Loading...
HomeMy WebLinkAbout024624 RES - 10/16/2001RESOLUTION APPROVING PLANS AND SPECIFICATIONS FOR IMPROVEMENTS TO THE FOLLOWING HIGHWAY IN CORPUS CHRISTI, NUECES COUNTY, TEXAS: Southmoreland Addition Street Improvements, Phase 3A Lewis Street between Richard and Clemner Southmoreland Addition Street Improvements, Phase 4A Ramsey Street between Brawner Parkway & Norton Street APPROVING THE DIRECTOR OF ENGINEERING SERVICES' PROJECT CONSTRUCTION COST ESTIMATE INCLUDING AN ESTIMATE OF THE PORTION OF COSTS TO BE PAID BY THE CITY AND THE PORTION TO BE PAID BY ASSESSMENTS; SETTING A PUBLIC HEARING ON THESE PROPOSED ASSESSMENTS TO OCCUR DURING THE DECEMBER 11, 2001 CITY COUNCIL MEI~TING; DIRECTING THE CITY SECRETARY TO ARRANGE TO PUBLISH NOTICE OF THIS PUBLIC HEARING; AND ORDERING THE DIRECTOR OF ENGINEERING SER'~ICES TO PROVIDE WRITTEN NOTICE OF THE PUBLIC HEARING-- aTO PROPERTY OWNERS In its Resolution No. ~.3~Ll~r~?} , passed on October 16,2001, the City Council determined that it was necessary to improve and ordered the improvement of the following highway in Corpus Christi, Nueces County, Texas: Southmoreland Addition Street Improvements, Phase 3A Lewis Street between Richard and Clem~er '\ Southmoreland Addition Street Improvement, Phase 4A Ramsey Street between Bra~vner Parkway and Norton Street (collectively, the Southmoreland Addition Area Street Improvements Phases 3A and 4A)(the "Project"). In Resolution No. ~) (~4(e ~:)-~ , the city council stated that the Project consisted of 3 categories of improvements: 1) street, curb, gutter, and sidexvalk improvements to be paid for partly by the city and partly by assessments; 2) driveways to be paid for entirely by assessments; and 3) other improvements, to be paid for by the city, because either the assessment statute did :? 24 ¢ 24 not apply to these improvements or the city was not making assessments to pay for them. The city's department of engineering services prepared detailed Project plans and specifications. The city then received bids to construct the Project accordingly. After evaluating the apparent lowest responsible bid to construct the Project, the director of engineering services prepared a Project construction cost estimate (attached as Exhibit A). This estimate specifies anticipated total Project construction cost and the city portion of this cost, the preliminary total of assessments, and various assessment rates. The estimate also includes a bid tabulation and a preliminary assessment roll listing proposed assessments against each abutting or affected property. NOW, THEREOFRE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI, TEXAS: SECTION 1. The Project plans and specifications are approved. SECTION 2. In accordance with Texas Transportation Code Section 313.024, the Project construction cost estimate is approved; however, the assessments listed in the preliminary assessment roll cannot be imposed