HomeMy WebLinkAboutC2005-661 - 12/13/2005 - Approved
CITY OF CORPUS CHRISTI
AMENDMENT NO.4
CONTRACT FOR PROFESSIONAL SERVICES
The City of Corpus Christi, Texas hereinafter called "City", and LNV ENGINEERING. INC.,
hereinafter called "Engineer", agree to the following amendments to the Contract for
Engineering Services for Oso Water Reclamation Plant Structure/Process Improvements
(Clarifier Bridaes/Aeration Basin/Fine Bubble Diffuser), as authorized and administratively
amended by:
Ori inal Contract
Amendment No. 1
Amendment NO.2
Amendment NO.3
December 17, 2002
Se tember 26, 2003
Au ust5, 2004
October 11, 2004
Motion No. M2002-420
Administrative A roval
Administrative A roval
Administrative A roval
$256,600.00
$6,000.00
$19,950.00
$24,900.00
Exhibit "A", Section 1. Scope of Services, Phase 2 - Clarifier 2,3, and 4 Improvements
(Project No. 7271), Part A. Basic Services, Item No. 1 Preliminary Phase, Item No. 2
Design Phase, Item No.3 Bid Phase, Item No.4 Construction Phase shall be modified to
include additional Basic Services to design the recommended improvements for Clarifier
Bridges No.5, 6, 7, and 8 at the Oso Water Reclamation Plant.
Exhibit "A", Section 1. Scope of Services, Phase 2 - Clarifier 2, 3, and 4 Improvements
(Project No. 7271), Part B. Additional Services, Item No. 1 Permitting, Item No. 3
Topographic Survey, Item No.5 Construction Observation Services, Item No.6 Start Up
Services, Item NO.7 Warranty Phase shall be modified to include additional Additional
Services to design the recommended improvements for Clarifier Bridges No.5, 6, 7, and
8 at the Oso Water Reclamation Plant.
This project consists of the replacement of four (4) rectangular clarifier bridges,
including rail replacement and electrical festooning system. Also included in this project
is concrete crack repair for each clarifier basin.
Exhibit "A", Section 3. Fees, Phase 2 - Clarifier 2, 3, and 4 Improvements (Project No.
7271), Part C. Summary of Fees is modified and is attached as Exhibit "8" Summary of
Fees.
All other terms and conditions of the December 17, 2002 contract between the City and
Engineer, and of any amendments to that contract, which are not specifically addressed herein
shall remain in full force and effect.
Dan
Pr ident
801 Navigation, Suite 300
Corpus Christi, TX 78408
(361) 883-1984 Office
(361) 883-1986 Fax
0).."?fQ5.:.Y.LJ. AU: nUI',iLL.
:;~ CQlfNl,;IL ....--.J~/12l:5
.._. .-.. ___.. ftL.
30AMENDMENT NO 4\AMENDMENT NO 4 -;:F~.~'T;;P;-r-IZ-
CITY OF CORPUS CHRISTI
By ~~~ I~()S-
Ronald F. Massey ~ate
Assistant City Manager
ATTEST
By ~
Armando Chapa, City Se etary
2005-661
12/13/05
M2005-413
L'\V Engineering
By
AMEND. NO.4
Page 1 of 2
RECOMMENDED
BY~/ ~ Z ~~/~ Jz/FI~:r
g~. scobar, P. E. Date
irector of Engineering Services
Project Number: 7271
Fund Source: 550950-4500-00000-150143
Encumbrance Number: E7230ASM
i dJSERS2IHOMf-'VELMAPIGEN\WASTEWATER\7230\AMENDMENT NO 4iAMENDMENT NO 4
LNV ENGINEERING
ENGINEERS & CONSULTANTS
r )ctobcr 24. .'1 )05
VIr Angel Escobar, P.E-.
