HomeMy WebLinkAboutC2005-085 - 3/22/2005 - ApprovedCHANGE ORDER Department of Engineering Services City of Corpus Christi, Texas CHANGE ORDER NO: 05 PROJECT NO: 4285 CONTRACT TIME: Operating Department: Enqineerinq Services DATE: March 11. 2005 Name ct Project: Corpus Christi Baseball Sladium - Whalaburqer Field Contractor: Fulton-Coastcon/Hunt JV Complete 4-5-05 CHANGE ADD DEDUCT FCH PCO's #11,21.29,34,37,39,43,44,47,50,51,59,60,64 *Note: Please ref. attached Pages 2 of 2 for PCO details. Total Add. Lump Sum S297,004.00 $297~004.00 Why was lhis change necessary? (If left off the plans and specifications, explain why) These are items thai were not part of the oriqinal bid or they were removed as a Value Enqineednq option Ihal later had to be added back/ How can similar changes be avoided in Ihe future? 1. Due to the fast track nature ct the Baseball Stadium, the desiqn concept was not fully developed until after construction had bequn. Thus, Ihis chanqe could not be reasonably avoided. A, CONTRACT PRICE ................................................. $ 21,460,526.00 , B. TOTAL CHANGE ORDERS (inc. current) ........................ $ 1,630,300.00 C. NEW CONTRACT PRICE .................................................... $ 23,090,826.00 I' ,q,, // ( I , D. THIS CHANGE ORDER .................................................. $ 297,00=4.00 E. PERCENT TOTAL CHANGE (B/A) .................................... 7.6 Fo ~ - C~n~b'uctiofi II~nager F PREVIOUS ADDN'L TIME AUTHORIZED ......................... n/a c d ~ ~ · G. ADDN'L CONTRACT TIME THIS CHANGE ORDER .......... n/a c d H TOTAL ADDITIONAL TIME ................................ n/a c d CiTY OF CORPUS CHRISTI, TEXAS / / City Engineer Title: v APPROVED: '~~ ~//~'TJ'/%pe, rating Department ~. ~ apagementJBudget Department k=C'~Z'~l.~ Legal Depart ent ATTEST: [y~ "Z. OO5'- o'~ ~ AUTH0~d.t, 2005-085 03/22/05 M2005-098 Fulton-Coastcon/Hunt JV Page 1 of 2 CHANGE ORDER No. 3 - Whataburger Field Department of Engineering Services City of Corpus Christi, Texas a) PCO#11- Additional demolition to warehouses resulted in additional underground footings being located under construction areas. As a result, several concrete footings had to be removed. Add = $3,549.00 b) PCO#21- Rubble was removed from site. This rubble was left over from the previous demolition crew on site because it was not in their contract. Add = $1,894.00 c) PCO #29- Architectural Fascia channel was needed to "close off" suite level roof. This item was left off of earlier plans. Add = $63,375.00 d) PCO #34- 124 lineal feet of tube stiffener was added as per RFI #176 response dated 11-18-04. Add = $13,706.00 e) PCO #37- Additional Debris was removed from site. This debris included trash, wood, and metal left by previous demolition contractor. Add = $10,320.00 f) PCO #39- Directed to install an additional 52 Stadium seats as shown on submittal. Add = $4,010.00 g) PCO #43- Steel contractor requested additional monies for extra detailing time which came as a result of RFI #65 and RFI #66. Add = $1,797.00 h) PCO #44- Response to RFI #108 resulted in an extension of precast beams to support precast. Add = $2,083.00 i) PCO #47- RFI #152 resulted in the addition of a deck support angle. Add = $2,696.00 j) PCO #50- (8) Raker seats were added above vomitories. Add = $5,971.00 k) PCO #51- Previously Value Engineered Zinc Clad III steel coating was refigured and added back in some locations. Add = $82,311.00 I) PCO #59- Precast method would not allow for placement of "double riser" seating up to concourse slab. To allow erection to continue singles were cast, which required a new form. Add = $30,493.00 m) PCO #60- Fire pump was not included in the original design. A hydraulic analysis indicated that a fire pump would be necessary. Add = $51,428.00 n) PCO #64- Drink holders for seating were included in the Specifications to be supplied by owner. Add: $23,371.00 TOTAL $297,004.00 Page 2 or 2