HomeMy WebLinkAbout031786 ORD - 06/11/2019 Ordinance amending Corpus Christi Code to change residential building
permit fees from valuation based to square footage based; providing for
publication; and declaring an emergency for a one-reading action
Whereas, Texas House Bill 852, effective May 21. 2019. prohibits the use of the value of
the dwelling or the cost of constructing or improving the dwelling in determining the amount of a
building permit or inspection fee required in connection with the construction or improvement of a
residential dwelling
Now therefore, be it ordained by the City Council of the City of Corpus Christi, Texas:
Section 1. The Corpus Christi Code of Ordinance, Chapter 14, Article XIII. Division 1, Section 14-
1302 is amended by adding the following language that is underlined (added)and deleting the
language that is stricken (deleted) as delineated below:
Sec. 14-1302. -Commercial and residential building permit and inspection fees
valuation.
(a) The building permit fees applicable to the issuance of a building permit for residential
construction shall be based on the total square footage at a rate according to the fee schedule
published in section 14-1313 rounded up to the nearest cent.
(ak) The standardized building valuation system to be used to compute commercial
construction permit fees will consider the total value of all construction work, including
plumbing, electrical, paving, parking, driveway approach, energy conservation, fuel gas,
mechanical equipment, and other systems, including appurtenances and site improvements,
materials, labor, contractor's profit and overhead.
(1) The valuation of building, alteration, or structure used in computing commercial building
permit fees will be based on, and at least equivalent to, the latest standardized building
valuation data as published by the International Code Council Building Safety Journal, as
adjusted by the latest regional construction cost adjustment factors published annually by
Engineering News Record. The building official may alternatively accept a comparable
valuation submitted by the applicant. The applicant's valuation shall be verified against the
Elimination of Architectural Barriers Report, if one is required, and the higher of the two (2)
valuations shall be used. In the event the Elimination of Architectural Barriers Report
valuation is not available prior to issuance of the permit, the Elimination of Architectural
Barriers Report valuation shall be confirmed prior to conducting the final inspection. If
additional permit fees are required, the final inspection shall not be passed until all fees are
paid. If no Elimination of Architectural Barriers Report is available, the building official may
refer to the latest standardized building valuation data as published by the International Code
Council Building Safety Journal, as adjusted by the latest regional construction cost
adjustment factors published annually by Engineering News Record.
(2) The applicant for a construction permit may appeal any determination of the building official
to the building code board of appeals.
(3) Standardized building valuations required pursuant to paragraph (1) will be used as the
basis for permitting of a commercial project.
(4) Standardized building valuations required pursuant to paragraph (1) for pre-engineered
metal building warehouses must be values derived pursuant to paragraph (1).
(5) Standardized building valuations required pursuant to paragraph (1)will be derived from the
latest data published by International Code Council Building Safety Journal and Engineering
031786
SCANNED
News Record and adjusted based on the regional multiplier published by the International
Code Council.
(6) The standardized building valuations referred to in paragraph (1) are adopted by reference
and declared to be a part of this section.
(7) If, in the opinion of the building official, or the building official's authorized representative,
the valuation of a commercial building, alteration, structure, electrical, energy conservation,
fuel gas, mechanical, or plumbing systems appears to be underestimated on the application,
the permit may be denied, unless the applicant can show detailed estimates or appraisals
that meet the approval of the building official. Alternatively, the building official may set the
permit valuation pursuant to the standardized building valuation data adopted in paragraph
(1), and issue the permit with a fee based on that valuation. Permit valuations must be based
upon total construction cost, such as electrical, energy conservation, fuel gas, mechanical,
plumbing equipment and other systems, including materials and labor, site improvements,
contractor's profit and overhead.
(b) When determining the value that is applied to the fee schedule, values are rounded up to
the next higher one thousand dollar-valuation category.
(Ord. No. 028756, § 1, 8-31-2010)
Section 2. The Corpus Christi Code of Ordinance, Chapter 14. Article XIII. Division 1. Section 14-
1304 is amended by adding the following language that is underlined (added)and deleting the
language that is stricken (deleted) as delineated below:
Sec. 14-1304. - Processing and plan review fee.
(a) A processing and plan review fee must be paid in addition to the regular permit fee as in the
fee schedule published in section 14-1313Table 13 1.
