB staff will be invited to
participate in the pre -application meeting.
2/24/94 - 17 - Phase II - Scope of Work
SECTION 5 - COST ESTIMATES AND FINANCING ALTERNATIVES
Task Description Budget
5.1 Financing and Cost Issues Cost Included
in Section 1
Based on the preliminary estimate of capital costs developed in Phase
I and more detailed engineering studies performed in Section 1, a
more thorough evaluation of costs will be made for the preferred
alternatives. This evaluation will include the following:
1. Permitting Costs
2. Engineering Costs
3. Construction Costs
4. Legal and Financing Costs
5. Impact Mitigation Costs
6. Land and Easement Costs
7. Water Rights Costs
8. Estimate of Operation and Maintenance Costs
9. Pricing policies for water supplies resulting from alternatives
5.2 An annual time series of costs for the preferred alternatives will be
developed. These costs will include debt service, operation and
maintenance costs, water supply costs, and other associated project
costs. These annual costs will then be used to develop estimates of
average monthly cost increases to the main types of retail and
wholesale customers within the City of Corpus Christi's 12 -county
service area.
2/24/94 - 18 - Phase II - Scope of Work
SECTION 6 - IMPLEMENTATION PLANNING
Task Description Budget
6.1 Scheduling and Phasing Cost Included
in Section 1
Develop an overall schedule for the preferred alternatives, including
the following:
I. TNRCC Pertnit Application
3. State Permitting
Federal Permitting
4. Preconstruction Schedule (including phasing options)
S. Construction Schedule
6.2 Legal/institutional Issues/Administration
1. HDR and the Authority's and City's legal counsels (under
separate contracts) will evaluate institutional and legal issues
likely to arise. These include:
1. Water rights issues
'_. Construction -related legal requirements
1. environmental and regulatory permits
2. utility and constntction easements
3, land and right-of-way acquisition
3. Long-term contractual requirements
water purchase agreements
2. existing facility usage requirements
3. operation and maintenance agreements
4. ownership and operational issues
'r W AHA iI M UI}A1 aclaultztes M eta 11196a Ia* wwlew.
$32,000"
2/24/94 - 19 - Phase II - Scope of Work
SECTION 7 - REPORTS AND MEETINGS
Task Description Budget
7.1 Report Preparation $98,500
At the completion of Phase II, the interim draft report prepared in
Phase I will be revised and expanded to reflect the additional analysis
performed during Phase II. Summaries of alternatives evaluated, costs
and benefits of each, and a recommended alternative or group of
alternatives will be presented. A draft final report will be prepared
and coordinated with sponsors. Twenty five (25) copies of the draft
final report and seventy (70) copies of the final report will be provided
along with two unbound originals of the final report.
Included in the draft report will be an appendix containing review
letters of Phase I, together with a written response to each of the
review comments. Included in the final report will be an additional
appendix containing review letters of the Phase II draft report, together
with a written response to each of the review comments.
7.2 Meetings
Cost Included
in Section 4
It is anticipated that the consultant and, as appropriate, subconsultants
will participate in not more than six review meetings, three with the
PMC and three with the TAC, to present study results and receive
project sponsor input.
An additional two meetings with TNRCC, TPWD, COE, and CCC for
determination of project permitting requirements and agency
coordination will be attended. Additionally, a pre -application meeting
with the TNRCC will be held.
2/24/94 - 20 - Phase II - Scope of Work
7.3 Schedule for Completion
The draft report for Phase II should he completed approximately 12
months after notice to proceed as shown on the schedule on
Attachment No. 2.
Total Costs: 5866,800
w:106MP /13CORRIPnASA]-ser
2/24/94 - 21 - Phase TI - Scope of Work
TNRCC REGULATORY GUIDANCE DOCUMENT
I. INTRODUCTION
H. GENERAL ANALYTICAL STEPS IN EVALUATING AN APPLICATION
III. APPLICATION REVIEW AND ACTION
A. GENERAL
1. APPLICATION REQUIREMENTS
2. WATER AVAILABILTY
3. BENEFICIAL USE
4. NON -IMPAIRMENT OF EXISTING WATER RIGHTS (rHI. "NO
INJURY" RULE)
5. PROTECTION OF PUBLIC WELFARE
6. WASTE PREVENTION AND WATER CONSERVATION
7. ENVIRONMENTAL ASSESSMENTS
8. BASIN OF ORIGIN PROTECTION
B. APPLICATION PROCESSING
1. PRE -APPLICATION MEETING
2. SUBMISSION OF DOCUMENTS
3. REVIEW FOR ADMINISTRATIVE COMPLETENESS
4. RETURN OF DEFICIENT APPLICATION
5. TECHNICAL REVIEW
6. NOTICE AND ACTION
APPENDIX: ALTERNATIVE WATER DEVELOPMENT STRATEGIES
c5
z
z
w
ttS
Q
Project Schedule
South Central Trans -Texas -- Phase II
Months —11
1 -e
•
•
•
14
(e1
P•.
N
H
1-4
eti
10
O,
8
N
Nes
h
4
fn
N
.-r
rn
i.
O
Co
O
C.
CA
d
•O
0.,.
i
—
d
E
a)
0
—>y
0
O
CO
CU
,�
~
cu
>ca
>L.,
con
an
ro
0
a a1
o 'Q
L��i
CL
0 es
unc
a
u an
L
0
]
a
=
0
L
C
V
..a
L) 0
a •A
bD N
C
p•
'O azcd
a s
d
E-,
.O
o
o
cc
0
h
i
on
d
02
N
CO
W
O
^O
a
O
U
-
y
E
0
_8
- Q
co
w a-
con
C
0
a"i o
Vi �i
.-. c.
o `
N
v
2
..r
OCCyc
Gm
CfGCL
Corpus Christi, Texas
1-1 day of
Mal
The above resolution was passed by the following vote:
Mary Rhodes
Dr. Jack Best
Melody Cooper
Cezar Galindo
Betty Jean Longoria
Edward A. Martin
Dr. David McNichols
David Noyola
Clif Moss