Loading...
HomeMy WebLinkAboutC2006-219 - 5/23/2006 - Approved /' ~ 2006-219 OS/23/06 M2006-155 Golf Course Builders Int'l S p E C I A L P R 0 V I S 1 U l~ 0 r r t i. S PEe I FIe A T ION S l""" AND FOR M S o F CON T RAe T S ...... FOR - - .... - GOLF COURSE IMPROVEMENTS COURSES) - GABE LOZANO SR. AND BON 0 S (EXISTING GOLF CENTER r Finger Dye Spann, Inc. Golf Course Architects 2000 S. Dairy Ashford Rd. Suite 210 Houston, Texas 77077 DEPFiliTMENT OF ENGINEERING SERVICES CITY OF CORPUS CHRIST I, TEXAS Phone :361/880-3500 Fax: 361/880-3501 I PROJECT NO: 3274 f DRAWING NO: CP lS6 F.u TRANSMISSION Department of Engineering Services Major Projects Activity City of Corpus Christi P.O. Box 9277 Corpus Christi, Texas 78469-9277 Phone: 36] -826-3527 Fax: 36]-826-350] To: ALL PLAN HOLDERS Date: May 09,2006 j~~~/I'P /1t.ak Pages: 2 (including cover sheet) FrOIO: Angel R Escobar, P. E. l"1 A. Director of Engineering ervices Subfect: GOLF COURSE IMPROVEMENTS (EXISTING COURSES)-GABE LOZANO SR. GOLF CENTER Project No. 3274 Addendum No.3 Comments: This fax transmission contains the signed, sealed addendum from FINGER DYE SPANN, INe ' S Baxter Spann, ASLA and includes NO attachments.. The addendum provides clarification of the description of work and quantities to be included in item B 5 of the PROPOSAL FORM Prospective bidders are hereby notified of the following modifications to the contract documents. These modifications sball become a part of the contract documents. All provisions of the contract documents not specifically affected by the Addenda shall remain unchanged. City of Corpus = Christi '" _ ~ [- l ADDENDUM NO.3 -- ---- ----. -- - ---------- , - May 09,2006 TO: ALL PROSPECTIVE BIDDERS PROJECT: GOLF COURSE IMPROVEMENTS (EXISTING COURSES) - GABE LOZANO SR. GOLF CENTER - PROJECT NO. 3274 Prospective bidders are hereby notified of the following clarifications and/or modifications to the contract documents. These clarifications and modifications shall become a part of the contract documents. The provisions of the contract documents not specifically affected by the addendum shall remain unchanged. L PROPOSAL FORM/ ADDENDUM NO.2 A. Item Description for Bid Item No. B.5 DELETE: "Provide one-coat surface treatment and striping of existing parking area (Approx. ~f)" ADD: Provide Hea" Dutv Pavemeot Sealer (Gem Seal) and striping of existing parking area (Approx. 6700 SY) .. Make pen and ink changes to the hard copy of the Proposal Form and appropriate changes to the digital version that was forwarded as Attachment :2 of Addendum 2 Please acknowledge receipt of this addendum. in the appropriate place on your PROPOSAL FORM END OF A"ENDUM NO. J BS/rs I I' (. b '\~ll'~ 0 '1 -) c. Of 1'~:',.-: ::\ " . ~ r. .F"{,;__ I ./ '~t~~ BPr~ter SA/Epann. ASLA \,,"-, . . oJect \\ . ~ ., __, . t FINGER DYE SPANN, INC. BAXT[R c,c" if ~ -e .. t> " \'"'" . c; r ~ 1;i .-?~ .':'(} ,'- ';' O' J::'/Slt. . ~ ~C;~pi' ~f\C~' ". ^......~ -t. -- ADDENDUM NO.3 PaRe 1 of 1 ~ .....'" FAX TRANSMISSION Department of Engineering Services \1ajor Projects Activity City of Corpus Christi P.O. Box 9277 Corpus Christi, Texas 78469-9277 Phone: 361-826-3527 Fax: 361-826-3501 To: L\I L PLAN HOLDERS Date: May 05, 2006 From: ( Angel R Escobar, P. E. 'rIt~,.,v Director of Engineerin~~ices Pages: 3 (including cover sheet) Subject: GOLF COURSE IMPROVEMENTS (EXISTING COURSES)-GABE LOZANO SR. GOLF CENTER Project No. 3274 Addendum No.2 omments fhis fax transmission contains the signed, sealed addendum from FINGER DYE SPANN, INC.'S Baxter Spann, ASLA and includes NO attachments. [he addendum provides a copy of the Pre-Bid meeting Attendance Roster Sign-in Sheet, Project Sign Schematic, Bid-Spreadsheet electronic file, a new, Technical Specification for Heavy-Duty Pavement Sealer, Project Drawing AutoCADD files and General Clarifications to the Special Provisions and Drawings. .. Tile entire Addendum including ALL attachments thereto, are being provided on Compact Disk (CD), to ALL Planholders and will be sent by U.S. PRIORITY MAIL, this afternoon. * RESERVED COPIES of the entire Addendum including ALL attachments will be available for pick-up at Engineering Services Reception Desk, at 3:00 PM. Prospective Bidder's who wish to, may call 361-826-3500 to reserve a copy and it will be ready, upon arrival. Copies on hold that are NOT picked up by close of business today will be mailed, as indicated above. Prospective bidders are hereby notified of the following modifications to the contract documents. These modifications shall become a part of the contract documents. All . provisions of the contract documents not specifically affected by the Addenda shall remain unchanged. - ('ity of Corpus Christi ~DD~~DUM NO.2 1 May 05, 2006 ro: ALL PRosPEcrrvE BTODERS PROJECT: GOLF COURSE IMPROVEMENTS (EXISTING COURSES) - GABE LOZANO SR. GOLF CENTER - PROJECT NO. 3274 - --""-"-- -.-- .....-......--_.._._.._.. _"_. ___ ..'_..m.____.._ _'__".. ..____..~...._~__~~._..~_____. Prospe~ve bidders are hereby notified of the following clarifications and/or modifications to the contract documents. These c1arifictlons and modifications shall become a part of the contract documents. The provisions of the contract documents not specifiailJy affected by the addendum shall remain unchanged. I. PART A - SPECIAL PROVISIONS A. Paragraph A-I Time and Place of Recelvin2 Proposals I Pre-Bid Meeting and Notice to Bidders ADD: Tbe Sin-In sbeet I Attendance Roster (from tbe Pre-Bid meetinl!) is herewith provided. for the Bidder's information and use (see Attaehment No. n. B. Paragraph A-21 Project Signs ADD: Bond 2014 Prolect Si2n sehe.atie (see Attach.ent No.2). C. Paragraph A-SO Electronic Bid Submittal ADD: C. General ClarifICations: L Paragrapb A-4 Method of Award: Clarification of method of award of bid; The bids wiD be evaluated based on the following order of priority, subject to the availability of funds: 1. Total Base Bid, or 2. Total Base Bid, Plus Additive Alternative No. I, or 3. Total Base Bid, Plus Additive Ahernatlve No.1, Plus Additive Alternative No. 2, or 4. Total Base Bid, Plos Additive Alternative No. I, Plus Additive Alternative No.2, Plus Additive Alternative No.3, or 5. Total Base Bid, Plus Additive Alternative No. I, Plus Additive Alternative No.2, Plus Additive Alternative No.3. Plus Additive Alternative No.4 2 Paragraph A-22 Minority I Minority BusiDtSS Enterprise PartkipatioD Policy: Clarification of MBE goals: The lIDals for t.is project are Minority Participation 45% and Minority Business Enterprise PartidoatioD 15-10. 3 Paragflpb A-25 Sales Tal Elemption (NOT USED): Clarification of IosunDee and Tn Exempt requirements conflids in SpecificatioDS; In case of CODOk4 tbe "SeC~OD A - Special Provisions" bike precedence over tbe "Part B - Cenenl Provisioas"--see G~eraJ Provision 8-6-22. If aay otber questions concerning losonnee requirements arise, bidden may contact Svlvla Arria!!a at 361-826-3530. II 'ART T - TECNICAL SPECIFICATIONS ADD: New SECTION 025420 - REA VY DUTY PAVEMENT SEALER (see Attaebmeat No.4). ADDENDUM NO.2 Page 1 of2 III DRAWINGS A, Eledronic Drawing Files (DWGsl ADD: AutoCADD files of drawinl! sbeets I tbrooD 34 (see Attacbment No. !l. A, Sbeet 2 of 34 General Notes No. (j ADD: B. General Clarirlcations: I. Trees which are to be removed sbaO be eitber chipped or bauled away for disposal in a lawful location. If trees are chipped, material shall be taken to one central location on site. 2 Bunker fabric sball be InstaOed as shown in the Bunker Detail on Sheet 22 of the plans. Bidder shall assume that the specified fabric will be required on 50% of the total bunker floor area. .t Access point(s) and laydown area will be near the maintenance faciDty, with tbe eIact location and dimension to be coordinated on site with City and golf course staff prior to Contractor mobilization. 4. There wUl be no additional contract time added If aoy or all alternative bids are accepted. 5 Grass strip pings from greens and tees may be disposed of in an agreed-upon location or locations on site. 6, Tbe Cootrador wUl apply the fint waterlog following grass installation aDd shaD thoroughly communicate in advance with City golf coune staff to advise them of areas whieh win be planted aDd turned over to tbe City for grow-in maintenance. In the eveDt tbat grassing of an entire work area (Le. green, bunker, tee, etc.) is not completed, Contractor wiD be required to water grass until the entire work area 15 complete and is turned over to the City for maintenaoce. Irrigation clarifications: a. All irrigation components throughout the project sbaD be marked so as to comply with all Local, State, and Federal guidelines for tile use of emueot water. b. Contractor sball obtain approval for control wire paths from City Representative prior to lostanation. c. The City bas designated that Hunter irrigatioo components be used for servicing aDd standardization with currently installed system. d. On Sheet 32 of 34 of the Plans, sleeves wblch service tbe landscaped Islands are to be Included In Alternative Bid No.3. Baxter Spawl, ASLA Project NE FINGER DYE SPANN. INC .~~'.,-" t,Y~' '\~, \~~~'",c1/ . . . . C"'~' ',(f(;c: A?. ~1'/ . ~(.:~:~:.::.;;"~\.',, ' END OF ADDENDUM NO.2 BSm; Attachments: es OR CD ADDENDUM NO.2 Page 2 0(2 ('ityof Corpus ChrIstI L ADDENDUM NO. 1 ...... '~pri L <1 006 ~.......~ Al PP:\SFECi IVE 13 I lDEk., PROJBCT: GOLF COURSE IMPROVEMENTS (EXISTING COURSES) - GABE LOZANO GOLF CENTER :.'spect '11 tract j.,,:ument adde "j iTn bIdder ,ire nerfc'by rh, se mod 11Sict1s f 'lot I ed of t,he fo llowinq modifications to the 11 d lons shall become a part of the contract he I ,ntract 'iocuments not specifically affected by :I, cuments The pr hall cerna U .: h 11)(1 I Sl>ECIAL PROVISIONS PARAGRAPH A-I, TIME AND PLACE OF RECEIVING PROPOSALS / PRE-BID ~ING AND NOTICE TO BIDDER'S DELETE' rhe 'UI rer t. Nelt] if? t Bidder' f In its entIrety. ADD: The REVISED Notice to Bidder's (see Attachment No.1), in lieu thereof. II PART B GENERAL PROVISIONS PARAGRAPH B-7, PROSECUTION AND PROGRESS ADD- New Paragraph B-7-15, AVAILABILITY OF FUNDS Funds are appropriated by the City, on a yearly basis. If funds, for any reason, are not appropriated in any given Year, the City may direct suspension or termination of the contract. If the Contractor is terminated or suspended and the City r~ests remobilization at a later date, the Contractor may request payment for demobilization /remobilization costs. Such costs shall be addressed through a change order to the contract Please acknowledge receipt of this addendum, in the appropriate place on your PROPOSAL FORM. Escobar, P E. ot Engineering Services rs 'oehmer ' NO.1, REVISED Notice to Bidder's ENGINEERING SERVICES P.O. Box 9277 Corpus Christi, TX 78469-9277 ADDENDUM NO.1 Page 1 of 1 r-;;~~~'~-~"l NOTICE TO BIDDERS ealed pn 'posa S addessed tc the Ci t Y of Corpus (:hristi, Texas for: GOLF COURSE IMPROVEMENTS (EXISTING COURSES) - GABE LOZANO SR. GOLF CENTER: onsist:-, if a T,:tdl Baoie Bid:md 4 Additive Alternates that include: t enovat n'J eIght eeL 181 C< J\1I Sf' greens and the existing practice putting Leen, :cnst ruct on If neiV ~Hnd bunkers, lake expansion and shoreline tabili 3tlon, gradInll, dra oaqe, and Irrigation of selected fairway areas, lncretf art rat h 'errova I dnd i nstallatioD, existing tee resurfacing and new ee con tructl.Jn, dno irrigatIon and grassing of all disturbed areas. In Cli:lditior the pr:]e::t includes iemolition of a portion of the existing entry j[ive and parkin,) to, f can,tl iH t ion of new entry drive and parking area, f::mporar access t c ur:disturoed [I.irking arpa, dnd ldndscape improvements near Lne entr'} driVE od new paIfuog area in ac.cordance with the plans, oeci Eiil ions dnd 'or tract docdments; wl11 be lecelved at _he of f i,:e of the City Secretary until 2:00 p.m. on W~sday, May 10, 