until after a public hearing is conducted in accordance with state law and the city council's Assessment Process Rules Resolution. SECTION 3. A public hearing on proposed assessments for the Southmoreland Addition Street Improvements, Phase 3A and 4A, will be held during the City Council's December 11, 2001 meeting. This meeting will begin at 2:00 p.m. in the City Council Chambers, 1201 Leopard, Corpus Christi, Texas. SECTION 4. The city secretary will arrange to publish notice of this public hearing in accordance with the Assessment Process Rules Resolution. SECTION 5. The director of engineering services will provide written notice of the public hearing to property owners in accordance with the Assessment Process Rules Resolution. ATTEST: Armando Chapa City Secretary CITY OF CORPUS CHRISTI Samuel L~'Neal, Jr. ' Mayor Approved this the ! ! day of ~'ff&¢ ~ James R. Bray, Jr. City Attorney /oI~ P. Bu~-~:e, ~r. V - (.~/s~istant City Attorney t ,2001. Corpus Christi~T~xas ~ day of/.(' .~7~.~, 2001 The above resolution was passed by the following vote: Samuel L. Neal, Jr. Brent Chesney Javier D. Colmenero Henry Garrett Rex Kinnison Bill Kelly John Longoria Jesse Noyola Mark Scott EXHIBIT A PROJECT CONSTRUCTION COST ESTIMATE The Southmoreland Addition Area Street Improvements Phases 3A and 4A (the "Project") will consist of street, curb, gutter, sidewalk, and driveway improvements to: Southmoreland Addition Area Street Improvements Phase 3A - Lewis Street, Richard to Clemner Phase 4A - Ramsey Street, Norton to Brawner Parkway The streets will be constructed by excavation to a sufficient depth for the following pavement sections: standard 6" curb and gutter section; 9" Flexible Base-Limestone Geogrid reinforcement; and One course surface treatment; 1.5" HMAC-Type D or 1.5" HMAC-Type D with 3" HMAC-Type C and widths of 28 and 36 feet measured from the back-of-curb to back-of-curb, within the existing right-of-way. Sidewalk improvements will also include 5 or 7 or 8 foot-wide reinforced concrete sidewalks, 4 inches thick. Reinforced concrete driveways will be constructed. Applying corpus Christi Code Section 49-21, the estimated amount per front-foot proposed to be assessed against abutting property and its owners is smnmarized below: ITEM BID PRICES FOR MAXIMUM ASSESSABLE ASSESSMENT IMPROVEMENTS RATES PER (PLUS ENGINEERING CORPUS COSTS) ADJUSTED CHRISTI PER CORPUS CODE SECTION CHRISTI CODE 49-21 SECTION 49-21 A. Pavement, Curb, and Gutter Improvements 1)Base Bid Item: $28.09 per L.F. $19.50 per L.F. Lewis Street 28' Back-of-Curb to Back-of-Curb ("B-B") 2)Base Bid Item: $48.42 per L.F. 19.50 per L.F. Ramsey Street 36' B-B 3) Additive $84.70 per L.F. 19.50 per L.F. Alternate Item: Ramsey Street from Back-of-Curb B. Sidewalks 1)Base Bid ltem- $1.94 per L.F. $1.00 per S.F. Lewis Street 2)Base Bid Item- $1.94 per L.F. $1.00 per S.F. Ramsey Street 3)Add. Alt. #1- $2.59 per