Loading...
HomeMy WebLinkAboutC2005-288 - 6/21/2005 - ApprovedFUNDING SOURCE: 550910-4475-00000-180163 0~-40B0-00000-iB0iBB COI~'RACT TIME: 240 C.D. O~a':n9 Depmr~nent: Yale: I~.'E: June 16, 2005 H~.r~ = Ptoqect: Sou:hazde T:inmlllaa~on Ymter Mazn Ph 4 and 4A(8390 &nd 8425) C. on~r ~c'Lor: Ldug~lin- i'hyalJll, Inc. __ ;:id ~be fcll~ln9 to the Contract: ,BEE ATTAinMENT NC. 1. i-du,:t the foll~wing tr~ ~e ~tract: .~ A~ ~. 1~ ~.dd ;2' wm=eE line oxte~on for R~ Fzeld I~atriol Pirk l.;'-a. ~ to ;he Contraci:; 85,365.20 83,568.36 127,230.00 Ls_~z_.nTrAa~r ~o. ~)_L .................... avoided in the f=cure? The -~hingea co~tld ~ m~ ~gh ~mttug ~r~t during ~bo ~mn p~riti~ ~. A. ~ ~ ........................ $7,139t820.00 ~. ~ ~ ~ (laid3. ~) ..... $ 41,70].56 C. ~W ~ ~ ..................... ~7f181,523.$6 p. qumTff ~ ~ .................... $ 41,703.56 E:. IgBf~T ~ ~ ('B/A) ............. 0 ,BO% F. ~ AI~'L T~ Ad~, ?~ ......... 0 C.D G. A~3'L ~ ~ qug~m ~ ~m~rm.. 4~ C.D. W.. ~ ~IT3~ TIJ~ .................. 45 C.D. CONSTRUCTION COSTS FOR CHANGE ORDER No. 1 SOU'I"HSIDE WATER TRANSMISSION MAiN Pf-IASES 4 AND 4A (3~ ~ ~ Coat Total 14,2(X) LF 0_~4 ~,4~..74 1 I..8 I,~,~43.~3 1 LB 18,024.04 1~i,034.04 2 EA $1,100 4 EA ~8,063.71 ~2,254.84 1 EA $1,~6.{~ ~1 1 L,S $14,478.79 I)14,4'~.'~ 2 EA ~40 2 EA ~,000 -~IQ,000 I A'I-FACHMENT NO. I I · b k b b m Ii k Ii. MI m '~.~.~ ,~[~,..hment _s ~_o be reviewed .n conjunction with Attachment No.'e 1 and 2. I~mm ~1, B1 m~ ~ - The ~olyethylene (PEJ wrap was r~ tn ~e bid ~nts as a ~d breaker with the ~m~nt st~ilize~ sand f~ Statio~ 113+00 to 255+00. SJbse, lUentiy It was dete~n~ that ~he ~ wrap was not ~~ for ~ wi~ ~e ;~re~.~d c~nt ~th~lc prote~ion syst~. ~ ~ wr~ was ~le~ ~ m ~ b~nt %leaker was s~st~t~ted for use as ~nd breaker ~tween ~he concrete pi~ end cern' s~abi/lz~ sand ~;. lleu ,,~ Lhe PE wrap ~ S~tion 113+00 to S~tion 255+00. X~ A~ ~ m~ - Welds were not required at these locations bas~ on calculations ?~rrtcd out during the design phase. During construction it was not~ that the ~e wou.d be buried fairly d~ep un,er future drainage courses and would be difficult to eNcav%~e to make red, irs in the future. As an ad,ed safety feature to m-aura Joi~t integ: '.fy the City Water Depar~_~ent decided to constr~ct the pi~e u~ing f~ll _-%~.-~?ferential we]ds at these locations. Xi~m A4, ~ ---~ B~ - The desiqn of SPA 30 (a proposed master plan sanitary sewer pro.~e.?t) was on going through out the design phase of the Southsidm Water w~ansnlsnton Main Phases 4 and 4A (SSTM). To accommodate SPA 30 design cJ~an~es that we~w mp]mmented after the SSTM bid, a 42" casing pipe was added at Station 233+00 ant a' Station 243+90, 22.5 degree bends were a~ed at Station 232+90 and at Station 232+.~'-. ~nd 0.1 ~o 5.0 bells were deleted at Statio~ 233+00 and at Station 233+43 's~- Al t~chment No.'s 4 ,,nd 5). I~ && To s~mpllf¥ future pipe drainin~ o~erations the Cit~ dec4ded to take advantage of eMisting surface water drainage ~oints along the a~i~r~en~ of the water tran-m~sston main. In order to dischar~m to the surface water d£aana.ue polnts we redes|~ned som~ of the blow off valves dss;g:, t, ~he BOV's used on the Lake TeKana Pipeline (see Attachment ~o. 6). X*---- A? - Based on c-~nts fro~ the TCEQ a water s~m?ling station was added mt the inter,ecl [on of Rodd Field Road and Yorktown Blvd to [acilitate water sam~lin~ for bactexto]o~ical and chlorine residual testing (see AttmcJ~nt No. 7). X~~m Welds were not required at these locations base~ on calculations carried out during the ~esign phase. As an added safety feature to ensure Joint inte~rit¥ the T~'.