2006, and then publicly opened and read. Any bid received 3fter closing time wi 1 be returned unopened, A pre-bId meeting IS be conducted by the Ci ;olf Course, 4401 Old jiscUSSJ)f! of thf' pro cheduled for 10:00 a.m., Tuesday, May 2, 2006 and will y. The lucation of the meeting will be the Gabe Lozano Brown~vilie Rd., Corpus Christi, TX and will include a ect elements. ~ site visit will follow. i\ bid bond in t he amount f 5% ) f the highest amount bid must accompany each proposal Failure to prcJVide the bid bond will constitute a non-responsive proposal which wi 1 not i)e~'cnsidered, Failure to provide required performance and payment bonds fer contracts over $25,000.00 will result in E rfeiture of the 5% oid bond to the City as liquidated damages. Bidder's pLan depos it 1 S sllbj ,"ct tc mandatory forfei ture to the City if bidding jocument; are not F:tL rned to the City within two weeks of receipt of bids. i)lans, proposal forms, speci ti<::dtions and contract documents may be procured from the City Englneer upon 1 deposit of Fifty and no/100 Dollars ($50.00) as 3 guarantee of thelI Ieturn 1n good condition within two weeks of bid date. Document 'c'an be c>bt.aloed by ma l upon r'eceipt of an additional $10.00 which a non refundable p< staqe/handl ing charge. l'he bidder IS hereby' not if i Ed Uld t the owner has aoicertained the wage rates which prevail in the 1 oca1i t y in which Ull s work is to be done and that such wage sca le is set. out in thE' cant ract documents obtainable at the office of 'he City Engineer and the Contractor shall pay not less than the wage rates so '3hown fc c each era [1' crt VpE 0 f "laborer" "workman It, or "mechanic" employed ,n this "I jec:t ['he City reserves the ight to reject any or all bids, to waive irregularities Hld to ai~cept the bid which, in t he City's opinion, seems most advantageous to tie City and in t tie bEst lntere,'i of the public. TY OF' CORPUS CHRISTI, TEXAS I Angel R. Escobar, P. E. Director of Engineering Services I Armando Chapa City Secretary C:E"lised 7/':: Ot ADDENDUM NO. 1 Attachment No. 1 Page 1 of 1 C" P E ,...,. A L P R 0 V I S I 0 N S ,) " t-' I: ( F ~ A T I 0 N S '~J A N D ) ~' C 0 N T R A C T S A N 0 B 0 N 0 S F 0 R "" F 0 F M S " w" ~.~ GOLF COURSE IMPROVEMENTS COURSES) - GABE LOZANO SR. f). '~l f'> Vinger Dye Spann, Inc. (~o] f (~ourse Architects 2000 <;. Dairy Ashford Rd. Suite 210 Houston, Texas 77077 p, DEPARTMENT OF ENGINEERING SERVICES CITY O~ CORPUS CHRISTI, TEXAS E'!lone: 361/880-3500 cd>'; H,J/880--350J I PRO,JECT NO: 3274 I DRAWING NO: CP 156 (EXISTING GOLF CENTER r'~_ i Revl se,) ,') 10(i) '. GOLF COURSE IMPROVEMENTS (EXISTING COURSES) -GABE LOZANO SR. GOLF CENTER Table of Contents "'"{ NOTICE TO BIDDERS (ReVLied '/',IOOl NOTICE TO CONTRACTORS - A (BE'vised Sept. 2000) I'\surance RequiremeIlt:: NonCE TO CONTRACTORS - B (Rpvised 1/',/00) ~'_.--.;: l_ Worker's Compensation Projects For Government i::overage Entities For Building or Construction G r P~ A - SPECIAL PROVISIONS m f\- 1 A-2 A 3 l\ ", 4 ,1\- 5 l\-6 A7 1\-8 11.- 9 .l\-lO 1\- 11 "'12 13 14 ,--15 .1\,-16 \-.17 \,-18 \ 19 20 ,'\-- 21 22 23 24 1\-25 -26 27 ?8 ,. 29 30 1\' 31 32 .1\-33 34 35 A-36 n i8 ~~ ,~ .,4 r'.~ ;,.".~ I' ,.. ..", <9 Tlms and Place of Receivlng Proposals/Pre-Bid Meeting Deflnitions and Abbrevidtions Description of Project Method of Award Items to be Submitted wlth Proposal Time of Completion/LiqU1dated Damages Workers Compensat ion In,;uraIli:e Coverage Faxed ProposaL.; Acknowledgment ot Addenda Wage Rates (Revised 7/S/00) Cooperation with Public Agencies (Revised 7/5/00) Ma intenance \)f Services Area Access and Traffic Contlol Construct ion Equipment Spi LJ age and Tracking Excavation and Removals Disposal/Salvage of Materials Field Office Schedule and Sequence 01 Construction Construction Staking Testing and Certification Project Signs Minority/Minority Business E:nterprise Participation Policy (Revised 10/98) Inspection Required (Revised 1/5/00) Surety Bonds Sales Tax Exemption NO LONGER APPLICABLE (6/11/98) Supplemental Insurance Hequirements Responsibility for Damage Claims Considerations for Contract Award and Execution Contractor's Field Administration Staff Amended "Consideration of Contract" Requirements Amended Policy on Extra Work and Change Orders Amended "Execution of Contract" Requirements Conditions of Work Precedence of Contract Documents City Water FaCilities Speclal Requirements Other Submittals (Revised 9/18/00) Amended "Arrangement and Charge for Water Furnished by the City" Worker's Compensation Coverage for Building or Construction Projects for Government Entities Certificate of Occupancy and Final Acceptance A-40 Amendment to Sect Lon B-H-6: Partial Estimates ^ 41 Ozonc-Advioory A-42 OSHA Rules & Regulations A-43 Amended Indemnification & Hold Harmless (9/98) A 44 Change Orders (4/26/99) A-AS As-Bu i lt Dimensions and Drawings (7/5/00) ~ 16 Diopaoal af Highly Chlorinated Water (7/5/00) A-4-+-- Pre Conotruction Exploratory Eucavationo (7/5/00) 1'1-48 Overhead Electrical Wires (7/5/00) A 49 Amend "Maintenanc'~ Guaranty" (8/24/00) ~. PAR'!' B GENERAL PROVISIONS '-. PAR'!' C FEDERAL WAGE RATES AND REQUIREMENTS PART S STANDARD SPECIFICATIONS Section 021020 - Site Clearing and Stripping Section 021040 - Site Grading Section 020180 - Removing old structures Section 022100 Select Material Section 022420 - Silt Fence Section 025202 - Scarifying and reshaping base course Section 025205 - Pavement Repair, Curb, Gutter, & Driveway Replacement Section 025210 - Lime stabilization Section 025220 - Flexible Base - Caliche Section 025412 - Prime Coat Section 025424 - Hot mix asphalt concrete pavement (Class A) Section 025608 Inlets Section 025610 - Concrete curb and gutter Section 025802 Temporary Traffic controls during construction Section 025807 - Pavement Markings Section 025813 - Pr~tormed striping & emblems Section 030020- Portland cement concrete Section 032020 Reinforcing steel Section 038000 Concrete structures Section 055420 - Frames, Grates, Rings and covers .. , .... -. , %..,. ~. .,- t1 I PART T c r" !..... F r', -- f I TECHNICAL SPECIFICATIONS ~,pct lon Section Section Section Section Section Section Section Section Section Section Section Section (;C-iHO 10 Sununary of Work GC-01040 Coord~ndtion GC-OI051 Survey~;, Lines, dnd Grades GC-01150 Measurement and Payment GC-02000 Sjte Work GC-02100 Clearing, Thinning, and Grubbing GC-02200 Golf Course Grading GC-02300 Greens dnd Sand Bunkers GC-02400 Golf Course Drainage GC-02440- Irrigation System GC-02485 -- Grassing GC-02515 - Concrete Golf Cart Path 02806 -- Landscaping LIST OF DRANINGS r-' (' rot r- ,....". ,... NOTICE AG~ 1 2 3 4 9. 10.-15 16 -21 2? 23 24. 25 26 27 28 29, 30 3] , 32 33 _ 34 TITLE SHEET GENERAL NOTES SHEET LAYOUT PLAN GOLF GRADING, DRAINAGE & CART PATH PLANS GOLF fRRIGATION PLANS GRASSING PLANS GOLF CONSTRUCTION DETAILS LAKESHORE PROTECTION PLAN PARKING LOT SEAL COAT PLAN TEMPORARY ENTRANCE PLAN PARKING LOT EXISTING CONDITIONS PARKING LOT DEMOLITION PLAN PARKING LOT LAYOUT PLAN PARKING LOT GRADING & DRAINAGE PLAN PARKING LOT PAVING & DRAINAGE DETAILS PARKING LOT LANDSCAPE PLAN PARKING LOT IRRIGATION PLAN LANDSCAPE & IRRIGATION DETAILS BEST MANAGEMENT PRACTICES PROIJOSAL/DISCLOSURE STATEMENT PERJIIOBMANCE BOND PAnENT BOND ..... .- r ~ / ! c ! r~ <~ r f' ... t"i :..... FC: r NOTICE TO BIDDERS ....... -. NOTICE TO BIDDERS F a ed prnposa J5, addressed t,) the City of Corpus Christi, Texas for: n , " r- DMPROVBMENTS TO GABE LOZANO GOLF COURSE This project consists of renovating eighteen (18) course greens and the existing practice putting green, !ostructlon of new sand bunkers, lake expansion and shoreline stabilization, Cj:adingl jrdinage, and irrigation of selected fairway areas, concrete c?rt path remuved and installatLon, existing tee resurfacing and new tee construct all, and irrigation and grassing of all disturbed areas. In addition, the project includes demolition of a portion of the existing entry dLi ve and parking lot, construct ~on of new entry drive and parking area, temporary access to undlsturbed parking area, and landscape improvements near the entry drive dnd new parking area. r~ ......, I r" - F will be received at the offi ce of the City Secretary until 2: 00 p.m. on wednesday, May 10, 2006, and then publicly opened and read. Any bid received after closing time will be returned unopened. ~ F A pre-bid meeting is scheduled for 10:00 a.m., Tuesday, May 2,2006 and will be conducted by the City" The location of the meeting will be the Gabe Lozano Golf Course, 4401 Old Brownsville Rd., Corpus Christi, TX. - A bid bond .1 n the amount" of 5% of the highest amount bid must accompany each proposal. Failure to provide the bid bond will constitute a non-responsive proposal which will not be considered. Failure to provide required performance and payment bonds for contracts over $25,000.00 will result in forfeiture of the 5% bid bond to the City as liquidated damages. Bidder's plan deposit 1S subject to mandatory forfeiture to the City if bidding documents are not returned to the City within two weeks of receipt of bids. r" ,... ."" Plans, proposal formsl speciflcations and contract documents may be procured from the City Engineer upon a deposit of Fifty and no/100 Do1~ars ($50.00) as a guarantee of their return in good condition within two weeks of bid date. Documents can be obtained by mail upon receipt of an additional $10.00 which is a non-refundable postage/handling charge. ~ JI i The bidder is hereby notified that the owner has ascertained the wage rates which prevail in the locality in which this work is to be done and that such wage scale is set out in the contract documents obtainable at the office of the City Engineer and the Contractor shall pay not less than the wage rates so shown for each craft or type of "laborer", "workman" I or "mechanic" employed )0 this project. I: , !II" The City reserves the right to reject any or all bids, to waive irregularities dnd to accept the bid WhlCh, in the City's opinion, seems most advantageous to r.Le City and in t:he best interest: of the public. ~) ., CITY OF CORPUS CHRISTI, TEXAS Is/'Angel R. Escobar, P.E. Director of Engineering Services .-. Is/ Armando Chapa City Secretary ReVlsed 7/5/00 I'-~ : -" -- ,-'!' r~~ H ~ ,---, -... NOTICE TO CONTRACTORS - A -+ I'-:tt .-c_,,,"- !lIIIP" -,- ; NOTICE TO CONTRACTORS - A INSURANCE REQUIREMENTS Revised September, 2000 l\ Certj ficate of Insurance indicating proof of coverage Ln the following amounts is required: f -- - - ---- --- -------- --- TYPE OF INSURANCE 30-Day Notice of Cancellation required on all certiftca 1~~~~'::';~i1;ty .:c~ud~g- ~- . ..- " 2. Premises - Operations 3. Explosion and Collapse Hazard 4. Uaderground Hazard 'i Pnkiuctsl Completed Operations 6. Hazard 7, Contractual Insurance 8. BmadFonn Property Damage 9. InlIependent Contractors ~ 10. ~l Injury ~ '--'--... MINIMUM INSURANCE COVERAGE -.- f---- tes Bodily Injury and Property Damage .-- r.- $2,000,000 COMBINED SINGLE LIMIT D $1,000,000 COMBINED SINGLE LIMIT WHICH COMPLIES WITH THE TEXAS WORKERS' COMPENSATION ACT AND PARAGRAPH II OF THIS EXHIBIT $100,000 $1,000,000 COMBINED SINGLE LIMIT $2,000,000 COMBINED SINGLE LIMIT 0 REQUIRED e 00 NOT REQUIRED See Section B~-II and Supplemental Insurance Requirements 0 REQUIRED 00 NOT REQUIRED _._'----- See Section B-6-11 and Supplemental Insurance Requirements 0 REQUIRED l&J NOT REQUIRED _.... AUTOMOBILE LIABILITY--OWNED NON-OWNE OR RENTED .--.----------. -..---..-.-----.-..-. WORKERS' COMPENSATION EMPLOYERS' LIABILITY --..-...-.....-..--- -.----..-- EXCESS UABILlTY , - PROFESSIONAL POLLUTION LIABILITY I ENVIRONMENTAL IMPAIRMENT COVERAGE Not lirnjfed to sudden & accidental discharge; to includ long-tela environmental impact for the disposal of contamieants ..._..._---~-,_.._- .----------. BUILDERS' RISK . _..