Loading...
HomeMy WebLinkAboutM1984-0721 - 02/01/1984s MOTIONS - 2/1/84 • 17. Approving the capital improvement plan for the Sanitary Sewer System as proposed on the January 5, 1984 memorandum; subject - Wastewater System. SEp 19 1364 $4 -0721 MICROFum, 0 • TO: Honorable Mayor Luther Jones & DATE: January 26, 1984 Council Members FROM: James K. Lontos P.E., Assistant City Manager SUBJECT: Wastewater System Two planning projects recommended in the Wastewater System Capital Improvement Program which obviously have raised the concerns of the Staff and a number of citizens are (a) Oso Plant Facility Plan, and (b) Master Plan South of Oso Creek, as shown on the previously submitted Wastewater System report. After further review of the need for both of these projects, it appears that if separate projects are approved (a) Facility Plan for Oso Plant, and (b) Master Plan South of Oso Creek, each of the two projects must consider the facts relating to the other. In other words, a Facility Plan for the Oso Plant should consider all factors regarding further expansion including how the area along either side of the Oso Creek could be served in the future by wastewater lines. It may be possible that a portion of the area just north of Oso Creek could be changed from the present Master Plan and be diverted to another plant if one is proposed. At the same time, if the Master Plan Study indicates that another wastewater treatment plant is essential to handle the growth on the south side of Corpus Christi, then a facility plan for the Oso must consider the effect this plant would have on future expansion of Oso. For this reason, it appears that both projects should be combined and a general overall report be prepared that answers questions about any future expansion of the Oso Plant and the development of a Master Plan along the Oso Creek. The same engineering firm could be working on a plan taking into consideration all factors of growth on the south side; therefore, it is recommended that the two projects that are submitted in the Wastewater System report dated January 5, 1984 be combined into one and be entitled "Wastewater Master Plan Along Oso Creek & Study of Future Expansion of Oso Plant ", at an approximate cost of $155,000. James K. Lon s, P.E. Extension 385 JKL /ajr TO Honorable Mayor Luther Jones & Council Members FROM Edward A. Martin, City Manager & DATE January 5, 1984 James K. Lontos, P.E., Assistant City Manager SUBJECT Wastewater System One of the major goals of the City Council is a New Wastewater Treatment Plant and in general a review of our entire sewer system. To generalize on the system's condition is difficult. Reports on specific phases of the system can easily be written identifying problem conditions and offering solutions, but to give an overall analysis of the system in detail would be rather difficult. This memorandum will attempt to give you a short summary of both treatment and collection, identify the basis general problems with both, and then end with a summary of recommendations in the form of additional Capital Improvement Projects in the foreseeable future. I. TREATMENT The City of Corpus Christi presently has eight wastewater treatment plants, including one package treatment plant, in use. These plants are basically secondary treatment facilities using either trickling filter or activated sludge type treatment. Major improvements and /or expansion programs have been completed, are in progress, or are currently being planned on every one of the plants in the City. The increased discharge standards of the 1972 Water Pollution Control Act have had an impact on the plants. All of the expansion programs have been in accordance with the regulations promulgated by the Environmental Protection Agency. The new regulations include the following increased restrictions critical to our plants. 1) Pollutants reduced at least 907. before discharge. 2) BOD (Biochemical Oxygen Demand) maximum allowable 20 ppm. 3) SS (Suspended Solids) maximum allowable 20 ppm. 4) Liability Class I - Rating received when discharging into (a) shellfish area, (b) recreational area, (c) industrial harbor. This rating requires that all effluent be treated, never bypassed, that the plant be protected from a 100 year flood and that a dual power source be installed from an outside source. A. BROADWAY SYSTEM The Broadway Treatment Plant, located on West Broadway between Sam Rankin and Resaca, is a trickling filter plant having a nominal design capacity of ten million gallons per day (MGD) and a hydraulic capacity of fifteen MGD. The Broadway is classified as a Liability Class I Plant since it discharges into an industrial harbor (the port) which adjoins Corpus Christi Bay, a recreational area. Since initial construction in 1936, major alterations and additions to the plant have been made in 1940, 1950 and 1954. Because of its age and because of