L.F. $1.00 per S.F. Ramsey Street C. Driveways 1) Base Bid Item $4.05 per S.F. $4.05 per S.F. Lewis Street 2) Base Bid Item $4.05 per S.F. $4.05 per S.F. Ramsey Street Property which sides along the street being improved will be assessed at the rates specified above. Property backing onto a street being improved will be assessed at the rates specified above except if access is prohibited. In that event, the rates will be reduced 50%. Under Corpus Christi Code Section 49-21, special assessment rates apply to certain residential, church, and school properties as follo~vs: ITEM SPECIAL ASSESSMENT RATES PER CORPUS CHRISTI CODE SECTION 49-21 A. Pavement, Curb, and Gutter Improvements $9.75 per L.F. B. Sidewalks 1.00 per S.F. C. Driveways Base Bid Item - Lewis Street $4.05 per S.F. Base Bid Item - Ramsey Street $4.05 per S.F. For property siding on a street being improved, assessment rates for curb, gutter, pavement, and side~valk improvements will not exceed 50% of the respective rates specified in the immediately preceding chart. Except where the property is more than 250 feet in depth, property backing on the street being improved will not be assessed for curb, gutter, and pavement improvements unless driveway access is allowed. If driveway access is allowed, then the assessment rate will be 50% of the residential fronting rate for curb, gutter, and pavement, and 50% of the residential rate for sidewalks. Except as otherwise provided in section 49- 21, where a sidewalk exists in front of the property, there will be no sidewalk assessment. Finally, if the property is over 250 in depth, the assessment rates will be the same as if the property were fronting the street. Anticipated Total Project Construction Cost Preliminary Total of Assessments City Portion (See Project bid tabulation attached as Exhibit 1 ). $664,099.25 $ 41,899.88 $622,199.37 A preliminary project assessment roll is attached as Exhibit 2. CITY OF CORPUS CHRISTI By: Name: Title: Date: EXHIBIT 1 iai EXHIBIT 2 PRELIMINARY ASSESSMENT ROLL 10110/01 SOUTHMORELAND STREET IMPROVEMENTS PHASE III ITEM OWNER AND NO. PROPERTY DESCRIPTION DESCRIPTION OF ASSESSMENT LEWIS STREET FROM CLEMMER STREET TO RICHARD STREET NORTHSlDE FILSERTO MARTINEZ 146 CLEMMER, 78415 LOT 24, BLK9 SOUTHMORELAND SUB. R~IB-RES 14000 LF. 567.50 S.F. C.G. & PVMT. S/VV D~N 1-22 TOTAL AMOUNT AMOUNT ASSESSED 2 LEROY MOSES 149 RICHARD, 78415 LOT 1, SLK9 SOUTHMORELAND SUB R-1 B-RES LEWIS STREET SOUTHSIDE FROM CLEMMER STREET TO RICHARD STREET 3 ESTELLA AMADOR 206 CLEMMER, 78415 LOT 13, BLK 14 SOUTHMORELAND SUB. R-lB-RES 140.00 LF 617.50 S.F 102.EO S.F 118.50 S.F. C.G. & PVMT. S/W DNV 1-2 DAN 488 0.50 3(~.75 4.05 415.13 4,(]5 479.93 140.~0 L.F. C.G. & PVMT. 4.88 683.20 627.50 SF S,NV 0.50 313.75 4 HOWARD SULLIVAN 201 RICHARD, 78415 LOT 12, BLK 14 SOUTHMORELAND SUB. R-lB-RES RICHARD STREET INTERSECTION END LEWIS STREET SOUTHSIDE END LEWIS STREET 140.