Loading...
HomeMy WebLinkAboutC2005-252 - 5/31/2005 - Approved CHANGE ORDER Department of Engineering Services City of Corpus Christi, Texas CHANGE OR.DER NO: 6 Operating Department: Wastewater FUNDING SOURCE: .~t~Cql~ ' q~C0- (~(30-CONTRACTTIME: 308C.D. DATE: May 20, 2005 Name of Project: 30 Gravn, Sewer Line, Greenwood to Richter Ditch - P R. 7196 Contractor: Garver Construction, Ltd. CHANGE SEE ATTACHED BI~EAKDOWN ADD $433,336_10 DEDUCT TOTAL NET: $433,336.10 Why was this change necessary? (If left off the plans and specifications, explain why'? Additional work is required to provide land owners access to water and wastewater utilities in this area which are currently not available. How can similar changes be avoided in the future? Unavoidable· A CONTRACT PRICE $ 2.524,704.00 B TOTAL CHANGE ORDER (inc. current) $ 535,552.10 C NEW CONTRACT PRICE $ 3,060,256. [0 D THIS CHANGE ORDER $ 433,336.10 E PERCENT TOTAL CHANGE (B/A) 21.21 % F PREVIOUS TIME AUTHORIZED 93 C D. G ADDN'L CONTRACT TIME THIS CI-L~NGE ORDER 90 C.D H TOTAL ADDITIONAL TIME 183 CD. JS CHRISTI, TEXAS o.r of Enlifinl:ering ~ervic.~. j 7{/ ~l~ S~lbg %ir. of Management & Budget ~ ~ - L~al CITY OF COR] D~ Fe APPROVE 05131105 '_ ....... ;---~ a M2005-177 SEC':, 7~[*¥ '-~/L~ · %qM~N DO CHAPA Project Manager By: Title: ' ' Garver Construction CHANGE ORDER NO. 6 30' Gravity Sewer Une, Greenwood D~. to Richter Dt'tch P.R. No. 7196 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 CHAN~E Acid the following Item~ lo Ute contraot: PART A - SANITARY SEWER Mobilization - 1 L.S. O $5,750.00/L.S 4' Dia SS MH 0-6 - 4 Ea. O $3,680.00/Ea. 4' Dia. MH>6' - 15 V.F. O$25~.75/V.F. 5' Dia. SS MH 0-6 - 2 Ea. O$6,095.00/Ea. 5' Dia. MH>~' - 18 V.F. 05431 25/V F. 8' SS PVC SDR26 8-10 - 456 L.F. 0~$51.75/L.F. 8' SS PVC SDR26 10-12 - 53 L.F. O$57,50/L.F. 12' SS PVC SDR28 10`12 - 767 L.F. O ~o4.40/L.F. 12' SS PVC SDR26 12-14 - 410 L.F. O$79.35/L.F. 12' SS PVC SDR26 16-18 - 492 L.F. O$110.40/L.F. 6' De~o SS Sen, ice Connection - 9 Ea. O51,380.OO/Ea. 12' Cae - 1 EA. - O$575.00/Ea. Tnmch Safety - 2178 L.F.- ~$1.15/L.F. ACP Driveway Repair - 159 L.F. O$44.85/L.F. Caliche Ddveway Repair - 30 L.F. O$16.1Q/L.F. Concrete Driveway Repair- 70 L.F. O$90.85A..F. Remove & Replace Fence - 50 L.F. ~$57.50/L.F. SWP3 - 1 L.S. @$4,600.00/L.S. Wellpo~nts - 1000 L.F. O$36.80/L.F. Ulilily AJlowance - I L.S. @$5,750.00/L.S. Remove exJeling s~olic - 1 L.S. ~$6,900.00/LS ADD $5,750.00 14,720.00 3,881.25 12,190.00 7,762.50 23,598.00 3,047.50 49,394.80 32.,533.50 54,316.80 12,420.00 575.00 2,504.70 7,131.15 6,359,50 2,875.00 4,600.00 5,750.00 6,900.00 SANITARY SEWER SUB-TOTAL: $293,592.70 CHANGE Add t~a following Items to Ihe contract: PART B - WATERLINE Mobilizalion - 1 L.S. 0$5,750.0~L.8. 2 12' C900 DR 18 PVC - 1,660 L.F. 3 12 X 12 Tee, DI - 1 Ea. 4 12 x 8 Reclucer - 1 Ea. 05477.25 5 12' 45 Degree Bend - 4 Ea. O $575.00/Ea. 6 12' Ph.~g - 1 Ea. 7 12' Gate VaJve - 3 Ea. O51,955.00~Ea 6 Sen, ice line connection to meier - 7 Ea. O $690.00/Ea. 9 Fire Hydrant assembly - 4 Ea. O$4,197.50/Ea. 10 Trench Safety - 1,660 L.F. O51.15/t_F. 11 ACP dri~way repair - 89 L F. O$44.85/LJ=. 12 Callche driveway repair - 30 L.F. O$16.10/L.F. 13 Concrete driveway repair - 40 L.F. 14 Rerno~,~ & replace lenco - 50 L.F. O$57.50/L.F. Ll~ily Alh:~ance - 1 L.S. WATERLJNE SUB-TOTAL: GRAND TOTAL: ApD $5,750.00 83,996.00 862.50 477.25 2,300.00 230.00 5,865.00 4,830.00 16,790.00 1,909.00 3,991.65 2,875.00 $139,743.40 $433,336.10 DEDU(~I'