Loading...
HomeMy WebLinkAboutM1982-0198 - 06/23/1982• MOTIONS - 6/23/82 7. Plans and specifications be approved and bids be received July 21, 1982, for modifications to the air conditioning and heating system at the Greenwood Branch Library. It is proposed to provide a new water chiller and replace the existing duct work in the crawl space under the building. A new boiler would also be provided for the building's heating system. The existing air conditioning and heating equipment is gas fired and was installed in 1966 with parts for the equipment no longer being made. The 1981 -82 General Revenue Sharing budget allocated $60,000 for this work. (See staff memo #9). M82 -0198 SEP191984 A"U.U. 1