Loading...
HomeMy WebLinkAboutC2005-074 - 3/8/2005 - ApprovedCHANGE ORDER Depa~ of Engineering Services City of Corp~a ChHetl, Texa~ CHANGE ORDER NO: 94- PROJECT NO: 4285 CONTRACT TIME: Comoleta 4-5-05 Operating Department: Enolneedna Sauces DATE: February 24. 2005 Name o[ Project: Comus Chd~ Baseball Stadium - Whatabumer Field Contractor: Fultofl--CoastcotvH unt JV 1. Owner PCO's #,6 $14,082.00 2. FCH PCO's #1,2,4,5 $233,286.00 'Note: Please mr. attached Page 2 ol~ 2 for PCO details. Total Add. Lump Sum Why was this change necessary? (1! left off the plans and specific, eBons, explain why) Some of the steel sb'uct'um was not de§ned In the bid documents, This reflects additional steel and change to the pre- cast as Dart of the test-track orocess. C. NEW CONTRACT PRICE .................................................... $ D. THI~ CHANGE ORDER ..................................................... E. PERCENT TOTAL CHANGE (B/A) ...................................... F. PREVIOUS ADDN'L TIME AUTHORIZED ........................... G. ADDN'L CONTRACT TIME THIS CHANGE ORDER .......... H. TOTAL ADDITIONAL TIME ................................................ How can similar changes be avoided in the future? 1. Due to the fast ITack nature of ~he Baseball Stadium. the desian conceet was not fully develooe~ un~il after ¢onstrucUon had beoun, Thus, this chsnae could not bo rease,nablv avoided. A. CONTRACT PRICE .............................................................. $ 21,480,526,00 B. TOTAL CHANGE ORDERS (Inc. current) .......................... $ 1,333.296.00 22,793,822,00 247,368.00 6.21% rea cd rea cd tVa cd '~5~-t.o~al ~artmont 2005-074 03/08/05 M2005-080 Fulton-Coastcon/Hunt JV Page 1 of 2 CHANGE ORDER No. 4 - Whataburger Field Department of Engineering Services City of Corpus Christi, Texas a) Owner PCO #6- HKS issued new lighting fixtures in several areas, along with cove details to accommodate lighting. Add = $14,082.00 b) PCO #1- Mill order steel changes issued by HKS in Package B Drawings. Add = $87,714.00 c) PCO #2- Design of pre-cast seats had to be redesigned. Change in matedal increased cost of matedal and galvanizing. Add = $19,259_00 d) PC0 #4- Miscellaneous changes per HKS clarification of details resulted in deduction of steel erection man-hours and material. Deduct = ($6,747.00) e) P~Q #,~- Mill order steel changes issued by HKS in Package C Drawings. Package C detailed additional material, freight, decking, and man-hours. Add = $133,060.00 TOTAL $247,368.00 Page 2 of 2