HomeMy WebLinkAbout024854 RES - 04/30/2002
RESOLUTION
APPROVING PLANS AND SPECIFICATIONS FOR
IMPROVEMENTS TO THE FOLLOWING HIGHWAY IN
CORPUS CHRISTI, NUECES COUNTY, TEXAS:
Woodlawn Drive from South Padre Island Drive (SPID) West
Bound Frontage Road to McArdle Road
APPROVING THE DIRECTOR OF ENGINEERING
SERVICES PROJECT CONSTRUCTION COST ESTIMATE
INCLUDING AN ESTIMATE OF THE PORTION OF COSTS
TO BE PAID BY THE CITY AND THE PORTION TO BE
PAID BY ASSESSMENTS; SETTING A PUBLIC HEARING
ON THESE PROPOSED ASSESSMENTS TO OCCUR
DURING THE JUNE 11, 2002 CITY COUNCIL MEETING;
DIRECTING THE CITY SECRETARY TO ARRANGE TO
PUBLISH NOTICE OF THIS PUBLIC HEARING; AND
ORDERING THE DIRECTOR OF ENGINEERING SERVICES
TO PROVIDE WRITTEN NOTICE OF THE PUBLIC
HEARING TO PROPERTY OWNERS
In its Resolution NoD).l.~5~ passed on April 30, 2002, the City Council determined that
it was necessary to improve and ordered the improvement of the following highway in Corpus
Christi, Nueces County, Texas:
Woodlawn Drive from South Padre Island Drive (SPlD) West Bound Frontage Road to
McArdle Road (the Woodlawn Drive Street Improvements Project).
In Resolution No.ffi4-'3'53, the city council stated that the Project consisted of3
categories or improvements: I) street, curb, gutter, and sidewalk improvements to be paid for
partly by the city and partly by assessments; 2) driveways to be paid for entirely by assessments;
and 3) other improvements, to be paid for by the city, because either the assessment statute did
not apply to these improvements or the city was not making assessments to pay for them.
The city's department of engineering services prepared detailed project plans and
specifications. The city then received bids to construct the project accordingly.
After evaluating the apparent lowest responsible bid to construct the Project, the director
of engineering services prepared a Project Construction Cost Estimate (attached as Exhibit A).
This estimate specifies anticipated total Project construction cost and the city portion of this cost,
the preliminary total of assessments, and various assessment rates. The estimate also includes a
bid tabulation and a preliminary assessment roll listing proposed assessments against each
abutting or affected property.
( "., (l . ) 4
d::'. i 'J \.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF CORPUS CHRISTI, TEXAS:
SECTION 1. The project plans and specifications are approved.
SECTION 2. In accordance with Texas Transportation Code Section 313.024, the
Project construction cost estimate is approved; however, the assessments listed in the preliminary
assessment roll cannot be imposed until after a public hearing is conducted in accordance with
state law and the city council's Assessment Process Rules Resolution.
SECTION 3. A public hearing on proposed assessments for the Woodlawn Drive Street
Improvements Project will be held during the City Council's June 11,2002 meeting. This
meeting will begin at 2:00 p.m. in the City Council Chambers, 1201 Leopard, Corpus Christi,
Texas.
SECTION 4. The city secretary will arrange to publish notice of this public hearing in
accordance with the Assessment process Rules Resolution.
SECTION 5. The director of engineering services will provide written notice of the
public hearing to property owners in accordance with the Assessment Process Rules Resolution.
ATTEST:
CITY OF CORPUS CHRISTI
~
Armando Chapa
City Secretary
Approved this the ~ay of .A,:(
James R. Bray, Jr.
City At rney
Samuel L. Neal, Jr.
Mayor
,2002.
By:
n P. Burke, Jr.
sistant City Attorney
CORPUS CHRISTI, TEXAS
8{fh DAY OF ~
The above resolution was passed by the following vote:
,2002
Samuel L. Neal, Jr.
Brent Chesney
Javier D. Colmenero
Henry Garrett
Bill Kelly
Rex A. Kinnison
John Longoria
Jesse Noyola
Mark Scott
H\LEG-D1R~ohn\RESOLUT1\Woodlawn_AppfP]ans & SpeCHes wpd
r (', 4
u.: '.~' g ~)
NOTICE OF PROPOSED ASSESSMENTS
Preliminary Assessment Roll
Woodlawn Drive Street Improvements
(from SPID West Bound Frontaae Road to McArdle Road)
This street shall be constructed by excavation to a width and depth to permit the laying
of a standard 6-inch curb and gutter section, 8-inch compacted subgrade with geogrid
reinforcement, 9-inch lime stabilized flexible base, 2.5-inch hot mix asphaltic concrete
pavement, Type "D". The street shall be 28-feet and constructed within the existing
right-of-way. There will be 4-foot wide standard reinforced concrete sidewalks 4-inches
thick with ADA compliance and 6-inch thick reinforced concrete driveway.