__._--,---~._- ~._- ._-~.. -..-.-..--. INST ALLA nON FLOATER Page 10f2 -->The City of Corpus Christi must be named as an additional insured on all coverages except worker's compensation liability coverage. DThe name or the projed must be listed under "description of operations" on each certificate of insurance. OFor each insurance coverage, the Contractor shall obtain an endorsement to the applicable insurance policy, signed by the insurer, providing the City with thirty (30) days prior written notice of cancellation of or material change on any coverage. The Contractor shall provide to the City the other endorsements to insurance policies or coverages which are specified in section B-6-11 or Special Provisions section of the contract. . A completed "Disclosure or Interest" must be submitted with your proposal. Should you have any questions regarding insurance requirements, please contad the Contract Administrator at 880-3500. :.. 4 .... Page 2 of 2 G c c t'~ ',.l r - ~-t ........ -~" -- ~.. ~- NOTICE TO CONTRACTORS - B ...-;~ , , ,~,~ NOTICE TO CONTRACTORS B WOR~~'S CO~PE~SATION COVERAGE FOR BUILDING O~ CCNSTRUCTION PROJECTS FOR C:CVE?-!~ENT ENTITIES :'exas law requi::es that :-.ost contr:::.ct:ors, subcc::t:~actors, and oths~s ?roviding work or serv~ces for a City building C~ c~nstruction pre ec:!: r:lust: be covere6. by worke~ I s compensation insura:!ce, authorized se.L!: :.::surance, or "n appr::ved worke~' s compensat::"::::;:1 coverage agree!!:e!"~t ~.~ Even If Texas !Qw does :lot require a contractor, subcontractor or others performing project services (including deliveries to the job site) :::J provide 1 or the 3 forms of worker 's compensacion coverage, the C~ty will require such coverage for all individuals providing work or ser.rices on this proj eel'. at any time, includi:lg during the mal:".:::er:ance guaranty period. :.:otor carriers which are ~equired to regl.s::e~ wi th the Texas Depar::::-ent of Transportacion under Texas Civil Stat:~~es Article 6675c, and which provide accidencal insurance coverace under Texas Civil Statutes Article 6675c, Sect::.on 4(j) need not --::-ovide 1 of t.he ~ forms cf worker's compensation coverage. ,~ , ,j'~ The Contractor agrees ;::) comply with all applicable provisions of T~xas Administrat 1 ve Code 7itle 28, Section 11.0.1.1:0, a copy of whic~ ~s attached and deemed i~corporated into the project contract. Please note that under section 110.11.0: l, certain language 7.ust be included in the Contractor's Contract with the City and the Contractor's contracts with subcontraccorslnri ,:)thers providing services for the project; 2, the Contractor is required to submit ::'0 the City certificates of c~verage for its employees and for all subcontractors and others providing services on the Proj ect. The Contractor is required to obtain and submit updated certificates showing extension of coverage during the Project; and 3 the Contractor lS reauired to post the requ:.~ed notice at t:he job site. By s::.g:1ing this Contract, the C'~ntractor certifies that: :..:: ...;ill timely cOl'!1~l:' ...tith these Not::.ce to Cc;ntractors "B" requirements. NOTICE 70 CONTMCTORS - B (Rev~seo ~/13/g8J Page 1 of 7 8/7/18 <. .. '-~ . ...:.~c .i .....'l 0....; T<' 'I -. S I"\.i'Sl'R -(' E j It e .!.. . L'(L. _--\'\i. <, Part II. TEXAS \VORKERS' CO\lPENSATION CO~-1MISSIO~ ,.-., ('hapter 110. REQUIRED NOTICES OF COv"'ER--\.GE Subchapter B. L\1PLO\'ER NOTICES ~ 110.110 Reporting RequIrements for Building or Construction Projecl.S for Govemmenul Entities ....., ... (a) The foUowing words and terms, when l:sed in this ruie, shall h2.ve me following meanings, unless the context c:e:my inmcates otherwise. T e~ not define:i in this ruie shall have me me3I1ing de5.ned in the Texas Labor Code, if so defined. .... 1) Cer1ifi<2:.e or cove:-age (ce~(24e l-.~. .:vpy of a cer-.mcare or i::lsurance, :!. certificate or autboriry to se~-insure :ssued by the a)mmissicn, cr a workers' compe:lSztion coverage agreement CIWCC-S 1, TWCC-82, nVCC-S3, or TWCC-S4), showing SIaIDtory workers' compensation insurance coverage for the person's or entity's e:nployees (including those subject to a coverage agreement) providing -;ervices on a oroject, !Dr the duration of L.1.e project. (2) Building or coostruc+.ion--nas the ffie:l!'i!lg defined in the T ~xas Labor Code, S 406.096( e)(1). (3) Connc.c4or-A person bidding for or awarded a building or coasrruc--.ion project by a government2.l entIty, (4) Covecage-Workers' comoensation insurance meeting Lhe stzrutory requirements of the Texas Labor Code, ~ 401.011(44). 5) Coverage ~greement-A writte::l ~gree~e"lt on form nVCC-Sl. form TWCC-S2, form TIVCC-S3, .>r fqrm TWCC-84, filed with the Texas Workers' Compensation Commission which establishes a ~-~~p between the parries for purposes of the Texas Workers' Compensation Act, pursuant to the T~ Lzbor Code; Chapter 406, Subchapters F and G, as one of employer/employee and establishes who will be responsible for providing workers' compensation coverage for persons providing services on the project. (6) Duranoo of the project-includes the tlIIle from the beginning or-work. 00 the project until rte worle on the ;?roject h2.S bee:: compie~ed 2...;0 accepted by the governmental entity. 7) Persons croviding services on the projesr ("subcontrzctor" i..-: 9 406.096 of me Act)-\Vith the exception or- persons exduded under subseCtions eh) and (i) of this section, includes all persons o~ entIties performing all or part of the services the contractor has undertaken to perfonn on the proJec'~ regardless o{ whether Ih:u peson comracd directly with the contractor and regardless of whether that person h2.S employees. n..is indudes but is not limited to independent contractors, subconrractors. leasiag ~ompanies, moror carriers, owner-operators, employees of my such entity. or employees of mventity furnishing persons to perform services on the proje::r, "Services" includes but is not limited htto:llv.rww sc s .st2te D'. '.Js/tac'23IIV 1 i OIBIl 10 110 htmJ ~IOTICE TO CONTRACTORS - - Revised 1/13/981 Pa'le 2 ot 1 817/98 \. Page 2 C~-::> "'"' fwi .:;r:'.-:;::::: ::img, 0:- oe::'.ering e~U1p~e:1! cr ;::::.:~:-:~s. cr ~r~\lding labor, t.a.:.,spc;""::!.::cn. ar othe:- ',~c~ ;e::::..: :0. a orOlec:. '~:;::rY1ces' does not i;::::.:::e actr.~t:e~ !.!!'.:-eiated to the pfOje~_ s:.lcn as Ji)(i__':~e'.'~'" Cc > ':endars C1.::c:, supply deiivefles, 2.:~::: c~!iverv of :or...aole tollets. ': Prcj~<ldudes the crc',lsian af ill semces r~:2!ed to a ccilGing or construo..ian C0:::.2.ct far a ,iverr_':1e:::2.~ e:1Uty (b) Prc\10;r.; ar causing to be provided a ceniiica:e or coverage ~ursuant to this rule is 2. ':prese:;.t2.::c~ DY the insured :hat all emplayees cf:he insured wno are pro~;ding services en the :1fojec ~e c::'.'ered by workers' compensation cove:-age, that the coverage is based on proper ~porring oE c;asswcation codes and payraU arnour.!s, and that ail coverage agreementS r.ave been filed Ith the a?~ropriate insurance carrier or, in the case of a self-insured, with the corrunission's Division )T Se!f--L'1sur2...~ce Regujatiof'~ Providing false or misieuiing cexzcates of coverage, ar fuii;ng to ovide or r::2.ll1tain required coverage, ar failing te re?on any c:-.znge that materially aife~..s the cHavision aE coverage may S"..loject the contractar or other person providing services on the project to adminisrra:~ve cenalties, crirnil1.aI penalties, civil pe:;.aities, ar other ci'lfi! actions. 1') A gaver:l:::emal e.'1tiry tI:.ar enters into a buildil,"g or consuuc-..:ao contract on a project shall: f"--; . ) include tr. [~e bid SpeCmClt1ons, all the provisions of paragrcpn (7) of this subsection, esing the language reqwred by paragrzpn (7) of this subsec;o~c~ ) as pan or' t.~e contract, using the language required by paragraph (7) of this subsection, require the 'onuac:or ro perform as required in subsection (d) oftrus section; 3) obtain ;"Tc;n the contrac:or a certificate of coverage for each pe~son providing services an the nroject, prior to that pe~son beginning work on the project; i 4) obtain.frcm the contracror anew certificate of coverage showing extension of caverage: (A) before tI:e end of the c...:r.-ent coverage period. if L1.e contrac:ar's current certificate of coverage shows that the coverage period ends.during the duration of the project; and tB) no iater &..anseven days a..4:er the expirationoft!le coverage for e:!ch other person providing services on the project whase current certificate shows that the coverage period ends during the duration of the project; J) retain ce:nncates of coverage on file for the duration of the project and for three years thereafter; :6) provide a C.:Jpy of the ce~iDcates af coverage to. the commission upon request and to any person nutle~ ~c the:'!1 by law; and (7) use the I~~uage cantain~ U1 the following Figure i for bid speciiications and contr;?'GS, ..".'ithOUl any ad4itiemi words or changes, except those required to accoD'moQate the specific document in whichEhey ar~ cont3ined or i:O impose stricter standards of dOCt4::lentation: T28S110 110(c)(7) tOi hUpl/www SOS.Siate.tx usitac.'2SlIIlll OlBlllO IIO.hurJ NOTICE TO CONTRACTCRS - 3 Revised 1/13/981 paqe 3 ot 1 817198 ...... ".,- \c ll( Page:; of6 .! A contractOr sn2.ii ) provide coverage for its empicyees Froviding services on a project, f::;~ t..~e duration of the project .':!.Sed on proper re?oning of class:::c:'c::on codes and p2.)Tcil amounts CL.':c ::..:.:::g of any coverage ~?feements; 2) provide a certificate of covernge snowing workers' compensation coverage to the governmental =:1tiry prior to beginni."g work on ilie :;:-cj~ ... .:;) provide the governmental eatir:..~ ~~.or to meenci ~f tbe-.cov.et4lgC pe.-icri, 2. new certificate of :ovetage showing extension of ccverage, if the coverage period shown on the contractor's current -~rri.ficate of coverage ends during tr:e duration of the project; . le,. ( 4) obtain. from each person providing services on a project, and provide te tbe governmental entity: - -\) a certificate of coverage, prior to that person beginning work on the project, so the governmental =nuty win have on file cerlificates of coverage showing coverage for all persons providing services on .-:e project; and ,v) no later than seven days after recei;n by the contractor. a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certiiicate of coverage ends during ... the duration of the project: (5) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (6) notify th~ governmental entity in writing by certified mail or personal delivery, within ten days after the coatnlCtor kneW or shouJdbave ir..nown, of any change that materially affects the provision of coverage of any person providing se..~ces on the project; (7) post a notice on each project site informing all persons providing services ontheoproject that they are required to be covered, and staring how a person may verify current ccvenge and report failure to provide dovecage. This notice does not satisfy other postirig requirementS inlposedbytheActor other commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type, and shall be in both FneJic:h and Spanish and any other language common to the worker population. The text for the notices sha.ll be the fonowing text provided by the coDllDksion on the sample notice, without any additional words or changes: REQtJIRED WORKERS' COMPENSATION COVERAGE "The law requires that each person working on this site or providing services rdated to this constRIction project must be covered by workers' compensation insurance. T:-is includes persons providing. hauling. or delivering equipment or materials, or providing labor or tranSportation or other service related to the project, regardless of the identity of their employer or statuS as an employee. U "Call the Texas Workers' Comper.sation Commission at 512-440-3789 to r~eive infotmation on the legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide (".-Overage." hup:/lwww.sos.state.bcusltacJ28/II1110/B111O.110.html NOTICE: 70 CONTRACTORS - B Rev;ued 1/13/98) paqe . o~ -, 8fl/98 .C l-'age 4 or b ,:"" c.c;:::ac:x.;;uly req~~e ~2-::1 ~e=-scn \\.ltn ;,\'hcr:: :: conrraC:3 :: ;:=-o'\;de services c:: 3. ;::-oject to: A.) proviae coverage based on p!"aper re~oni;~g of classification codes 2o..'1d payroii 2.J.-::ounts and filinQ :"ny coverage agree:::e:::s Dr ~ of i:s emcicyees proviciing se~.ices en the projec:, :-or the duratio~ Lhe ?fO)ect, 'Ii) prc\.;de a certifiC2i.e 0:- covercge to the con:.~ctor prior to that person beginni..~g "~"oric on the pi Oje::::: ) inciuce in all contr,GS ..0 pro\lde sefYlces cr. the projec:: ~~e ianguage in subse:::-...icn (e)(3) of this -~Ctlon: provide the contraGc.. prior :0 the end of ..he coverage pe:iod, a new cenifi~:e or- coverage " ,lowing extension of coverage. if the coverage period shown on the current cert.iiiw.:e of coverage ..nds during the duration of the project: r.: I E) obtain from each other ?erson with whom :: conrrac::s. and provide to the con:rac::or: (i) a certiiicate of coverage, prior to the other ?e:-son beginrling work on the proj~: ::....d prior to the end of the coverage period, a new cenificate of coverage showing eX!e::sion oithe ove~~ge period., if the coverage period shown on the current ce:-tiiicate of coverage ends during the duration of the project; -, retain all required cer.iiicates of coverage on rue for the duration of me project a:~d for one year ,1ere3frer, ,..,}..,tiiy the governmental entity in writing by certified mail or personal delivery, v.-ithin ten days :-fteriheperson kneW or should have known. of any change that materially affectS the PfQvision of overage of any person providing services on the project; and COl1J:Iacmally require :::lcn other person with whom it conrrac..s. to perform as required by ;jbparagraphs (A)-{H) of this paragraph., with the certificate of coverage to be provided to the person iy- whom they are providing sernces. c) A person providing services on a project. other than a contractor. sha.I1: \ 1) provide coverage for its employees providing services on a project, for the duration of the project , 'ied on proper reporting of classification co<ies and payroll amounts and filing of any coverage greer:;ems; ('n provide a certificate or" coverage as required by its contract to proviae services en me project. .'! lor to beginning work on [he projec~ C?' have the following language in its contract to pwvide services on the project: "9y signing this onrract or providing or causing to be provided a certificate of coverage. the person signing this contract is representing tO'the governmental entity that all employees of the person signing this ,m:rac: who will provide services on the project will be covered by workers' compensation coverage l1np:J1v.-ww sos.state.tx.uslrad28/ll11101B111O.110hunl NOTrc~ TO CONTRACTORS - B lleYised 1/13/98) Page 5 c t 7 sn198 """"""' ,,- ... rage.: Ul U 'or u:: c~ration of t.~: oroiect, that the c~';erage will be ::~e::i on proper reporting of classification ,;ocies and oayroll z...-::o~~, and that all cove:age agreeme~:s '~-iil be filed with the appropriate \llsura::c: ~er or, ::: the case of a self-w.sc.red. with the commission's Division or Self-Insurance Reeciation. ProvidinlZ false or misleading i.-:rorcation may subject the contractor to administrative pe~ries_ c:iminaI Fe;a1ties, civil penalties. or other civil ac+..:oDS. .. (4) provide the person for whom it is providing services on the project, prior to the end of the coverage period shown on its current certificate of coverage, a new certificate showing extension of coverzge. if the coverage period shown on ~he certificate or coverage ends during the duration of the proJe::::; - (S) obtain from each person providing se:vices on a project under contract to it, and provide as required by its comract: '-- (A) a certificate of coverage. prior to the other person beginning work on the project; and ..... (B) prior to the end of me coverage period. a new certificate of coverage showing extension of the coverage period, if the coverage period shown on the current certificate of coverage ends during the ,juration of the proj~; (6) retain all required cerriiicates of coverage on file for the duration of the project and for'one year therez4er; '.. (7) nolify the govem:nental entity in writing by certified mail or personal delivery, of any change that materially affects the provision of coverage of any person providing services on the prbjec{ami send the nocice within ten days after the person knew or should have known of the change; and (8) coauactually require each other person with whom it COntracts to: ;-....,.. (A) provide coverage based on proper reporting of cla.ssificatioll ~es and payrOU.~ot1nt~:~, f;iti~~ of any coverage agree.:nems for all of its e.':1ployees providing services on the proj~ for tft:e ~on afme project; .. (B) pnwide a cenificate of coverage to it prior to that other person beginning work: on the project; (q in~de in all contracts to provide services on the project the language in paragraph (3) oftms subsecQon; (D) prcwide, prior to the end of the coverage period. a new certificate of coverage showing extension of the coverage period. if the coverage period shown on the current certificate of coveraee ends during the duration cf the project; . . - (E) cbtain from eacn other person under C0nrract to it to provide services on the project, and p~vide as required by its contract: . (i) a c~e of coverage, prior to the other person beginning work on the project; and (ii) prior to~e ~d of the coverage peri~ a new cecti:ficate of coverage showing exI:~oq,of the coverage penod. If the coverage period shown on the current certificate of coverage endS diiringthe bttp:l/wwwsos.state.tx..usltad281II11101B1l10 IIO.htmJ NO'1''ICE TO COIfTItACTORS - B Reviaedl!13~'.. Page 6 oL 1 8n198 f" \.l J Page 6 of 6 r duraaon c r ::le comrae:: (F) retain ail required ce:-::'::C2:es ot coverage on rue for the duration of .he project and for one year t hereafte:- l: f G) notify tbe govemme~~a.i e~rity in -writing by cenitied mail or personai delivery. within ten days after the person knew or should have knOWll., of any change that IIl2.teriaily affectS the provision of coverage of any person providing services on the project; and r ' ~ (H) contraaually require e;!C~ pe:son with whom it contracts, to perform as required by this subparagraph and subparagraphs (A)-{G) of this paragraph, with the ce:1ificate of coverage to be provided to the person for wnom they are providing services. o f" W (f) If any provision of this rule or its application to any person or circ.l.-nstance is held invalid, the invalidity does not affect other provisions or applications of this rule that can be given effect without the invalid provision or application., and to this end the provisions of this rule are declared to be severable r' ~...., (g) 11Iis ruie is applicable for building or constrUction contracts advemsed for bid by a governmental entity on or after September I, 1994. This rule is also applicable for those building or construction contracts entered into on or after September I, 1994, which are not required by law to be advertised for bid (h) The coverage require:nem in this rule does not apply to motor carriers who are required pursuant to Texas Civil Statutes, Article 6675c. to register with the Texas Department of Transportation and who provide accidental msuf2Jlce coverage pursuant to Texas Civil Statutes, Article 6675c, ~ 4(j). (i) The coverage requirement in this rule does not apply to sole proprietors, partners, and corporate officers who meet the requirements of the Act. ~ 406.097(c). and who are explicitly excluded from coverage in accordance with the Act, ~ 406.097(a) (as added by House Bill 1089, 74th Legislature; 1995, ~ 1.20). TIlls subsection applies only to sole proprietors. partners. and corporate executive officers who are excluded from coverage in an insurance policy or certificate of authority to self-insure that is delivered, issued for deliverY, or renewed on or after Januarv 1 1996. - . . Source: The provisions of this 9 110.110 adopted to be effective September I, 1994. 19 TexReg 5715; amended to be effective November 6. 1995,20 TexReg 8609. Return to Section Index http://wwwsos.state.tx.usitad2S/IlJllOIBIl1O IIO.html NOTICE :-0 CONTRACTORS - a Revi~ed 1/13/981 paqe 1 ot 7 Sn198 ""lIlI!PJ'".- (""- la.. u L1 PART A SPECIAL PROVISIONS ........ .,.- GOLF COURSE IMPROVEMENTS (EXISTING COURSES) -GABE LOZANO SR. GOLF CENTER CITY PROJECT NO. 3274 SECTION A - SPECIAL PROVISIONS A-I T~ and Place of Receiving Proposals/Pre-Bid Meeting ..1 Sealed proposals will be received In conformity with the official adver tlsement invit Lng bids for the proJect. Proposals will be received in the f fiee :)f the ~ity S(~cretary, located on the first floor of City Hall, !-'O} Leopard Street, unb 1 2:00 p..., Wednesday, Hay lOth, 2006. Proposals mai}c'd should be addressed in the following manner: City f Co pus Chrisu City Secretary's Jfflce 1201 Leopard Street Corpus ChrIsti, Texas 78401 A'Mtl: BID PROPOSAL COURsES) -GABE LOzAtfo 3274 GOLF COURSE DlPROVEMENTS (EXISTING sa. GoLF cElftE'R - ctTY' PROJJ!:CT NO. A pre-bid meeting Ttl<2 meeting wIl] Brownsvi 11e Rd , pruject elements. will be held on Tuesday, ~y 2, 2006, beginning at 10:00am. 'onvene at the Gabe Lozano Sr. Golf Center, 4401 Old Ccrpus Christi, TX. and will include a discussion of the A site visit will follow. ~.. ~d~I tic!!.,:} ~... CJ~..~ara~_v.i..:?l tc1tion_s_~gl_~~_<:onduc:ted by the City. A-2 Definitions and Abbreviations Sectlun B-1 )f the General PrOVisions will govern. A-3 Description of Project GQLF COURSE DlPROVEMEllTS (EXISTING COURSES) -GABE LO~ ~~. GQIaFCElft'ER, This project consists of renovating eighteen (18) cours,e9teen$atllt:!i the ~)Cisting practice puttin<;j' green, construction of new' sand bunkers, lake expansion and shoreline stabilization, grading, drainage, and rriqat lon:)f sph'cted fairway areas, concrete cart path removal and nsLed J at lon, ex is Ling tee rpsurfaci ng and new tee construction, and nigat ion and grassing ot <ill disturbed areas. In additidh~~ the ]Jrojecl include~ cjemolitioll f a portion of the existing entry drive ind parking j,)t, :onstrucl jon of new entry drive and parking 'area, empCrij r y acc-e'>s t () und i t.urbed parking area, and landscape mprnvement: near lhe ent ry dt ive and new parking area. '-4 Method of Award The blds wilJ be evaluated basf~d on the following order of priority, subject r) 'hi dvailabi lit "I f fund'';: ~. Total Base Bid, or 2, Total Base Bid, Plus Additive Alternative No. I, or '" Total Base Bid, Plus Additive Alternative NO.1, Plus Additive Al terna ti ve No 2, or 4 Total Base Bid, Plus Additive Alternative No.1, Plus Additive Al ternati ve No 2, Plus Addi ti ve Al ternati ve No.3, or ~ Total Base Bid, Plus Alternative No.1, Plus Additive Alternative No. 2 Plus Additive Alternative No.3, Plus Additive Alternative No.4 Section A - SP (ReviSed 12/15/04) Page 1 of 28 EXPLANATION OF PROPOSAL Base Bid Items include: C.1 C.2 I I 1--- 6.7 .--'-- G.8 -""'--" 6.'13 G.14 G.16 6.19 ---"~- G.aO 1.7 Renovate existing ~ns 1 - 18 and PG including find existing seedbed limits, remove top 4", add,4" approved seedbed sand, bll, ~pe, funtigate, fine gra<te, prep, fertilize, and grass as shown and specified Install new chipping green, induding earthwork, shaping, subdrainage, outfalls, gravel blanket, seedbed, prep, irrigation, and as indicated J,~ Instal new bunkers including earthwork, shaping, subdrainage, outfalls, c1ean~, liner fabric, sand, ingation Improvement$ & adjustments. and grassing as indicated No.6Fairwa Bt,mk. s -2ndlanding,!!,~_____ ________ No.6 Green Bunke~n__. No,Q Green Bunke!!