HomeMy WebLinkAboutC2005-247 - 5/24/2005 - ApprovedDEVELOPER AGREEMENT FOR TEMPORARY IMPROVEMENTS
STATE OF TEXAS §
COUNTY OFNUECES §
THIS AGREEMENT is entered imo between the City of Corpus Christi, a Texas
Home-Rule Municipal Corporation, P.O. Box 9277, Corpus Christi, Texas 78469-9277,
hereinafter called "City" and:
Alireza Mos~aghasi dPo/a Al Development, Inc., 6530 Samba Drive, Corpus Christi, Nueces
County, Texas 78414
Alex Azali, d/b/a Springfield Development, Inc., 6201 Meadow Vista Drive, Corpus Christi,
Nueces County, Texas 78414
(3CE Properties, Inc. d/b/a Gulf Coast Equities, Inc., 5333 Yorktown Blvd., Corpus Christi,
Tx 78413 hereinafter called "Developers".
WHEREAS, Developers in compliance with the City's Platting Ordinance, have filed
and/or recorded plats to develop tracts of land:
South Fork Unit 3
South Fork Unit 4
South Fork Unit 5
Morningstar Unit 2,
hereinafter called "Developmems", and
WHEREAS, the Developem have commenced construction of infrastructure and
related site improvements within the respective subdivisions in accordance with City
approved construction plans and specifications, and
WHEREAS, the Developers want to proceed with construction and sale of residential
units without delay and interruption, and
WHEREAS, the Developments are located within the Greenfields by the Bay Lift
Station Service Area as shown in EXHIBIT 1, and
WHEREAS, the Greenfields by the Bay Lift Station was determined to be operating
at or near capacity per Design Memorandum submitted by Naismith Engineering, Inc., dated
December, 2004, as Revised February 17, 2005, and
WHEREAS, City requires a temporary means of increasing the capacity of
Greenfields by the Bay Lift Station to handle the additional flows from the Developments
until the existing Lift Station and 8-inch Force Main is replaced with an new larger Master
Plan Lift Station and 12-inch Force Main. and
WHEREAS, it is in the best interest of the City and the Developers for the
temporary, automatic, self priming, electric pumping system with electrical upgrade fully
integrated with the existing lift station to be designed and constructed at this time;
2005-247 'emporary Improvements
05/24/05 Station
M2005-165
Mostaghasi, Alireza, et al
NOW THEREFORE, for and in consideration of said City authorizing the installation of a
temporary pumping system within the Greenfields by the Bay Lift Station to increase the
operating capacity of the existing lift station to handle the increased flows from the
Developments until the new Master Plan Lift Station and 12-inch Force Main are fully
operational, the City and Developer for and in consideration of the mutual covenants herein
exchanged to be kept and performed, the parties do hereby covenant, and agree as follows:
REQUIRED TEMPORARY IMPROVEMENTS
a. The Developer will design and construct the installation ofa selfcontaflned,
fully automatic, self priming, electric temporary pumping system on skids,
complete in place and ready for operation in compliance with the following
requirements or approved equal:
i. Consist of two (Godwin Pump Dri-Pnme Model CD 150M Automatic
Self-Priming per Exhibit 2 or approved equal)
ii. with new control panel and necessary electrical upgrade complete in
place for operation and use
iii.pumping system to be set on concrete pad
iv. integrated with existing lift station
v. electrical certification for all electrical integration with existing lift
station controls:
vi. maintain pumping capacity of existing lift station during installation of
temporary pumping system and electrical tie in;
vii. complete, inspected, accepted by the City and operational within the
next 45 calendar day time period.
PLANS AND SPECIFICATIONS
a. The Developer will prepare plans and specifications and construction contract for
the installation of the required temporary improvements in the Greenfields by the Bay Lift
Station to serve the Developments, through its consultants subject to review and approval by
the City.
CITY ACCEPTANCE, OWNERSHIP AND MAINTENANCE
a
The City will assume permanent ownership of the temporary pumping system
subject to testing, inspection and acceptance by the City.
The City will maintain the temporary pumping system until the new Master
Plan Lift Station and Force Main are constructed, accepted and fully
operational.
CONSTRUCTION CONTRACT AWARD BY DEVELOPERS
a. The Developer will award a construction contract and complete the design and
construction of the required improvements within 45 calendar days in accordance with
approved plans and specifications.
Developer Agreement for Temporary Improvements
Greenfields by the Bay Lii~ Station
Page 2 of 5
DEVELOPER FUNDING
The Developers will pay for 100% of the cost of design and installation of the
temporary pumping system improvements with electrical upgrade estimated at
$51,995.60, EXIIIBIT 3.
b. The Developer will not be reimbursed for this temporary pumping system from
the Sanitary_ Sewer Trunk System Trust Fund or other funds.
The Developers will either pay the proportionate share of cost as defined in
EXHIBIT 4 to the City or place in escrow with a title institution acceptable to the
City provided the following requirements are met:
i. Payment is made within 10 calendar days to the City or title institution;
ii. The title institution notifies the City when the required mount has been
deposited:
iii. The title institution requires City inspection, testing and acceplance prior
to release of payment for required temporary improvements.
