HomeMy WebLinkAbout024897 RES - 06/11/2002RESOLUTION
APPROVING PLANS AND SPECIFICATIONS FOR
IMPROVEMENTS TO THE FOLLOWING HIGHWAYS IN
CORPUS CHRISTI, NUECES COUNTY, TEXAS:
Birmingham Street from Airline Road to Lyons Street and Lyons
Street from Airline Road to end of street
APPROVING THE DIRECTOR OF ENGINEERING
SERVICES PROJECT CONSTRUCTION COST ESTIMATE
INCLUDING AN ESTIMATE OF THE PORTION OF COSTS
TO BE PAID BY THE CITY AND THE PORTION TO BE
PAID BY ASSESSMENTS; SETTING A PUBLIC HEARING
ON THESE PROPOSED ASSESSMENTS TO OCCUR
DURING THE JULY 23, 2002 CITY COUNCIL MEETING;
DIRECTING THE CITY SECRETARY TO ARRANGE TO
PUBLISH NOTICE OF THIS PUBLIC HEARING; AND
ORDERING THE DIRECTOR OF ENGINEERING SERVICES
TO PROVIDE WRITTEN NOTICE OF THE PUBLIC
HEARING TO PROPERTY OWNERS
In its Resolution No.0~Oiq4qtOpassed on June 11, 2002, the City Council determined that
it xvas necessary to improve and ordered the improvement of the following highways in Corpus
Christi, Nueces County, Texas:
Birmingham Street from Airline Road to Lyons Street and Lyons Street from Airline
Road to end of street
In Resolution No. ~l'b'q¢. the city council stated that the Project consisted of 3
categories or improvements: 1) street, curb, gutter, and sidewalk improvements to be paid for
partly by the city and partly by assessments; 2) driveways to be paid for entirely by assessments;
and 3) other improvements, to be paid for by the city, because either the assessment statute did
not apply to these improvements or the city was not making assessments to pay for them.
The city's department of engineering services prepared detailed project plans and
specifications. The city then received bids to construct the project accordingly.
After evaluating the apparent lowest responsible bid to construct the Project, the director
of engineering services prepared a Project Construction Cost Estimate (attached as Exhibit A).
This estimate specifies anticipated total Project construction cost and the city portion of this cost,
the preliminary total of assessments, and various assessment rates. The estimate also includes a
bid tabulation and a preliminary assessment roll listing proposed assessments against each
abutting or affected property.
024897
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF CORPUS CHRIST1, TEXAS:
SECTION 1. The project plans and specifications are approved.
SECTION 2. In accordance with Texas Transportation Code Section 313.024, the
Project construction cost estimate is approved; however, the assessments listed in the preliminary
assessment roll cannot be imposed until after a public hearing is conducted in accordance with
state law and the city council's Assessment Process Rules Resolution.
SECTION 3. A public hearing on proposed assessments for the Birmingham Street and
Lyons Street Improvements Project will be held during the City Council's July 23, 2002 meeting.
This meeting will begin at 2:00 p.m. in the City Council Chambers, 1201 Leopard, Corpus
Christi, Texas.
SECTION 4. The city secretary will arrange to publish notice of this public hearing in
accordance with the Assessment process Rules Resolution.
SECTION 5. The director of engineering services will provide written notice of the
public hearing to property owners in accordance with the Assessment Process Rules Resolution.
ATTEST:
CITY OF CORPUS CHRISTI
Armando Chapa
City Secretary
Approved this the .~'"day
James R. Bray, Jr.
city
/ !~hn P. Burke~Jr.
~ssistant City A~orney
Mayor
.2002.
CORPUS CHRiSTI, TEXAS
\ \'~x DAY OF ~ A./b-[~ ,2002
The above resolution was passed by the following vote:
Samuel L. Neal, Jr.
