Loading...
HomeMy WebLinkAboutM1983-0334 - 06/22/1983MOTIONS - 6/22/83 10. Five traffic signal controllers for Traffic Engineering be purchased from Doerr Associates, Arlington, Texas, for the total amount of $22,825.00. Four of the controllers are based on low bid. The fifth controller is based on second low bid which is $521 more than the low bid of Signal Engineering of Corpus Christi because the controller is solid -state pretimed which is less costly to maintain and will allow for more flexibility in coordinating timing with other signals. Three bids were received. The controllers will replace ones at Baldwin and Morgan, Baldwin and Port, Morgan and Crosstown frontage road, Santa Fe and Louisiana and Ocean Drive and Airline. The existing controllers are 12 -15 years old and replacement parts are no longer available. The controllers for the first three intersections are included in the 6th Year Community Development Block Grant and the ones for the last two intersections are in the 1982 -83 Revenue Sharing Budget. i RFD-4 a11911V. 1183-0334