(b) The plan review fees must be paid at the time application is filed for each application
processed and reviewed for the purposes of obtaining a permit as required by the technical
construction codes except:
(1) Permits categorized over the counter as deemed by the building official. An official list
will be published each calendar year.
(c) Plan review fee is non-refundable.
(d) A third party plan review or inspection may be requested by the applicant at the time the
application is filed. The fee for a third party plan review or inspection requested by the
applicant pays the costs of services of an approved third party consultant and the applicable
overhead rate. The fee for a third party plan review requested by the applicant must be paid
at the time the application is filed. The fee for a third party inspection requested by the
applicant must be paid prior to the inspection. The fees for third party plan review and
inspection requested by the applicant are listed in the fee schedule in section 14-1313. Third
party consultant contracts are available through the development services department.
(e) Expedited plan review by internal staff may be requested by the applicant at the time the
application is filed. The expedited fee is payable at the time of application submittal according
to the fee schedule published in section 14-1313. Expedited plan review does not constitute
an approval of submitted plans.
(f) Customized plan review.
(1) Customers who desire expedited approval may schedule a meeting with the plan review
coordinator and staff in order to obtain the necessary permits for the submitted project.
Customers must be accompanied by their design professional(s), (engineers,
contractors, owners, or any else) who may make on the spot corrections, changes or
decisions necessary to address all of the deficiencies on the plans.
(2) Submitted plans must be ready for permit issuance.
(3) If all plan deficiencies can be addressed, a site/foundation permit has or can be issued,
a contractor has been hired and is present, and all fees paid, then a building permit will
be issued at the end of the customized plan review meeting.
(4) If some issues cannot be resolved at the customized plan review meeting, but can be
addressed at a later date, another customized plan review meeting will not be required.
Once the issues addressed, a building permit will be issued to the contractor.
(Ord. No. 028756, § 1, 8-31-2010)
Section 3. The Corpus Christi Code of Ordinance. Chapter 14. Article XIII, Division 1. Section 14-
1313 is amended by adding the following language that is underlined (added) and deleting the
language that is stricken (deleted) as delineated below:
Sec. 14-1313. -Technical construction codes fee schedules.
The following fee schedules apply to activities under article II of this chapter:
PIAN tamerAmt OF FEE
FRES
Plan Review Fees
Residential—
New Construction, $0.10 per square foot(Includes Building, Mechanical, Plumbing & Electrical
Additions, and i Permit)25%of the Building Pormit Foc
Remodeling
Commercial (Based as a percentage of the Building Permit Fee)
40% of the Building Permit Fee
15% of original plan review fee for third review submittal; 30% of original plan
review fee for fourth review submittal; 45% of original plan review fee for fifth
Multiple plan review review submittal; 60% of original plan review fee for sixth review submittal; 75%
fee of original plan review fee for seventh review submittal; 90% of original plan
review fee for eighth review submittal; 100% of original plan review fee for ninth
and above review submittals
Third party plan
review when Contract rate + 32% overhead rate
requested by
applicant
Expedited plan 150% of the plan review rate
review(internal staff)
Customized plan 150% of the plan review rate plus $150.00 per hour with a two-hour minimum.
review
BUILDING PERMIT FEE AMOUNT OF FEE
$0.315 per square foot (Includes Building,
RESIDENTIAL New Construction Mechanical, Plumbing & Electrical Permit)
($100.00 Min permit fee)0.52% of Valuation
$0.165 per square foot of the new addition or
remodeled area for building permit(excludes
Mechanical, Plumbing & Electrical Permit)
($100.00 Min permit fee)
RESIDENTIAL -Additions & Remodeling An additional $0.05 per square foot of the
new addition or remodeled area for each
required plumbing, electrical & mechanical
permit.
($50.00 Min. permit fee for each required
plumbing, electrical & mechanical permit-)
COMMERCIAL
$0 to $5 Million .70% of Valuation
$5.001 to $10 Million .65% of Valuation
$10.001 to$20 Million .60% of Valuation
$20.001 to$50 Million 58% of Valuation
Construction site offices $80.00
Signs
Sign $108.00
Building permit for electrical signs, per transformer $6.75
Min Fee$80.00
Residential Construction Building Permits
remodel, and repair For all other residential building $100.00 0.52% of Valuation
permits NOT associated with new construction, additions,
or remodels
Residential- Other
Swimming-peel 80.00
Roofing and siding $.045 sq.ft.