the Corpus Christi Beach infiltration, the plant had deteriorated badly and, thus, needed improvement. In 1978 and 1981, two major expansion contracts were awarded which included construction of a new primary clarifier, rehabilitation of four standard rate filters, replacement of four final effluent pumps and motors and rehabilitation of the entire plant to phase into the new structures. Total cost of these improvements was approximately $7 million. Wastewater System *ge No. 2 • New structures include a sand filter at the end of the plant, a lift station at the head of the plant, intermediate lift pumps, an aerobic digester system, a sludge drying system, and new headworks including a grit collector and return flow reconditioner. The first contract is complete, as is the work in Corpus Christi Beach. The second contract is still underway and near completion. In addition, a wastewater collection system was installed on Corpus Christi Beach which ties into the Broadway Plant. Three new lift stations and a force and gravity main system were installed to serve this area at a cost of $1 million. These improvements did not increase the capacity of the plant, but did provide tertiary treatment to meet the Federal requirements. B. OSO WASTEWATER TREATMENT PLANT The Oso Plant, located near Ennis Joslin and Nile Drive, is the largest plant in the City. It is being enlarged to treat 16.4 million gallons per day. Because of the plant's effluent discharge into the Oso Bay, which is a shell- fish area, it is classified Liability Class I, thus, having stricter require- ments than an average plant. The plant is affected mostly by the growth in the southside area. Over a number of years the City acquired all of the land from the Plant to the existing Pharaoh Valley Subdivision and the Oso Golf Course, to provide for its future expansion and to further create a buffer zone restricting development, thus, reducing citizen complaints. Five separate contracts have been awarded since 1979 to expand the average plant capacity from 12 MGD to 16.4 MGD with a storm peak flow of 98 MGD. Total cost of these improvements is approximately $20 million. This plant treats 517 of the City's wastewater. Two of these five contracts provided for plant expansion. The other three involved construction of new and /or renovation of existing lift stations and a force and gravity main system to expand the service area of the plant. These improvements will provide expanded plant capacity to serve the southside area of the City. In addition to the above contracts, the sliplining of the McArdle trunk line is in the process with two additional contracts, one completed and the second underway, totaling $3.5 million. The initial engineering work and studies resulting in the present enlargement of the plant were initiated approximately ten years ago. The growth in the southside during the last ten years is bringing the plant again to near design capacity. Because of the projected growth in the area, it is essential that steps be taken to begin work necessary for the next expansion. A project is listed in the proposed Capital Improvement Program to respond to this need. Problems related to collection system will be treated separately under Collection System in this report. C. ALLISON WASTEWATER TREATMENT PLANT The S. L. Allison Wastewater Treatment Plant, located on McKenzie Road serving the northwest section of the City, is a contact stabilization treatment facility constructed in 1966, with a design capacity of 2 MGD, It is the newest plant and serves the fast growing Northwest Area of the City. It has a capacity of two million gallons per day. Many operational problems have occurred, the result of which has been the issuance of a number of non - compliance citations by the Texas Department of Water Resources, to the City. Wastewater System &ge No. 3 . Recently, two contracts were awarded for interim improvements at the Allison Plant. One contract was for construction of a new aerated lagoon in series with an aerated pond at a cost of $250,000. The second provides for a new clarifier, modification of a chlorine contact chamber and various piping and electrical work, at a cost of $447,000. Both of these contracts are considered interim improvements designed to improve effluent quality until permanent expansion and improvements can be completed. Plans and specifications for permanent improvements are complete. The plant is to be expanded to 5 MGD which is determined to be adequate to handle growth in the service area for the foreseeable future. All permits have been received and the plans have been approved by the Texas Department of Water Resources. We have been very active with the Texas Department of Water Resources in attempting to have this project offered a grant. Numerous meetings have been held and all preparatory work is done. It now appears that a grant for permanent