Brent Chesney
Javier D. Colmenero
Henry Garrett
Bill Kelly
Rex A. Kinnison
John Longoria
Jesse Noyola
Mark Scott
024897
TABULATION OF BIDS
DEPARTMENT OF ENGINEERING - CITY OF CORPUS CHRISTI, TEXAS
TABULATED BY: 'Angel R. Escobar, P.E., Director of Engineering Services
DATE: Wednesday, May 29, 2002
ENGINEER'S ESTIMATE:
TIME OF COMPLETION:
$912,485,00
210 Cal. Days
SALINAS CONSTRUCTION W.T. YOUNG CONST.
BIRMINGHAM & LYONS DRIVE STREET 5134 FM 3006 P.O. BOX 9197
IMPROVEMENTS - PROJECT NOS. 6136 & 6137 PLEASANTON, TX 78064 CORPUS CHRISTI, TX 78469
ITEM I DESCRIPTION I QTY. I UNIT UNIT PRICE I AMOUNT UNIT PRICE I AMOUNT
PART A - STREET, SIDEWALK AND DRIVES - BIRMINGHAM DRIVE
A-I Street Excavation 3,706 S.Y. $14.97 $55,478.82 $7.50 $27,795.00
A-2 8" Compacted Subgrade With Geogrid 3,706 S.Y. $2.85 $10,562.10 $5.00 $18,530.00
A-3 9" 2% Lime Stabilized Caliche Base 3,706 S.Y. $11.22 $41,581.32 $6.90 $25,571.40
A-4 Prime Coat 445 GAL. $2.00 $890.00 $2.20 $979.00
A-5 2-1/2" HMAC Surface 2,965 S.Y. $7.90 $23,423.50 $8.50 $25,202.50
A-6 6" Curb and Gutter 2,118 L.F. $9.00 $19,062.00 $9.00 $19,062.00
A-7 4' Sidewalk and Turnouts 8,892 S.F. $3,50 $31,122.00 $3.10 $27,565.20
A-8 Concrete Drives 5,312 S.F. $4.75 $25,232.00 $4.30 $22,841.60
A-9 Concrete Ramp Type 7 2 EA. $800.00 $1,600.00 $1,100.00 $2,200.00
A-10 Traffic Control Plan 1 L.S. $5,600.00 $5,500.00 $3,300.00 $3,300.00
A-11 Relocate Signs & Mailboxes 1 L.S. $2,500.00 $2,500.00 $2,000.00 $2,000.00
A-12 Ozone Day I EA. $1,000.00 $1,000.00 $200.00 $200.00
A-13 Header Curb at ROW 100 L.F. $10.00 $1,000.00 $17.90 $1,790.00
A-14 Remove and Replace Pavement @ Airline Rd. 100 S.Y. $50.00 $5,000.00 $50.00 $5,000.00
A-15 Remove Curb & Gutter at Airline Road 50 L.F. $5.00 $250.00 $17.00 $850.00
SUBTOTAL PART "A · - STREET, SIDEWALK AND DRIVES - BIRMINGHAM
DRIVE ITEMS (A-l-A15) $224,201,74 $182,886.70
EXHIBIT "A" Page 1 of 8
SAUNAS CONSTRUCTION W.T. YOUNG CONST.
