Loading...
HomeMy WebLinkAboutM1983-0182 - 04/06/1983MOTIONS - 4/6/83 Plans and specifications for the expansion of the Flour Bluff Wastewater Treatment Plant be approved and bids be received May 25, 1983. The plant capacity will be expanded to 3 MGD with a peak flow of 9 MGD to provide an increased level of service to the Flour Bluff area. Included in the expansion are new clarifiers, aeration basins, 28 new sludge drying beds, force and gravity mains, and an office and control building. The existing lift station on Military Drive will be renovated and a new lift station will be built on Flour Bluff Road between Purdue Road and Glen Oak Drive. Total cost of the project is estimated at $6.2 million. A grant from EPA in the amount of $4.6 million (75 %) has been received. 083 -0182