Loading...
HomeMy WebLinkAboutC2005-244 - 5/24/2005 - Approved CHANGE ORDER Department of Engineering Services City of Corpus ChrlsIL Texas CHANGE ORDER NO: Operating Department: Name o f Prc~jecl: 2 Yorktown Blvd. - Lake Travis Drive to Weber Ro~d lmprvs., Ph. I & 2 - P.R 6150 H & G Contractors, Inc. nl)p FUNDINGSOURCE:~Oqf'0 ~0-~003c/~ CONTRACTT1M~: 360C.D. May 19, 2005 DEDU(~T SEE A~I~I'ACHED BREAKDOWN $172..tO0.00 Why wa~ this change necessary? (lflefl offthe plans and specifications, explain why? Lighting, fiber optics and irrigataon were added to the projecT. How can similar changes be avoid~l in the future? Unavoidable. A CONTRACT PRICE $ B TOTAL CHANGE ORDER (inc. current) $ C NEW CONTRACT PRICE $ D THIS CHANGE ORDER $ E PERCENT TOTAL CHANGE (B/A) F PREVIOUS TIME AUTHORIZED G ADDN'L CONTRACT TIME THIS CHANGE ORDER H TOTAL ADDITIONAL TIME 2,388,102.98 193,670.00 2,581,772.98 172,300.00 8.11% 0 C.D. 90 C.D. 90 C.D. CITY OF CORPU~ CHRISTI, TEXAS APPROVE~iT~ d~4fi/f~d ~X-xOpe r a tin g Depart men t H & G Contractors Project Manager 2005-244 ........... .~ 05/24/05 '~re~TMIY T/~ M2005-164 A~I-ACHMENT TO CHANGE ORDER NO. 2 Yorktown Boulevard from Oso Parkway to Weber Road Project #6150 CHANGE ADD DEDUCT Add the following items to the Contract: 1. Trench/Bore for approximately 6.000' for placement of 1-2" sch 40 gray conduit for secondary cable with 36" cover (700' will be in same trench with primary). 2. Trench/Bore for approximately 800' for placement of 1-2" sch 40 gray conduit for primary cable with 48" cover. 3. Placement of primary conduit into existing AEP splice box. 4. Form and pour concrete pad with pillar [or one single-phase transformer pad. 5. Trench/Bore for approximately 6,000' for placement of 1-2" sch 40 gray conduit for fiber optic cable for 36" cover. 6. Bore for approximately 1,000' for placement of 1-2" sch 40 white conduit for irrigation at median openings and road crossings. Cap each eric and mark with PVC post. 7. Bore approximately 200' for placement of 1-4" sch 40 conduit for future at FM 43. 8. Placement of 34 (with electrical logo lids) and 12 (with fiber optic logo lids) 36" x 24" x 24" open bottom hand holes as specified. 9. Proof all conduit and placement of pull line in each. 10. Restoration of work area LUMP SUM PRICE: $172,300