BIRMINGHAM & LYONS DRIVE STREET 5134 FM 3006 P.O. BOX 9197
IMPROVEMENTS- PROJECT NOS. 6136 & 6137 PLEASANTON, TX 78064 CORPUS CHRISTI, TX 78469
ITEM I DESCRIPTION I QTY. I UNIT UNIT PRICE I AMOUNT UNIT PRICE I AMOUNT
PART B - STORM SEWER - BIRMINGHAM DRIVE
B-1 24" RCP 15 L.F. $55.00 $825.00 $46.00 $690.00
B-2 18" RCP 542 L.F. $38.50 $20,867.00 $35.00 $18,970.00
B-3 15" RCP 121 L.F. $40.00 $4,840.00 $33.00 $3,993.00
B-4 Manhole Type "A" 5 EA. $3,000.00 $15,000.00 $2,400.00 $12,000.00
B-5 5' Slot Inlet 8 EA. $2,800.00 $22,400.00 $2,600.00 $20,800.00
B-6 Sidewalk Drain 10 EA. $70.00 $700.00 $250.00 $2,500.00
B-7 Topsoil and Grass Seeding 8,790 S.F. $0.25 $2,197.50 $0.25 $2,197.50
B-8 Topsoil and Grass Sodding 13,750 S.F. $0.65 $8,937.50 $0.50 $6,875.00
B-9 Remove Abandoned Structures 1 L.S. $7,500.00 $7,500.00 $4,500.00 $4,500.00
B-10 Trench Safety Plan 674 L.F. $1.00 $674.00 $1.00 $674.00
B-11 Pollution Prevention Plan 1 L.S. $4,500.00 $4,500.00 $2,300.00 $2,300.00
B-12 Traffic Control Plan 1 L.S. $1,000.00 $1,000.00 $3,300.00 $3,300.00
SUBTOTAL PART "B' - STORM SEWER - BIRMINGHAM DRIVE (ITEMS Bl-Bl3) $89,441.00 $78,799.50
Page 2 of 8
SAUNAS CONSTRUCTION W.T. YOUNG CONST.
BIRMINGHAM & LYONS DRIVE STREET 5134 FM 3006 P.O. BOX 9197
IMPROVEMENTS - PROJECT NOS. 6t36 & 6t37 PLEASANTON, TX 78064 CORPUS CHRISTI, TX 78469
ITEM I DESCRIPTION I QTY. I UNIT UNIT PRICE I AMOUNT UNIT PRICE I AMOUNT
PART C - SANITARY SEWER - BIRMINGHAM DRIVE
C-1 8" PVC, 4'-6' Cut 715 L.F. $17.32 $12,383.80; $31.50 $22,522.50
C-2 8" PVC, 6'-8' Cut 320 L.F. $18.54 $5,932.80 $53.00 $16,960.00
C-3 Manhole, 4'-6' Deep 3 EA. $2,850.00 $8,550.00 $2,250.00 $6,750.00
C-4 Manhole, 6'-8' Deep 4 EA. $3,100.00 $12,400.00 $3,100.00 $12,400.00
C-5 6" PVC Service, Near Side 16 EA. $450.00 $7,200.00 $760.00 $12,160.00
C-6 6" PVC Service, Far Side 15 EA. $500.00 $7,500.00 $1,150.00 $17,250.00
C-7 Connect to Existing Service 26 EA. $385.00 $10,010.00 $360.00 $9,360.00
C-8 Trench Safety Plan 1,035 L.F. $1.00 $1,035.00 $3.00 $3,105.00
~,-9 Traffic Control Plan I L.S. $1,000.00 $1,000.00 $3,300.00 $3,300.00
3-10 Remove Existing Manhole Tops and Fill 6 EA. $800.00 $4,800.00 $940.00 $5,640.00
3-11 Grout Existing Sanitary Sewer Lines 1,120 L.F. $5.00 $5,600.00 $8.50 $9,520.00
C-12 Temporary Sanitary Sewer Bypass 1 L.S. $5,000.00 $5,000.00 $2,000.00 $2,000.00
C-13 Wastewater Utility Allowance I L.S. $10,000.00 $10,000.00 $10,000.00 $10,000.00
SUBTOTAL PART "C" - SANITARY SEWER ITEMS - BIRMINGHAM DRIVE
(ITEMS C'1.C'13) $91,41~1.60 $¥30,967.50
Page 3 of 8
SAUNAS CONSTRUCTION W.T. YOUNG CONST.