improvements will be received, since the plant is rated high on the priority list. D. WESTSIDE WASTEWATER TREATMENT PLANT The Westside Plant, located at the intersection of Saratoga and Greenwood, was constructed in 1957 as a trickling filter plant with a design capacity of 3 MGD. General improvements to the plant began in May, 1978 and were completed in April, 1981 at a cost of $900,000. An automatic backwash filter was installed to provide an additional step in the treatment process. This will provide for future expansion which is planned within the next two years. The 1982 bond program provides $3.2 million to increase the capacity from 3 MGD to 5 MGD. Engineering selection for the design of the expansion should take place early in 1984. The plant serves the general area along Padre Island Drive from Ayers to I.H. 37 and north to Up River Road. E. FLOUR BLUFF (LAGUNA MADRE) PLANT The Flour Bluff Plant is one of two plants that serve the Flour Bluff area. This plant, built in 1971, is a contact stabilization plant with a design capacity of 500,000 gallons per day. A major expansion contract has been awarded to Basic Constructors, Inc. of Houston, Texas totaling $4,250,000. The plant capacity will be expanded from 500,000 GPD to 3 MGD with a peak flow of 9 MGD. Expansion includes new clarifiers, aeration basins, 28 new sludge drying beds, force and gravity mains, and an office and control building. The existing lift station on Military Drive will be renovated and a new lift station will be built on Flour Bluff Road between Purdue Road and Glenoak Drive. A grant from the Environmental Protection Agency has been received which will fund 75% of the total cost of improvements. Receipt of this grant was not anticipated during preparation of the 1982 Capital Improvements Program. This has freed approximately $3 million in local funds which can be used for additional projects, as outlined later in this report. Wastewater System f 0age No. 4 l F. LAGUNA SHORES WASTEWATER TREATMENT PLANT The Laguna Shores Plant, built in 1967, is similar to the Flour Bluff Plant but has a design capacity of 300,000 GPD. When the Laguna Madre Plant is expanded, this plant will be converted to a pumping facility to pump raw wastewater by force to the Laguna Madre Plant for treatment. G. PADRE ISLAND TREATMENT PLANT This plant, located on Whitecap Boulevard near the Laguna Madre, is a 500,000 GPD contact stabilization plant that was constructed by the developer of the Padre Island Subdivisions, Padre Island Development Corporation. Control and operation has been assumed by the City and the area has been annexed. Under agreement with Padre Island Investment Corporation and the City, Padre will construct the next phase of enlargement at their cost, as required. Such construction must commence when the present plant exceeds 80'/, of its capacity for three consecutive months. This has occurred this year. •Plans for the first phase expansion are prepared now by Padre Island Investment. II. COLLECTION SYSTEM The collection system for each plant consists of gravity lines and lift stations with force main. The lines are generally laid on very flat grades because of the flat terrain with lift stations as needed, in order to reduce the depth of gravity lines and save on cost of construction. Most of the gravity system is of vitrified clay pipe with the exception of a number of large concrete trunk lines which will be the subject of discussion separately. There are some sections of polyethylene pipe, cast iron, and at least one short section of smooth flow corrugated metal pipe and a test section of truss pipe. A clean bill of health can not be given to the collection system in this report or any other. There are a number of prob- lems with some sections of the system. Infiltration causes sewage overflows during rain, growth in the downtown area would eventually cause the system to be overloaded and relief lines could be essential downtown. Roots in the smaller lines must impede the flow and eventual rehabilitation programs may have to be undertaken. All of this is not to say that the system is in bad shape; I believe the collection system is in a relatively good shape, but continuous maintenance and upgrading is essential. The sanitary sewer collection system has undergone major revisions and improvements and additional improvements are being planned. There are a number of major collector trunk lines which were installed 20 to 40 years ago and made of concrete. Over the years it has been our experience that concrete pipe, when used in a sanitary sewer collection system for gravity flow of sewer in an environment like the City's, has not been adequate. The hydrogen sulfide gasses produced from the sewer flow and the resultant chemical reaction with the concrete erodes the top of the concrete pipe over a period of years and causes severe deterioration! The