HomeMy WebLinkAboutC2005-700 - 10/11/2005 - Approved
CSJ: 2142-01-017
2142-01-022
Project Name: Rand Morgan
Funding Category: 1
STATE OF TEXAS
COUNTY OF TRAVIS
~
~
ORIGINAL
LOCAL TRANSPORTATION PROJECT
ADVANCE FUNDING AGREEMENT
for Rand Morgan Road Improvements
THIS Local Project Advance Funding Agreement (LPAFA) is made by and between the State of
Texas, acting by and through the Texas Department of Transportation, hereinafter called the "State",
and the City of Corpus Christi, acting by and through its duly authorized officials, hereinafter called
the "Local Government."
WITNESSETH
WHEREAS, a Master Agreement between the Local Government and the State has been adopted
and states the general terms and conditions for transportation projects developed through this
LPAFA; and,
WHEREAS, the Texas Transportation Commission passed Minute Order 108812 and 109667 that
provides for the development of, and funding for, the project describe herein; and,
WHEREAS, the Governing Body of the Local <;3overnment has approved entering into this LPAFA by
resolution or ordinance dated l '-' i i. ",.) , which is attached hereto and made a part
hereof as Attachment A for developm~nt of the specific project which is identified in the location map
shown as Attachment B.
NOW, THEREFORE, in consideration of the premises and of the mutual covenants and agreements
of the parties hereto, to be by them respectively kept and performed as hereinafter set forth, it is
agreed as follows:
AGREEMENT
1 The period of this LPAFA is as stated in the Master Agreement, without exception.
2. Termination of this LPAFA shall be under the conditions as stated in the Master Agreement,
without exception.
3. Amendments to this LPAFA shall be made as described in the Master Agreement, without
exception.
4 Scope of Work
The scope of work for this LPAFA is described as rehabilitation of roadway and adding shoulders
from SH 44 to Leopard Street and construction of two (2) - twelve foot (12') travel lanes with a
fourteen foot (14') center turn lane from Leopard Street to IH 37.
2005- 700
I 01ll/05
Res026497
Page 1 of 4
Revised 6/13/05
TxDOT
CSJ: 2142-01-017
2142-01-022
Project Name: Rand Morgan
Funding Category: 1
5 Right of Way and Real Property shall be the responsibility of the Local Government, as stated in
the Master Agreement, without exception.
6 Adjustment of utilities will be provided by the Local Government as required and as stated in the
Master Agreement without exception.
7 Environmental Assessment and Mitigation will be carried out as stated in the Master Agreement,
without exception.
8 Compliance with Texas Accessibility Standards and ADA will be as stated in the Master
Agreement, without exception.
9, Architectural and Engineering Services will be provided by the State, as stated in the Master
Agreement, without exception. The State is responsible for performance of any required
architectural or preliminary engineering work. The Local Government may review and comment
on the work as required to accomplish the public purposes of the Local Government. The State
will cooperate fully with the Local Government in accomplishing these local public purposes to the
degree permitted by State and Federal law.
10. Construction Responsibilities will be carried out by the State, as stated in the Master Agreement,
without exception.
11. Project Maintenance will be undertaken as provided for in the Master Agreement, without
exception.
12. Local Project Sources and Uses of Funds
a. Project Cost Estimate: A Project Cost Estimate is provided in Attachment C. Any work done
prior to federal authorization will not be eligible for reimbursement. It is the Local
Government's responsibility to verify with the State that the Federal Letter of Authority has
been issued for the work covered by this Agreement.
b. A Source of Funds estimate is also provided in Attachment C. Attachment C shows the
percentage and absolute dollar amount to be contributed to the project by federal, state, and
local sources.
c. The Local Government IS responsible for all non-federal and non-state funding, including all
project cost overruns, unless otherwise provided for in this Agreement or through amendment
of this agreement.
d. After execution of this LPAFA, but prior to the performance of any work by the State, the Local
Government will remit a check or warrant made payable to the "Texas Department of
Transportation" in the amount specified in Attachment C as the local contribution for
Preliminary Engineering. The Local Government will pay at a minimum its funding share for
this estimated cost of preliminary engineering as stated in the Local Project Sources and Uses
of Funds provision of the Master Agreement.
e. Sixty (60) days prior to the date set for receipt of the construction bids, the Local Government
shall remit its remaining financial share for the State's estimated construction oversight and
construction costs and any others costs owing.
f In the event the State determines that additional funding is required by the Local Government
at any time during the development of the Project, the State will notify the Local Government
in writing. The Local Government will make payment to the State within thirty (30) days from
receipt of the State's written notification.