BIRMINGHAM & LYONS DRIVE STREET 5134 FM 3006 P.O. BOX 9197
IMPROVEMENTS- PROJECT NOS. 6t36 & 6t37 PLEASANTON, TX 78064 CORPUS CHRISTI, TX 78469
ITEMI DESCRIPTION I QTY. J UNIT UNIT PRICE I AMOUNT UNIT PRICEI AMOUNT
PART D -WATER - BIRMINGHAM DRIVE
D-I B" PVC 1,100 L.F. $21.00 $23,100.00 $23.00 $25,300.00
D-2 Fire Hydrant Assemblies I EA. $3,470.00 $3,470.00 $3,040.00 $3,040.00
D-3 B" Gate Valve 2 EA. $1,590.00 $3,180.00 $1,060.00 $2,120.00
D-4 ~" 45° Bend 4 EA. $315.00 $1,260.00 $330.00 $1,320.00
D-5 ~" 22-1/2° Bend 2 EA. $315.00 $630.00 $360.00 $720.00
D-6 12" x 8" Tapping Sleeve and Valve Tie-In 1 EA. $5,400.00 $5,400.00 $1,640.00 $1,640.00
D-7 1" Single Service, Near Side 15 EA. $520.00 $7,800.00 $540.00 $8,100.00
D-8 1" Single Service 8 EA. $520.00 $4,160.00 $770.00 $6,160.00
D-9 1-1/2" Double Service, Far Side 4 EA. $750.00 $3,000.00 $1,090.00 $4,360.00
D-10 Connect to Existing Services 26 EA. $300.00 $7,800.00 $410.00 $10,660.00
D-11 Trench Safety Plan 1,100 EA. $1.00 $1,100.00 $2.00 $2,200.00
D-12 Traffic Control Plan 1 L.S. $1,000.00 $1,000.00 $3,300.00 $3,300.00
D-13 Seal Existing Line and Services 1 L.S. $1,000.00 $1,000.00 $3,160.00 $3,160.00
D-14 Water Utility AIIowan ce I L.S. $10,000.00 $10,000.00 $10,000.00 $10,000.00
SUBTOTAL PART "D"- WA TER ITEMS BIRMINGHAM DRIVE (ITEMS t D-17D) $72,900.00 $82,080.00
Page 4 of 8
SALINAS CONSTRUCTION W.T. YOUNG CONST.
BIRMINGHAM & LYONS DRIVE STREET 5134 FM 3006 P.O. BOX 9197
IMPROVEMENTS- PROJECT NOS. 6'136 & 6'137 PLEASANTON, TX 78064 CORPUS CHRISTI, TX 78469
ITEM I DESCRIPTION I QTY. I UNIT UNIT PRICE I AMOUNT UNIT PRICE I AMOUNT
PART E - STREET, SIDEWALK AND DRIVES - LYONS DRIVE
E-1 Street Excavation 3,835 S.Y. $14.67 $56,259.45 $7.50 $28,762.50
E-2 8" Compacted Subgrade With Geo~rid 3,835 S.Y. $2.85 $10,929.75 $5.00 $19,175.00
E-3 9" 2% Lime Stabilized Caliche Base 3,835 S.Y. $11.22 $43,028.70 $6.90 $26,461.50
E-4 Prime Coat 460 GAL. $2.00 $920.00 $2.20 $1,012.00
E-5 2-1/2" HMAC Surface 3,068 S.Y. $7.90 $24,237.20 $8.50 $26,078.00
E-6 6" Curb and Gutter 2,298 L.F. $9.00 $20,682.00 $9.00 $20,682.00
E-7 Type "A" Header Curb (Sidewalk) 150 L.F. $15.00 $2,250.00 $19.00 $2,850.00
E-8 4' Sidewalk and Turnouts 9,117 S.F. $3.50 $31,909.50 $3.10 $28,262.70
E-9 Concrete Ddves 8,557 S.F. $4.75 $40,645.75 i $4.30 $36,795.10
E-10 Concrete Curb Ramp Type 3 2 EA. $800.00 $1,600.00 $2,220.00 $4,440.00
