HomeMy WebLinkAbout024624 RES - 10/16/2001RESOLUTION
APPROVING PLANS AND SPECIFICATIONS FOR
IMPROVEMENTS TO THE FOLLOWING HIGHWAY IN
CORPUS CHRISTI, NUECES COUNTY, TEXAS:
Southmoreland Addition Street Improvements, Phase 3A
Lewis Street between Richard and Clemner
Southmoreland Addition Street Improvements, Phase 4A
Ramsey Street between Brawner Parkway & Norton Street
APPROVING THE DIRECTOR OF ENGINEERING SERVICES'
PROJECT CONSTRUCTION COST ESTIMATE INCLUDING AN
ESTIMATE OF THE PORTION OF COSTS TO BE PAID BY THE
CITY AND THE PORTION TO BE PAID BY ASSESSMENTS;
SETTING A PUBLIC HEARING ON THESE PROPOSED
ASSESSMENTS TO OCCUR DURING THE DECEMBER 11, 2001
CITY COUNCIL MEI~TING; DIRECTING THE CITY
SECRETARY TO ARRANGE TO PUBLISH NOTICE OF THIS
PUBLIC HEARING; AND ORDERING THE DIRECTOR OF
ENGINEERING SER'~ICES TO PROVIDE WRITTEN NOTICE OF
THE PUBLIC HEARING-- aTO PROPERTY OWNERS
In its Resolution No. ~.3~Ll~r~?} , passed on October 16,2001, the
City Council determined that it was necessary to improve and ordered the
improvement of the following highway in Corpus Christi, Nueces County, Texas:
Southmoreland Addition Street Improvements, Phase 3A
Lewis Street between Richard and Clem~er
'\
Southmoreland Addition Street Improvement, Phase 4A
Ramsey Street between Bra~vner Parkway and Norton Street
(collectively, the Southmoreland Addition Area Street Improvements Phases 3A and
4A)(the "Project").
In Resolution No. ~) (~4(e ~:)-~ , the city council stated that the
Project consisted of 3 categories of improvements: 1) street, curb, gutter, and
sidexvalk improvements to be paid for partly by the city and partly by
assessments; 2) driveways to be paid for entirely by assessments; and 3) other
improvements, to be paid for by the city, because either the assessment statute did
:? 24 ¢ 24
not apply to these improvements or the city was not making assessments to pay
for them.
The city's department of engineering services prepared detailed Project
plans and specifications. The city then received bids to construct the Project
accordingly.
After evaluating the apparent lowest responsible bid to construct the
Project, the director of engineering services prepared a Project construction cost
estimate (attached as Exhibit A). This estimate specifies anticipated total Project
construction cost and the city portion of this cost, the preliminary total of
assessments, and various assessment rates. The estimate also includes a bid
tabulation and a preliminary assessment roll listing proposed assessments against
each abutting or affected property.
NOW, THEREOFRE, BE IT RESOLVED BY THE CITY COUNCIL
OF THE CITY OF CORPUS CHRISTI, TEXAS:
SECTION 1. The Project plans and specifications are approved.
SECTION 2. In accordance with Texas Transportation Code Section
313.024, the Project construction cost estimate is approved; however, the
assessments listed in the preliminary assessment roll cannot be imposed until after
a public hearing is conducted in accordance with state law and the city council's
Assessment Process Rules Resolution.
SECTION 3. A public hearing on proposed assessments for the
Southmoreland Addition Street Improvements, Phase 3A and 4A, will be held
during the City Council's December 11, 2001 meeting. This meeting will begin
at 2:00 p.m. in the City Council Chambers, 1201 Leopard, Corpus Christi, Texas.
SECTION 4. The city secretary will arrange to publish notice of this
public hearing in accordance with the Assessment Process Rules Resolution.
SECTION 5. The director of engineering services will provide written
notice of the public hearing to property owners in accordance with the
Assessment Process Rules Resolution.
ATTEST:
Armando Chapa
City Secretary
CITY OF CORPUS CHRISTI
Samuel L~'Neal, Jr. '
Mayor
Approved this the ! ! day of ~'ff&¢ ~
James R. Bray, Jr.
City Attorney
/oI~ P. Bu~-~:e, ~r. V -
(.~/s~istant City Attorney t
,2001.
Corpus Christi~T~xas
~ day of/.(' .~7~.~, 2001
The above resolution was passed by the following vote:
Samuel L. Neal, Jr.