DIrector of Fngmeenng ServIces
(It v of Corpus Christi
I) O. Bl)x 91"7
(orpus Christi. Texas 78469-9277
RL' Amendment to ProfessIOnal ServIces Contract at the Oso Water Reclamation Plant:
Oso Water Reclamation Plant Structure/Process Improvements
Clanfier Bridges/Aeration Basin/Fine Bubble DIffuser
Phase II - Clarifier 2, 3, & 4 Improvements, Project No. 7271
Clarifier 5, 6, 7 & 8 Improvements
Dear Mr. Escobar:
Please allow this letter to serve as our formal request to amend our Contract to include Professional Services as
detailed in the attachments for the above referenced project. The total Basic Services fee is $181,150.00. The
total Additional Services fee is $171,000.00. bringing the total fee to S352.150.00. The estimated construction
cost is '53,~Q 1,000.00.
. Ih~ folloWIng table shows a breakdown of fees for the Origmal Contract and Amendment No.4:
Original Contract Amendment No.4
(Clarifier No.2, 3, & 4) (Clarifier No.5, 6, 7 & 8)
Fee ! % of Construction Fee % of Construction
$ -T- $
40,000+ 2.0% 55,000 1.4%
$ 84,500 I 4.2% $ 50,000 1.3%
$ --.--+ 0.2% $ 5,000 0.13%
4000 I
, + ----
$ 20,000 + 1.0~/o $ 71,150 1.8%
----.
$ 148.,50~ __L 7.4'~o $181,150 4.7%
-~_.-
Activity
.[Preliminary Phase
2. DeSIgn Phase_~____
\ Bid Phase
-"-"-""--_.~-----''''-''-'---'--'----''--'.-
4. Construction Phase
Sub-Total Basic Services
rhe construction cost for Clarifiers No.2. 3 & 4 was $2,007.600.00. Bids were received for this project in June
2004. The L'stimated construction cost for Clarifiers No.5, 6, 7, & 8 IS $3,821,000.00. This anticipated
construction cost is based on the previous project and includes intlation and contingencies for the clarifier bridges.
I he antiCIpated schedule is to award the constmction contract in August 2006.
,\Iso included m this submittal are the Task LIst and City Council Agenda Summary.
] f YOU have any questions, please feel free to give me a call at (361) 883-1984.
DSL/jns
.\ttachments
i \ 'IT;IUS ( :l1-istif: 16l' \menJmern'i .\mendlTlcnt ~ll ..1 1 'J-III-: ,.; (\~'.l'I I ,tt!\:-nd '\;: -1 E I bl)] 13 Jill'
EXHIBIT "A"
Page 1 of 5
801 NAVIGATION, SUITE 300 · CORPUS CHRISTI, TEXAS 78408 · (361) 883-1984 · FAX (361) 883-1986
OSO WATER RECLAMATION PLANT STRUCTURE/PROCESS IMPROVEMENTS
CLARIFIER BRIDGES/AERATION BASIN/FINE BUBBLE DIFFUSER
PHASE II - CLARIFIER 2, 3, & 4 IMPROVEMENTS, PROJECT NO. 7271
AMENDMENT NO.4
SCOPE:
Amend Original Contract as follows under Exhibit A-1, Basic Services;
Task List.
ADD:
Design the recommended improvements for Clarifier Bridges No.5, 6, 7 &
8 at the Oso Water Reclamation Plant. This project consists of the
replacement of four (4) rectangular clarifier bridges, including rail
replacement and electrical festooning system. Also included in this project
is concrete crack repair for each clarifier basin.
FEES:
The fee for performing the above work is as follows:
Basic Services
Preliminary Phase
Final Design
Bid Phase
Construction Phase
Total Basic Services:
$ 55,000.00
$ 50,000.00
$ 5,000.00
$ 71,150.00
$181,150.00
Additional Services
Permit Preparation (TCEQ)
Topographic Survey
Construction Observation Services (not full time)
Start-Up Services
Warranty
Total Additional Services:
Total Amendment No.4:
$ 2,000.00
$ 14,000.00
$148,000.00
$ 2,000.00
$ 5,000.00
$171,000.00
$352,150.00
EXHIBIT "A"
Page 2 of 5
SCHEDULE:
December 13, 2005
December 14, 2005
March 13, 2006
March 31 , 2006
A ril 3, 2006
Ma 29,2006
June 12, 2006
Jul 10,2006
Jul 24,2006
Au ust18,2006
Se tember 4, 2006
Se tember 27, 2006
November 14, 2006
December 2006
June 2008
Wednesday
Monda
Frida
Monda
Monda
Monda
Monda
Monday
Frida
Monda
Wednesda
Tuesda
Weekda
Weekda
EXHIBIT "A"
Pa e 3 of 5
OSO WATER RECLAMATION PLANT
STRUCTURAUPROCESSIMPROVEMENTS
CLARIFIER BRIDGES/AERATION BASIN/FINE BUBBLE DIFFUSER
PROJECT NO. 7271
AMENDMENT NO.4 - CLARIFIER NO.5, 6, 7, & 8 IMPROVEMENTS
TASK LIST
CLARIFIER NO.5. 6. 7. & 8 IMPROVEMENTS
1 ) Perform field investigation as required to define specific areas of
improvements and other applicable parameters required to complete the
items as shown on this Task List.