E-11 Concrete Ramp Type 6 I EA. $800.00 $800.00 $5,270.00 $5,270.00
E-12 Concrete Ramp Type 7 3 EA. $800.00 $2,400.00 $1,100.00 $3,300.00
E-13 Traffic Control Plan I L.S. $5,500.00 $5,500.00 $3,300.00 $3,300.00
E-14 Relocate Signs and Mailboxes 1 L.S. $2,500.00 $2,500.00 $3,400.00 $3,400.00
E-15 Relocate Fence 100 L.F. $13.00 $1,300.00 $13.00 $1,300.00
E-16 Street Barricade 1 EA. $500.00 $500.00 $316.00 $316.00
E-I 7 Ozone Day I EA. $1,000.00 I $1,000.00 $240.00 $240.00
E-18 Header Curb at ROW 100 L.F. $10.00 $1,000.00 $19.00 $1,900.00
E-19 Remove and Replace Pavement at Airline Rd. 103 S.Y. $50.00 $5,150.00 $50.00 $5,150.00
E-20 Remove Curb and Gutter at Aidine Road 50 L.F. $5.00 $250.00 $19.00 $950.00
SUBTOTAL PART 'E' - STREET, SlDEWALK AND DRIVE. LYONS DRIVE
(ITEMS E-I-E-20) $252,862.35 $2~9,644.80
Page 5 of 8
SAUNAS CONSTRUCTION W.T. YOUNG CONST.
B,RM,.G.AM &.YONS DR,VE STREE 8134 rM 3008 P.O. BOX 9 97
IMPROVEMENTS- PROJECT NOS. 6t36 & 6137 PLEASANTON, TX 78064 CORPUS CHRISTI, TX 78469
TEMI DESCRiPTiON I QTY. I UNIT UNIT PRICE I AMOUNT UNIT PRICEI AMOUNT
PART F - STORM SEWER - LYONS DRIVE
F-1 36" RCP 360 L.F. $72.15 $25,974.00 $76.00 $27,360.00
F-2 30" RCP 153 L.F. $58.75 $8,988.75 $61.00 $9,333.00
F-3 18" RCP 440 L.F. $38.50 $16,940.00 $34.00 $14,960.00
F-4 15" RCP 148 L.F. $40.00 $5,920.00 $42.00 $6,216.00
F-5 Manhole Type "A" 3 EA. $3,000.00 $9,000.00 $2,460.00 $7,380.00
F-6 Manhole Type "B" 2 EA. $4,000.00 $8,000.00 $2,860.00 $5,720.00
F-7 5' Slot Inlet 5 EA. $2,800.00 $14,000.00 $2,640.00 $13,200.00
F-8 Sidewalk Drains 10 EA. $70.00 $700.00 $240.00 $2,400.00
F-9 Topsoil & Grass Seeding 8,744 S.F. $0.25 $2,186.00 $0.25 $2,186.00
F-10 Topsoil & Grass Sodding 20,210 S.F. $0.65 $13,136.50 $0.50 $10,105.00
F-11 Remove Abandoned Structures 1 L.S. $7,500.00 ' $7,500.00 $4,680.00 $4,680.00
:-12 Trench Safety Plan 1,086 L.F. $1,00 $1,086.00 $3.00 $3,258.00
---13 Pollution Prevention Plan 1 L.S. $4,500.00 $4,500.00 $2,500.00 $2,500.00
F-14 Traffic Control Plan I L.S. $1,000.00 $1,000.00 $3,300.00 $3,300.00
F-15 Ouffall Structure I EA. $7,000.00 $7,000.00 $2,500.00 $2,500.00
F-16 4' x 4' Post Type Ditch Inlet 1 EA. $2,000.00 $2,000.00 $2,500.00 $2,500.00
SUBTOTAL PART "F" - STORM SEWER - LYONS DRIVE - (ITEMS FI.FI6) $127,931.25 $117,598.00
Page 6 of 8
SAUNAS CONSTRUCTION W.T. YOUNG CONST.
