HomeMy WebLinkAbout022770 RES - 11/26/1996RESOLUTION
DETERMINING THE NECESSITY FOR AND ORDERING THE
IMPROVEMENT OF THE FOLLOWING HIGHWAYS IN CORPUS
CHRISTI, NUECES COUNTY, TEXAS:
Del Mar Area Street Improvements --Phase III
Del Mar Boulevard --South Staples Street to South Alameda Street
Naples Street --15th Street to South Alameda Street
Atlantic Street --15th Street to South Alameda Street
Southern Street --15th Street to South Alameda Street
Louisiana Avenue --Brownlee Boulevard to South Alameda Street
Brownlee Boulevard --South Staples Street to Louisiana Avenue
Cole Street --Brownlee Boulevard to South Staples Street
15th Street --South Staples Street to Louisiana Avenue
16th Street --South Staples Street to Louisiana Avenue
Southern, Atlantic, and Naples Streets between 15th Street and 16th Street
Cole Street --Brownlee Boulevard to South Alameda Street
Louisiana Avenue --Brownlee Boulevard to Swantner Drive
SPECIFYING THAT CERTAIN OF THESE IMPROVEMENTS WILL BE
PAID FOR PARTLY BY THE CITY AND PARTLY BY ASSESSMENTS
WHILE OTHERS WILL BE PAID FOR ENTIRELY BY ASSESSMENTS;
AND DIRECTING THE CITY'S DIRECTOR OF ENGINEERING SERVICES
TO FILE A NOTICE OF PROPOSED ASSESSMENTS WITH THE NUECES
COUNTY CLERK
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF CORPUS CHRISTI, TEXAS:
MS0922050.mistbakl
November 21, 1996 (9:44am)
t; 41. ,u
�1CROFILMED
SECTION 1. Under Corpus Christi City Charter Article X, Section 1(a)(12) and Texas
Transportation Code Chapter 313, the city council determines that it is necessary to improve and
orders the improvement of the following highways in the city:
Del Mar Boulevard --South Staples Street to South Alameda Street
Naples Street --15th Street to South Alameda Street
Atlantic Street --15th Street to South Alameda Street
Southern Street --15th Street to South Alameda Street
Louisiana Avenue --Brownlee Boulevard to South Alameda Street
Brownlee Boulevard --South Staples Street to Louisiana Avenue
Cole Street --Brownlee Boulevard to South Staples Street
15th Street --South Staples Street to Louisiana Avenue
16th Street --South Staples Street to Louisiana Avenue
Southern, Atlantic, and Naples Streets between 15th Street and 16th Street
Cole Street --Brownlee Boulevard to South Alameda Street
Louisiana Avenue --Brownlee Boulevard to Swantner Drive
(collectively, the "Del Mar Area Street Improvements --Phase III Project") (the "Project").
As specified in more detail in Project plans and specifications, the Del Mar Area Street
Improvements --Phase III Project will include:
1. filling, grading, raising, paving, or repairing the streets in a permanent manner;
2. widening or narrowing various sections of these streets;
3. constructing and realigning curbs, gutters, and sidewalks; and
4. constructing driveways.
Additionally, street, curb, gutter, sidewalk, and driveway improvements will be made to marginal
access streets located on the south side of Cole Street from Brownlee Boulevard to South
MS0922.050 mis(bek)
November 21, 1996 (844em)
2
Alameda Street, and on both sides of Del Mar Boulevard from South Staples Street to South
Alameda Street.
For purposes of this resolution, "highway" includes any part of a street, alley, public
place, or square, including a part left wholly or partly unimproved in connection with another
street improvement.
SECTION 2. The Project consists of 3 categories of improvements: a) street, curb,
gutter, and sidewalk improvements to be paid for partly by the city and partly by assessments; b)
driveways to be paid for entirely by assessments; and c) other improvements, to be paid for by
the city, because either the assessment statute does not apply to these improvements or the city is
not making assessments to pay for them. An assessment against abutting property or affected
railway property will create a lien on the property and a personal liability and charge against the
property owner.
