Loading...
HomeMy WebLinkAboutM1983-0030 - 01/26/1983• MOTIONS - 1/26/83 • 7. Approving plans and specifications for the Baldwin Water Line Improvements and receive bids on this project March 2, 1983. The project includes the construction of 36 -inch and 30 -inch water line in Baldwin Boulevard from near South Staples and along Airport Road to Santa Elena and tying into Navigation Boulevard. It replaces an old existing 24 -inch water line which is now out of service because of numerous breaks and leaks caused by corrosion due to age. The construction of this line will provide better transmission capability in the downtown area and improve the pressures in that area. 083-0030 JW &M VIE0 899 191984