McArdle Line, the Greenwood Trunk Line, and the Oso and Nile Lines are all concrete. When the top of the line begins to deteriorate, the pipe collapses along with the asphalt pavement which results in a cave -in. This has happened along the McArdle Line and most recently the Oso Line. Several factors must be considered in the design of a sewer collection system. When choosing the type of pipe to be used, it is important that the properties of the pipe contribute to a permanent, trouble -free system. Generation of hydrogen sulfide Wastewater System 0 / • age no. 5 l is the most critical element in the protection of the sewer pipe. Other factors include temperature, strength, age and pH of the sewage, velocity of the flow and Sulfate concentration. Ordinary domestic sewage from an average home can contain scalding water, drain openers, scouring powders, detergents, bleaches and other household chemicals. Industrial waste discharges can contain chemicals, solvents, acids and alkalis. All these chemical products can attack flexible pipe and some rigid pipe such as plastic, metal or cement bonded materials. Primarily, the type of pipe used in the City of Corpus Christi for the sewer collection system is clay pipe. Clay pipe hardly ever wears out. Although it is produced in smaller diameters and sections than concrete or plastic pipe, it is a highly stable pipe and will not deflect under trench load. When installing plastic or PVC pipe, extreme care must be taken in the installation process to be sure that the bottom of the trench where the pipe will rest is exactly level and that the backfill is done properly. The soil around the pipe must be compacted to at least 95% of its maximum density. Plastic pipe requires lateral support to limit vertical deflection. If this is not done correctly, the plastic pipe has a tendency to squash down or deflect, thus, reducing the capacity of the pipe. The temperature of the water flowing through the pipe has an effect on plastic pipe causing it to expand and contract reducing the integrity and strength of the pipe. Discharges from washing machines, showers and dishwashers produce a temperature of from 80 ° -90° at times. Clay pipe is not affected by high water temperatures. Since it is an inert material, it is impervious to chemicals and cannot be destroyed. It is highly abrasion- resistant, impervious to corrosive soils and will not be affected by sewer cleaning equipment. Clay pipe has two disadvantages when compared to concrete or plastic pipe. First, it is more expensive to install because it is produced in shorter lengths. Second, because of the number of joints required, the chance for storm and ground water infiltration is greater. Following is a brief description of the specific problems relating to the concrete sewers in the system and also a summary of the City's Television Inspection System. A. McArdle Road S anitary Sewer Line The McArdle line is a 42" concrete trunk which carries wastewater to the Oso Plant. It was built in 1962 to relieve the Staples Street sewer and connects with a major branch of this line at the intersection of Carroll Lane and Houston Street. In 1976, the City adopted a facility plan for improvements to the Oso Plant which included rehabilitation of the McArdle Line. The facility plan indicated the seriousness of the condition of the line. Deterioration of the line was so bad that the reinforcing steel was exposed in places. To reduce the hvdrogen sulfide corrosion, hydrogen peroxide was injected into the pipe at various locations. From 1974 to 1978, six major failures in the line occurred. When the line was televised, the extent of the deterioration was revealed. Plans to slipline the 42" concrete pipe with a 36" thick -wall poly- ethylene pipe were prepared. Sliplining is a process involving insertion of the polyethylene pipe into the concrete pipe. The pipe is delivered in 35 to 40 foot joints. Prior to insertion, the joints are joined together by heat fusion to form a length of pipe long enough to reach from one manhole to the next. The space between the concrete and liner pipe is then sealed with cement grout, making a gas -tight section between manholes and eliminating further corrosion of the concrete Wastewater System age No. 6 • pipe from hydrogen sulfide gas. This method was chosen for the McArdle Line because of the limited right -of -way available. This small space prevents open cutting the street to replace the pipe. The project limits were from Carroll Lane to Diile Drive. Plans called for rehabilitation of all manholes and grouting of the voids between the pipe and the liner. The first contract was awarded in February, 1979 to Shur -Flo, Inc, and John G. Holland Construction Company of Houston at a cost of $1 million. It was completed in May, 1980. The contract for the second phase was awarded in May, 1981 to McCullough Contracting Company for $2.5 million. This contract is still under way. Numerous cave -ins have occurred on the line and the contractor has filed a suit in Federal district court for damages. The work is approximately 80% complete. B. NILE DRIVE & OSO TRUNK SE14ER The Nile Drive and Oso Trunk Line is a 48" and 42" concrete trunk line which runs from the intersection of Everhart and Bonner down Curtis Clark and Williams Drive and connects to the Oso Plant. The pipe increases to 48" as it approaches the plant. It serves the area between Holly Road and Padre Island Drive from Oso Creek to Ayers, including Schanen Estates, or approximately 5800 acres. The line was constructed in 1955 at a cost of $362,000. It is a concrete line similar to McArdle and is showing the same signs of deterioration as the McArdle Line. A large amount of sludge accumulates on the bottom of the line which, at times, impedes flow and increases the opportunity for creation of hydrogen sulfide gasses. This line is on the priority list for a Federal rant, and has a very low rating. It is possible, however, that a grant could be issued if local funding is available and the construction plans are complete. Under Capital Improvements section of this report, a project is included for engineering services for design. C. GREENWOOD TRUNK LI -E This is also a large concrete sewer line, but because of its limited flow it appears that the deterioration is not as severe as the McArdle or Oso Trunk; therefore, no immediate remedies are proposed, but rather a close monitoring system to gauge its condition in the future. D. TELEVISION INSPECTION SYSTEM In 1978, the City purchased a television video system housed in a mobile van. The camera is capable of televising lines from 6" to 42" in diameter and produces a video film on cassette. The film can be monitored in the van or in the office. The television equipment was purchased to detect and seal leaks in the sewer system which allow rainwater, ground water and storm sewer overflows to infiltrate the sewer collection system placing a heavy load on the treatment plants. The equipment is used to locate trouble areas in the existing system, to determine the condition of existing lines in preparing a preventative maintenance program and to inspect sewer lines in new subdivisions. The basic crew consists of two employees. It has been determined that this is not the optimum size crew and that an additional employee is needed for maximum productivity. Depending on the type of work involved, the two -man crew may be supplemented by additional personnel particularly in locating stoppages and breaks in the older lines. The crew has been averaging 4500 feet of lines televised per month. Of this footage, about 60% is new line and 407. existing mains. Wastewater System Oge No. 7 0 Prior to purchasing the camera, Wastewater Division personnel inspected all new subdivision lines using sunlight, high intensity lamps and mirrors. When the camera became available, all new subdivision lines were televised. The Division has found that a satisfactory inspection can be made in less time using mirrors for an initial inspection and using the television camera only on those lines where the visual inspection indicates a problem or where because of curves in the line, a visual inspection is not possible. On old lines, the camera has proven to be very effective in locating breaks, misaligned pipe, obstructions, and broken taps. A line in service must be open sufficiently to enable a cable to be pushed or floated through the line to pull the camera to a trouble spot. When wastewater treatment plant expansions are completed and sufficient pumping capacity is installed at the plants to eliminate the necessity to hold sewage back in the lines during peak periods and catch up at night during low flows, the camera will be used to inspect the large transmission lines, particularly concrete, in use in the system. The workload in the Wastewater Division this fiscal year has been greater than anticipated in the number of new subdivisions and taps being added to the system and with the extremely dry weather the number of repairs made in the older lines. Overtime has been extensive and supplemental manpower and equip- ment has not been available to assist the television crew. These concerns have been addressed as the 1983 -84 budget was prepared. It is the Division's goal to increase footage televised to a minimum of 10,000 feet monthly with the increased televised footage being in the older system. III. PROPOSED CAPITAL IMPROVEMENT PROGRAM A total of $5,950,000 was approved in the 1982 bond election for the Flour Bluff Plant expansion. In March of this year, the Environmental Protection Agency issued a grant which represents 75% of the total cost of plant expansion, including engineering fees and contingencies. A plan for the strategic use of the funds freed by the issuance of the bonds