LPAFAShortGen.doc
Page 2 of 4
Revised 6/13/05
CSJ: 2142-01-017
2142-01-022
Project Name: Rand Morgan
Funding Category: 1
g. If any existing or future local ordinances, commissioners court orders, rules, policies, or other
directives, including but not limited to outdoor advertising billboards and storm water drainage
facility requirements, are more restrictive than State or Federal Regulations, or if any other
locally proposed changes, including but not limited to plats or replats, result in increased costs,
then any increased costs associated with the ordinances or changes will be paid by the local
government. The cost of providing right of way acquired by the State shall mean the total
expenses in acquiring the property interests either through negotiations or eminent domain
proceedings, including but not limited to expenses related to relocation, removal, and
adjustment of eligible utilities.
h. The state auditor may conduct an audit or investigation of any entity receiving funds from the
state directly under the contract or indirectly through a subcontract under the contract.
.() . Acceptance of funds directly under the contract or indirectly through a subcontract under this
. \ J \9 contract acts as acceptance of the authority of the state auditor, under the direction of the
. "1,,. leaislative audit committee. to conduct an audit or investiqation in connection with those funds.~
A.lentity that is tCE' subject of an audit or investigalion 'TIust ::.rovide the State Auditor with access to any information the State Auditor consl'ders I t t h' t' t' or audi
" . re evan 0 t e mves Iga Ion ~
o 13. Document and Information Exchange. The Local Government agrees to electronically deliver to ,...3
the State all general notes, specifications, contract provision requirements and related
documentation in a Microsott@ Word or similar document. If requested by the State, the Local
Government will use the State's document template. The Local Government shall also provide a
detailed construction time estimate including types of activities and month in the format required
by the State. This requirement applies whether the Local Government creates the documents
with its own forces or by hinng a consultant or professional provider.
14. Incorporation of Master Agreement Provisions. This LPAFA incorporates all of the governing
provisions of the Master Advance Funding Agreement (MAFA) in effect on the date of final
execution of this LPAFA, unless such MAFA provision is specifically excepted herein.
15. Insurance. If this agreement authorizes the Local Government or its contractor to perform any
work on State right of way, before beginning work the entity performing the work shall provide the
State with a fully executed copy of the State's Form 1560 Certificate of Insurance verifying the
existence of coverage in the amounts and types specified on the Certificate of Insurance for all
persons and entities working on State right of way. This coverage shall be maintained until all
work on the State right of way is complete. If coverage is not maintained, all work on State right
of way shall cease immediately, and the State may recover damages and all costs of completing
the work.
16. Signatory Warranty. The signatories to this agreement warrant that each has the authority to enter
into this agreement on behalf of the party represented.
LPAFAShortGen.doc
Page 3 of 4
CSJ: 2142-01-017
2142-01-022
Project Name: Rand Morgan
Funding Category: 1
IN TESTIMONY HEREOF, the parties hereto have caused these presents to be executed in
duplicate counterparts. r/ 'i: 'Z 44J
t.,-#. tJ (p, I AUIMOaUW.
I.. -~..._.---- .,,, IlID.~'
!" ~1l._....._....L____
It-[
... .......................--
SEr..n AlfV-cfL
By:
(Si
Title
l .:
,,( +~ .', " - r'c,.:,
.. , I '--f J i.! \. L',.-r -.- . i "
I. I '( u ~Ofll1
Date: \ L AlTEST AflMANDO~;:'-(:) -~
THE STATE OF TEXAS CITYSECRET.4RY
Executed for the Executive Director and approved for the Texas Transportation Commission for the
purpose and effect of activating and/or carrying out the orders, established policies or work programs
heretofore app~ved and authorized by the Texas Transportation Commission.
By: ~?~I~a~:::ection
Office of General Counsel
Texas Department of Transportation
Date: &~P~A I') ;)..,(:')0..5-
LPAFAShortGen.doc
Page 4 of 4
Revised 6/13/05
RESOLUTION
AUTHORIZING THE CITY MANAGER OR HIS DESIGNEE TO
ENTER INTO A LOCAL PROJECT ADVANCE FUNDING
AGREEMENT (LPAFA) FOR RAND MORGAN ROAD
IMPROVEMENTS MADE BY AND BETWEEN THE STATE OF
TEXAS, ACTING BY AND THROUGH THE TEXAS
DEPARTMENT OF TRANSPORTATION, AND THE CITY OF
CORPUS CHRISTI.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF CORPUS
CHRISTI, TEXAS;
SECTION 1. The City Manager or his Designee is authorized to enter into
a Local Project Advance Funding Agreement (LPAFA) for Rand Morgan Road
Improvements made by and between the State of Texas, acting by and through
the Texas Department of Transportation, and the City of Corpus Christi.
