HomeMy WebLinkAboutM1983-0334 - 06/22/1983MOTIONS - 6/22/83
10. Five traffic signal controllers for Traffic Engineering be purchased from
Doerr Associates, Arlington, Texas, for the total amount of $22,825.00.
Four of the controllers are based on low bid. The fifth controller is based
on second low bid which is $521 more than the low bid of Signal
Engineering of Corpus Christi because the controller is solid -state pretimed
which is less costly to maintain and will allow for more flexibility in
coordinating timing with other signals. Three bids were received. The
controllers will replace ones at Baldwin and Morgan, Baldwin and Port,
Morgan and Crosstown frontage road, Santa Fe and Louisiana and Ocean
Drive and Airline. The existing controllers are 12 -15 years old and
replacement parts are no longer available. The controllers for the first
three intersections are included in the 6th Year Community Development
Block Grant and the ones for the last two intersections are in the 1982 -83
Revenue Sharing Budget.
i
RFD-4 a11911V. 1183-0334