HomeMy WebLinkAbout023676 RES - 06/22/1999Th
RESOLUTION
APPROVING PLANS AND SPECIFICATIONS FOR IMPROVEMENTS TO
THE FOLLOWING HIGHWAYS IN CORPUS CHRISTI, NUECES
COUNTY, TEXAS FOR THE ANNAVILLE AREA STREETS NO. 3,
PHASE H PROJECT:
Margie Drive between Leopard Street and Martine Drive
APPROVING THE DIRECTOR OF ENGINEERING SERVICES' PROJECT
CONSTRUCTION COST ESTIMATE INCLUDING AN ESTIMATE OF THE
PORTION OF COSTS TO BE PAID BY THE CITY AND THE PORTION TO
BE PAID BY ASSESSMENTS; SETTING A PUBLIC HEARING ON THESE
PROPOSED ASSESSMENTS TO OCCUR DURING THE JULY 13, 1999
CITY COUNCIL MEETING; DIRECTING THE CITY SECRETARY TO
ARRANGE TO PUBLISH NOTICE OF THIS PUBLIC HEARING; AND
ORDERING THE DIRECTOR OF ENGINEERING SERVICES TO
PROVIDE WRITTEN NOTICE OF THE PUBLIC HEARING TO
PROPERTY OWNERS
In its Resolution No. 0A36,15 , passed on June 22, 1999, the City Council
determined that it was necessary to improve and ordered the improvement of the following
highways in Corpus Christi, Nueces County, Texas:
Margie Drive between Leopard Street and Martine Drive
(collectively, the "Annaville Area Streets No. 3, Phase II Project") (the "Project").
In Resolution No. Oa 56,r/5" , the city council stated that the Project consisted of 3
categories of improvements: 1) street, curb, gutter, and sidewalk improvements to be paid for
partly by the city and partly by assessments; 2) driveways to be paid for entirely by assessments;
and 3) other improvements, to be paid for by the city, because either the assessment statute did
not apply to these improvements or the city was not making assessments to pay for them.
The city's department of engineering services prepared detailed Project plans and
specifications. The city then received bids to construct the Project accordingly.
After evaluating the apparent lowest responsible bid to construct the Project, the director
of engineering services prepared a Project construction cost estimate (attached as Exhibit A).
This estimate specifies anticipated total Project construction cost and the city portion of this cost,
the preliminary total of assessments, and various assessment rates. The estimate also includes a
bid tabulation and a preliminary assessment roll listing proposed assessments against each
abutting or affected property.
H:U.EGDIR\SHAR®UERRY\O 15.RES
023676
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF CORPUS CHRISTI, TEXAS:
SECTION 1. The Project plans and specifications are approved.
SECTION 2. In accordance with Texas Transportation Code Section 313.024, the
Project construction cost estimate is approved; however, the assessments listed in the preliminary
assessment roll cannot be imposed until after a public hearing conducted in accordance with state
law and the city council's Assessment Process Rules Resolution.
SECTION 3. A public hearing on proposed assessments for the Annaville Area Streets
No. 3, Phase II Project will be held during the city council's July 13, 1999 meeting. This
meeting will begin at 2 p.m. in the City Council Chambers, 1201 Leopard Street, Corpus Christi,
Texas.
SECTION 4. The city secretary will arrange to publish notice of this public hearing in
accordance with the Assessment Process Rules Resolution.
SECTION 5. The director of engineering services will provide written notice of the
public hearing to property owners in accordance with the Assessment Process Rules Resolution.
ATTEST:
CITY OF CORPUS CHRISTI
Armando Chapa, Ci Secretary Samuel L. Jr., May
Legal form approved on ` , 1999; James R. Bray, Jr., City Attorney.
By:
Gerard V. D'Alessio, Assistant City Attorney
H:U.EG-DIR\SHAREDVERRY\015.11ES
2
Corpus Christi, Texas
day of
,1999
The above resolution was passed by the following vote:
Samuel L. Neal, Jr.