Brent Chesney
Javier D. Colmenero
Henry Garrett
Rex Kinnison
Bill Kelly
John Longoria
Jesse Noyola
Mark Scott
EXHIBIT A
PROJECT CONSTRUCTION COST ESTIMATE
The Southmoreland Addition Area Street Improvements Phases 3A and 4A (the
"Project") will consist of street, curb, gutter, sidewalk, and driveway
improvements to:
Southmoreland Addition Area Street Improvements
Phase 3A - Lewis Street, Richard to Clemner
Phase 4A - Ramsey Street, Norton to Brawner Parkway
The streets will be constructed by excavation to a sufficient depth for the
following pavement sections:
standard 6" curb and gutter section;
9" Flexible Base-Limestone
Geogrid reinforcement; and
One course surface treatment;
1.5" HMAC-Type D or 1.5" HMAC-Type D with 3" HMAC-Type C and
widths of 28 and 36 feet measured from the back-of-curb to back-of-curb,
within the existing right-of-way.
Sidewalk improvements will also include 5 or 7 or 8 foot-wide reinforced
concrete sidewalks, 4 inches thick.
Reinforced concrete driveways will be constructed.
Applying corpus Christi Code Section 49-21, the estimated amount per front-foot
proposed to be assessed against abutting property and its owners is smnmarized
below:
ITEM BID PRICES FOR MAXIMUM
ASSESSABLE ASSESSMENT
IMPROVEMENTS
RATES PER
(PLUS
ENGINEERING CORPUS
COSTS) ADJUSTED CHRISTI
PER CORPUS CODE SECTION
CHRISTI CODE 49-21
SECTION 49-21
A. Pavement, Curb,
and Gutter
Improvements
1)Base Bid Item: $28.09 per L.F. $19.50 per L.F.
Lewis Street 28'
Back-of-Curb to
Back-of-Curb
("B-B")
2)Base Bid Item: $48.42 per L.F. 19.50 per L.F.
Ramsey Street 36'
B-B
3) Additive $84.70 per L.F. 19.50 per L.F.
Alternate Item:
Ramsey Street from
Back-of-Curb
B. Sidewalks 1)Base Bid ltem- $1.94 per L.F. $1.00 per S.F.
Lewis Street
2)Base Bid Item- $1.94 per L.F. $1.00 per S.F.
Ramsey Street
3)Add. Alt. #1- $2.59 per L.F. $1.00 per S.F.
Ramsey Street
C. Driveways 1) Base Bid Item $4.05 per S.F. $4.05 per S.F.
Lewis Street
2) Base Bid Item $4.05 per S.F. $4.05 per S.F.
Ramsey Street
Property which sides along the street being improved will be assessed at
the rates specified above.
Property backing onto a street being improved will be assessed at the rates
specified above except if access is prohibited. In that event, the rates will
be reduced 50%.
Under Corpus Christi Code Section 49-21, special assessment rates apply to
certain residential, church, and school properties as follo~vs:
ITEM SPECIAL ASSESSMENT RATES PER
CORPUS CHRISTI CODE SECTION
49-21
A. Pavement, Curb, and Gutter Improvements $9.75 per L.F.
B. Sidewalks 1.00 per S.F.
C. Driveways
Base Bid Item - Lewis Street $4.05 per S.F.
Base Bid Item - Ramsey Street $4.05 per S.F.
For property siding on a street being improved, assessment rates for curb,
gutter, pavement, and side~valk improvements will not exceed 50% of the
respective rates specified in the immediately preceding chart.
Except where the property is more than 250 feet in depth, property
backing on the street being improved will not be assessed for curb, gutter,
and pavement improvements unless driveway access is allowed. If
driveway access is allowed, then the assessment rate will be 50% of the
residential fronting rate for curb, gutter, and pavement, and 50% of the
residential rate for sidewalks. Except as otherwise provided in section 49-
21, where a sidewalk exists in front of the property, there will be no
sidewalk assessment.
Finally, if the property is over 250 in depth, the assessment rates will be
the same as if the property were fronting the street.
Anticipated Total Project Construction Cost
Preliminary Total of Assessments
City Portion
(See Project bid tabulation attached as Exhibit 1 ).
$664,099.25
$ 41,899.88
$622,199.37
A preliminary project assessment roll is attached as Exhibit 2.
