HomeMy WebLinkAboutM1983-0030 - 01/26/1983• MOTIONS - 1/26/83 •
7. Approving plans and specifications for the Baldwin Water
Line Improvements and receive bids on this project March 2,
1983. The project includes the construction of 36 -inch and
30 -inch water line in Baldwin Boulevard from near South
Staples and along Airport Road to Santa Elena and tying into
Navigation Boulevard. It replaces an old existing 24 -inch
water line which is now out of service because of numerous
breaks and leaks caused by corrosion due to age. The
construction of this line will provide better transmission
capability in the downtown area and improve the pressures in
that area.
083-0030 JW &M VIE0
899 191984