2nd-driveway $80 00
FEES FOR MOVING STRUCTURES -BOTH RESIDENTIAL AND COMMERCIAL AMOUNT OF FEE
House moving permit 346- JO
Traffic engineering moving route sheet $61.00
Relocation survey $110.25
Survey fee (14-306(d)) $140.00
Mobile home/HUD-code manufactured housing installation permit $106.50
MISCELLANEOUS CONSTRUCTION FEES AMOUNT OF FEE
Certificate of Occupancy
Certificate of occupancy for change of use of existing building or
$215.00
structure
Duplicate certificate of occupancy/Certificate of completion $25.00
Temporary Events
Temporary event permit w/o food service $80.00
Temporary event permit w/food service $199.80
Miscellaneous Fees
Greater of:
Permit extension $80.00or
33.75%of permit fee
Greater of:
Renewal of expired permit $80.00 or
33.75% of permit fee
+ permit extension fee
Request for refund on canceled permit if no work done $40.00
Permit research $15.00 per hour
Demolition Permits
Greater of:
r
Demolition permit $80per 77 per
square foot
Penalty Fees
Work commenced but not finished Greater of 2x permit fee or
investigative fee
Work completed Greater of 2x permit fee or
investigative fee
Investigative fee $450.00
Re-inspection fee (per inspection) $80.00
Special Inspection Fees
Inspection fee + $100.00+$1.83
Inspections outside City, but within ETJ
per mile
Inspections outside City and ETJ Inspection fee + $1.83 per mile
+$100.00 for each 200 miles
Third party inspections when requested by Contract rate +32% overhead
applicant rate
Reduced Fees
Reduced fee for public schools, Federal, State, county, municipal Greater of:
governments and other political subdivisions with ad valorem tax 50% of regular permit fee
status or minimum fee
Minimum fee $80.00
BUILDING PERMIT FEES (ELECTRICAL AMOUNT OF FEE
ONLY)
Building Permit Fees (ELECTRICAL ONLY) are for Stand Alone Permits NOT Associated with a
Building Permit for new construction
Residential $0.05 per square foot 0.52% of Valuation
Commercial
$0 to$5 Million .70% of Valuation
$5.001 to $10 Million i .65% of Valuation
$10.001 to $20 Million .60% of Valuation
$20.001 Million to$50 Million 58% of Valuation
Minimum fee $10080.00
FUEL GAS FEES :!-AMOUNT-OF-FEE
Fuel Gas Fees for Stand Alone Permits NOT Associated with a Building Permit
Residential °
Commercial
$04e-$5 Million °
$5.001 to$10 Million °
° I
wee $8040
MECHANICAL PERMIT FEES AMOUNT OF FEE
Mechanical Permit Fees for Stand Alone Permits NOT Associated with a Building Permit
Residential $0.05 per square foot 0.52% of Valuation
Commercial
$0 to $5 Million .70% of Valuation
$5.001 to $10 Million .65% of Valuation
$10.001 to $20 Million .60% of Valuation
$20.001 to $50 Million .58% of Valuation
Temporary operation inspection $80.00
Minimum fee $10080.00
PLUMBING CODE FBS AMOUNT OF FEE
Plumbing Permit Fees for Stand Alone Permits NOT Associated with a Building Permit
Residential $0.05 per square foot °
Commercial
$0 to$5 Million .70% of Valuation
$5.001 to$10 Million .65% of Valuation
$10.001 to $20 Million .60% of Valuation
$20.001 to $50 Million .58% of Valuation
Minimum fee $80.00
Backflow Prevention
Backflow prevention device test filing fee $20.00
Minimum fee $10080.00
LICENSE FEES
Classification Examination Fee License Fee
House mover None $133.00
CONTRACTOR REGISTRATION FEES AMOUMJ
Mechanical contractor 3135.00
Lawn irrigator $135.00
Backflow prevention assembly tester $135.00
Requests for interpretation, technical ruling, modification of code, concurrence for use of an
alternative material or method, and appeal from decision of Building Official to technical $265.00
construction appeals and advisory boards
(Ord. No. 028756, § 1, 8-31-2010; Ord. No. 031247, § 6, 9-19-2017)
SECTION 4. If for any reason any section paragraph subdivision clause phrase word or provision of this
ordinance shall be held invalid or unconstitutional by final judgment of a court of competent jurisdiction it
shall not affect any other section paragraph subdivision clause phrase word or provision of this ordinance
for it is the definite intent of this City Council that every section paragraph subdivision clause phrase word
or provision hereof be given full force and effect for its purpose.