&. No. 13 Green Bunk~___ No. 15 Grass Bunker No. 17 ~oach Bu~--=.1~ ~il'lQ area No. 17 Green Bunke s I Reroute sections of exiSting path, where indicated on plans, including demolition, grading, paving,bacfdill, and regrassing _ + of indicated surrounding areas as specified on Hole 10__. _ ___ I Reroute sections of existing path, where indicated on plans, including demolition, grading, paving, backfill, and regrassing - !.of in_dicated _surrounding areas a~ at Hole 15 Tee _______, Section A - SP (Revised 12/15/04) Page 2 of 28 1.8 '--1: , ~.~. 1.10 Add section of path, where indicated on plans, including demolition. grading, paving, backfill, and regrassing of indicated surrounding areas as specified at Hole 17 Tee Add section of path, where indicated on plans, including demofltiori, grading, paving, backfill, and regrassing of indicated SUfI' at NQ.9 Eucutive to cad. '. ~ .... _.!\I~~ceJ()lmisGeIIa~us l!~fied improvements to be determined Additive Alternate NO.1 items include: lJ :-1 ...,~ ~. I 1.2 Reroute sections of existing path, where indicated on plans, including demolition, grading, paving, backfiU, and regrassing o~ indica~~ sll':f"()lJnding a,reas _a~ S~CIf!ed on Hole? Reroute sections of existing path, where indicated on plans. including demolition, grading, paving, backfiU, and regrassing of Iflt:1ica!ec!.~urrounding areas.~ seec1fied on H()Ill.3 Additive Alternate No. 2 i terns include: 1.1 Reroute sections 01 existing path, where indicated on plans, incIud'mg demolition, grading, paving, backfiU, and regrassing . of indicated surrounding areas ~fied on Hole 2. . __. ._....__.. L2 Reroute sections 01 existing path, where indicated on plans, including demolition, grading, paving, backfiU, and regrassing ofindicat~surroun~~.<J~~.~ <J~':>~ on H~Ie_~ Section A - SP (Revised 12/15/04) Page 3 of 28 Additive Alternate NO.3 Itern:= nclude' 8.1 Install all improvements to entry and pat1(ing area including demolition, grading, drainage, paving, tern entrance and striping as in<flCated and specified Il!stall oV~,of remainder of exist!!1g~OOng lot as indicated and specified Install plant matenal, planting beds, landscape edging, site grading, fine grading, solid sodding, 'I, i' lion and sleeves as within islands of alternate bid 8.2 8.4 Instal new bunkers including earthwork, shaping, subdr.linage, outfaUs, cleanouts, liner fab!!s...~nd,)rrgation I~ovements & adjusbnents, and grassing as indicated No. 14 Green Bunker(s)..~" __.........._...__ NO:J6 GreenBunk~..._. .._... _"_. No. 17 Fairwa Bu s - 1st land' _.J~ 1.4 Reroute sections of existing path, where inalCated on plans, including demolition, grading, pavi09,' ~,*fi", aild regrassing j' of indicated surrounding areas as ~cified on Hole 12___.___ Reroule sections of existing path, where indicated on plans, including demolition, grading, paving, backfil, and regrassing . :, ot indica~ surrounding areas as s~fied at Hole !!.F~_. "__""_ .__J 1.9 Additive Alternate NO.4 llems include. G,1 &3 G.4 Install new bunkers including earthwortt, shaping, subdrainage, outfa'ls, cleanouts. liner fabric, sand, irrgation Improvements & adjustments, and grassing as indicated No. 1 Fairwa Bunks No.!Green Bunk~. No.4 Green Buntcer(s). ..... No. 5 Fairwa Bunk~_. No. 7 Bunkers - left side ------.-----....- L5 1.& 1- _. Reroute sections of existing path, where indicated on plans, including demolition. grading, paving, backfiB, and regrassing of indicated surrou 'fied at Hole 14 Tee Reroute sections of existing path, where indicated on plans, including demolition, grading, paving, backfill, and regrassing .of indicated surroun~areas .~ at Hole 14 Fwy .._.___. The i, y r'~s.,' [Vi'S irreguLHities dod t advant aqeous te- the i the [iqht to [eject any Jr all bids, ,) accept tIlt' bid which, in tht' City's opinion, ity ard in the best interest of the public. to waive is most Section A - SP (Revised 12/15/04) Page 4 of 28 A 5 Items to be Submitted with Proposal . .,-.,iI< r oWlnq items ar_ereg~ired to be submitted wi th the proposal: 1 5% Bid Bond Proposal) (Must reference Pro;ect Name as identified in the (A Cashier's Check, certified check, money order or bank draft from any State or National Bank will also be acceptable.) 2 DIsclosure of Interests 3tatement 3 Qualifications Statement(See Technical Specifications Section GC-01010) 4 Information and documentation required by items A-28, A-29, and A-30 of these Special Provisions A ;;> Time of Completion/Liquidated Damaqes T mil11mize tnconvenience to the general public and to minimize their '0'U1 e to dangerous conditions, the Contractor will be required to follow t-Lghl schedulIng fOI construction and will be required to meet deadlines for " npiet ion (f each phase )f construction shown below. The project has been d lLJed into phases Time dura.tion for construct i.on is allocated for each pt~SF, and if the work tn that phase is not complete as shown below, 1. ] qU! dated lamages wi] 1 i)e d:isessed fc.r each day that the work is not completed. Time dutation tor pach phase is not transferable. The working time f( r compiet l')f1 of the entire Project will be 150 calendar days '.H :h Phase and a;>-;sociated sprigging ot the Project shall be completed within Lh. number of calendar days or dates allocated below. Detailed descriptions .' the phases C!["e provided on the contract drawings as indicated below: From Day one* Ph....se A - Holes 10 throuqh 18 closed 123 Calendar Days I\U G["eens renovations and sprigging for holes 10 - 18 must be complete within the first 19 calendar days of this phase. l'he remainder of the work all holes 10 18 and the practice range must be completed. (Additive Alternate No.2 and items G.IO, G.1l. I 5 and].6 of Alternate 4 are ncluded in this phase) *S~t of. the phase i,. deli.neated by the Notice to Proc~. Completion shall )f' bdsed on sat is factory work, completed in accordance with the plans, ;l '-L:ations, and .)ther contract documents and accepted by the City. From Day 30* Phase B - Holes 1 through 9 closed 120 Calendar Days Greens renovations and sprigging for holes 1 - 9 must be complete within the first 19 calendar days of this phase. he remainder of the work on holes 1 9 and the practice range must be completed. (Additive Alternates No.1 and items G.1 through G.9 of No.4 Additive Alternate are lncluded ill this phase.) Section A - SP (Revised 12/15/04) Page 5 of 28 Phase C-- Parking Lot Construction 75 Calendar Days Al1 ] lfldscdpIng and work In tlH~ parkIng lot must b.. 'omplpted. TemporalY pdlking must be provided t ,1 )ughOllt Lhp const [UC t ion period for patrons utilizing t',p 'lpen port on of the facility Additive Altprnate N,. ~ 15 uwlllded in thIS phose. *Start of the Phases B and C commences 30 calendar days after the beginninq of the contract period as delineated by the Notice to Proceed. Completion shall b(~ based on sat isfactory work, completed in accordance with the plans, specj(i 'atior,s. and )ther (Ontl (.t documents and accepted by the City. Days Allocation for Rain. The Cmtractor shdll ant lCJpate the following number of work days lost due to rain (n determIning the contract schedule and for each phase and associated sprig':Jinq of the contract. ^ 1 aIn day is defined as any day in which the amoun1 )f t a Lri measured by the Nationa 1 Weather Set'vices at the Power Street Stormwat er Pum!= Stat lOll is 0 ct.' inch or qreater. No extension of time will be C(f,~ idered unt 11 the expe.'j ,'d number of rain days has been exceeded and the F.ng 1 neer hdS ag eed that t IH' stdtus of construction was such that there was a impact del. rim'.mta I t (\ t tH canst [\lct ion schedule. ,Janua! y 3 Days Md\ 4 Days September 7 Days Februd r 'i J Day:~ ,Junp 4 Days October 4 Days March 2 Day': J II J Y l Days November 3 Days .!\pr il ; Day i\Utfu s I. 4 Days December 3 Days Thi S PI je':t Calen(la Da y:;, exceeding the for each pha~e eSient lall y i construct i,on contract for a period of 150 is dE tal led elsewhere III the contra,:t documents. Damages for ~otal time tllocted shall be independent of damages assessed a: d,'scr i bed ,tbe ve The ('ant ract or shall commenep work receipt of ""rltten notice from the designe,o ("Cjty Engineer") to proceed within ten (10) calendar Director of Engineering days after Services or For Pdeh calendar day that dllY work remains incomplete after the time specified In the Contract fOJ completion of the work for each phase and associated sprigging and the total contract duration, or after such time periOd .:is extended pursuant t () other provisions of this Contract, $1000.00 ~ calendar day will bE dssessed against the Contractor as liquidated damag"s Said 1 i.quidated damages are not imposed as a penalty but as an est imd t< of ':hE damages that the City wi 11 susta in from delay in completion of th" work, wh 1 eli damages by their nature are not capable of precise proof. The [)lr,'ctor uf Eng~neerinq Services (CIty Engineer) may withhold and deduct from monies Jtherwise due the Contractor from the monthly pay estimate the amount of 1 iquidated damage'3 (j1lP the Ci ty, A-7 Workers Compensation Insurance Coverage If the Cont rac:t,)r' s workers' compensation insurance coverage for its employees war king or, the Project. is terminated or canceled for any reason, and replacement wurkers' compensation insurance coverage meeting the requiJ ements ot t hi:; Cont ract 1 s not in effect on the effective date of cancel lilt ion at the worker~,' compensation insurance coverage to be replaced, then any C)ntracte.r employee not covered by the required workers' comperlsdt ion inslJrarwe coverage must not perform any work on the Project. Secti.on A - SP (Revised 12/15/04) Page 6 of 28 F, Lt he r more, tor ec,ch calendar day incl uding and after the effective date of t rmination or cancellation of the Contractor's workers' compensation 1 surance coverage for its employees working on the Project until the date r placement workers' ~ompensation insurance coverage, meeting the r ~qu rement:; of th s Contract, is III effect for those Contractor employees, qu d,jted damages will bf' assessed against and paId by the Contractor at t:he ghes. daily rate elsewhere specified in this Contract. Such liquidated damaqe WI 1 accumulate without notice from the City Engineer to' the r ,nt ra 'tor ano ..ri! 1 be lssessed and paid even if the permitted time to cnmr e t h.. PlO ief has "ot expi red. In a.."( ',)rdan';e WI th other [equI rement::. of this Cont ract, the Contractor shall Ii t pc r mi t subcont l actors 01 others to work on the Project unless all such dl \'idual s work inq on t he Project are covered by workers' compensation surance and unless the required documentation Df such coverage has been provided to the ~ontractor and the City Engineer. A-a Faxed Proposais Proposals faxed directly tt) the City will be considered P op(..sal.s must cont ain original signatures and guaranty and a cord,"\fIce with Seer ion B-2 (,t the General Provisions. non-responsive. be submitted in &-9 Acknowledgment of Addenda The:::ontractor shall acknowledge receipt of all addenda received in the appruprlate space provided lO the proposal. Failure to do so will be interprl'ted as non-receipt. SInce addenda can have significant impact on the propnsi J, fdl J un' t) acknowledqe reee Ipt, dnd a subsequent interpretation of non- r e'eipt, ,auld have ar' ddvers(' et fect when determining the lowest resp' n~ ble bidder, "'-10 Wage ~tes (REvised 7/5/00) Labor preference and wage rates for Construction Type(s): Heavy and, Building. In case of conflict, Contractor shall use higher wage rate. ~.PrevaLlir:!9.....!!.