Loading...
HomeMy WebLinkAboutC2006-207 - 5/11/2006 - NA AMENDMENT NO.4 TO CONTRACT FOR PROFESSIONAL SERVICES This City of Corpus Christl Texas hereinafter called "CITY", and Urban Enaineerina. hereinafter called "CONSULTANT", agree to the following amendment to the Contract for Professional Services for Downtown Drainaae Improvements. Phase 1, Proiect "An Water Street Interceptor and Inlets (Proiect No. 2036) as authorized and administratively amended by: _priglnal Small NE Agreemer"1t_ ~__ Au ust 28, 2003 Administrative A roval Amendment NO.1 Se tember 23, 2003 Motion No. M2003-348 Amendment No. 2__ February 10, 2004 Motion No. 2004-043 Amend,,!~nt_l'-Jo 3 Decemberl~c2_0Q~__, AdmiQi~trative A roval $24,892.00 $732,010.00 $374,813.00 $24,184.00 · In the original contract Section 2. SCOPE OF WORK shall be modified by the addition of the following scope as shown on the attached Exhibit "A' 1 Additional construction administration due to contractor's overrun of time. 2. Added 15 curb ramps to Water Street intersections and replacement of 88 feet of sidewalk. 3 Soil removal issues 4. Sanitary sewer repairs on Water Street. · In the original contract. Section 3. FEE shall be modified as shown on the attached Exhibit "A" for a total fee not to exceed $23.921.00 (in figures), Twentv- Three Thousand Nine Hundred Twentv-One Dollars and Zero Cents (in words), for a total restated fee not to exceed $1,179.820.00 (in figures), One Million One Hundred Seventy-Nine Thousand Eiqht Hundred Twentv Dollars and Zero Cents (in words). All other terms and conditions of the Contract and A~ts between the City and Consultant will remain In full force and effect '\ CITY OF CORPUS CHRISTI BAN ~NGINE RO~~",,,,:>~~5/" I u (t>> Assistant City Manager . RECOMMENDED , ~~e ;t.~' e R Escobar, P E Da e irector of Engineering Services ATTEST/L~i/ .. Armando Chapa, City stretary I Project Number: 2036 I Funding Source: 550950-4525-00000-160050 Encumbrance Number: 2006-207 OS! 11/06 4\A!~!prdmel! N~) Urhan t-"12ineering ~,..._."., rl rr URBANU l~ ENGINEERING ~.- ~'..~. .."--^---." ~---_.'-"'_."---' ...--.----.,.,- ..- Job No 37889A4.00 '8. '~-'; ""(j tJ3S5 r AX (36 J ,8546UU 1 March 20. 2006 TRANSMITTED VIA EMAIL AND ORIGINAL MAILED Mr Jerry Shoemaker Engineenng Services City of Corpus Chnstl P. 0 Box 9277 Corpus Christl. Texas 78469 RECEIVED ! I MAR 2 2 2006 i ENGINEERING SERVICES Subject: Downtown DralnaQe Improvements Phase 1 Proiect A - Water St. Interceptor and Inlets City Proiect No 2036 Dear Jerry There are several issues concerning the downtown drainage projects that impacted the completion or that we have been asked to address that is outside the scope of our engineering services These issues are summanzed as follows: AdditIonal construction administration due to Contractor's overrun of time. :> Added 15 curb ramps to Water S1. intersections and replacement of 88 feet of sidewalk. i SOl' removal issues 4. Sanitary sewer repairs In Water Sf. T'1e Contractor has greatly exceeded the completion time for the project. Original Contract Time was 260 Calendar Days (8.5 Months). Construction time started January 21, 2005 and was supposed to be completed by September 7, 2005. The project was essentially complete as of March 20 2006 for a total construction time of 424 Calendar Days (14 Months). Time was exceeded by approximately 5 5 months Our engineering fee for the construction administration of this project is $30,101. If the overrun is taken as a pro-rated value the additional fee would be $19,477 (5.5 Mo x $30101/8.5 Mo) We have looked at actual cost for the additional time due to the overrun and a cost breakdown is provided on the attached table. The CuSi.:, are contributed to the tIme associated with additional preparation/review of pay estimates and daily reports, the additional time required for site visits and status meetings with City and Contractor We are requesting that an amount of $10,948 be provided to cover the additional engineenng services. This amount should be covered by funds deducted from the Contractor due to the time overrun We were requested by Engineering Services Staff to add to the scope of the subject project the construction of 15 new curb ramps along Water St. and Shoreline Blvd. The additional engineering services required