~0 LF. 57750 S.F 182.50 S.F C.G. & PVMT. S/W DAN 1-L:~7 4.88 683.20 O.EO 288.75 4.05 739.13 1,711 RAMSEY STREET IMPROVEMENTS FROM BRAWNER PARKWAY TO NORTON STREET NORTHSIDE 5 CiTY OF CORPUS CHRISTI 3701 AYERS, 78469 LOT 20, BLK 1 MODERN HOMES SUB. R-lB-APT 13~.(]0 L.F. C.G. & PVMT. 0.00 0.00 0.00 ADAN RIVERA 238 E. VANDERBILT DR, 78415 LOT 14, BLK21 ARCADIA VILLAGE R-lB-RES 110.00 L.F. 467.50 S.F. 11850 S.F. C.G. & PVMT. SNV D/W 1-1Z 4?9.93 ITEM NO. 7 PRELIMINARY ASSESSMENT ROLL t01t0/01 SOUTHMORELAND STREET IMPROVEMENTS PHASE M OWNER AND PROPERTY DESCRIPTION QUANTITY ASSESSED DESCRIPTION RATE AMOUNT TOTAL OF AMOUNT ASSESSMENT ASSESSED C.G. & PVMT. 0.00 0.00 SNV 5' 0.50 250.00 250.00 JOE L GONZALES 234E. VANDERBILT DR., 78415 LOT 15, BLK21 ARCADIA VILLAGE R-lB-RES 100.00 LF. 50001 S.F. RAY E. WHITMIRE 722 MEADOWBROOK, 78412 LOT 16, BLK21 ARCADIA VILLAGE R-1 B-RES 65.00 LF. 325.00 S.F. C.G.&P~T. S~E 0.55 0.00 0.50 162.50 162.50 11 12 REBECCA LYNN RIVERIA 815WARBLAR ROCKPORT, 78382 LOT 17. BLK21 ARCADIA VILLAGE R-lB-RES NIEVES NUNEZ, JR. 222 E. VANDERBILT, 78415 LOT 18, BLK21 ARCADIA VILLAGE R-lB-RES JOHNNY M. ZEPEDA 218 E. VANDERBILT, 78415 LOT 19, BLK21 ARCADIA VILLAGE R-lB-RES DIANA R. & MICHELLE DAVILLA 214E. VANDERBILT, 78415 LOT 20, BLK21 ARCADIA VILLAGE R-lB-RES 62.50 L.F. 312.50 S.F. 62.50 LF 31250 S.F. 62.50 L.F. 312.50 S.F 62.50 L.F. 312.50 S.F. C.G.&PVMT. S~5' C.G & PVMT. SNV5' C.G.&PVMT. S~ C.G.&P~T. SNVS' 0.00 0.00 0.50 156.25 156.25 0.00 0.00 0.50 156.25 156,25 0.CO 0.03 0.50 156.25 156.25 0D0 0.(3(3 0.50 156.25 156.25 13 R GARZA 210E. VANDERBILT, 78415 LOT 21, BLK 21 ARCADIA VILLAGE R-lB-RES 6'2.5~ L.F. 312.50 S.F. C.G. & PVMT. SNV E 0,00 0.00 0.50 156.25 156.25 PATRICIA GALVAN 206E. VANDERBILT, 78415 LOT 22, BLK 21 ARCADIA VILLAGE R-lB-RES 62.55 L.F. 312.50 S.F. C.G, & PVMT, SNV E 0.00 0.00 0.50 156.25 156.25 ITEM NO. PREUMINARY ASSESSMENT ROLL t0110/01 SOUTHMORELAND STREET IMPROVEMENTS PHASE I1! OWNER AND PROPERTY DESCRJPTION DESCRIPTION OF ASSESSMENT 15 C. GUTIERREZ 202 E. VANDERBILT, 78415 LOT 23, BLK 21 ARCADIA VILLAGE R-IS-RES 65.03 L.F 32500 S.F. 286.63 S.F. C.G. & PVM'r. S/VV DNV 1-24.5' ROOSEVELT DRIVE INTERSECTION 16 ROBERTO PEREZ 158 E. VANDERBILT DR., 78415 LOT 1, BLK19 ARCADIA VILLAGE R-lB-RES 65.~0 L.F 325.00 S F. 177.00 S.F. C.G. & PVMT. S/W DNV 1-14' RATE AMOUNT TOTAL AMOUNT ASSESSED 0.00 0.00 0.00 4.05 1,160.85 1,160.85 0.(30 0.00 0.50 162.50 4.0~ 716.85 879.35 17 ENRIQUE MORENO 154 E. VANDERBILT DR., 78415 LOT 2, BLK 19 ARCADIA VILLAGE R-lB-RES 65.00 L.F. 325.C0 S.F. C.G.&P~T. S/W 0.00 0.00 0.50 162.50 162.50 18 FRANK MAYERS ET UX 33(3~ SAMOA DR., 78418 LOT 3, BLK 19 ARCADIA V1LLAGE R-lB-RES 65.00 L.F. 325.00 S F C.G. & PVMT. SM,,' 0.00 0.50 t62.50 19 SOCORRO PEREZ 1,~,6 E. VANDERBILT DR., 78415 LOT 4, SLK 19 ARCADIA VILLAGE R-lB 1-F RES 65.00 L.F. 325.00 S.F. C.G.&PVMT. S~ 0.00 O.O0 0.50 162.50 1 62 50 JESUS ALVAREZ 142 E. VANDERBILT DR., 78415 LOT 5, BLK 19 ARCADIA VILLAGE R-lB 1-F RES 65.00 LF. 32500 S.F. C.G.