HomeMy WebLinkAboutM1983-0182 - 04/06/1983MOTIONS - 4/6/83
Plans and specifications for the expansion of the Flour Bluff Wastewater
Treatment Plant be approved and bids be received May 25, 1983. The
plant capacity will be expanded to 3 MGD with a peak flow of 9 MGD to
provide an increased level of service to the Flour Bluff area. Included in
the expansion are new clarifiers, aeration basins, 28 new sludge drying
beds, force and gravity mains, and an office and control building. The
existing lift station on Military Drive will be renovated and a new lift
station will be built on Flour Bluff Road between Purdue Road and Glen
Oak Drive. Total cost of the project is estimated at $6.2 million. A grant
from EPA in the amount of $4.6 million (75 %) has been received.
083 -0182