HomeMy WebLinkAboutC2005-244 - 5/24/2005 - Approved CHANGE ORDER
Department of Engineering Services
City of Corpus ChrlsIL Texas
CHANGE ORDER NO:
Operating Department:
Name o f Prc~jecl:
2
Yorktown Blvd. - Lake Travis Drive to Weber Ro~d lmprvs., Ph. I & 2 - P.R 6150
H & G Contractors, Inc.
nl)p
FUNDINGSOURCE:~Oqf'0 ~0-~003c/~ CONTRACTT1M~: 360C.D.
May 19, 2005
DEDU(~T
SEE A~I~I'ACHED BREAKDOWN
$172..tO0.00
Why wa~ this change necessary? (lflefl offthe plans and specifications, explain why?
Lighting, fiber optics and irrigataon were added to the projecT.
How can similar changes be avoid~l in the future?
Unavoidable.
A CONTRACT PRICE $
B TOTAL CHANGE ORDER (inc. current) $
C NEW CONTRACT PRICE $
D THIS CHANGE ORDER $
E PERCENT TOTAL CHANGE (B/A)
F PREVIOUS TIME AUTHORIZED
G ADDN'L CONTRACT TIME THIS CHANGE ORDER
H TOTAL ADDITIONAL TIME
2,388,102.98
193,670.00
2,581,772.98
172,300.00
8.11%
0 C.D.
90 C.D.
90 C.D.
CITY OF CORPU~ CHRISTI, TEXAS
APPROVE~iT~ d~4fi/f~d ~X-xOpe r a tin g Depart men t
H & G Contractors
Project Manager
2005-244 ........... .~
05/24/05 '~re~TMIY T/~
M2005-164
A~I-ACHMENT TO
CHANGE ORDER NO. 2
Yorktown Boulevard from Oso Parkway to Weber Road
Project #6150
CHANGE ADD DEDUCT
Add the following items to the
Contract:
1. Trench/Bore for approximately 6.000' for placement of 1-2" sch 40 gray
conduit for secondary cable with 36" cover (700' will be in same trench
with primary).
2. Trench/Bore for approximately 800' for placement of 1-2" sch 40 gray
conduit for primary cable with 48" cover.
3. Placement of primary conduit into existing AEP splice box.
4. Form and pour concrete pad with pillar [or one single-phase transformer
pad.
5. Trench/Bore for approximately 6,000' for placement of 1-2" sch 40 gray
conduit for fiber optic cable for 36" cover.
6. Bore for approximately 1,000' for placement of 1-2" sch 40 white conduit
for irrigation at median openings and road crossings. Cap each eric and
mark with PVC post.
7. Bore approximately 200' for placement of 1-4" sch 40 conduit for future at
FM 43.
8. Placement of 34 (with electrical logo lids) and 12 (with fiber optic logo lids)
36" x 24" x 24" open bottom hand holes as specified.
9. Proof all conduit and placement of pull line in each.
10. Restoration of work area
LUMP SUM PRICE: $172,300