CITY OF CORPUS CHRISTI
By:
Name:
Title:
Date:
EXHIBIT 1
iai
EXHIBIT 2
PRELIMINARY ASSESSMENT ROLL
10110/01
SOUTHMORELAND STREET IMPROVEMENTS
PHASE III
ITEM OWNER AND
NO. PROPERTY DESCRIPTION
DESCRIPTION
OF
ASSESSMENT
LEWIS STREET
FROM CLEMMER STREET TO RICHARD STREET NORTHSlDE
FILSERTO MARTINEZ
146 CLEMMER, 78415
LOT 24, BLK9
SOUTHMORELAND SUB.
R~IB-RES
14000 LF.
567.50 S.F.
C.G. & PVMT.
S/VV
D~N 1-22
TOTAL
AMOUNT
AMOUNT ASSESSED
2 LEROY MOSES
149 RICHARD, 78415
LOT 1, SLK9
SOUTHMORELAND SUB
R-1 B-RES
LEWIS STREET SOUTHSIDE
FROM CLEMMER STREET TO RICHARD STREET
3 ESTELLA AMADOR
206 CLEMMER, 78415
LOT 13, BLK 14
SOUTHMORELAND SUB.
R-lB-RES
140.00 LF
617.50 S.F
102.EO S.F
118.50 S.F.
C.G. & PVMT.
S/W
DNV 1-2
DAN
488
0.50 3(~.75
4.05 415.13
4,(]5 479.93
140.~0 L.F. C.G. & PVMT. 4.88 683.20
627.50 SF S,NV 0.50 313.75
4 HOWARD SULLIVAN
201 RICHARD, 78415
LOT 12, BLK 14
SOUTHMORELAND SUB.
R-lB-RES
RICHARD STREET INTERSECTION
END LEWIS STREET SOUTHSIDE
END LEWIS STREET
140.~0 LF.
57750 S.F
182.50 S.F
C.G. & PVMT.
S/W
DAN 1-L:~7
4.88 683.20
O.EO 288.75
4.05 739.13
1,711
RAMSEY STREET IMPROVEMENTS
FROM BRAWNER PARKWAY TO NORTON STREET NORTHSIDE
5 CiTY OF CORPUS CHRISTI
3701 AYERS, 78469
LOT 20, BLK 1
MODERN HOMES SUB.
R-lB-APT
13~.(]0 L.F.
C.G. & PVMT. 0.00 0.00 0.00
ADAN RIVERA
238 E. VANDERBILT DR, 78415
LOT 14, BLK21
ARCADIA VILLAGE
R-lB-RES
110.00 L.F.
467.50 S.F.
11850 S.F.
C.G. & PVMT.
SNV
D/W 1-1Z
4?9.93
ITEM
NO.
7
PRELIMINARY ASSESSMENT ROLL
t01t0/01
SOUTHMORELAND STREET IMPROVEMENTS
PHASE M
OWNER AND
PROPERTY DESCRIPTION
QUANTITY
ASSESSED
DESCRIPTION RATE AMOUNT TOTAL
OF AMOUNT
ASSESSMENT ASSESSED
C.G. & PVMT. 0.00 0.00
SNV 5' 0.50 250.00 250.00
JOE L GONZALES
234E. VANDERBILT DR., 78415
LOT 15, BLK21
ARCADIA VILLAGE
R-lB-RES
100.00 LF.
50001 S.F.
RAY E. WHITMIRE
722 MEADOWBROOK, 78412
LOT 16, BLK21
ARCADIA VILLAGE
R-1 B-RES
65.00 LF.
325.00 S.F.
C.G.&P~T.
S~E
0.55 0.00
0.50 162.50 162.50
11
12
REBECCA LYNN RIVERIA
815WARBLAR
ROCKPORT, 78382
LOT 17. BLK21
ARCADIA VILLAGE
R-lB-RES
NIEVES NUNEZ, JR.
222 E. VANDERBILT, 78415
LOT 18, BLK21
ARCADIA VILLAGE
R-lB-RES
JOHNNY M. ZEPEDA
218 E. VANDERBILT, 78415
LOT 19, BLK21
ARCADIA VILLAGE
R-lB-RES
DIANA R. & MICHELLE DAVILLA
214E. VANDERBILT, 78415
LOT 20, BLK21
ARCADIA VILLAGE
R-lB-RES
62.50 L.F.
312.50 S.F.
62.50 LF
31250 S.F.
62.50 L.F.
312.50 S.F
62.50 L.F.
312.50 S.F.
C.G.&PVMT.