for each ramp included an initial investigation, obtaining dimenSions of existing conditions preparing detailed sketch of new ramp, answering Contractor and inspector's questions, checking progress and checking completion. The services also Included contacting the Contractor concerning the additional work, negotiating and preparing change orders and reviewing/approving the additional work in pay estimates. In addition the Contractor was requested to remove and replace approx 88 of existing sidewalk, including two e\f2404 EXHIBIT "A" Page 1 of 3 Mr Jei ry Shoerna~e! March 20 2006 Page driveways on the east side of Water St between John Sartain 51. and William S1. We assisted with negotiating the Ghange order cost, prepared the change order, provided details to the Contractor for the drrveways, coordinated the work. visited the site to check progress and answer Contractor questions and reviewed/approved the additional work in pay estimates. A breakdown of the additional time IS provided on the attached table. We are requesting that an amount of $7 946 be provided to cover the additional engineering services. An additional soil Issue has been encountered The soil issue required sampling and testing to obtain approval from the Texas Commission on Environmental Quality to allow disposal at the City's landfill. Ten samples were obtained from the soil stockpile and delivered to the local office of Anal~sis Inc Testing results were rushed by Analysis Inc. to expedite approval of the permit We are requesting that an amount of $3,512 be provided to cover testing requirements Contrae;tor was requested by Engineering Services Staff to add to the scope of the project repairs to the existing sanitary sewer line in Water S1. between Coopers Alley S1. and John Sartain St Construction Services staff has been managing most of this issue but we have 'ncurred some costs. The additional engineering services required for this item included minor coordination before and during construction, preparation of traffic control exhibit, answering Contractor and Inspector s questions, checking progress and reviewing/approving the additional work in pay estimates A breakdown of the additional time is provided on the attached table. We are requesting that an~mount of $1 515 be provided to cover the additional engineering serVices -'-OTAL PROPOSED ADDITIONAL FEE 3 4 Additional construction administration Added curb ramps and SIdewalk Soil removal issues Sanitary sewer repairs in Water St TOTAL $10,948.00 $7,946.00 $3.512.00 $1 ,515.00 $23921.00 2 We request that our present AE contract be amended by $23,921 to add the engineering services to accomplish this additionai work. Please review and let me know should you have any questions or comments. Sincerely, URBAN ENGINEERING MM Enclosure '/,- \.J\...;C ::.-l Mark Maroney, P.E. _----) ..------- xc: Joe Trejo - Engineering Services Kent Power - Construction Services EXHIBIT "A" Page 2 of 3 4: t- o :.u ., o 0::: 0- w 'J) OOt- <(UJ J:..J O-Z 000 t-z ffi4: :E(J) wn:: >0 Ot- 0:::0- O-W :Eo 0::: wllt 01- <(z ~<: ~ G. OZ z 3: o I- Z 3: o o lUgs ,0 , :1- -~ iO cr I~~ ,~ <r: :2: ~. '..J ,<( !e.) I~ iO ~ ~'ZI~ <(,0 -!z 91F~ iZ'LLCO I :I: I, <( fA O!a: ~IO ! U) ~I I t-'cr O,W w:w Co ,-,,2 ~ O(5w a:a.. 2 W I/) I I ! ! , I f Ii II- , ......--*-.~- -. C 10 fA Q,; (i5 cr -f:.~ c J: z - :i c <( z o i= u :;:) a:: .- CI) z o o en :t .- z o :=E iD lit) ...J <( Z o i= - c c <( o o .n .- . if} -, fA o o ..q- .F.J. co o !ft (.:J o o N tA l[) <n t o a. Q) '- ;>. ell -0 eel <n ~ re E .;:;; (/) a> ;>. ell a.. Q) ..... ell Q. Q) ..... a... .~ .C!? > Q) n:: ":I (-.) (0 L0 ~'} "1" ('J Y} o ~ o o :<A- o o o <!) L{) tA Q v <n :~ <n > ,~ <n u -0 o 'C W CL -- <n C o ... <n Q) :J a c o '~ C -0 .... o o o I,." V N co N fA Too'-' ~ a:. o .... th V N fA- o fA- ~~.~ '" I~ o o o co N fA- o N l/l Q) o ~ Q) (/) m c 'C Q) Q) ,S m c w - m II) m c '';:; CD CD E l/l :J - m U5 r<) CG ~ fA- o o v fA c' o o lJ) c ..- fA lJ) I'- ---l <( I- o ~- ~ z w :=E w u <( ...J a.. w a:: ~ ...J <( ~ w C en C z <( CI) a.. :=E ~ II) a:: :;:) u o w o c <( r'-l (J) OJ l:A C-\l -r- fA o fA o "" o 0 {f} 'l;f; o o co (J) fA I'- <n G3 c ..... o u Q) CD ..... en Q) 10 0> ti Q) > c --. -...' ~ '<t ,A o fA o L{) r<) fA o o N (J) r<) fA co N '- Q) c C o L U m CD '- o - .c o Q) ~ II) Q) .... m a.. Q) ..... CL N '<t' ("\I N fit V N fA o tA o o ~ o o o .,- ,,~ trl Lf) (/) ,~ <n > Q) :~ (/) --- c: ,Q 10 C -0 ..... o o o (0 o <0 L{) ~ o ~ o ~ o o .J9 o o <0 l[) ~ v II) ..... a> 'E o Q) Cl C llJ J::: o Q) ..... m a.. CD ..... a.. --- Q) ..