BIRMINGHAM & LYONS DRIVE STREET 5'134 FM 3006 P.O. BOX 9197
IMPROVEMENTS- PROJECT NOS. 6136 & 6t37 PLEASANTON, TX 76064 CORPUS CHRISTI, TX 78469
ITEM I DESCRIPTION I QTY. I UNIT UNIT PRICE I AMOUNT UNITPRICE I AMOUNT
PART G - SANITARY SEWER - LYONS DRIVE
G-1 8" PVC, 6'-8' Cut 954 L.F. $17.32 $16,523.28 $27.00 $25,758.00
G-2 8" PVC, 8'-10' ICut 188 L.F. $18.54 $3,485.52 $43.50 $8,178.00
G-3 Manhole, 6'-8' Deep 2 EA. $3,000.00 $6,000.00 $2,500.00 $5,000.00
G-4 Manhole, 8'-10' Deep 3 EA. $3,200.00 $9,600.00 $3,220.00 $9,660.00
G-5 8" PVC Service, Near Side 15 EA. $450.00 $6,750.00 $880.00 $13,200.00
G-6 6" PVC Service, Far Side 17 EA. $500.00 $8,500.00 $950.00 $16,150.00
G-7 Drop Connection, Sta. 0+95.26 1 EA. $1,500.00 $1,500.00 $3,040.00 $3,040.00
G-8 Connect to Existing Service 22 EA. $385.00 $8,470.00 $460.00 $10,120.00
G-9 Trench Safety Plan 1,142 L.F. $1.00 $1,142.00 $3.00 $3,426.00
G-10 Traffic Control Plan 1 L.S. $1,000.00 $1,000.00 $3,300.00 $3,300.00
G-11 Remove Existing Manhole Tops and Fill 4 EA. $800.00 $3,200.00 $820.00 $3,280.00
G-12 Grout Existing Sanitary Sewer Lines 1,220 L.F. $5.00 $6,100.00 $6.50 $10,370.00
G-13 Manhole Rehabilitation 2 EA, $2,000.00 $4,000,00 $2,400.00 $4,800.00
G-14 Wastewater Utility Allowance I L.S. $10,000.00 $10,000,00 $10,000.00 $10,000.00
G-15 Remove & Replace Pavement @ Airline Road 24 S.Y. $50.00 $1,200.00 $50.00 $1,200.00
SUBTOTAL PART "G" - SANITARY SEWER ITEMS - LYONS DRIVE (ITEMS Gl- $87,470.80 $127,482.00
G15)
Page 7 of 8
SAUNAS CONSTRUCTION W.T. YOUNG CONST.
BIRMINGHAM & LYONS DRIVE STREET 5134 FM 3006 P.O. BOX 9197
IMPROVEMENTS- PROJECT NOS. 6136 & 6137 PLEASANTON, TX 78064 CORPUS CHRISTI, TX 78469
ITEM I DESCRIPTION I QTY. I UNIT UNIT PRICE I AMOUNT UNIT PRICE I AMOUNT
PART H -WATER - LYONS DRIVE
H~I 8" PVC 1,112 L.F. $21.00 $23,352.00 $23.40 $26,020.80
H-2 Fire Hydrant Assemblies 2 EA. $3,470.00 $6,940.00 $3,040.00 $6,080.00
H-3 8" Gate Valve 3 EA. $1,590.00 $4,770.00 $1,060.00 $3,180.00
H-4 8" Tee I EA. $540.00 $540.00 $330.00 $330.00
H-§ 8" Blind Flange, 2" Tap, Test Riser Assembly I EA. $975.00 $975.00 $310.00 $310.00
H-6 8" 22-1/20 Bend 3 EA. $315.00 $945.00 $360.00 $1,080.00
H-7 12" x 8" Tapping Sleeve & Valve Tie-In 1 EA. $5,400.00 $5,400.00 $1,650.00 $1,650.00
H-8 1" Single Service, Near Side 16 EA. $520.00 $8,320.00 $540.00 $8,640.00
H-9 1" Single Service, Near Side 12 EA. $520.00 $6,240.00 $750.00 $9,000.00
H-10 1-1/2" Double Service, Far Side I EA. $750.00 $750.00 $1,080.00 $1,080.00
H-11 1-1/2" Double Service, Near Side 1 EA. $750.00 $750.00 $920.00 $920.00
H-12 Connect to Existing Services 22 EA. $300.00 $6,600.00 $410.00 $9,020.00
H-13 Trench Safety Plan 1,112 L.F. $1.00 $1,112.00 $2.00 $2,224.00
H-14 Traffic Control Plan 1 L.S. $1,000.00 $1,000.00 $3,300.00 $3,300.00
H-15 Seal Existiing Line and Services 1 L.S. $1,000.00 $1,000.00 $3,160.00 $3,160.00
H-16 SpeciaIWaterAIIowance 1 L.S. $10,000.00 $10,000.00 ! $10,000.00 $10,000.00
SUBTOTAL PART 'H" - WATER ITEMS - LYONS DRIVE. (ITEMS HI-H17) $78,694.00 $85,994.80