S~5'
C.G & PVMT.
SNV5'
C.G.&PVMT.
S~
C.G.&P~T.
SNVS'
0.00 0.00
0.50 156.25 156.25
0.00 0.00
0.50 156.25 156,25
0.CO 0.03
0.50 156.25 156.25
0D0 0.(3(3
0.50 156.25 156.25
13
R GARZA
210E. VANDERBILT, 78415
LOT 21, BLK 21
ARCADIA VILLAGE
R-lB-RES
6'2.5~ L.F.
312.50 S.F.
C.G. & PVMT.
SNV E
0,00 0.00
0.50 156.25 156.25
PATRICIA GALVAN
206E. VANDERBILT, 78415
LOT 22, BLK 21
ARCADIA VILLAGE
R-lB-RES
62.55 L.F.
312.50 S.F.
C.G, & PVMT,
SNV E
0.00 0.00
0.50 156.25 156.25
ITEM
NO.
PREUMINARY ASSESSMENT ROLL
t0110/01
SOUTHMORELAND STREET IMPROVEMENTS
PHASE I1!
OWNER AND
PROPERTY DESCRJPTION
DESCRIPTION
OF
ASSESSMENT
15
C. GUTIERREZ
202 E. VANDERBILT, 78415
LOT 23, BLK 21
ARCADIA VILLAGE
R-IS-RES
65.03 L.F
32500 S.F.
286.63 S.F.
C.G. & PVM'r.
S/VV
DNV 1-24.5'
ROOSEVELT DRIVE INTERSECTION
16
ROBERTO PEREZ
158 E. VANDERBILT DR., 78415
LOT 1, BLK19
ARCADIA VILLAGE
R-lB-RES
65.~0 L.F
325.00 S F.
177.00 S.F.
C.G. & PVMT.
S/W
DNV 1-14'
RATE AMOUNT TOTAL
AMOUNT
ASSESSED
0.00 0.00
0.00
4.05 1,160.85 1,160.85
0.(30 0.00
0.50 162.50
4.0~ 716.85 879.35
17
ENRIQUE MORENO
154 E. VANDERBILT DR., 78415
LOT 2, BLK 19
ARCADIA VILLAGE
R-lB-RES
65.00 L.F.
325.C0 S.F.
C.G.&P~T.
S/W
0.00 0.00
0.50 162.50 162.50
18
FRANK MAYERS ET UX
33(3~ SAMOA DR., 78418
LOT 3, BLK 19
ARCADIA V1LLAGE
R-lB-RES
65.00 L.F.
325.00 S F
C.G. & PVMT.
SM,,'
0.00
0.50 t62.50
19
SOCORRO PEREZ
1,~,6 E. VANDERBILT DR., 78415
LOT 4, SLK 19
ARCADIA VILLAGE
R-lB 1-F RES
65.00 L.F.
325.00 S.F.
C.G.&PVMT.
S~
0.00 O.O0
0.50 162.50 1 62 50
JESUS ALVAREZ
142 E. VANDERBILT DR., 78415
LOT 5, BLK 19
ARCADIA VILLAGE
R-lB 1-F RES
65.00 LF.
32500 S.F.
C.G.&PVI~r.
S~
0.00 GOO
0.50 162.50 162.50
21
GEORGE HASLAM KEHOE, III
138 E. VANDERBILT DR., 78415
LOT 6, BLK 19
ARCADIA VILLAGE
R-lB RES
85.00 L.F.
425.00 S.F.
C.G.&PVMT
0.00 0.00
0.50 212.50 212.50
ALICIA RIOJAS
134 E. VANDERBILT DR., 78415
LOT 7, BLK 19
ARCADIA VILLAGE
R-IS 1-F RES
85.00 L.F
425.03 S.F.
C.G. & PVMT.
S/W
0.00 GOO
0.50 212.50 212.50
ITEM
NO.
