HomeMy WebLinkAboutC2005-002 - 1/11/2005 - Approved CHANGE ORDER No. 11 Department of Engineering Services City of Corpus Christi, Texas CHANGE ORDER NO: 11 FUNDING SOURCE: 550910-3181-00000-110710 Operating Department: Department of Enqineerinq Services Name of Project: Convention Center Expansion/Renovation #4198 Contractor: Moorhouse/Beecroft Joint Venture, LLC DATE: December 10, 2004 CONTRACT TIME: 670 C.D. CHANGE AS FOLLOWS: Provide each of the following revisions (Items "a" through "bb") as identified on the a[tached Pages 2 of 5 through 5 of 5 in accordance with the requirements outlined in the Contract Documents. Total Add - Lump Sum: $388,749.00 Why were these changes necessary? (If left off the plans and specifications, explain why) The maiodty of the attached proposed revisions include work as required to modify or complete the current set of Desiqn Documents. How can similar changes be avoided in the future? Many of these items could have been included in the oriqinal scope of work if additional information would have been available at the time the conb'act amount was aqreed upon. A. CONTRACT PRICE ............................................... $ B. TOTAL CHANGE ORDERS (inc. current) ............ $ C. NEW CONTRACT PRICE .....................................$ D. THIS CHANGE ORDER ........................................ $ E. PERCENT TOTAL CHANGE (B/A) ....................... F. PREVIOUS ADDN'L TIME AUTHORIZED ............ G. ADDN'L CONTRACT TIME THIS CHANGE ORDER H. TOTAL ADDITIONAL TIME .................................. 24,614,045.00 2,868,472.00 27,482,517.00 388,749.00 11.65% 0CD 0 CD 0 CD Pro CITY OF CORPUS CHRISTI, TEXAS ~fE::jfy Engineer ~, APPROVED/: ~'~:~ (,~/O~e r a ti n~ D e p t. CONTRA~_R By: - Title/¢~;2 ~'~.~' ¢~Directolof Management ~ ~O ~r~, Legal Department 2005-002 01/11/05 M2005-010 Moorhouse/Beecroft Joint Venture CHANGE ORDER No. 11 CONVENTION CENTER EXPANSION Department of Engineering Services City of Corpus Christi, Texas a.) b.) c.) d.) e.) g.) PCO/CR No, 43 - Provide additional under floor lighting in the crawl space. All additional work shall be performed in accordance with the letter from Rabalais Constructors dated December 8, 2004. Also refer to the Moorhouse/Beecroft Change Proposal No. 46 dated December 8, 2004. Add = $2,961.00 PCO/CR N o. 6 6 - Remove and replace the wet roof insulation pdor to installation of new replacement roof. Also, provide new electrical power to the roof top air handling units. All additional work shall be performed in accordance with the Moorhouse/Beecroft Change Proposal No. 74 dated November 19, 2004. Add = $150,123 00 PCO/CR No. 78 - Provide revisions [o the ceiling heights at the operable wall partitions in the Ballroom. All additional work shall be performed in accordance with the responses to the Request for Information No. 248, 251 and 252. Moorhouse/Beecroft Change Proposal No. 112 dated December 3, 2004. Add = $45,959.00 PCO/CR No. 118 - Provide additional steel support bracing required above the ballroom ceiling. All additional work shall be performed in accordance with the response to the Request for Information No. 322-R1 dated January 23, 2004. Moorhouse/Beecroft Change Proposal No. 136 dated December 5, 2004. Add = $12,346.00 PCO/CR No, 141 - Provide additional XMA-3 light fixtures at the exterior columns. All additional work shall be performed in accordance with the Proposal Request No. 43 issued by'f'VS/Gignac dated May 5, 2004. Moorhouse/Beecroft Change Proposal No. 164 dated November 15, 2004. Add = $9,346.00 PCO/CR No. 144- Provide additional work as required to paint the metal panels in the curtainwall shadowboxes. All additional work shall be performed in accordance with the response to the Request for Information No. 393 dated May 13, 2004. Also refer to the Moorhouse/Beecroft Change Proposal No. 159 dated May 11, 2004. Add -- $16,507.00 PCO/CR No. 148 - Provide modifications to the drywall around the glass handrails in the Selena Auditorium. All additional work shall be performed in accordance with the response to the Request for Information No. 308 and 358. Also refer to the Moorhouse/Beecroft Change Proposal No. 152 dated June 3, 2004. Add = $9,561.00 h.) PCO/CR No. 1'~0 - Provide revisions to the control sequence at the automatic doors. All additional work shall be performed in accordance with the responses to RFI's No. 417 dated July 14, 2004. Moorhouse/Beecroft Change Proposal No. 192 dated August 20, 2004. Add -- $660.00 Page 2 or5 CHANGE ORDER No. 11 CONVENTION CENTER EXPANSION Department or Engineering Services City of Corpus Christi, Texas i.) PCO/CR No. 173 - Provide flowable fill at the Barge Dock flapper valve as required to fill the void between the paving slab and the manhole. All additional work shall be performed in accordance with the Moorhouse/Beecroft Change Proposal No. 185 dated August 30, 2004. Add = $915.00 j.) PCO/CR No. 174 - Provide two coats of paint on the floor of the Rehearsal Hall in the Selena Auditorium. All additional work shall be provided in accordance with the Moorhouse/Beecroft Change Proposal No. 197 dated August 25, 2004. Add = $2,744.00 k.) PCO/CR No. 175 - Provide Siemon Cat 6 patch panels to replace the telephone punch down panels. This change was requested by the City MIS Department All additional work shall be performed in accordance with the MB-JV Change Proposal No. 198 dated September 1, 2004. Add : $5,481.00 PCO/CR No. 176 - Provide an additional Type "A" inputJoutput plate on the east wall of Ballroom "B". All additional work shall be performed