~ Scales '!he Corpus Orristi City Counci,l has determined the general prevailing IIlllUIIUII hourly wage rates for Nueces County, Texas as set out in Part C. The Oxltractor and any subcontractor RUSt not p3Y less thaI, the specified wage rates to all laborers, worknen, and nechanics aIployed by than in tiie exeaKion of the Contract. The Contractor or subcontractor shall forfeit sixty dollars ($60.00) per calenda.r day, or portion thereof, for each laborer, ~rkman, or rrechanic enplo~, if slIch person is paid less than the specified rates for the classi fi cation of work perfornE'Ci. The Contractor and each subcontractor nust keep an accurate record showulg the oanes and classifications of all laborers, workrren, and ned1anics enplovEO(j by them to =Ilflect ion wi th t he Project and showing the actual wages p3id to each ~rke, '!he Ccmtractor will make bi-weekly certified payroll sutmittals to the City Engineer. The COntractor will also obtain cq:>ies of such certified payrolls fran all subcontractors and others working on the Project. These c:bc::urrents will also be sutmitted to the City Engineer bi-weekly.. (See section for Minority/Minority Business Enterprise Participation fulicy for ad::titional requirarents concerning the prq:>er fonn and content of the payroll sutmittals.) cne and Ofle-half (l~) t.ines the specified hourly wage Imlst be paid for all hours worked in exceSs of 40 hours in illlY one ~k and for all hours worked on Sundays or holidays. (See Section Bl-l, D2finitiorlof Terms, and Section B-7-6, Working Hours.) Section A - SP (Revised 12/15/04) Page 7 of 28 A-1! . Cocp:!raticn wi.th Public Ager1cl.es (ReVISed 1/5/00) 1be Contractor shall cooperate with all plblic and private agencies with facilities operating within the limits of the Project. The Contractor shall provide a forty-eight (48) hour notice to any dfPl icable agency when lr.Qrk is anticipated to proceed in the vicinity of any facility by using the DrG TESS Systal\ 1-800-344-8377, the Lone Star Notification Crnpany at _. 1-800-669-8344, md the Southwestern Bell L:x-.ate Group at 1-800-828-5127. For the Contractor's (Xlnvenience the fo 1 lowing telephone nutbers are listed. .;i t Y Enguleer Project Fnglneer Finger Dye Sp.UUl, I nc Traffic Engineering Police ~partment Water D:part.nent Wastewater Department Gas Department Stann Water Cepartnent Par"ks & Recreation Department Streets /, Solid Waste ServIc:e~; A E P 880-3500 7.81-496-4300 880-3540 882-1911 857-1880 857-1818 885-6900 857-1881 880-3461 857-1970 299-4833 881-2511 SBC City Street Div. Jar Traffic Signal/Fiber Cpti c IDcatf C:ablevision !\CSI (Fiber Cpt ic) KM.: (Fiber CPUc) ChoiceCan (Fiber Cptic) (:APRX1( (Fiber cpt ic) Brooks Fiber C{)tic (MAN) 857-1946 857-5000 887-9200 813-1124 881-5767 512/935-0958 972-753-4355 A-12 Maintenance of Services (880-3140 after hours) (880-3140 after hours) (885-6900 after hours) (880-3140 after hours) (693-9444 after hours) (1-800-824-4424,after hours) 857-1960 (857-5060 after hours) (Pager 800-724~3624) (Pager 888-204-1679) (Pager 850-2981) (M:bile) The Contractor shall take all precautIons in protecting existing utilities, both above and below ground. The Drawings show as much information as can be reasonably obtained from existing as-built drawings, base maps, utility records, etc. and from as much field work as normally deemed necessary for the construction of this type of project with regard to the location and nature of underground utilities, etc. However, the accuracy and completeness of such. information is.. not guaranteed. I t is the Contractor's' sole and complete responsibil ity to locate such underground features sufficiently in advance of his operations to preclude damaging the existing facilities. If the Contractor encounters utility services along the line of this work, it is his responsibility 10 maintain the services in continuous operation at his own expense. In the event of damage to underground utilities, whether shown in the drawings, the Contractor shall make the necessary repairs to place the utilities back in service to construct the work as intended at no increase in the Contract price. All such repairs must conform to the requirem:ents of the company or agency that owns the utilities. Where existing seweIS are ence,untered and are interfered with (i.e. broken, cut, [,tc'.), f low must be maintained. Sewage or other liquid must be handled by the Contractor either by ,~onnection into other sewers or by temporary pumping to a satisfactory outlet, all with the approval of the City Engineer. Sewage or other 1 iquid must~ not be pumped, bailed or flumed over the streets or ground surface and Contractor must pay for all fines and remediation that may result if sewage or other 1 iquid contacts the streets or g"round surface. It is also the Contractor's responsibility to make all necessary repairs, relocations and adjustments t c the satisfaction of the City Engineer at no increase in the Contract price. Materials for repairs, adjustments or relocations of sewer service lines must be provided by the Contractor. Section A - SP (Revised 12/15/04) Page 8 of 28 A-13 Area Access and Traffic Control SufflCient traffic '~ontroL measures must and 0 pnJvJde a mi,imum of inconvenience be used to assure a safe condition to motorists and the public. The ':ontractor wll be requl[(~d to schedule his operations minimum adverse impact 00 the accessibility of the museum may include, but is not i imi ted to, working driveways cons' rli,'tlon (,t temf>orary tamps, etc so and in as to cause pub lie. Th i s hal f widths I The C:C'ntractor shdll :::omply with the City of Corpus Christi's Uniform Ba rr i c"ding St andar ds clnd PIae t ices as adopted by the City. Copies of this document an ,lva lahle thlou<Jh the C i t y' s Traffic Engineering Department. The Contra;'tor shall ;ecure thE necessary permit from the City's Traffic Enginepring Depaltmpnt. All ,osts f()r traffic control dre considered subsidiary; therefore, no direct payrnpnt will bp made to Contractor. A-1. Construction Equipment Spillage and Tracking The :ontrdctol shall keep the adjoining streets free of tracked and/or spilled matprials going t,) c,r from the construction area. Hand labor and/or mechdnj;-al '~quipment must be used where necessary to keep these roadways cleat f job-related materials Such work must be completed without any incr<,'a: e In th.~ Con'ract price St reet and curb II ne mu~;t: be cleaned at the end of the work day or more frequently, if necl'ssary, to prevent material from washing into the storm sewer ';ystem. No v sible materJal that could be washed into storm sewer 1S allowed to rema in 01 the Peoje',::t site or d,djoining streets. A-1S Excavation and Removals The excavated areas behind curbs and adjacent to sidewalks and driveways must be fIlled with ",-led_n" dirt. "Clean" dirt is defined as dirt that is capable of providing a good growth of grass when applied with seed/sod and fertilIzer. The dirt must be free of debris, caliche, asphalt, concrete and any other matecial 'hat detract:c from iLs appearance or hampers the growth of gr as c All xlsting::on,'rete and asphalt withln the limits of the Project must be removerl unless othelwise nuted All fluessary removals ine luding but not limited to pipe, driveways, sidewaJ ks, etc , ar.' to bE- cOllsidered subsidiary to the bid item for "Street Excavation"; therefore, no direct payment will be made to Contractor. A-16 Disposal/Salvage of Materials Excess excavated mdterial, broken asphal t, concrete, broken culverts and other unwanted material becomes the property of the Contractor and must be removed from the ;;ite by the Contractor. The cost of all hauling is considel'ed subsididry; therefore, no direct payment will be made to Contr ,let or Section A - SP (Revised 12/15/04) Page 9 of 28 ..... A-l1 Field Office NOT USED 'l.!fl.e--. "ontrJct7&E-mtlS-t --~i5tt- ,+-hc City Engineer or -. hiD repre:Jentati ":e \lith .:l field-flffiec Jt -t':-fie con:Jti-+tet:-iBft Gi te. The field office mUGt contain at lea:Jt l-2-G--::quJrc-f€.et:-d e-f u:JeJbJ-e-- :;paee. The field officc mU3t be air conditioncd afl4- ttea-t-e4 afld--.-ffH:j-St---be~-t*Fft~.hed \iith In inclined tJble that meaDurea Jt !-east J{}!'-7(--NJ-!' -dH4-++,<Q +;.2+ chJira.---'I'fie- Contr.:1ctor Dh.:lll mO'.T the field ~~ Bft----E-fte---s-3:te ttS--~red by the *~y Engineer or hiG repreDent.:ltive. 'l!fle-- f-ie-l4-- -frHiee ---fftHfrt--- ~ f-tt-Ffl-isttee- \; i t h-a- tel e p h 0 n e ( \{ it h 2 1 hour per ' day afl-S-Wf.r-t~.--se-rv-i€<'+ dfl4--f'AX--machine -pa-i4-fe-tc---by the Contr.:lctor. There iG no ~t-+f+"---p.+y f{c€ffl -F+.F---t-tte fCieH e+cF+ee, A-18 Schedule and Sequence of Construction To ffil.Llmize 1 nc;)nveniencp tu the general public and to minimize their expo:,:.ule to dangerous condi t ions, the Contractor:- will be required to follow tighl cheduling fo c(,nstruct]on and will be required to meet deadlines for camp!.,l ion (f each phase )f ,:onstruction shown below. The project has been dividel1 intc phaies Time duration for construction is allocated for each phas, dnd it t he woe k in 1 hat phase is not complete as shown below, liqUi'i,lted ,iamdg.os Wl] 1 i)e i;sessed for each day that the work is not camp ~'ted rime iurdtion for '?dch phase is not transferable. The \cJorkinq tune fcr completion 01' the entire Project will be 150 calendar days Theontractor ~;ha i 1 submit the City Engineer a work plan based on calerj(ia r days for construction of the entire project and broken down into construction of each phase. This plan must detail the schedule of work for each construction phase and shall be structured to meet all of the requirements specified in Section A-6 "Time of Completion/Li<luidated Damages", and must be submi tted to the City Engineer at least three (3) worki'!o Jays prlO t) the pre-construction meeting. The Contractor shall furnish a Construction Schedule for the following phases of work (detai] ed de scr Lpt OIlS of the st ages are provided on the contract drawings as Ildlcated below) : From Day o,,~* PIlase A - Holes 10 through 18 closed 123 Calendar Days All Greens renovations and sprigging for holes 10 18 must be complete withir the first 19 calendar days of tLi pha:;e The n~mainder ot the work OIl holes 10 18 and the practice rdnge must be completed. (Additive Alternate No. 2 and j ems G.IO. G 11 r.5 and I 6 of Alternate 4 are inCluded in this phase.) *Start of the phase ~s delineated by the Notice to Proceed. Completion shall be based on satjsfac~ory work, completed in accordance with the plans, speci; jations, and ,ther cont ract documents and accepted by the City. From Day 30* Phase B - Holes 1 through 9 closed 120 Calendar Days All Greens renovatIons and sprigging for holes 1 - 9 must be complete within the first 19 calendar days of thi phase. The remainder of the work on holes 1 9 and the practice ranqe must be completed. (Additive Alternates No.1 and items G.1 through G.9 of No_4 Additive Alternate are i!lcluded in this phase.! Secti.on A - SP (Revi.sed 12/15/04), Page 10 of 28 Phase C - Parking Lot Construction 75 Ca1endar Days Al dnds<:aplrHj acid work in the parklllg lot must :>e completed l'emporary parking must be provided htoughout. the onstruction period for patrons utilizing fI<c' open port la,s uf the facility_ Additive Alt.ernate No 3 i.': 1 nc i udpd in t h i 0' phase. *Start of the Phases B and C commences 30 calendar days after the beginning of the contract period as delineated by the Notice to Proceed. Completion shall be based on satisfactory work, completed in accordance with the plans, specIfIcations, and other contrdct documents and accepted by the City. The plan must also ndicate the schedule of the following work items: 1 InitJ-_~i~,:;chedu..l~ ::ubml t to the City Engineer three the Pre-Canst I'uct lOCi Meell ng an i.n i t i al Construction (3) days prior to Progress Schedule t.or review 2 I_t:ems ~~__IIlcl~de' )how complete sequence of construction by activity, denti fyi nq Work c f :"t'f>arate stages and other logically grouped j('tlvltteS dentify the first work day of each week. 3 S~bmittal_1~at'2s: Iudi c'ate submi tta 1 dates required for all submittals for the entire project. 