2) Attend and participate in project start and planning meetings (3 meetings)
with City staff to discuss planning and conceptual design. Gather information
and perform close coordination with Wastewater Department staff.
. These 3 meetings to include Consultant with OWNER:
(1) to review the scope of work
(2) to verify the OWNER's requirements for the PROJECT
(3) to review available data.
3) Develop a preliminary construction schedule and sequencing plan that
includes all the items as shown on this Task List. This schedule will include
procurement, construction, testing, coordination, and provision for minimum
interruption of services and construction schedules with planned Capital
Improvement Program (CIP) funding.
4) Prepare one (1) hard copy and one (1) electronic (pdf) copy of the Letter
Report including data collected and conceptual cost estimates for the
anticipated equipment, civil/site work, structural, and related construction
costs for all the items as shown on this Task List and make recommendation
to the City staff.
5) Review with City staff, revise, and furnish one (1) hard copy and one (1)
electronic (pdf) copy of final report. Obtain approval to proceed to Design
Phase.
The Engineer shall perform the above Services by considering the essential
project parameters including the following:
· Perform inspection of bridges and basins for Clarifiers 5, 6, 7, and 8 to
determine existing condition of the clarifiers.
EXHIBIT "A"
Page 4 of 5
6)
7)
8)
9)
. Determine sequence of work that minimizes impacts to plant operations
and fits within C.I.P, budget.
· Perform topographic survey of key structures, existing concrete wall,
inlets, bridge rails and top of structures.
· Provide recommendation on the most cost effective approach including
budget constraints.
Design Phase
. Provide one set of construction drawings in accordance with Exhibit A.
. Engineer to use plans and specs provided by the City as a guide.
· Note: This does not include a separate set of drawings for cleaning
Clarifiers 5, 6, 7 and 8 in order to do inspection.
Bid Phase
. Attend pre-bid conference
. Prepare addenda, as necessary
. Prepare bid tabulation and letter of recommendation
Construction Phase - provide one set of construction drawings.
. Perform monthly site visit
. Prepare Change Orders as required
. Prepare application for payment
Provide topographic survey of entire existing clarifier structures for Clarifiers
5,6,7, and 8.
10)
City to provide all existing drawings (original and as-built), contract
documents, and submittals.
11 )
During all phases of the project, provide a one-page monthly progress report
via email to the designated City staff by the fifty (5th) day of each month.
Provide an additional hard copy of the one-page monthly progress report with
the submittal of each monthly invoice.
EXHIBIT "A"
Page 5 of 5
'"
w
W
LL
LL
o
>-
0::
~
:;:
:;:
::>
'"
'"
I-
Z
w
:;:0::
ww
>fJI
0::>
o::LL
o.!!:
:;:0
;;)W
",-'
WID
UID
0::>
0::10
,,-W
_Z
wi<:
0::_
::>Z
1--
U'"
::>~
0::10
I-Z
"'0
1--
~~
-'W
"-<
Z_
0",
i=~
~8
<0::
-'10
~ffi
0::_
o::!!:
wO::
~:3
;:U
o
'"
o
co
o ~
r-- r-
~o:-t5
-..... '"
~ ~-2
Uo~
'" z c
l.~~
- c =>
~~O?
<I>(/)W
E - cO
~ i Q1
o E C)
a. ~ 2
.s2::
_ 0. C
ro E CD
5-0::
u'<:t ....