is formulated. The plan takes into consideration some of the needs in each collection system as identified and evaluated by Staff. Planning essential for the orderly growth of the City, as well as preliminary engineering and facility plans for the Oso, which may be prerequisite of an EPA grant, receives in my opinion high priority, followed by projects in Flour Bluff, Padre Island, and the other systems. A detailed description of each project is included. It is proposed to use $2.9 million to improve the collection systems in Flour Bluff, on Padre Island, and in the Oso, Broadway and Allison Systems. Also included in this plan is the preparation of the Facility Plan for the next phase of expansion at the Oso Wastewater Treatment Plant and engineering fees for sliplining the Oso and Nile Drive Trunk Lines, and updating the Wastewater Master Plan. The rapid growth in the Flour Bluff area has created a large demand for sewer service. Completion of the plant expansion will allow more trunks to feed into the plant, thus, providing sewer service to a larger area of Flour Bluff. The major portion of the proposed additional work is in the Flour Bluff area. The following projects are proposed. A. PLANNING PROJECTS 1. Engineering for Sliplining of Nile Drive & Williams Drive Lines - The Wastewater System • Page No. 8 lines are 48" and 42" concrete pipe. Rehabilitation is proposed by inserting polyethylene lining material into the existing re- inforced concrete sewer lines. This would involve approximately 4500 feet of 48" pipe and 17,500 feet of 42" pipe. The project is on the State's priority list, and completion of engineering work and plans, plus the availability of funds from the State Level, could move the project up in rating for a grant. The line recently had a serious cave -in indicating that the same deterioration as the McArdle line could be taking place. The project is for preliminary and design work only. Estimated Cost ..................$ 225,000 Oso Plant Facility Plan - A preliminary plan for future expansion of the Oso Plant is needed. With the rapid growth of the south part of the City, planning for expansion beyond the current design year must begin now. The plant flow is approaching design capa- city even before the plant is finished; therefore, planning for the future is essential. Questions have been raised regarding future expansion of the plant. The area the plant now serves is still largely undeveloped but future development is anticipated. EPA would eventually participate in this cost, probably 55% EPA and 45% City. Estimated Cost ..................$ 55,000 Master Plan South of Oso Creek - Development is pushing to Oso Creek at this time. In the foreseeable future development is expected to cross the Oso. There are no provisions for wastewater treatment or collection south of Oso Creek. For a City to orderly grow with some guarantee of protection of its citizens against pollution it is important that planning must take place in terms of how this area could be served by wastewater. The City Council's goals include the construction of a new wastewater treatment plant. Development of a master plan of this area of rapid growth will enable the Council to determine the most logical location to extend new services and whether a new wastewater plant is needed. Estimated Cost ..................$ 100,000 $ 380,000 B. FLOUR BLUFF & PADRE ISLAND SYSTEM PROJECTS The Flour Bluff collection system is a relatively new system and major deficiencies are related to developed areas that do not yet have sani- tary sewer service available. Since laterals for the Don Patricio area were included as a separate project in the 1982 bond program, they are not listed here. Other lateral line projects are listed. The Padre Island System is also a relatively new system with no appar- ent problems in the collection system. All existing sewers on Padre Island were installed by Padre Island Development Corporation to meet City of Corpus Christi design standards. There were no projects approved in the 1982 bond program to provide sewers for existing sub- divisions on the Island that were not a part of the Corporation's development. It is proposed to establish a project to provide service to Padre Island No. 1 and No. 2 Subdivision now that they are within the existing city limits. Wastewater System of age No. 9 1. Laguna Vista Shores & Holidav Harbor - Various sized lines are needed to serve the area on either side of Laguna Shores Road and Shore Drive between Riverdale and Yorktown. A lift station and force main system has previously been constructed which provides for the main trunk and transmission lines in the area. Estimated Cost ................. $ 400,000 2. Bayside Acres 1 & 2 - This area is near Yorktown and Laguna Shores Road. There are a number of homes existing in this area without sewers. A number of lots have been platted prior