23
PRELIMINARY ASSESSMENT ROLL
10110/01
SOUTHMORELAND STREET IMPROVEMENTS
PHASE III
OWNER AND
PROPERTY DESCRIPTION
~ESC~P~:~ I TOTAL
QUANTITY AMOUNT
ASSESSED ASSESSMENT RATE AMOUNT ~-~$~-~SED
~3.00 LF. C.G. & PVMT. 0.(X3 O.QO
465.00 S.F SNV 0.50 23,?_ .50 232.50
HERMAN NAST
4630 HAECKERVILLE RD
CIBOLO, TX. 781(36
LOT8, BLK19
ARCADIA VILLAGE
C/O ROXANNE G. THOMAS
130 E. VANDERBILT, 78415
24
LEON E. LEVINS
126 E. VANDERSILT DR., 78415
LOT9, BLK19
ARCADIA VILLAGE
R-lB 1-F RES
61.00 L.F. C.G. & PVMT. 0.00 0.00
306.00 S.F. S/W 0.50 152.50 152.50
ROGELIO MONTEMAYER, JR.
337 NORTON, 78415
LOT 25, BLK 19
ARCADIA VILLAGE
R-IS 1-F RES
80.00 L.F. C.G. & PVMT. 4.88 3~0.40
350.Q0 S.F SNV 0.50 175.00
170.50 S.F. DNV 1-1(7 4D5 6g053
NORTON STREET INTERSECTION
END RAMSEY STREET
NORTH SIDE
RAMSEY STREET IMPROVEMENTS
FROM BRAWNER PARKVVAY TO NORTON STREET SOUTHSIDE
26 LE MAR GENTMAN ET AL
P.O. BOX 7114, 78467
LOT 5, BLK 11
SAM HOUSTON ADDITION
A-1 APT
73.50 L.F. C.G. & PVMT. 19.50 1,433.25
2,45.00 S.F. S.NV 5' 1,00 245.00
20.00 S.F. SNV EX1' 1.00 20.03
182.50 S,F. DNV 1-2~ 4.0(5 739.13
27
CHARLES. QUINN &
D,S. SCHUMAC &
RAMIRO O. GARCIA ET UX
4621 STONEGATE WAY
SW 20.9~ OF LOT 3, & ALL LOT 4
SAM HOUSTON ADDITION
A-1 APT3
84.00 LF C.G. & PVMT. 19.50 1,638.00
252.00 S.F SNV 5' 1.00 252.00
19.50 S F SNV EXT 1.00 19.50
:Z3~2.00 S.F. DiW 1-29' 4,0~ 939,60
2,8,49.10
JESUS G. CANTU ET UX
EUGENE BOULIGNY
309 SANTA MONICA PL, 78411
SW 41.88' OF LOT 2 & NE 41.88' OF LOT 3. BLt( 11
SAM HOUSTON ADDITION
A-1 APT
8400 L.F. C.G. & PVMT. 19.50 1,638.00
267.EO S.F SNV 5' 1 D0 267.50
300.50 S.F. DNV 1-2~ 4.05 1,217.O3
3,122.53
Page 4 of 5
r¸
ITEM
NO.
29
PREUMINARY ASSESSMENT ROLL
10110101
SOUTHMORELAND STREET IMPROVEMENTS
PHASE III
OWNER AND
PROPERTY DESCRIPTION
QUAN~TY
ASSESSED
NOE LOPEZ ET UX
3~02 RAMSEY, 78415
LOT 1 & NE 20.~4' OF LOT 2, BLK 11
SAM HOUSTON ADDITION
DESCRIPTIONOF RATE
ASSESSMENT AMOUNT
63.00 L.F. C.G. & PVMT. 19.50 1,228.50
5800 S.F. SNV 1.00 58.00
3~5.~0 S.F.
TOTAL
AMOUNT
A$~F~Fn
D/W 1-51.16 4.05 1,518.75
SAM HOUSTON PARK
SAM HOUSTON ELEMENTARY SCHOOL
363 NORTON, 78415
TRACT LOT 1, BLK 1
SAM HOUSTON ELEMENTARY SCHOOL TRACT
RETURN TO NORTON ST.
RETURN TO NORTON ST.
932.00 L.F C.G. & PVMT
5,.563~00 S.F. 7' SNV
720.00 S.F. 8' SNV
25.00 L.F. C.G.
125.00 S.F. S/W
362.50 S.F DNV 1-2~
9.75 9,067.00
1.00 5,~:~.a0
1 .ao 720.00
0.00 0.00
1.00 125,00
4.06 1/468.13
16,963.13
NORTON STREETINTERSECTION
END RAMSEY STREET SOUTHSIDE
END RAMSEY STREET
END PROJECT
$ 41,8~g.88