SECTION 5. Publication shall be made one time in the official publication of the City of Corpus Christi as
required by the City Charter of the City of Corpus Christi.
SECTION 6. Penalties are as provided in Section 1-6 of the Code of Ordinances.
SECTION 7. Upon the written request of the Mayor or five Council members, copy attached, the City
Council finds and declares an emergency due to the need for immediate action necessary for the efficient
and effective administration of City affairs and suspends the City Charter rule that requires consideration of
and voting upon ordinances at two regular meetings so that this ordinance is passed and takes effect upon
first reading as an emergency measure this 11th day of June, 2019.
11th Day of June 2019
TO THE MEMBERS OF THE CITY COUNCIL
Corpus Christi, Texas
For the reasons set forth in the emergency clause of the foregoing ordinance,an emergency exists requiring
suspension of the City Charter rule as to consideration and voting upon ordinances at two regular meetings:
I/we, therefore, request that you suspend said Charter rule and pass this ordinance finally on the date it is
introduced, or at the present meeting of the City Council.
Respectfully, Respectfully,
Mayor
Council Members
The above ordinance was passed by the following vote:
Joe McComb
Roland Barrera Q
Rudy Garza
Paulette M. Guajardo 1417-e-
Gil Hernandez
Michael Hunter �^/"9'i/.�
Ben Molina H'b 11�
Everett Roy
Greg Smith
PASSED AND APPROVED this I 1 day of 1-30<-- , 2019.
ATTEST: CITY OF CORPUS CHRISTI
r � . . _ ,
Reb-cca Huerta .: McComb
City Secretary - or
EFFECTIVE DATE
6) 11 IN
031786 9
•
•
TN
PART OF THE USA TODAY NETWORK
Certificate of
Publication
NOTICE OF PASSAGE OF
ORDINANCE(S)
N 0.031786, Ordinance
amending Corpus Christi
Code to change residential
building permit fees from
CITY OF CORPUS CHRIS TI valuation based to square
PO BOX 9277 footage based; providing
for publication; and declar-
ing an emergency for a
CORPUS CHRISTI,TX 78469-9277 one-reading action. This or-
ed
dinance was passsand ap-
proved by the Corpus
Christi City Council on
June 11, 2019 and takes ef-
STATE OF WISCONSIN) feet upon first reading as
an emergency measure on
)) June 11,2019.
COUNTY OF BROWN) /s/Rebecca Huerta
City Secretary
I,being first duly sworn,upon oath depose and say that I
am a legal clerk and employee of the publisher,namely,the
Corpus Christi Caller-Times,a daily newspaper published
at Corpus Christi in said City and State,generally circulated
in Aransas,Bee,Brooks,Duval,Jim Hogg,Jim Wells,
Kleberg,Live Oak,Nueces,Refugio,and San Patricia,
Counties,and that the publication of which the annexed is a NOTICE OF PASSAGE OF
true copy,was inserted in the Corpus Christi Caller-Times ORDINANCE(S)
inance
on the following dates: amending 786Corpus Christi
Code to change residential
building permit fees from
valuation based to square
June 17,2019 footage based; providing
for publication; and declar-
On this June 17,2019,I certifythat the attached document declar-
ing as emergency os a
one-reading action. This or-
is a true and exact copy mad/b t1the publisher: dinance was passed and ap-
proved by the Corpus
Christi City Council on
June 11, 2019 and takes ef-
fect upon first reading as
an emergency measure on
June 11,2019.
L-gal Notice Clerk /s/Rebecca Huerta
City Secretary
Notary'i. c,State Sconsin,County of Brown
5.1503
Notary Expires
Publication Cost:$102.00 i
Ad No:0003628322 NANCY H E Y R M A N
Customer No: 1243917 Notary Public
PO#: State of Wisconsin