to annexation that can not be developed without a sewer collection system. The sewer mains will serve existing and expected development. Estimated Cost... ............... $ 455,000 3. Bluewater Subdivision Sewer Mains - This subdivision is also near Laguna Shores and Yorktown, will be served by approximately 1860 feet of sewer mains to serve existing homes. Estimated Cost ................. $ 175,000 4. LaSuuna Shores Treatment Plant (Lift Station The rehabilitation rehabilitation of the lift station at the Laguna Shores Treatment Plant, that pumps sewage from Laguna Shores to Laguna Madre, was deleted from the Laguna Madre Expansion project when it appeared funding for the project would be a problem. It is recommended that this project be reestablished. The Laguna Shores Treatment Plant will be converted to a pumping station with the addition of two submersible pumps. The station will pump 1,5 million gallons per day to the Laguna Madre (Flour Bluff) Plant eliminating the need to treat at two Flour Bluff locations. Estimated Cost ................. $ 100,000 5. Kingswood Subdivision, Unit 1 - Lines will be laid along Easy Street to serve existing homes. This subdivision has all other Platting requirements including curbs and gutters installed. The installation of sewer lines will bring subdivision to standards. Estimated Cost ................. $ 52,000 6. Padre Island Subdivision Units 1 & 2 - This area is between Padre Island Drive and Pakery Channel and between Park Road 53 and County Park. -There have been numerous requests by residents of the area for sewer service. Currently, there are 31 developed lots in the service area with an additional 154 undeveloped lots. The area is now in the City Limits. Extension of sewer in this area would serve these developed lots, plus it will stimulate development, as it will also make service available to undeveloped but platted lots. Estimated Cost ................. $ 275,000 $1,457,000 Wastewater System &age No. 10 C. OSO SYSTEM PROJECTS • Many of the collection problems associated with the Oso system were addressed in the 1982, 1977 and preceeding bond programs and are now either completed or nearing completion. Two concrete sewers, a 48" and a 42" in this system have not been sliplined and are showing signs of deterioration. An engineering and design project is proposed under Planning Projects in this report. Nottarb Place Subdivision - This area is off of Weber Road on the other side of Saratoga. The entire subdivision is developed and has additional land adjacent, available for development. The City is currently working with a developer for joint participation in the construction of a lift station which will serve the master plan tributary area. The older sections of Nottarb Sub- division do not have a collection system. When the newer sections of Nottarb were constructed, a lift station sized to handle flows from the older sections was built. A collection system to service the older area is proposed, since it is now inside the City Limits. Estimated Cost ..................$450,000 Lakeview Acres Subdivision - Growth in this area, located near the northwest corner of the intersection of Holly Road and Rodd Field Road, has resulted in citizen requests for service. Sanitary sewers have been laid in the old Lakeview Acres Subdivision on a piecemeal basis. It is proposed to provide service to all of the remaining unserved lots in the subdivision. Estimated Cost ..................$ 80,000 3. Horne Road Sanitary Sewer An existing sanitary sewer line varying in size from 36" down to 24" exists in a portion of Carroll Lane, Houston Street, Kostoryz and Horne Road. This line, because of the numerous cave -ins upstream, has a number of restrictions in it; therefore, is not running to design capacity. These restrictions are in the form of slude buildup which has accumulated over the years. The line may eventually need to be replaced, but it is recommended that it be cleaned in order that the flow be accelerated, thus reducing line surcharge upstream particularly around the McArthur Street Area and making it possible to better monitor its structural condition (through the use of TV cameras) and hydraulic capacity. Estimated Cost ................. $ 200,000 BROADWAY COLLECTION SYSTEM $ 730,000 The Broadway collection system is the oldest in the City. Since most of the system was laid in streets using clay pipe, the system is generally in good shape and gives fewer maintenance problems. The major problems were in areas where ground water infiltrated through the joints. Many of these sections have been replaced with clay pipe with a superior joint material to minimize infiltration. Wastewater personnel have televised much of the downtown area and have repaired pipes at several locations to prevent ground -water infiltration and sewage exfiltration into the storm sewer system. This program appears to have substantially reduced the downtown odor problem. Wastewater System Page No. 11 0 The construction of the multi -story office buildings and hotels along Shoreline will place a heavy load on the Water Street trunk. Fortu- nately, the peak loads from the Convention Center area, the hotels, anc the office buildings will generally occur at different times of the day which will allow the line to handle a larger volume than might be expected from a line of this size. One project of importance, however, is as follows. 