If property is exempt from a street improvement assessment lien when the improvements
are ordered, then no assessment lien will be created. The owner of the exempt property,
however, will be personally liable for an assessment in connection with the property.
SECTION 3. To ensure that assessment liens take effect as soon as possible, and to
ensure that the liens will apply to the fullest extent even if assessed property is subdivided or
sold, the director of engineering services will file a notice of the proposed assessments with the
Clerk of Nueces County, Texas. This notice will describe, or describe by reference, each parcel
of property abutting the proposed improvements and affected railway property, if any. The
notice will be substantially in the form attached to this resolution as Exhibit A.
ATTEST: 4/
•
Armando Chapa, City Secretary
CITY OF C US CHRISTI
Mayor, Mary
est
APPROVED THE o2 DAY OF /V CJe M - , 1996.
JAMES RSB Mr./Le-Si
JR.,/CITY°ATTORNEY
By: Mr./Le- fS✓)CI. 5
Michael L. Scanlon
Assistant City Attorney
MS0922050,m1s(bak)
November 21, 1996 (8:44am)
3
es
EXHIBIT A
NOTICE OF PROPOSED ASSESSMENTS
FOR STREET AND RELATED IMPROVEMENTS
DEL MAR AREA STREET IMPROVEMENTS -PHASE III
STATE OF TEXAS
COUNTY OF NUECES
1. In its Resolution No. , passed on , 1996, the City
Council of the City of Corpus Christi, Texas determined that it was necessary to improve and
ordered the improvement of the following streets:
Del Mar Boulevard --South Staples Street to South Alameda Street
Naples Street --15th Street to South Alameda Street
Atlantic Street --15th Street to South Alameda Street
Southern Street --15th Street to South Alameda Street
Louisiana Avenue --Brownlee Boulevard to South Alameda Street
Brownlee Boulevard --South Staples Street to Louisiana Avenue
Cole Street --Brownlee Boulevard to South Staples Street
15th Street --South Staples Street to Louisiana Avenue
16th Street --South Staples Street to Louisiana Avenue
Southern, Atlantic, and Naples Streets between 15th Street and 16th Street
Cole Street --Brownlee Boulevard to South Alameda Street
Louisiana Avenue --Brownlee Boulevard to Swantner Drive
(collectively, the "Del Mar Area Street Improvements --Phase III Project") (the "Project").
As specified in more detail in Project plans and specifications, the Del Mar Area Street
Improvements --Phase III Project will include:
M50922 048 mis(bak)
November 21, 1996 (8:53am)
A. filling, grading, raising, paving, or repairing the streets in a permanent
manner;
B. widening or narrowing various sections of these streets;
C. constructing and realigning curbs, gutters, and sidewalks; and
D. constructing driveways.
Additionally, street, curb, gutter, sidewalk, and driveway improvements will be made to marginal
access streets located on the south side of Cole Street from Brownlee Boulevard to South
Alameda Street, and on both sides of Del Mar Boulevard from South Staples Street to South
Alameda Street.
2. The cost of street, curb, gutter, and sidewalk improvements will be paid for partly
by the city and partly by assessments against:
A. property abutting the part of the highways to be improved; and
B. affected railway property, if any.
Costs to construct driveways will be paid for entirely by assessments.
3. Property abutting the proposed improvements, and affected railway property, if
any, is described in Exhibit A.
CITY OF CORPUS CHRISTI
By:
Name:R.H. Shackelford. P.E.
Title: Director of Engineering Services
Date:
Approved as to form this the day
of 1996.
JAMES R. BRAY JR., CITY ATTORNEY
By:
Michael L. Scanlon
Assistant City Attorney
MS0922.048.m1s(bak)
November 21, 1996 (853am)
EXHIBIT A
Property descriptions will be attached to the copy which is filed with the county clerk.
Corpus Christi, Texas
6p day of
The above resolution was passed by the following vote:
Mary Rhodes
Dr. Jack Best
Betty Black
Melody Cooper
Tony Heldenfels
Betty Jean Longoria
John Longoria
Edward A. Martin
Dr. David McNichols
\forms\066
0
J
euriP