- (lJ .. o 0> Q) Z v CD . en "- ~ <0 (") ~ o Ii) (") ~ I'- o ~ o o <0 Ii) I'- ~ v Ii) -' <( I- a I- CI) a:: <( a.. w a:: a:: WI '3: ' w en > a:: <( .- z <( en ....: CI) a:: w .- ~ 0: <0' <0 ~' I Ni I o ih If) Q) - (U E .. If) Q) ~ ro ~ Ci oj ~' (UI :61 'C: I 0, Q' 01 .....1 gl --I ~i .I I I ~I :.cl XI WI ~I 01 ~I lEI (lJ' .....1 f-i I (I)' ....1 (U I 9-i ! ~, !Cl.. '. L{) I 'Ii) 'co, , Ell I It) ..... It) co o o N o N I U a: <( :2: ..... ~ NI ! v I , ! Ii) I' 0'> "-' I~I 1 1.0 0> ~'J...' t- I (")1 ! i(") j 1 01 <O! Ii) I Ell I ! i , I vi 0: NI ~.j ...- ~ 00 1....J <( I- a t-' N EXHIBIT "A" Page 3 of 3 ~..' '. Ci1y of .. Corpu~ ::"' _ Chnstl ~ CITY OF CORPUS CHRISTI DISCLOSURE OF INTERESTS City of Corpus Christl Ordinance 17112, as amended, requires all persons or firms seeking to do business with the City to provide the following information Every question must be answered If the question is not applicable, answer with 'N/A FIRM NAME: Urban EnQlneerinq STREET: 2725 Swantner Drive FIRM is: Corporation_______ 5. Other CITY' Corpus Christl ZIP: 78404 2 Partnership X 3 Sole Owner_ 4. Association_ DISCLOSURE QUESTIONS If additional space is necessary, please use the reverse side of this page or attach separate sheet. 1 state the names of each employee of the City of Corpus Christi having an ownership interest constituting 3"0 or more of the ownership in the above named firm. Name Job Title and City Department (if known) ~_._----------- 2 state the names of each official of the City of Corpus Christi having an ownership interest constituting 3% or more of the ownership in the above named firm. Name Title N/A ___________ .____ ____ 3. state the names of each board member of the City of Corpus Christi having an ownership interest constituting 3% or more of the ownership in the above named firm. Name Board, Commission or Committee N/A________________ 4 State the names of each employee or officer of consultant for the City of Corpus Christi who worked on any matter related to the subject of this contract and has an ownership interest constituting 3% or more of the ownership in the above named firm, Name Consultant N/A__________ .-", ~ \ CERTIFICATE I certify that all Information pro ided is tr~. and correct as of the date of this statement, that I have not knowingly withheld disclosure of any Infor tion requ sted, and that supplemental statements will be promptly submitted to the City of Corpus Christi, Texas as anges cur . Certifying Person Title Authorized Representative ~/, "IlL 1')(0 Signature of Certifying Person Date EXHIBIT "B" Page 1 of 2 DEFINITIONS a Board Member A member of any board, commission or committee appointed by the City Council of the City of Corpus Christi, Texas Employee Any person employed by the City of Corpus Christi, Texas, either on a full or part time basis, but not as an independent contractor Firm. Any entity operated for economic gain, whether professional, industrial or commercial and whether established to produce or deal with a product or service, including but not limited to, entities operated in the form of sole proprietorship, as self-employed person, partnership, corporation'd'oint stock company, joint venture, receivership or trust and entities whicl1, for purposes of taxation, are treate as non-profit organizations. Official The Mayor, members of the City Council, City Manager, Deputy City Manager, Assistant City Managers, Department and Division Heads and Municipal Court Judges of the City of Corpus Christi, Texas. Ownership Interest Legal or equitable interest, whether actually or constructively held, in a firm, including when such interest is held through an agent, trust, estate or holding entity. Constructively held refers to holaing or control established through voting frusts. proxies or special terms of venture or partnership agreements. Consultant Any person or firm, such as engineers and architects, hired by the City of Corpus Christi for the purpose of professional consultation and recommendation b c a e EXHIBIT "B" Page 2 of 2