Javier D. Colmenero
Melody Cooper
Henry Garrett
Dr. Amold Gonzales
Rex A. Kinnison
Betty Jean Longoria
John Longoria
Mark Scott
H:V Fr-DIR\SHAREDVERRY\015.RES
3
n
023676
EXHIBIT "A"
PROJECT CONSTRUCTION COST ESTIMATE
ANNAVILLE AREA STREET IMPROVEMENTS NO. 3, PHASE II
1. The Annaville Area Street Improvements No. 3, Phase II Project (the "Project") will
consist of street, curb, gutter, sidewalk, and driveway improvements to:
Margie Drive between Leopard Street and Martine Drive
2. The streets will be constructed by excavation to a sufficient depth for the following
pavement sections:
a. standard 6" curb and gutter section;
b. 10" compacted lime stabilized subgrade;
c. 6" compacted caliche base; and
d. 1.5" Type "D" Hot Mix asphaltic pavement.
3. Sidewalk improvements will also include 5 foot -wide reinforced concrete sidewalks,
4 inches thick.
4. Reinforced concrete driveways will be constructed.
5. Applying Corpus Christi Code Section 49-21, the estimated amount per front -foot
proposed to be assessed against abutting property and its owners is summarized below:
H:U.EGDIRVSHAREDUERRY\015.RES
4
ITEM
SPECIAL ASSESSMENT
RATES
PER CORPUS CHRISTI
CODE SECTION
49-21
BID PRICES FOR ASSESSABLE
IMPROVEMENTS (PLUS
ENGINEERING COSTS)
ADJUSTED PER CORPUS
CHRISTI CODE SECTION 49-21
MAXIMUM
ASSESSMENT RATES
PER CORPUS CHRISTI
CODE SECTION 49-21
A. Pavement, Curb, and
Gutter Improvements
$ 1.00 per S.F.
C. Driveways
$ 5.40 per S.F.
1) Base Bid Item: Margie
Drive 28' Back -of -Curb to Back -
of -Curb ("B -B")
$16.15 per L.F.
$16.15 per L.F.
B. Sidewalks
$2.59 per S.F.
$1.00 per S.F.
C. Driveways
$5.40 per S.F.
$5.40 per S.F.
A. Property which sides along the street being improved will be assessed at the rates
specified above.
B. Property backing onto a street being improved will be assessed at the rates
specified above except if access is prohibited. In that event, the rates will be
reduced 50%.
6. Under Corpus Christi Code Section 49-21, special assessment rates apply to certain
residential, church, and school properties as follows:
ITEM
SPECIAL ASSESSMENT
RATES
PER CORPUS CHRISTI
CODE SECTION
49-21
A. Pavement, Curb, and Gutter Improvements
$ 9.75 per L.F.
B. Sidewalks
$ 1.00 per S.F.
C. Driveways
$ 5.40 per S.F.
A.
For property siding on a street being improved, assessment rates for curb, gutter,
pavement, and sidewalk improvements will not exceed 50% of the respective rates
specified in the immediately preceding chart.
B. Except where the property is more than 250 feet in depth, property backing on the
street being improved will not be assessed for curb, gutter, and pavement
improvements unless driveway access is allowed. If driveway access is allowed,
then the assessment rate will be 50% of the residential fronting rate for curb,
H:II.EGDIRVSHAREDUERRY\015.RES
5
gutter, and pavement, and 50% of the residential rate for sidewalks. Except as
otherwise provided in Section 49-21, where a sidewalk exists in front of the
property, there will be no sidewalk assessment.
Finally, if the property is over 250 feet in depth, the assessment rates will be the
same as if the property were fronting the street.
7. Total Bid Price*
Preliminary Total of Assessments
City's Share
$ 178,627.50
$ 25.026.54
$ 153,600.96
(*See Project bid tabulation attached as Exhibit 1).
8. A preliminary Project assessment roll is attached as Exhibit 2.
CITY OF CORPUS CHRISTI
HAI Fr D1R\SHAREDUERRY\015.RES
6
By:
Nam
Title: ActingDfor of Engineering Services
Date: )///9f