Loading...
HomeMy WebLinkAboutM1982-0005 - 03/17/1982.0 0 MOTION - 3/17/82 The proposal from Trinity Engineering Testing Corporation for laboratory testing at the Oso Wastewater Treatment Plant be accepted. Testing includes soil tests on the subgrade and levee which will be built around the plant, paving tests, asphalt mix design and densities, backfill proctors and densities, T -lock line plate inspection and concrete mix design, control and test cylinders. Cost of the testing is not to exceed $18,005. Funds are available in the contingency appropriation of the project. The project is funded 75% by a grant from the Environmental Protection Agency and 25% by 1977 Sanitary Sewer Bonds. MICROFILMED M82 -nn(�5 SEP 10 111-4