&PVI~r. S~ 0.00 GOO 0.50 162.50 162.50 21 GEORGE HASLAM KEHOE, III 138 E. VANDERBILT DR., 78415 LOT 6, BLK 19 ARCADIA VILLAGE R-lB RES 85.00 L.F. 425.00 S.F. C.G.&PVMT 0.00 0.00 0.50 212.50 212.50 ALICIA RIOJAS 134 E. VANDERBILT DR., 78415 LOT 7, BLK 19 ARCADIA VILLAGE R-IS 1-F RES 85.00 L.F 425.03 S.F. C.G. & PVMT. S/W 0.00 GOO 0.50 212.50 212.50 ITEM NO. 23 PRELIMINARY ASSESSMENT ROLL 10110/01 SOUTHMORELAND STREET IMPROVEMENTS PHASE III OWNER AND PROPERTY DESCRIPTION ~ESC~P~:~ I TOTAL QUANTITY AMOUNT ASSESSED ASSESSMENT RATE AMOUNT ~-~$~-~SED ~3.00 LF. C.G. & PVMT. 0.(X3 O.QO 465.00 S.F SNV 0.50 23,?_ .50 232.50 HERMAN NAST 4630 HAECKERVILLE RD CIBOLO, TX. 781(36 LOT8, BLK19 ARCADIA VILLAGE C/O ROXANNE G. THOMAS 130 E. VANDERBILT, 78415 24 LEON E. LEVINS 126 E. VANDERSILT DR., 78415 LOT9, BLK19 ARCADIA VILLAGE R-lB 1-F RES 61.00 L.F. C.G. & PVMT. 0.00 0.00 306.00 S.F. S/W 0.50 152.50 152.50 ROGELIO MONTEMAYER, JR. 337 NORTON, 78415 LOT 25, BLK 19 ARCADIA VILLAGE R-IS 1-F RES 80.00 L.F. C.G. & PVMT. 4.88 3~0.40 350.Q0 S.F SNV 0.50 175.00 170.50 S.F. DNV 1-1(7 4D5 6g053 NORTON STREET INTERSECTION END RAMSEY STREET NORTH SIDE RAMSEY STREET IMPROVEMENTS FROM BRAWNER PARKVVAY TO NORTON STREET SOUTHSIDE 26 LE MAR GENTMAN ET AL P.O. BOX 7114, 78467 LOT 5, BLK 11 SAM HOUSTON ADDITION A-1 APT 73.50 L.F. C.G. & PVMT. 19.50 1,433.25 2,45.00 S.F. S.NV 5' 1,00 245.00 20.00 S.F. SNV EX1' 1.00 20.03 182.50 S,F. DNV 1-2~ 4.0(5 739.13 27 CHARLES. QUINN & D,S. SCHUMAC & RAMIRO O. GARCIA ET UX 4621 STONEGATE WAY SW 20.9~ OF LOT 3, & ALL LOT 4 SAM HOUSTON ADDITION A-1 APT3 84.00 LF C.G. & PVMT. 19.50 1,638.00 252.00 S.F SNV 5' 1.00 252.00 19.50 S F SNV EXT 1.00 19.50 :Z3~2.00 S.F. DiW 1-29' 4,0~ 939,60 2,8,49.10 JESUS G. CANTU ET UX EUGENE BOULIGNY 309 SANTA MONICA PL, 78411 SW 41.88' OF LOT 2 & NE 41.88' OF LOT 3. BLt( 11 SAM HOUSTON ADDITION A-1 APT 8400 L.F. C.G. & PVMT. 19.50 1,638.00 267.EO S.F SNV 5' 1 D0 267.50 300.50 S.F. DNV 1-2~ 4.05 1,217.O3 3,122.53 Page 4 of 5 r¸ ITEM NO. 29 PREUMINARY ASSESSMENT ROLL 10110101 SOUTHMORELAND STREET IMPROVEMENTS PHASE III OWNER AND PROPERTY DESCRIPTION QUAN~TY ASSESSED NOE LOPEZ ET UX 3~02 RAMSEY, 78415 LOT 1 & NE 20.~4' OF LOT 2, BLK 11 SAM HOUSTON ADDITION DESCRIPTIONOF RATE ASSESSMENT AMOUNT 63.00 L.F. C.G. & PVMT. 19.50 1,228.50 5800 S.F. SNV 1.00 58.00 3~5.~0 S.F. TOTAL AMOUNT A$~F~Fn D/W 1-51.16 4.05 1,518.75 SAM HOUSTON PARK SAM HOUSTON ELEMENTARY SCHOOL 363 NORTON, 78415 TRACT LOT 1, BLK 1 SAM HOUSTON ELEMENTARY SCHOOL TRACT RETURN TO NORTON ST. RETURN TO NORTON ST. 932.00 L.F C.G. & PVMT 5,.563~00 S.F. 7' SNV 720.00 S.F. 8' SNV 25.00 L.F. C.G. 125.00 S.F. S/W 362.50 S.F DNV 1-2~ 9.75 9,067.00 1.00 5,~:~.a0 1 .ao 720.00 0.00 0.00 1.00 125,00 4.06 1/468.13 16,963.13 NORTON STREETINTERSECTION END RAMSEY STREET SOUTHSIDE END RAMSEY STREET END PROJECT $ 41,8~g.88 Page 5 of 5