The assessment rates have been calculated in accordance with the City's current
assessment policy and the low bid prices submitted by Kin-Isles, Inc. The assessment
rates are as follows:
Item Adjusted Bid Price Plus Assessment
Engineering Cost Rates
6" C. G. & PVMT.-28'-0" B-B $26.76 L. F. $19.50 L. F.
Sidewalk - 4' Conc. SIW $2.12 S. F. $1.00 S. F.
Driveways $4.32 S. F. $4.32 S. F.
Residential, Church, School Property
6" C. G. & PVMT. $9.75 L. F.
Sidewalk (4') $1.00 S. F.
Driveways $4.32 S. F.
Actual Cost Y, Street (C. G., Pavement $56.66 L. F.
& SIW 28' B-B)
Total Bid Price $439,796.00
Preliminary Assessments $59,351.99
City Share $380,444.01
'Angel R. Escobar, P. E.,
Director of Engineering Services
EXHIBIT "A"
H:\HOME\VELMAR\GEN\STREET\6140 WOODLAWN\NECESSITY\NOTICE OF PROPOSED ASSESSMENTS
CITY ENGINEER'S STATEMENT
WOODLAWN DRIVE STREET IMPROVEMENTS
FROM SOUTH PADRE ISLAND DRIVE (SPID)
WEST BOUND FRONTAGE ROAD TO McARDLE ROAD
My name is Angel R. Escobar. I am the City Engineer for the City of Corpus Christi and
have served in this capacity for the last 26 months and as Assistant City Engineer for the
last one-hundred and twenty months (120) months.
I am a Professional Engineer, licensed by the State of Texas since 1977. I have over 24
years of experience in design of construction and estimating the costs thereof.
I am familiar with this project which encompasses:
Woodlawn Drive Street Improvements from South Padre Island Drive (SPID)
West Bound Frontage Road to McArdle Road
The project consists of construction of 1,300 linear feet of 28-foot back-to-back pavement,
sidewalks, and driveways; 1,065 linear feet of storm sewer; 1,225 linear feet of sanitary
sewer; and 1,245 linear feet of water line together with all appurtenances as shown on the
plans and called for in the specifications.
Funds to finance the project are available in the FY 2001-2002 Street, Storm Water,
Wastewater, and Water Capital Improvement Program.
Prior to this hearing, I had an estimate of project costs prepared, and it compared favorably
with the bids received. In my opinion, the costs are true and accurate. This project is
estimated to start in July 2002 with completion in December 2002.
r
,.-1
9 R. Escobar, P.E.
irector of Engineering Services
:;;,;L+. ,,~
(Date)
H:\HOME\VElMAR\GEN\STREET\6140 WQODLAWN\CONSTRUCTION\ENGINEER STATEMENT
GEORGE
N.
PARASKEVAS
REALTORS
May 22, 2002
EVERHART PATIO PLAZA
5440 EVERHART
CORPUS CHRISTI. TEXAS 78411
PRELIMINARY ASSESSMENT ROLL, Woodlawn Drive
Woodlawn Drive - McArdle Road to S.P.I.D.
My name is George N Paraskevas and I am a State Certified Residential appraiser and
have been evaluating property and practicing real estate in the Corpus Christi area since 1971. I have
experience in appraising both commercial and residential properties, and I am fumiliar with the real
estate market in Corpus Christi.
I am fiuniliar with the Woodlawn Drive Street Improvements. I agree with Mr. Jeff Barroso's
description of the conditions to be changed and I am fiuniliar with the improvements to be made by the
City of Corpus Christi.
I have reviewed the project assessment roll; and personally examined each ofthe 32 parcels ofland
therein. In my opinion each such parcel will be specifically benefited by each improvement to be assessed
against it; without regard to the community benefit.
In addition, it is my opinion that each such parcel will be specially enhanced by such improvement at
least to the extent ofthe assessment stated.
Thank you,
j p ~ .
" "",p_",c,
George N Paraskevas
Appraiser