~ Water D~partment decided to construct the pipe using full circ,~*erential welus at these locations. X~A9 - As an ack/ed ~afety feature, to ensure that Joint c~ntinuity was ~mlnta_i_ned dur~nq plec~)ent of the water main pipe inside the steel caain~ ~ipe, the City Water E)epartment decided to construct the pipe w~th full cir~erential wmlded Joints. ATI'ACHMENT NO. 3 I~-- ~3 ~ M D..rlnq '.he ~(.~tqr, phaa- ~he City D*,va!op~nt ~i~m ~rt~nt ~%~ ted that an ]8" a~eel ('~n,] ;,[~ be lnsrallet at Station 224+94 .:T.~el :a:dng pi~ ~ inst~ll,~ .,t S~ation 2'72+08 for fut~ ~e-~ ~ ~ssi~s. ?~=se ~.~Jngs ~re ~let*~ fr~ ~e project s~ ~e · ~,.'...- ~e:vl,.lng Rodd V:llaqe chaT,ged ana the ~stngs were ~ longer re.ired at Xt~ ~ · Mo~e up to date sanitary sewer master plan information wee acquir~ after '~e pruject bid. B~sed .'Jn a review of this information it was detar~ined that the drop et Station 272+00 was not required. Based on information provided by En.][n~,r;ng Services it was also determ/ned that a drop would b~ requir~ et Station : ?.l, '. t J go under a prof,osed future drainage structure. The dr~ at Station 272+00 w%~ m ~e.~ [o Station 274-50 and the associated 48" casing pipe was deleted since it w~ :: l,)nger required ;see Attachment No. 8). · x~ ~ - During a detailed review after the project bid it was dete.~nad City #ater D~par~_ment could effectively operate the pipeline with fewer After ~_be project bid Development Services requested that a 12" water line be exten,~ed fro~ the existing 12' water line on Yorktown Blvd to service the Bz~d Field lands'rial Park (see Attac2rm~nt No. 9). I:~ge 2 c~2 ~ ~ ) mm m ~ ~ ~ ~m mmm m mm m m mmm ~ ~ mj~+~ ~ m ~ m m m m m m m m : m m - ~mem~m _ ~m m ' : m Fm m mm mm mm~-- ~ m.' ...... ~m~~ ~.m mm m m ' ' ....... ~ ~o~-.~~ ................... m ...... m ~ ~, m, m~ ~m m ~_._m m ml~ ~ '~ ( --'/ --) X~ ' ~ / .... mmm ~ , ~ 'm ) '~ m ' '~'''m'~ ~ m mm m'~ '4.z~ ~ , m~Y mmm mm m:.mm mm. ~ ~ ~ mm~ ....... ~ _ ~ ..... ~---m~ ............ m~,m ~ .... ' i'm ~ ~ ~ m : m m m m mm ~ :X ~ ~ ~~m m m mm :m ~ ~ ' ~ ~ m ~ m m : ~ m ~ m m m m ~ ~ m ..... ~ ~ ~ ~ m ~ mm ~ ~ ~mm ...... ~ ~m~ ~~m m m ~ ~ ~ mm ~m m mm ~m mm m m ]~! f ~ ..... 232.+__0~.. ......... ~+~ ~ ~ +mm-- ( \¥,.,'1. ' A'rTACH~E],~IT NO. 4 I i.CL',PSE NO. 88WC SAMPLING STATION All stations shall be enclosed In a Iockable, nonremovable, etutninum- cast housing. When opened, the station shall require no key for operation, and the water will flow ,n an el brass watervmy. All w~'klng parts will be of brass and serviceable ~,um above ground w~[h no digging. (Optional: If desired,. 1/2" brass drain tube sttaJl be wll~in the locking cowr) A 1" ball vane ~ co~bul the water flow, and be located befo~ the sempIIng bibb, as manufactured by Kupferie Foundry MO 631O2. { 'ATTACHIk~N'I' NO. 7 A I ,"":'I.,. ,'1'1' .... ,lilt .,I ,,j