4 Re-Submission Revise clnd resubmit as required by the City Engineer. 5 Monthly Updat'~: Submi t Updated Construction Progress Schedule to show .iCtual progre::s of e1ch stage by percentage against initial Schedule. It the meaning,nd Intent l,t this Contract that the Contractor shall be allowed to prcsecute his work at such times and seasons in such order or precedence, and n such manner as shall be the most conducive to economy of const ruetion, "ubjet t to the fullowing conditions: A, The ::chedule i E'qu ir ement s <is noted abov(, at :Ollst ruction shall be structured to meet all ,f Section A-6 "Time of Completion/Liquidated Damages" and B. The sc:hedu] elf con:;truct ion sha 11 not conf! ict with any provision of the Cuntla<'t Documents, Clnd also rhat when the City is having other wurk don.:, ei' her by cor,t ract or by Cit y forces, the City Engineer may direct 'he tJme and manner of constructing the work done under this Contract so I hat conf 1] cts wi 11 be avoided and the construction of various works being done ror the City will be harmonized. C" Traffic:ontrll 15 ('ssE'nt lal to maintaining public safety and flow of t r af fic. The :ont ractor :;hall be aware of other construction projects occurring in the drea dnd shall coordinate scheduling, traffic control, maintenance at services and street access with other contractors. D. Cunt [actor s,iall :oor d i nate and cooperate with the const rue! io'l ;chedul ing ,md traffic control modifications E'vents that WIll occur during the period of the Contract. City for for special Section A - SP (Revised 12/15/04) Page 11 of 28 ~-19 Construction Project Layout and Control The ,jl awings may depict but not necessary include: lines, slopes, sect 100S, meaSUI em,'nts, bench marks, baselines, etc. that are requ u'd t cClnst ru, 't a project of this nature. grades, normally Majo prov 'ontr(.L, dnd two j,.d by thf' (it or (2) bench marks required for project layout, Co~sultdnt Project Engineer. wi 11 be The ontTact 01 shal i furni sh all lines, slopes and measurements necessary for contro of the work If, 1uring constru,:tion, it IS necessary to disturb or destroy a control point ;;r bench mal k, the Contractor shall provide the City or Consultant Project Enguleer 4H hour: notice so that alternate control points can be estal,ll. shed by the Ci ty 01 ~:')[jsultant Project Engineer as necessary, at no cost t.' the Contractor, Co,ntro] points or bench marks damaged as a result of the :ontracr:OI' s negllgerlce wi 11 be restored by the City or Consultant PrCJj,"f Engineer .1t the expens" of the Contractor. If, t or whatever H'ason, it 1 S necessary to deviate from proposed line and grade to properl y execute the work, the Contractor' shall obtain approval of the 'j t Y or Consu tant !'roje,:t Engineer prior to deviation. If, in the opin] .Jr' of r:he (i t or Cmsll L tant Project Engineer, the required deviation woule] necessi tatc' revi s ion to the drawings, the Contractor shall provide suppor'C i ng measurements as required for the Ci ty or Consultant Project Engin'?"1 to revise the drawings The 'ontracLo[ ~;ha II tie 1 '"'.1. or reference all valves and manholes, both exist ing and propoStC'd, Eo r t he purpose of adjusting valves and manholes at the ,ompletion of t he paving process. Also, the City or Consultant Project Engineer may require that the Contractor furnish a maximum of two (2) personnf~] fa r the pL cpose .,f ",c;,; isting the measuring of the completed work. The CJ11tract')r shdlJ prOVide the following certification for documentation and vel i ficatiooJf ':ompliance with the Contract Documentsl plans and specifications. Sdio complldncp ':ertification shall be provided and prepared by a Third P,Hty lndependent Registered Professional Land Survey (R.-P.L.S.) licensed in the state of Texas retained and paid by the Contractor. The Third Party R.P.L.S. shall be approved by the City prior to any work. Any discrepancies shaLl be noted by the Third Party Surveyor and certify complLance t'l H\Y re']UlatOl Y pE'rmits. Following IS thf~ rninlmum schedule of documentation required: 1: r.r i9.<i_ti.':l!~. . Indicate trianguLated qUick coupling valves, horizontal locations to all gate, automat'ic referenced to permanent surface improvements. and &trcet~-.. --AJ:.l curb rcturn:31t point~ t;:mgency/point of circumference --Gti-rb-.....:rOO- gut ter-4'l-ew-.+Hte---ooth DideD of atrcet '-Bft- a 200' inter:.:11; · St reet cro,m:J on '...~,.. tfflc€:f'Ja1 .::lod at -a-J:..l-interacctiona. - W.lotc.l.:ltc r~ · 1'.11 rim/iwJcrt -el,cJ.::ltions--dt ffi.:lnholcD; · ^ll interocctinglineD in m.::lnhole:3; · CaDing clcJ.:ltion::;(top of pipe .:lnd flow line) (TXDOT and RR pcrmitD). -~'7 · .".11 top Of~€-S-~T · Yal vea vauH-s-r-i-ffi..; · Ca~;ing elcvationD~~f~ .:lnd flo;, line) (TXDOT and Rn permita). -- Stormw.:tter~ · .".11 rim/iw:ert -effv.:ttion:J-a-t;- manholcD; · ~ll interaecting linea in m.:tnholCD; · Ca:Jing elev.:ltionD (top of ~ and flow linc) (TXDOT and RR permitD) . Section A - SP (Revised 12/15/04) Page 12 of 28 - A-20 Testing and Certification All Lests required under th is item must be done by a recognized testing laboratory selecLed by the C]t~ Engineer The cost of the laboratory testing wi 11 btc burne by tLe City. In the event that any test fails, that test must be donF' over after correctlV(' measures have been taken, and the cost of rete',t \ ng Wi 11 b'.~ borne ty lh,; Contractor and derlucted from the payment to the ,'ont ract 01 The u 'ntract(, Engi [,e. J . mu' t. pro! ide ~ll applrcable certifications to the City A-21 Project Signs The ontracto! must followlng drawings canst ruetion beg] ns the \ ontractor. The the ( ity Engineer furnish and (Attachment and WIll be locat i on of install ! Project signs as indicated on the IV) The signs must be installed before maintained throughout the Project period by the signs wi 11 be determined in the field by A-22 Minority/Minority Business Enterprise Participation Policy (Revised 10/98) r-' 1. Po l.ic::y II is the policy of the City of Corpus Christi that maximum opportunity L; afforded minorit les, women and Minority Business Enterprises to participate i,. the per formance of contracts awarded by the City of Corpus Christi in support of Equal Employment Opportunity goals and objectives of the Affirmative Act.ion Policy Statement of the City dated O,tober, 1989, and ,my amendments thereto. In accordance with such p,,] icy, the City has established goals, as stated herein, both for mJflority Inti ~emale pa.rllc:ipation by trade dnd for Minority Business Enterprise. 2. Def initions d Prim~Contrac::.~or:: Any person, association or joint venture as awarded a City cont~act. firm, herein partnership, corporation, provided which has been b Subcgntractor: Any named person, firm, partnership, corporation, association, or joint venture as herein identified as providing work, labor, services, supplies, equipment, materials or any combination of the foregoing under contract with a prime contractor on a City contract. ~nClritLBusines~-.E~~erpri~~: A business enterprise that is owned and controlled by one or more minority person(s). Minoritypersons include Blacks, Mexican-Americans and other persons of Hispanic or igin, American Ind ians, Alaskan Nat1,ves, and Asians or Pacific Islanders For the purposes of this section, women are also considered as minor it i es. Minority person (s) must collectively own, operdte and/or dctively manage, and share in payments from such an ellterpr i ;e in t he manner hereinafter set forth: 1. Owned (a i For a sole proprletorship to bus] nes~ enterprise, it must per con be deemed a be owned by a minority minority Section A - SP (Revised 12/15/04) Page 13 of 28 (t ) For an enterprise doing business as a partnership, at least c,l .0% of the assets or interest in the partnership property must be owned by one or more min~rity person(s) For an enterprise doing busIness as a corporation, at tea '3t ') I 0% of the assets 01 interest in the corporate c;ha re:o must t)P owned by one or more minority per'30n (S) C, ntroll (d Tte primary power, direct or indirect, to manage a business elLerprise rests with d minority person(s) Share in ~ents Minority partners, proprietor or stockholders, of the enterpri:oe, as the case may be, must be entitled to receive 51 0% or mor~ of the total profits, bonuses, dividends, interest payments, conunissions, consulting fees, rents, prucurement, and subcontract payments, and any other monetary distrrbution paid by the business enterprise. i Mi 11_0t ~t 'i: See definition under Minority Business Enterprise. .~ Fema_!~ Owned Business Enterprise: A sole proprietorship that is owned dnd controlled by a woman, a partnership at least 51.0% of whose .1ssets or partnership interests are owned by one or more women, or a corporatIon at least 51.0% of whose assets or interests in the corporate shares are owned by one or more women. .Jo.!:.nt_Y~~.ture: :\ JOint venture means an association of two or more persons, Dartnershlps, corporations, or any combination thereof, founded t( carryon c! single business activity which is limited in 'Scope ,lOd direc ion The degree t.O which a joint venture may satisfy the stdted MBE goal cannot exceed the proportionate Interest (of the MBE as a member of the joint venture in the work to be performed by the Joint venture. For example, a joint venture wh ich 15 j 0 perf)rm 50.0% of the contract work itself and in which c1 mino! ity joint venture partner has a 50.0% interest, shall be deemed equivalent to having minority participation in 25.0% of the work M] nority members of the joint venture must have either financial, managerial, or technical skIlls in the work to be pecformed by the Oint venture. 0,. !.,OdJS i . The goals for participation by minorities and Ent~erprise5 expressed in percentage terms for aggregate work f orc~' on all construction work award are as follows: Minority Business the Contractor's for the Contract ~nority Participation (Percent) ~nority Business Enterprise Participation (Percent) 45 % 15 % Section A - SP (Revised 12/15/04) Page 14 of 28 b These goaLs dre applIcable to all the construction work (regardless of t ederal part icipation) performed in the Contract, including approved change orders. The hours of minority employment must be substantillly uniform throughout the length of the Contract and in Pdch trade. Th.~ transfer of minority employees from Contractor to Cnntracto or Irom project to project for the sole purpose of m.~et nq t :Ie Cont rac-ter' s percentage is prohibited. 4. C)me.lian~' ci Upon '~~ompletioL ,>1 the Project, a part 1 cJpa t ion, <iubstantiated by copies slIbmJ tt ed by the Cont J actor to the City final breakdown of paid invoices, Engineer. of MBE shall be o The (:ontrdctor shall make bl-weekly payroll submittals to the City Engineer. The Contractor is to indicate the percent of minority and female participdtion, by trade, which has been utilized on the ProJect. Along with the request for final payment on the Project, the Contractor wi lJ J ndicate, in writing, the overall participation In these areas whlch have been achieved. The City Engineer may WJ thhol d monthly or f l.nal payments to the Contractor for failure to ::iUbmlt bi weekly payrolls in a timely fashion or to submit overall partlclpa ion information as required. A-23 Inspection Required (Revioopd 7/5/00) The 'ontrdct~or sha 1 assure the appropriate building inspections by the Building Inspection Division dt the various intervals of work for which a perm1 t ] s required a.nd to assu re a final inspection after the building is completed dnd ready for occupancy. Contractor must obtain the C~rtificate of OccuPdn,'y, when dppl icable Section B-6-2 of the General Provisions is hereby amenc1ec in t ha t the Contrdctor must pay all fees and charges levied by the City' Eui ldinq rnspectiop Department, and all other City fees, including water/wastewater meter fees and tap fees as required by City. A-24 Surety Bonds Paragraph two (2) of Section 13-3-4 of the General Provisions is changed to read IS to] low" "No surety will be accepted by the City from any Surety Company who l: now in default or delinquent on any bonds or who has an interest 1-{' any litigation agalnst the City. All bonds must be issued by an lpproved ~)urety Company authorized to do business in the State of f"xas I f perf ormanc.