ATTEST:
~
Armando Chapa
City Secretary
APPROVED: October ~ I 2005.
OF CORPUS CHRISTI
RESO 4 Rand Morgan.doc
A"'A~l-\&JT A
\pf ~
02R497
CorpU~hristi, Texas
~of
a-(~
,2005
The above resolution was passed by the following vote:
Henry Garrett ;
Brent Chesney
Melody Cooper ~
Jerry Garcia a:!-
Bill Kelly {~
Rex A. Kinnison 4
John E. Marez
Jesse Noyola ~
Mark Scott
Arr"c..~M&JT A
20 ~ 2-
RESO 4 Rand Morgan.doc
026197
ide Mproject \councilexhlbits \exh6085/624 1. dwg
'-
",.
!
-~ }--
\....-/
PROJECT LOCA TlON
~~
~
~
Fw. 62.
--
'"
~
: II ·
~ -' --"'"-<< !!
LoeA TION MAP
NOT TO SCALE
NUECES RIVER
/
/
_ ;[uu
~:J?
. "-
'...
o
n::
I
z
jl
Cl::
01
::::<
01
z
~I
PROJECT SITE
Cl
a::::
Cl
o
o
;=
::.::
IX
<(
--'
u
AGNES
SEDWICK RD
vi
HWY 44
------I
N
~I
N
:::::;:1
.!:=.-
VICINITY MAP
NOT TO SCALE
~
N
~
N
(
ATTACHMENT "B"
CITY OF CORPUS CHRIST/, TEXAS
DEPARTMENT OF ENGINEERING SERVICES
RAND MORGAN RD (FM 2292) FROM HWY 44 TO
LEOPARD ST (# 6085)
RAND MORGAN RD (FM 2292) FROM LEOPARD
ST TO IH 37 (# 6241)
PAGE: 1 0 f 1
DATE: 08-16-2005
~
--
- -
- -
~
CSJ: 2142-01-017
2142-01-022
Project Name: Rand Morgan
Funding Category: 1
ATTACHMENT C
Project Budget Estimate and Source of Funds
There are two (2) project numbers set up for the two (2) sections to be improved along this roadway.
The locations of both Projects are on FM 2292. Project 2142-01-017 is described as rehabilitation of
roadway and adding shoulders from SH 44 to Leopard Street. The second project, 2142-01-022,
consists of the construction of two (2) - twelve foot (12') travel lanes with a fourteen foot (14') center
turn lane from Leopard Street to IH 37.
The total estimated construction cost of the two (2) projects is $2.800.000. The Local Government
will be participating in the project by providing the right-of-way required for this project and also any
utility adjustment and/or relocation costs.
Below is an estimate and source of funds for the project.
Description
Total
Estimate Cost
CSJ-2142-o1-o17
Rehabilitation of roadway $1,820,000 80% $1,456,000 20% $364,000 0% 0
and add in shoulders
CSJ-2142-01-o22
Construction of 2 travel 980,000 0% 0 100% 980,000 0% 0
lanes w/curb & utter
Direct State Costs - 11.5% 322,000 80% 257,600 20% 64,400 0
(including plan review,
ins ection and oversi ht
Indirect State Costs - 6.21 % 173,880 80% 139,104 20% 34,776 0% 0
(no local participation
required except for service
ro' acts
TOTAL $3,295,880 $1,852,704 $1,443,176 $0
Engineering and contingencies charges will be based on actual charges.
It is understood that the proposed improvements will be done by the State. This is a construction
estimate only, final participation amounts will be based on actual charges to the project.
LPAFAShortGen.doc
Page 1 of 1
Revised 6/13/05
.~....--~
I Texas Department of Transportation
PO HOX 4907 . CORPUS CHRISTI TEXAS 78469-9907. (361) 808-2300
January 12, 2006
JAN 1 ~ 200~)
FN(;lf~i:~EH
City of Corpus Christi
Angel Escobar, P.E.
Director of Engineenng Services
P.O. Box 9277
Corpus Christi, TX 78469
RE: Rand Morgan Road Proj ects
CSJ 2142-01-017
CSJ 2142-01-022
Dear Mr. Escobar;
We have received the fully executed Advance Funding Agreements for the above referenced
projects and I am forwarding your original copy of the agreement for your files.
If you have any questions or need additional information concerning these agreements, please let
me know.
Sincerely,
. 1,1.\"
1 (\,( " 1(, ~
Sonya ~. ~opez- osa'
Special Projects Coordinator
I
II -
,i \/r1.' ,r /'\../
;,.-1'. .,
,0
Enclosure
cc: Martin Horst, PE.
David Chapa
Project file
4n Equai Opportunity Employer