ADDITIONAL DEVELOPMENTS:
The City agrees to collect the proportionate share of the cost as identified at thc time
of recording a plat from any additional developer that opts to submit a plat during the
time the temporary pumping system is operational and Master Plan Lift Station and
new Force Main is not accepted by the City. The proportional share will be based on
the number of lots to be added to the total included in this agreement_
The City agrees to reimburse the Developers their proportional share of the payment
based on number of lots.
INDEMNIFICATION:
Developer shall indemnify and hold harmless the City, its agents, officers and
employees ("Indemnities") from all suits, actions or claims and from all liability for
any and all injuries or damages sustained by any person, including without limitation
workers compensation, personal injury or death, arising from or incident to this lift
station and force main construction. 'Fo the extent allowed by law, the City will
indemnify and hold harmless the Developer from any and all liability for any injuries
or damages as a result of the installation, construction and maintenance of the
temporary pumping system with electrical upgrade.
This agreement shall become effective and shall be binding upon and shall insure to
the benefit of the parties hereto and their respective heirs, successors, and assigns
from and after the date of execution.
Developer Agreement for Temporary [mprovemems
Greenfields by the Bay Lilt Station
Page 3 of 5
EXECUTED IN DUPLICATE originals, this day of
,2005.
DEVELOPERS:
Alireza i
President, ~;ent. Inc.
Alex ~ ......
President, Springfield Development, Inc.
Micha~ddges --
Presid~t, GCE Properties, Inc.
STATE OF TEXAS
COUNTY OF NUECES §
]'his ins~mn'aent was acknowledged before me M ,3~ I ttr2 ,2005, by
Alireza Mosta~hasi, as President, of Al Development, Ind., a Tex~ Corpora, on.
K A SIMON
;~ fl;4"*llr'hdF/'J/?'mrYi To~ I Notary Public, S. tate of Texas
STATE OF TE~S
COUNTY OF NUECES §
This instrument was acknowledged before me on, 2005, by Alex Azali, as Presiden[, of
Springfield Develol~.ment, l. tlC,. a I~x~ Corporation.
mo~,~, Notary Public, State of Texas
STATE OF TEXAS
COUNTY OF NUECES §
~lhis instrument was acknowledged before me on lM;,q I/-, , 2005, by
Micl-mel L_ Bri4ges, as ~9[ 9_CE Properties, Inc,, a Tex~ Corporation_
~tk~_~v*~,~mm'~l~ // .,-~ - / /
~ .,~--'~ M~RKA. S~MON Ili ~! // /~ //
~ [~K,.~J~' l1 Notary Public, S me of Texas
Developer Ag~ement for Temporary Improvements
Greenfields by the Bay Lift Station
Page 4 of 5
ATTEST:
Ammndo Chapm City Secrct~zy-5
THE crI'Y OF CORPUS CHRISTI
APPROVED:
[h dayof
By:
Assis~t citY%mey
.2005
SFATE OF TEXAS
COUNTY OF NUECES §
This instrument w~s acknowledged before me o~ /~~O , 2005, by George
K. Noe, City Manager of the City of Corpus Christi, Tex{~. a Texas home-rule municipal
corporation, on behalf of said corporation. .f. ~/~~
Notary Public, Slate of Texas
Developer Agreement for Temporary Improvements
Greenfields by the Bay Lift Station
Page 5 of 5
;~ Green Fields by ~e Bay Lift
S~on
Se~ce
Area
PUMPS
DV 150e V~cu~m Asset Sel]'-Pr£mmg Pump
Performance Curve for DV-150e
Flow s lnrhcated Are A[ llY Suchon Lig In Clema Wa[er
Page' 1 of I
Cost Estimate
Greenflelds By the Bay Lift Station Temporary Improvements
Item Description
1 Pump, DV 150 Skid Mounted w/controls
2 Float Controls
3 Misc. Piping and F~ngsNalves
4 Inbound Freight
5 Electrical ConduiLANire
6 Pad MounFElectdcal
7 FreightJDelivery of pump
Quantity Unit Unit Cost
2 EA $18,350.00
2 EA $29.00
1 LS $5,750.00
2 EA $120.00
520 LF $6.00
1 LS $1,000.00
1 LS $1,500.00
Construction Sub Total
Engineenng (7.5% of Construction)
TOTAL
Total
$36,700.00
$58.00
$5,750.00
$240.00
$3,120.00
$1,000.00
$1,500.00
$48,368.00
$3,627.60
$51,995.60
[~!_hibit-3 '
Page 1 of 1
SOURCE OF FUNDS
SUBDIVISION
Morningstar Unit 2
South Fork Unit 3
South Fork Unit 4
South Fork Unit 5
Temporary Improvements Total
Proportionate Cost
LOTS
SHARE%
NOT REIMBURSED
DEVELOPER
Temporary Improvements
45 17 $ 8,863
57 22 $ 11,226
6O 23 $ 11,817
102 39 $ 20,089
264 100 $ 51,996
Exhibit 4
Page 1 of 1