Loading...
HomeMy WebLinkAboutM1982-0195 - 06/23/1982• • MOTIONS - 6/23/82 The following actions be taken in connection with improvements at the Corpus Christi International Airport: (a) That the plans and specifications for the rental car parking lots be approved and bids be received July 21, 1982. The plans include the renovation and enlargement of the lots to accommodate the rental cars from the present 75 spaces to 133 spaces. (b) That the plans for the landscaping of the entrance road with palm trees and oleanders, and the landscaping of the area between the rental car lot and the loop road be approved, and bids be received July 21, 1982. (c) That the modification of the parking lot to reduce the short term parking and increase the long term parking be approved, and the parking meters along the loop road be removed to provide safer driving through and improve loading and unloading. (d) The preliminary report for the expansion of the commercial ramp and improvements to the safety areas at the end of runways be approved. The plans include the expansion of the ramp westwards another 300 feet to provide for two additional aircraft positions and grading and drainage improvements to the safety areas. (See staff memo #6). M82- 019 ., so 191984 MICROFRLMED