1. Re lace Corpus Christi Beach Force Main and Rehabilitate Lift Station - This lift station is located on Canal Street near the Harbor Bridge and pumps sewage from Corpus Christi Beach to the Broadway Plant. It is subject to flooding which makes the exist- ing pump set -up inoperable. The force main from Corpus Christi Beach also ties into the Water Street trunk. This force main from the ship channel to the Water Street trunk has become a high mainten- ance line with frequent blowouts. It is proposed to replace this line from the channel to the Broadway Plant. This will eliminate Beach flows from the Water Street main to increase its capacity for the downtown area and make this growth independent of any other collection system. Estimated Cost ................. 350,000 $ 350,001 E. ALLISON COLLECTION SYSTEM There are still some populated areas within this collection system area near existing trunk lines, but have no sewers. It is proposed to provide service to the Fallins Riverside and McGee Tract area. The remainder of the San Carlos area not served is proposed to be financed through the Community Development Block Grant Program. The major problems in this system are related to the erosion occurring in both the Hilltop Creek and Turkey Creek storm drainage ditches. Major sanitary trunks were laid adjacent and parallel to the bottom of these natural drainage channels. Bank erosion has exposed these lines and in many places storm flows wash out the lines when heavy rains occur. This allows raw sewage to enter the Nueces River and causes heavy in- filtration flows into the Allison Treatment Plant. Since these creeks are primarily storm drainage outfalls, erosion control should be financed from the Storm Sewer Bond Fund and no projects for stopping the erosion are proposed from the Sanitary Sewer Bond Fund. 1. Fallins Riverside & Magee Tract - This area includes Loma Alta, Rehfeld and Magee Lane. The existing homes are now served by septic tanks. This area has a hilly topography and will require extensive study to determine the most economical design layout. Estimated Cost ................. $ 350.000 $ 350,000 Wastewater System •Page Pao. 12 F. WESTSID_ E SYSTEM The Westside collection system has all been constructed since 1960. The major trunk serving the Westside Plant consists of a series of concrete mains varying in diameter from 60" to 42 ". No significant deterioration has been noted. Portions of the line will be televised during this calendar year and, if problems are noted, sliplining projects will be recommended (portions referred to as the Greenwood Trunk Line). There are no k rown major deficiencies in this system and no large populated areas not now being served. No additional projects are proposed for this area. -0- TOTAL.. .... ............................... $3,267,000 This program requires that $3,267,000 be reallocated from the Flour Bluff Plant to these individual projects. Because these projects did not receive priority over the 1982 Bond Projects, it is logical that implementation should follow the approved bonds. For this reason only, I would recommend that all projects follow the 1982 Bond Projects in terms of collection only with the exception of the Planning Section which should be moved ahead now. It is recommended that the program be approved and the funds transferred as required to establish the individual projects. The following breakdown shows the source of funds for these additional projects. Bonds Voted for Flour Bluff Plant $5,950,000 Local Share (EPA partially funded) 1,142,754 Balance 4,807,246 Proposed CIP Projects 3,267,000 Balance $1,540,246 The balance indicated would be used as the local share for the Allison Wastewater Treatment Plant. C� 1Q�Ut Edward A. Partin *v i \,rlK f Gi /rRf - II. Vi r LAGUNA VISTA SHORES I LEGEND —' — E'xis�in9 ro �� -�- AND 11OLIDAY HARBOR 211 ♦c - .- - -- I ;,e EAYSIDE ACRES ea,aw, 3 � CA�� B ErreF* asncnd) a- BLUEWATER u K I IJC l!001) 6 < >ar �� _. % � �� i �. Slo Ls r E�'�E�1j��go •� I 1 •• •'µ 6 va"cM`a i � \ • TT RgRY ~.� e^rTlRVb c�C pPpR ISL, OG -O be / �Y>d anAFo.ce Ina;a ro b ` y i JOTTAP3 PLACE g �19L } 1 Hew L; FeSratan r�u C'rf Oe�e %per Parnc.oa�,bn IF i_j LN \X MON ENEM, 7, f�, i I I "o i I� I .j | _ CORPUS CHRISTI BEACH, FORCE MAIN - c 71 _ 45.16 +.41> \\\ N � - FALLINS RIVERSIDE AND 4. GEE TRACTS. . SEP 1 91984 j r MIGROFALMEfY