=> '0 C
tn~~
III ("f)" E
c -'"
";:;; N U
'" ~ '"
~~r:
o ro 2
~G~
~ ~ g
IwO
.-U)
~ ,:i :
~ CL if)
0.. <1:
I
Q.
t--
... N
-Nt--
~!:lei
.~Z
~g:-;
< ~
0.
~
t--
M N
. Nt--
~!:lei
. 0( Z
~if-;
~ ~
0.
t--
N N
- Nt--
~::lei
. 0( Z
~~-)
< ~
...
t--
~ N
.Nt--
OW .
Z",O
ci~Z
~...~
...
M
::.
M t--
f-Wd
U~Z
~:c-;
1-0.0
Z 0::
o 0.
U
-' ~
~ .....
Z N
a:;:~
O::fJlO
O<Z
g:a
0::
0.
-'
<
I-
o
I-
00000
00000
00000
~~~~g
iNN';';
;;~.-~;;
000000000
000000000
cic:ioooci6c:i6
o 0 000 0
'V 0 <DOT"" .-
L6 oi lli-.q-N cok
N O'l ..... V
~ N
000000000
000000000
6c:ic:ic::iddcicici
000000000
000000000
cicicicicicicicici
o 0 000 0
o 0 000 0
-q- ~ N~O ~-
N co ...... N
~ N
000000000
000000000
oooc:icic:ici6o
o 0 0 0 0
"<t 0 CD ...--~ .-
.--l{)MNN
~ N
000000000
000000000
ooocicici606
o 0 000 0
o 0 000 0
0i ::f ';j NLD ;::
00 0000
000000000
cic:iciaocidoo
000000000
000000000
ooooc:i6660
000000000
000000000
6060c:i0666
000000000
000000000
cicicicic:icicicici
o 0 000 0
'<t" 0 <D 0..- T"""_
r;o-) LCi r--:N"t--- l()
~"<t .....
000000000
000000000
ci6c:icicici6cic:i
000000000 0
000000000 0
cicioci6c:icici6 0
o 0 000 0 0
o 0 000 0 ~
'" ~- ~NU'"i i ;;
N
'"
000000000 0
000000000 0
ciciooocidoci ci
o 0 0 000
v 0 co ,....
..,-~U'"iMNN~lO~
~ N '"
'"
[) -E ~ ~
'" i: "lj E !,!
4)00 W :::J E> og~
~ :8o~ 0 ~~~cn(/) U)
III .ci::;: 0:>".58"<(_
~f~ ~~ ffi ~~J~o~I~~
~ ~,,8~ ~ ~~~~Io.ul
:;:.~~u~ ~c l~c~ w~
o::sclllE~ o(~<(ISco~c"~
W~@f0J ~~~18g~~~iJ
~~:B80 ~~oo~5s~eo
~ om ~_co.~I-WUW o.~
<,....N~~:::J O,....N~~~CO~ro~
10 W 0( W
'"
t--
N
Mt--
W'
I-~~
U:c .
~o.a
I- 0::
Z 0.
o
U ~
-' t--
~N~
8!:lei
o(Z
ita
0::
...
00000
00000
~oo6o
00000
00000
ciooed
00000
O,....,OQ)lO
to.n.-<<ici
~,....,.......-(j)<O
,-- ~ '"
o
t--
N
~t--
!:lei
~z
g:a
0::
...
00000
00000
cici60ci
OOlOLOO
C"\lNlD(>>D
a)t'-.....:~M
<A~ '"
~~~~~
00000
ggg~~
ui ci u1,........:
lOll) f"-..ro
<A ~
Igggo8
ciccicio
wooeD
DOO') en
ci"':..q--<<:t-
~ N
00000
00000
ciocicio
&9-00t()1O
C\Io,....m
W"":NOl-
00000
00000
cic:icicici
<AO 0
o 0
en <D
-'
~
I-
o
I-
00000
00000
ciaocici
OOll')1.O0
C\lt--tO(nll')
ai,....- Lri"';..,....-
,.~ N<Xl
00000
00000
00000
<A
00000
00000
cieiocio
00000
01.0001,()
ii"'i'I~
o
t--
N
~t--
!:lei
<z
iEa
0::
0.