in accordance with the response to the Request for Information No. 421-R1. Moorhouse/Beecroft Change Proposal No. 201 dated September 2, 2004. Add = $2,466.00 m.) PCO/CR No. 177 - Provide electrical power to the new American Bank Center signs at the south and west sides of the building. All additional work shall be performed in accordance with Drawing 2 of 5 issued by Chandler Signs dated July 19, 2004. Moorhouse/Beecroft Change Proposal No. 206 dated October 12, 2004. Add = $4,164.00 n.) PCO/CR No. 179 - Provide revisions to the Kitchen Area as required to add a new account clerk office, cash room and a room with a counter. All additional work shall be performed in accordance with the Proposal Request No. 45 issued by TVS/ Gignac dated September 28, 2004. Moorhouse/Beecroft Change Proposal No. 215 dated November 16, 2004. Add = $21,770.00 o.) PCO/CR No. 182 - Remove and replace the broken escalator glass rail thatwas damaged during an event. All additional work shall be performed in accordance with the Moorhouse/Beecroft Change Proposal No. 209 dated November 15, 2004. Add = $4,224.00 p.) PCO/CR No. 184 - Provide all additional work associated with adding an expansion joint in the stone pavers between the Main Lobby Entry and the existing Prefunction Area. All additional work shall be performed in accordance with the response to the Request for Information No. 397 dated July 1,2004. Moorhouse/Beecroft Change Proposal No. 213 dated November 15, 2004. Add = $2,479.00 3of5 CHANGE ORDER No. ll CONVENTION CENTER EXPANSION DepadmentofEngineeringSe~ices Ci~orCorpusChristi, Texas q.) r.) s.) t.) u.) v.) w.) x.) PCO/CR No. 186 - Provide additional fireproofing at the structural steel tube members that were exposed during demolition. All additional work shall be performed in accordance with the Moorhouse/Beecroff Change Proposal No. 211 dated November 15, 2004. Add = ,'~,756.00 PCO/CR No. 187 - Provide additional thin set slate pavers at the entrance of the Selena Auditorium. All additional work shall be performed in accordance with the response to the Request for Information No. 431 dated August 19, 2004. Also refer to the Moorhouse/Beecroft Change Proposal No. 195 dated November 15, 2004. Add = $2,325.00 PCO/CR No. 188 - Provide various electrical revisions in the Kitchen including additional powedtelecom to the CheFs Office, power for the additional Ansul [ire suppression system at the popcorn popper vent hood, additional electrical ceiling drops for the portable warming cads. All additional work shall be performed in accordance with the Moorhouse/Beecroft Change Proposal No. 204 dated November 15, 2004. Add = $17,001.00 PCO/CR No. 189 - Provide all additional work associated with relocating the fire alarm devices in stone walls and metal wall panels. All additional work shall be performed in accordance with the response to the Request for Information No. 394. Moorhouse/Beecroft Change Proposal No. 171 dated November 19, 2004. Add -- $22,277.00 PCO/CR No. 190 - Provide additional sprinkler heads at each of the skylights. All additional work shall be per[ormed in accordance with the request for the Corpus Chdsti Fire Marshal and the Moorhouse/Beecro[t Change Proposal No. 186 dated August 26, 2004. Add = $8,131.00 PCO/CR No. 191 - Provide additional overflow drains at the section of root along the east side of the Prefunction Area. All additional work shall be performed in accordance with the Moorhouse/ Beecroft Change Proposal No. 172 dated November 18, 2004. Add -- $4,357.00 PCO/CR No. 192 - Provide revisions to the height of the glass doors in the Administration Area. All additional work shall be performed in accordance with the response to the Request for In[ormation No. 388 dated May 24, 2004. Moorhouse/Beecroft Change Proposal No. 170 dated November 18, 2004. Add = $2,265.00 PCO/CR No. 193 - Provide structural steel framing revisions above the existing stair at Column Line 10. All additional work shall be performed in accordance with the MEI Govind SKI-11-17-03, SK2-11-17-03 and SK3-11-17-03. Also refer Io the Moorhouse/Beecroft Change Proposal No. 100 dated November 18, 2004. Add -- $6,872.00 4 of 5 CHANGE ORDER No. 11 CONVENTION CENTER EXPANSION Department of Engineering Services CiLy of Corpus Christi, Texas y.) z.) aa.) bb.) PCO/CR No. 194 - Provide revisions to the structural support members at the escalator. Also revise the drywall framing around the escalator. All additional work shall be performed in accordance with the response to the Request for Information No. 273 dated January 15, 2004 and RFI No. 273-R1 dated January 30, 2004. Moorhouse/Beecroft Change Proposal No. 86 dated November 18, 2004. Add = $4,788.00 PCO/CR No. 195 - Provide new diffusers in the meeting room corddor ceilings as required to allow the diffusers to line up with the light fixtures. All additional work shall be performed in accordance with the Moorhouse/Beecroft Change Proposal No. 160 dated December 5, 2004. Add = $3,352.00 PCO/CR No. 196 - Provide revisions to the roof above the Main Lobby Area. All additional work shall be performed in accordance with the response to [he Request for Information No. 351 dated Apdl 2, 2004. Moorhouse/Beecroft Change Proposal No. 148 dated December 5, 2004. Add = $19,206.00 PCO/CR No. 197 - Provide a chase wall around the gas line in Stair E-2. All additional chase wall work shall be performed in accordance with the response to the Request for Information No. 377 dated May 27, 2004. Moorhouse/Beecroft Change Proposal No. 210 dated December 5, 2004. Add = $1,691.00 5 of 5