HomeMy WebLinkAboutM1983-0627 - 12/07/19830 0
MOTIONS - 12/07/83
4. Authorizing Change Order No. 1 to the Surfside Boulevard Connection to
Timon Boulevard on Corpus Christi Beach providing for the substitution of 5
inches of hot mix asphaltic base in lieu of 8 inches of sand /shell base for
roadway construction with no change in contract price for the base work.
The change was requested by the contractor and the staff feels that the
base substitution is equivalent in cost and is a superior base material.
'SPot984 83 -0627
MIGROOLMED