Loading...
HomeMy WebLinkAbout023676 RES - 06/22/1999Th RESOLUTION APPROVING PLANS AND SPECIFICATIONS FOR IMPROVEMENTS TO THE FOLLOWING HIGHWAYS IN CORPUS CHRISTI, NUECES COUNTY, TEXAS FOR THE ANNAVILLE AREA STREETS NO. 3, PHASE H PROJECT: Margie Drive between Leopard Street and Martine Drive APPROVING THE DIRECTOR OF ENGINEERING SERVICES' PROJECT CONSTRUCTION COST ESTIMATE INCLUDING AN ESTIMATE OF THE PORTION OF COSTS TO BE PAID BY THE CITY AND THE PORTION TO BE PAID BY ASSESSMENTS; SETTING A PUBLIC HEARING ON THESE PROPOSED ASSESSMENTS TO OCCUR DURING THE JULY 13, 1999 CITY COUNCIL MEETING; DIRECTING THE CITY SECRETARY TO ARRANGE TO PUBLISH NOTICE OF THIS PUBLIC HEARING; AND ORDERING THE DIRECTOR OF ENGINEERING SERVICES TO PROVIDE WRITTEN NOTICE OF THE PUBLIC HEARING TO PROPERTY OWNERS In its Resolution No. 0A36,15 , passed on June 22, 1999, the City Council determined that it was necessary to improve and ordered the improvement of the following highways in Corpus Christi, Nueces County, Texas: Margie Drive between Leopard Street and Martine Drive (collectively, the "Annaville Area Streets No. 3, Phase II Project") (the "Project"). In Resolution No. Oa 56,r/5" , the city council stated that the Project consisted of 3 categories of improvements: 1) street, curb, gutter, and sidewalk improvements to be paid for partly by the city and partly by assessments; 2) driveways to be paid for entirely by assessments; and 3) other improvements, to be paid for by the city, because either the assessment statute did not apply to these improvements or the city was not making assessments to pay for them. The city's department of engineering services prepared detailed Project plans and specifications. The city then received bids to construct the Project accordingly. After evaluating the apparent lowest responsible bid to construct the Project, the director of engineering services prepared a Project construction cost estimate (attached as Exhibit A). This estimate specifies anticipated total Project construction cost and the city portion of this cost, the preliminary total of assessments, and various assessment rates. The estimate also includes a bid tabulation and a preliminary assessment roll listing proposed assessments against each abutting or affected property. H:U.EGDIR\SHAR®UERRY\O 15.RES 023676 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI, TEXAS: SECTION 1. The Project plans and specifications are approved. SECTION 2. In accordance with Texas Transportation Code Section 313.024, the Project construction cost estimate is approved; however, the assessments listed in the preliminary assessment roll cannot be imposed until after a public hearing conducted in accordance with state law and the city council's Assessment Process Rules Resolution. SECTION 3. A public hearing on proposed assessments for the Annaville Area Streets No. 3, Phase II Project will be held during the city council's July 13, 1999 meeting. This meeting will begin at 2 p.m. in the City Council Chambers, 1201 Leopard Street, Corpus Christi, Texas. SECTION 4. The city secretary will arrange to publish notice of this public hearing in accordance with the Assessment Process Rules Resolution. SECTION 5. The director of engineering services will provide written notice of the public hearing to property owners in accordance with the Assessment Process Rules Resolution. ATTEST: CITY OF CORPUS CHRISTI Armando Chapa, Ci Secretary Samuel L. Jr., May Legal form approved on ` , 1999; James R. Bray, Jr., City Attorney. By: Gerard V. D'Alessio, Assistant City Attorney H:U.EG-DIR\SHAREDVERRY\015.11ES 2 Corpus Christi, Texas day of ,1999 The above resolution was passed by the following vote: Samuel L. Neal, Jr. Javier D. Colmenero Melody Cooper Henry Garrett Dr. Amold Gonzales Rex A. Kinnison Betty Jean Longoria John Longoria Mark Scott H:V Fr-DIR\SHAREDVERRY\015.RES 3 n 023676 EXHIBIT "A" PROJECT CONSTRUCTION COST ESTIMATE ANNAVILLE AREA STREET IMPROVEMENTS NO. 3, PHASE II 1. The Annaville Area Street Improvements No. 3, Phase II Project (the "Project") will consist of street, curb, gutter, sidewalk, and driveway improvements to: Margie Drive between Leopard Street and Martine Drive 2. The streets will be constructed by excavation to a sufficient depth for the following pavement sections: a. standard 6" curb and gutter section; b. 10" compacted lime stabilized subgrade; c. 6" compacted caliche base; and d. 1.5" Type "D" Hot Mix asphaltic pavement. 3. Sidewalk improvements will also include 5 foot -wide reinforced concrete sidewalks, 4 inches thick. 4. Reinforced concrete driveways will be constructed. 5. Applying Corpus Christi Code Section 49-21, the estimated amount per front -foot proposed to be assessed against abutting property and its owners is summarized below: H:U.EGDIRVSHAREDUERRY\015.RES 4 ITEM SPECIAL ASSESSMENT RATES PER CORPUS CHRISTI CODE SECTION 49-21 BID PRICES FOR ASSESSABLE IMPROVEMENTS (PLUS ENGINEERING COSTS) ADJUSTED PER CORPUS CHRISTI CODE SECTION 49-21 MAXIMUM ASSESSMENT RATES PER CORPUS CHRISTI CODE SECTION 49-21 A. Pavement, Curb, and Gutter Improvements $ 1.00 per S.F. C. Driveways $ 5.40 per S.F. 1) Base Bid Item: Margie Drive 28' Back -of -Curb to Back - of -Curb ("B -B") $16.15 per L.F. $16.15 per L.F. B. Sidewalks $2.59 per S.F. $1.00 per S.F. C. Driveways $5.40 per S.F. $5.40 per S.F. A. Property which sides along the street being improved will be assessed at the rates specified above. B. Property backing onto a street being improved will be assessed at the rates specified above except if access is prohibited. In that event, the rates will be reduced 50%. 6. Under Corpus Christi Code Section 49-21, special assessment rates apply to certain residential, church, and school properties as follows: ITEM SPECIAL ASSESSMENT RATES PER CORPUS CHRISTI CODE SECTION 49-21 A. Pavement, Curb, and Gutter Improvements $ 9.75 per L.F. B. Sidewalks $ 1.00 per S.F. C. Driveways $ 5.40 per S.F. A. For property siding on a street being improved, assessment rates for curb, gutter, pavement, and sidewalk improvements will not exceed 50% of the respective rates specified in the immediately preceding chart. B. Except where the property is more than 250 feet in depth, property backing on the street being improved will not be assessed for curb, gutter, and pavement improvements unless driveway access is allowed. If driveway access is allowed, then the assessment rate will be 50% of the residential fronting rate for curb, H:II.EGDIRVSHAREDUERRY\015.RES 5 gutter, and pavement, and 50% of the residential rate for sidewalks. Except as otherwise provided in Section 49-21, where a sidewalk exists in front of the property, there will be no sidewalk assessment. Finally, if the property is over 250 feet in depth, the assessment rates will be the same as if the property were fronting the street. 7. Total Bid Price* Preliminary Total of Assessments City's Share $ 178,627.50 $ 25.026.54 $ 153,600.96 (*See Project bid tabulation attached as Exhibit 1). 8. A preliminary Project assessment roll is attached as Exhibit 2. CITY OF CORPUS CHRISTI HAI Fr D1R\SHAREDUERRY\015.RES 6 By: Nam Title: ActingDfor of Engineering Services Date: )///9f