Loading...
HomeMy WebLinkAboutC2005-061 - 2/22/2005 - Approved CHANGE ORDER Department of Engineering Services City of Corpus Christi, Texas CHANGE ORDER NO: 3 Operating Department: Wastewater Department Name of Projoet: Resaca Liflt Station & 48" Wastewater Gravity Line (72118) Contractor: Holloman Corporation __ FUNDING SOURCE: 550910-42404)0000-150246 CONTRACT TIME: 270 C.D. DATE: February 15, 2005 CHANGE ADD D~DUCT SEE ATTACHED Why was this change ne~ezaary? (l[f left offthe plans and specifications, explain why) The change is necessary t~ avoid future conflicts with surface improvements. How can similar changes be avoided in the future? Better long-range planning/coordination with Development Services. A. CONTRACT PRICE .............................................................. $ 4.621.79~.00 B. TOTAL CHANGE ORDER (Inc. current) ........................... $ 362.619.63 C. NEW CONTRACT PRICE .................................................... $ 4.984.414.63 D_ THIS CHANGE ORDER .......................................................$ 201.781.00 E. PERCENT TOTAL CHANGE (B/A) .................................... 7.85*/. F. PREVIOUS ADDN'L TIME AUTHORIZED ...................... 4}- G. ADDN'L CONTRTACT TIME THIS CHANGE ORDER. SEE A'I"FACHED H. TOTAL ADDITIONAL TIME .............................................. SEE A'VI'ACI4E, D CITY OF CORI~_US ~l~lRIST1, TEXAS CONTRACTOR By: ~ By: Title: '~ APPROVE D ~k-'"~"'/C ' "~'~-OO pa ra tin g Department · -z'~ ' ~ Jl - Legal Department / -..~-4nffilll~C'll ('"~('~ I~- a...., ..-, _t__ .......................... moo5-o o Holloman Corporation ~: Page 2 ADD THE FOLLOWING BID ITEMS TO THE CONTRACT: A 1. Mobilization- 1 L.S_ ~ $20,579.00/L.S. A 2. 18", C-905 PVC Force Main (All Depths) -380 L.F. ~ $77.00/L.F. A 3. Boring and Steel Casing (36" Dia. x 1/2" Wail Thickness)-226 L.F. ~ $534.00/L.F. A 4. Steel Casing (36" Dim x 1/2" Wall Thickness) Installation by Direct Bury-20 L.F. ~ $211.00/L_F_ A5. 18" 90° Bend, D.I_M.J.- 1 Each ~ $4,014.00~ach A 6. 18" Plug, D.I.M.J-2 Each ~ $3,176.00/Each A 7. Trench Safety Related to Force Main Improvements Including Bore Pits-220 L.F. ~ $2_00/L.F. A 8. SWWPP Related to Force Main Improvements- 1 L.S. ~ $507.00/L.S. A 9_ Dewatering Related to Force Main Improvements- 1 L.S. ~ $9,032.00FL.S. A 10_ Traffic Control Related to Force Main Improvements- 1 L.S. ~ $564.00/L_S. A 11. Exploratory Excavations-1 L.S. ~ $1,129.00/L.S. A 12. Allowance for Unanticipated Adjustments- 1 L.S. ~ $5,000.O0/L.S. TOTAL ADD ADD $20,579.00 $29,260_00 $120,684.00 $4,220.00 $4,014.00 $6,352.00 $440.00 $507.00 $9,032.00 $564_00 $1,129.00 $5,000.00 ~201.781.0~ ADDITIONAL CONTRACT TIME THIS CHANGE ORDER It is recommended that the Contractor be granted 70 calendar day's additional time with the stipulation that the Resaca Lift Station be capable of pumping sewage no later than March 10, 2005. J:~PROJECT DATA COl~US~A04032411 (C) City of CC-Res~c..a Lift Stalion~5-CONTRACTS & CHANGE ORDERS~id items 2 15 2O05.d~e