Loading...
HomeMy WebLinkAboutC2005-049 - 1/25/2005 - Approved CHANGE ORDER Department of Engineering Services City. of Corpus ChristL Texas CHANGE OILDER NO: Operating Department: Name ot' Projecz: Contractor: " FUNDING SOURCE: CONT[:LACT TIME: Street DATE: 06-Jan-05 Laguna Shores Road./Mediterranean Drive to Caribbean Drive Rd. & Bridge Rehab. P,R. 6158 Bay~ Ltd. 465 C.D. CHANGE SEE ATTACHED BREAKDOWN TOTAL NET: ADD $293,078.00 $293,07§.00 DEDUCT Why was this change necessary? ( f eft off m p aris and specifications, explain why'? Requesl was a result o~'waterlines being in very porn condition and require immediate replacement. How can similar changes be avoided in the future? Unavoidable. B C D F. G H CONTRACT PRICE S 2,759,059.00 TOTAL CHANGE ORDER (inc. current) S 299,63000 NEW CONTRACT PRICE S 3,058,68900 THIS CHANGE ORDER 5 293,078 00 PERCENT TOTAl. CHANGE (B/A) 10.86% PREVIOUS TIME AUTHORIZED I0 C.D. ADDN'E CONTRACT TIME TH1S CHANGE ORDER 0 C.D FOTAE ~&DDITIONAL TIME 10 CD CITY OF CORPUS CHRISTI, TEXAS £Eng~5)eiing Services ~ , 5 ~ ' Bay, Ltd. C 0 NT ~,~xO R CHANGE ORDERNO. 2 Laguna Shores Road, Mediterranean Drive to Caribbean Drive Rd. & Bridge Rehab, Project 6158 CHANGE ADD DEDUCT Add the following quantites to the contract: I 6" PVC Waterline - 2,560 LF $117,760.00 @$46 00/LF 2 6" 90 Deg Bend - 2 EA 450.00 @$225 00/EA. 3 6" x 6" DI Tees - 10 EA 3,500.00 @$350 00/EA. 4 6' Gate Valves 18 EA 14,400,00 65800.00/EA. 5 Fire Hydrant Assembly 6 EA 27,000.00 @$4,500 00/EA. 6 Near Side Water Service - 13 EA 10,400.00 65800.00/EA 7 Far Side Water Service - 16 EA 16,000.00 65'1,000.00lEA 8 6" Waterline Tie-Ins - 6 EA 15,000,00 652,500.00/EA. 9 Exploration 1 L.S 3,000.00 653,000.00/L.S. 10 Wheel Chair Ramps - 3 EA 4,500.00 651,500.00/EA 11 Permanent Pavement Repairs 260SY. 18,200.00 6565 00/S Y 12 6" Concrete Ddveway - 234 SF 2,808.00 ~$12 00/S F. 13 Grade Ditches 2,560 LF 20,480.00 @$8 00/LF 14 Curb & Gutter 60 LF 3,480.00 6556 00/L.F 15 Traffic Control [or Waler - 1 L.S 21,500 00 @$21,50000/L S 16 Sewer Service Repairs 13 EA 4,550.00 @$350 00/EA. 17 Sediment Control Fence 300 L.F 1,800.00 ~$6.00/L,F. tS Sediment Contro[ Fence Remove 300 LF 75000 652.50/L F 19 Utilit7 Adjustment Allowance 1 L.S 7,500.00 @$7,500.00/L.S TOTAL CHANGE ORDER: $293,078.00 All work will be completed by April 1, 2005 DEPARTMENT OF ENGINEERING SERVICES CHANGE ORDER SUMMARY SHEET January 25, 2005 PROJECT: Laguna Shores Road Street Improvement Project from Mediterranean to Caribbean APPROVED: Cit~ Council on September 30, 2003 by Motion No. M2003-356 CONTRACTOR: Berry Contracting, inc. P.O. Box 4858 Corpus Chdsti, Texas 78408 TOTAL CONTRACT AMOUNT ...................... 25% Limit Amount .......................................... Change Order No. 1 (11/29/04) ..................... Change Order No. 2 (01/25/05) .................. Total .......................................................... $2,759,059.00 689,764.75 6,552.00 293,078.00 299,630.00 = 10.8 %< 25% EXHIBIT "B Page 1 of 1 r,ie , \Mproject\councilexhibit~\exh95107. dwg N CITY PROJECT No. 95107 LOCATION MAP NOT TO SCALE EXHr_BZT "C" NEIGHBORHOOD ZMPROVEMENT PROGRAM GREENBAY/MATLOCK/STONE/SP£D/ NAS DRIVE/NAVAL AIR STATION-CC CITY OF CORPUS CHRISTI, TEXAS CITY COUNCIL EXHIBIT DEP~E~ OF ~¢INE~IN¢ SERVIC~ PAGE: Io¢ 1 ~: 0f-18-2~5