00000
00000
oocicio
OOLOIOO
NC\I<OO)O
o;"':r:V.M
<A~ M
o
o
ci
o
<0
oi
~
o
o
ci
'"
o
o
ci
o
'"
'"
o
<0
'"
o
o
ci
o
<Ii
'"
'"
o
~ 0 I'"
-z 0
~ C M
~~~~
~~,....
:;;
o
o
g .~
~~~~
N(J)~""-
b"J-Oco.::
.- 0.0
E<(~
'0
<(
o
o
g o~
ci~~e
;;;:~ g~
E<(o
'0
<(
o
o
g.~
~~~~
(f).~ a.~
.- 0..0)
E<(o
'0
<(
o
o
o
o
<D
ill
'"
N
'"
g
g
o
N
;::
o
ON
NO
::"i'::
o~
ZN
c
o
.~
:;;
W
W
LL
o
W
N
0::
o
:c
I-
::>
~
-'
<
I-
o
I-
~ City of
~ Corpus
=- = Chnsti
~
CITY OF CORPUS CHRISTI
DISCLOSURE OF INTERESTS
City of Corpus Christi Ordinance 17112, as amended, requires all persons or firms seeking to do business with the City
to provide the following information Every question must be answered. If the question is not applicable, answer with
"N/A"
FIRM NAME: LNV Enqineerinq
STREET: 801 Naviqation, Suite 300
CITY:
Corpus Christi, TX
3. Sole Owner
ZIP: 78408
4. Association
FIRM is: 1. Corporation~ 2. Partnership___
5. Other
DISCLOSURE QUESTIONS
If additional space is necessary, please use the reverse side of this page or attach separate sheet.
1. State the names of each employee of the City of Corpus Christi having an ownership interest constituting
3% or more of the ownership in the above named firm.
Name Job Title and City Department (if known)
N/A
2. State the names of each official of the City of Corpus Christi having an ownership interest constituting 3%
or more of the ownership in the above named firm.
Name Title
N/A
3. State the names of each board member of the City of Corpus Christi having an ownership interest
constituting 3% or more of the ownership in the above named firm.
Name Board. Commission or Committee
Dan S. Levendecker
Water Shore Advisory Committee
4. State the names of each employee or officer of a consultant for the City of Corpus Christi who worked on
any matter related to the subject of this contract and has an ownership interest constituting 3% or more of
the ownership in the above named firm.
Name Consultant
N/A
CERTIFICATE
I certify that all information provided is true and correct as of the date of this statement. that I have not knowingly
withheld disclosure of any information requested; and that supplemental statements will be promptly submitted to the
City of Corpus Christi, Texas as changes oc~),W.'
Certifying Person: Dan S. Le en decker Title: President
Signature of Certifying Person:
y
Date:
///j"t1.s-
EXHIBIT "C"
Page 1 of 2
DEFINITIONS
a.
Board Member. A member of any board, commission or committee appointed by the City Council of the City of
Corpus Christi, Texas.
Employee. Any person employed by the City of Corpus Christi, Texas, either on a full or part time basis, but not as
an independent contractor.
Firm. Any entity operated for economic gain, whether professional, industrial or commercial and whether
established to produce or deal with a product or service, including but not limited to, entities operated in the form
of sole proprietorship, as self-employed person, partnership, corporation, joint stock company, joint venture,
receivership or trust and entities which, for purposes of taxation, are treated as non-profit organizations.
Official. The Mayor, members of the City Council, City Manager, Deputy City Manager, Assistant City Managers,
Department and Division Heads and Municipal Court Judges of the City of Corpus Christi, Texas.
Ownership Interest. Legal or equitable interest, whether actually or constructively held, in a firm, including when
such interest is held through an agent, trust, estate or holding entity. Constructively held refers to holoing or
control established through voting trusts. proxies or special terms of venture or partnership agreements.
Consultant. Any person or firm, such as engineers and architects, hired by the City of Corpus Christi for the
purpose of professional consultation and recommendation.
b.
c.
d.
e.
f.
EXHIBIT "e"
Page 2 of 2