TOTAL BASE BID (PARTS A, B, C, D, E, F, G & H) $'1,024,912.74 $'1,025,453.30
Page 8 of 8
CITY ENGINEER'S STATEMENT
BIRMINGHAM STREET FROM AIRLINE ROAD TO LYONS STREET
LYONS STREET FROM AIRLINE ROAD TO END OF STREET
My name is ,~ngel R. Escobar. I am the City Engineer for the City of Corpus Christi and have served in
this capacity for the last 26 months and as Assistant City Engineer for the last one hundred twenty
months (120) months.
I am a Professional Engineer, licensed by the State of Texas since 1977. I have over 24 years of
experience in design of construction and estimating the costs thereof.
I am familiar with this project, which encompasses:
· Birmingham Street from Airline Road to Lyons Street
· Lyons Street from Airline Road to end of street
This project consists of construction of 2,200 linear feet of 28-foot back-to-back pavement, sidewalks, and
driveways; 1,770 linear feet of storm sewer; 2,190 linear feet of sanitary sewer; and 2,200 linear feet of
water line together with all appurtenances as shown on the plans and called for in the specifications.
Limits of the work will be as follows:
· Birmingham Street from Airline Road to Lyons Street
· Lyons Street from Airline Road to end of street
Funds to finance the proposed project are available in the Utilities Commercial Paper Program.
Prior to this hearing, I had an estimate of project costs prepared, and it compared favorably with the bids
received. In my opinion, the costs are true and accurate. This project is estimated to start in August
2002 with completion in March 2003.
,~g~'l R. Escobar, P.E.
Director of Engineering Services
(Date)
H;'~H OM ~VELMAR~GEN~STRE ET~6122 FLOUR BLUFF PH 1 \CONSTRUCTION~ENGINEER STATEMENT
GEORGE N. PARASKEVAS
REALTORS
CORPUS CHRISTI. TEXAS 78411
June 20, 2002
PRELIMINARY ASSESSMENT ROLL
Birmingham and Lyons Street Improvements
Lyons Street - Airline Road to Dead End
Birmingham Street - Airline Road to Lyons Street
My name is George N Paraskevas and I am a State Certified Residential appraiser and
have been evaluating property and practicing real estate in the Corpus Christi area since 1971. I have
experience in appraising both commercial and residential properties, and 1 am familiar with the real
estate market in Corpus Christi.
I am familiar with the Birmingham and Lyons Street Improvements. I agree with Mr. JeffBarroso's
description of the conditions to be changed and I am familiar with the improvements to be made by the
City of Corpus Christi.
1 have reviewed the project assessment roll; and personally examined each of the 63 parcels of land
therein. In my opinion each such parcel will be specifically benefited by each Improvement to be assessed
against it; without regard to the community benefit.
In addition, it is my opinion that each such parcel will be specially enhanced by such improvement at
least to the extent of the assessment stated.
Thank you,
George N Paraskevas
Appraiser
OFFICE (512) 992-2541