~ and payment bonds are in an amount in excess )1 ten pet cent (10%) of l~he Surety Company's capital and surplus, UH' Suret y Company shall provide certi fication satisfactory to the ',T y Attorney that the Surety Company has reinsured the portion of r-hc bond amount that exceeds ten percent (10%) of the Surety :"mpany's capi' al ane! surplus wi th reinsurer (s) authorized to do bus iness 1n th.. State of Texas. The amount of the bond reinsured by any reinsurer may not exceed ten percent (10%) of the reInsurer's '::;apital and surplus. For purposes of this section, the ,lmount of allowed capital and surplus will be verified through the itate Board or Insurance as of the date of the last annual itltutory financial statement of the Surety Company or reinsurer luthorized and adrnitt,~d to do business in the State of Texas. The iUlety shall designate an agent who lS a resident of Nueces County, f'exas Each hand must be executed by the Contractor and the Section A - SP (Revised 12/15/04) Page 15 of 28 Sd ret y E'en contra,;ts n excess of $100,000 the bond must be executed by a Surety company that 15 certified by the United States S"cretory cf the Treasury or must obtain reinsurance for any 1 abil1tv in excess of $lOO,OOO from a reinsurer that is certified by the Unlt~d States Secretary of the Treasury and that meets all the abCiv,' n,qu l rements. The insurer or reinsurer must be listed in t:I1' Feder"d Register as holding certi ficates of authority on the i, t e ! he bond ',,;as I S5 llecl .. '. A-25 Sales Tax Exemption (NOT USED) Secti on--~ft;--~ 'EJlemption -ProviGion," iG deleted in itG entircty and the ful-l-<rw4 ft'g-'~t it u ted i n -~ ,,' t he reo [, ~-ae~-fur- --~'Jeffient::; -tB rea--l- property a\larded by the City of Corpu:J 8firi-s-E-l--OO- not--~i:-f..y--fur e)ICffiptionG -&f.- Saleo, Encioe, and Uoc TaJ(eo unleo::; t:fl.e-{~Ttract or e lee tG-E-e-- ~-a te under Zl GepZlrZlted eontrZlct aD defined by Seet:-i-ffit~.;.L9-l--&f-Ch.::lpter~,~l\dminiotration of Title 31, Public Finance of the Te)(a:JP.dRli ni::;trd+'~-ve-t-ede7 - or ::JUch other ruleG or. regulationG Zl:J ffi.::lY be promulgated by--thc Comptroller-of Public l\ccount:J of TeJIZlG. H +he-- ~~-t-F-ri-et--(7F-e-tee-tc'T+t+ -Bf* T<lte under .::I Gep.::lr.::lted contr.::lct, he ohall: h -- .:14-)ta1 r; t:-fit'--flee.~y-_.Ta-l-e-s~ pcrmi tG from the St.::lte Comptroller. ,h--- f-ctentifY-+fr-t:-fle .:lppr~atcc Gp.:lce on G+-fier-{;fia~--:i-ftt-fle-f*'--()P 00.::11 form Ht~r--a--te€I--H1 tot he -P-r-e- tf.~ . the "Statement of H.::Itcrial!) and the COGE- of m.::lteri.::ll::; phyoically +0---- PTovide----res-al-€- certift-eat-e-s to oupplierG. 4.-- PTe-v+&-+ne-~ty ,;ith---eepieo of m.::lteri.::ll iw.'oicco to ouhotantiate the fH -epe-s-a l:--~ tie- * ma te r: i a+s H--~~-a-e+fH---eee-s-- -fiB-t~-€+e€t----t-&- oper.::lte under-a- oeparated contract, he 1!l\Wt p.:ly--fur- -a-l-J :;alc3,-~i-se7 ,.md UDe TaKe::; .:lpplicable to thin Project. :ubcont ractoT'S- -ai'€-- ~-fL- f'B-f: D.J.leo ~m eJccmpti anD if the oubcontractor a--l-se-. complie::;-w-H;-ft-u -t-fle- aboTJc. rcquiremcnt!). The ... Contractor mUGt iooue a rCD.:llc ~B-e-ate- -t;&-_u the :Jubcontr.:lctor and the oubcontractor, in turn, iDGUC:~ -,-j-.. reaale--ee-H-ificatetB--ttiG auppl ier. A-26 Supplemental Insurance Requirements For each insurance coverage provided in accordance with Section 8-6-11 of the Contract, the Contractor shall obtain an endorsement to the applicable insurance policy, signed by the insurer, stating: in the event restrict_s the covenant:s tc, c!t~~ to.. of cancellation insurance d f forded mail prior written or material change that reduces or by thi s coverage part, each insurer notice of cancellation or material Section A - SP (Revised 12/15/04) Page 16 of 28 f: Ndme < Ci t Y of Corpus Christi Engineering Services Department Attn: Contract Administrator .) Address: P.U Box 9277 Corpus Christi, Texas 78469-9277 Number or days advance notice: 30 The 1 <ont ractoI shal provide to the City Engineer copies thereof cert ified by the insurer, within after the date th" City Engineer requests that Contra, t documents. the signed endorsements, or thirty (30) calendar days the Contractor sign the Within rhuty (30) calend.n days after the date the City Engineer requests that the Contractor sign the Contract documents, the Contractor shall provide the City Engjneer with a certificate of insurance certifying that the Contractor provl.de, worker'~; compensation insurance coverage for all employees of the Contral:tor employed on the Project described in the Cont r dl t . r": For each lnsurance <overage provided In accordance with Section 8-6-11 of the Cont r a, t, the Crmt ractor sha 11 obtain an endorsement to the applicable insurance policy, signed by the insurer, stating that the City is an addit ional insured under the insurance policy. The City need not be named as aociitinnal insured ([1 Worb.[<'s C,)mpensation coverage. F'or :cntracrUd i li ,bi Ilty HL<,urance coverage Sect i <)r B 6< 1 j (a of the ':ontract, the FQ' {orsement to this <:overaqe stating: obtained in Contractor accordance with shall obtain an C',ntldctol dgr,'es to indemnify, save harmless and defend the City, its agents, servants, and employees, and each of them against and h,ll.d it dnd hem harmless from any and all lawsuits, claims, d..mands, Liabi liLLes, losses and expenses, including court costs and attorneys' fees, for a[ on account of any injury to any person, or any death at any time resulting from such injury, or any damage I.,. any property, which may arise or which may be alleged to have at lsen out of or In connection with the work covered by this Cuntract. The foregoing indemnity shall apply except if such J wjury, death or damage lS caused directly by the negligence or :>ther fault of the City, its agents, servants, or employees or any p{>rson indemnilied hereunder. A-:i.1 Responsibility for Damage Claims NOT USED to d'<iraph (at- CeIler,} 1 Li Llbi:1-+ty- of Section B 6 11 of the General PrO'.lioion~ u afH. 'RBea-BT-4cite+.i:idt~ ::ontr.:lctor~ pro,.,,'ide Builder's Risk or :InsUl.latioB FloaioeJ! inour;:lnee covcrage for thc term of thc Contract; up to and' includingthc datc the ~ity fin.::llly -af~eepto the Projcct or \lark. BUi:lE1fi:t'~:;l\i.~ o:rtZalSU11:_tien Flofiter cO'Jcr;:lge--flffiS--t,.--be- o.n "1\11 Rick" farlit. Cqntr;)ctor IftU!3t P;:ly all ,~ neccoDary to procure ouch Bui.l.~' s.~Skez:.t~fcl.l14t.j:.....;tle.~~r IIlDUr.::lnCC . cO"Jer;:lgc, -+fleluding ;:lny dcductible. The City mUDt be n;:lmed +ddition.::ll inoured -e& -afty--policieD pro....iding ouch inour.::lncc coverage. Section A - SP (Revised 12/15/04) Page 17 of 28 A-28 Considerations for Contract Award and Execution To a1 ow the Clty Eilgineer to determine that the bidder is able to perform ts ol,J 1 qat l..ms undf.r t he proposed contract, then prior to award, the City ~nqlnpe! may If'quIre d bidder tr provide documentation concerning: Wh"thf.f .'lily' I i. ns have DPen filed against bidder for either failure'to pay for SFrVICES or mdterldls supplied against any of its projects begun wi thin the preceding two (2) years. The bidder shall specify the name lnd address of the party holding the lien, the amount of the lien, the t'aslS for the ien claim, and t.he date of the release of the lien. If tIi such i.~n has [l( t been released, the bIdder shall state why the J ,1m h.15 \0 l"en pC! c1; did Whether the] e are <lilY outstanding unpaid claims against bidder for ;ervice;, r materials supplied which relate t.O any of its projects begun ',.;i thin the preceding two (2) years. The bidder shall specify the name ind address:Jf the cldirnant, the amount of the claim, the basis for the ] <11m, md ail E'x:plcHldl lOr. why the claim has not been paid. A biddf'I may dl~o be requI red to supply construction references and a financial str1tement, prepared IlO later than ninety (90) days prior to the City Enqineer' .'; requ<~st, S1 gned dnd dated by the bidder f s owner, president or other authorized par' y, spe-:::ifying all current assets and liabilities. A-29 Contractor' s Field Ad:ai.ni.stration Staff The Cont ractor shaU employ tor this Project, as its field administration staff, superinh>ndents -md foremen wt10 are careful and competent and acceptable to the City Engine"'I The ellt eria upon whic"h the '~ity Engineer makes this determination may include the followinq l The Superintendent must have at least five (5) years recent experience in field management and oversight of projects of a similar size pnd complexity to this Project. Additionally, the Superintendent shall have spent the previous 3 years of cont inuous experience or 5 years in the previous 7 years as the head super ntendent on at least two golf course projects whose tutal cost, nol including clubhouse or other structures, was at least 2 0 million dOllars in 2006 dollars. This experience must include, but not !H'cessalily I im} ted to, scheduling of manpower and materials, safety, :uordinatlon of subcont[act.uls, and fdffiiliarity with the submittal process, fHieral a!l<j state waqe ratp '-,,,quireJTlents, and Gi-t-y Municipal contract close- Jut pI ocedures, The superintendent ;hall tJ" present, on the job site, at all times that work is bel nq perfCrTTlf'd 2. f'oremen, it utilized, shall have at least five (5) years recent experience in s imi lar work and be subordi nate to the superintendent. Foremen cannot act as superintendent without prior written approval from the City. Documentation concerning these requirements will be reviewed by the City Engineer. The Cont ractor 1 s field administration staff, and any subsequent substitutions or replacements thereto, must be approved by the City Engineer in writing prior to such superintendent assuminq responsibilities on the Project. Section A - SP (Revised 12/15/04) Page 18 of 28 l- L. r~ 1 2 3 4 5 Such written approval of field ;odmini$tration staff is a prerequisite to the City Jcnqi.neer's obligation to execute a contract for this Project. If such approval is not obtained, the award may be rescinded. Further, such written approval is also necessary pr ior t'j d change in f ield a~nlstration staff during the term of this Contract. If the Contractor fai Is to obtain prior written approval of the City Engineer concerning a.ny substi tut ions or replacements in its field administration staff for this Project during the term of the Contract, such a failure constitutes a basL; It) annul the CClItract pursuant to section 8-7-13. A-30 Amended "Consideration of Contract" Requirements Under "General PIovisiol1s and Requirements for Municipal Construction Cant a, t s" ~;_~c:tJct)~u 8-3- 1 C,?ns~c:I~Eati~!, of Contract add the following text: At the time of the bid, the contractor shall submit the qualifications and experience information that is identified Technical Specifications Section GC-01010, Subsection 1.04. Prospective Contractors who bid without meeting the qualifications shall have their bids subject to disqualification. Within five (~I working days following the public opening and reading of the propnSd]S, the three (3) apparent lowest bidders (based on the Base Bid only) must submit to the "ity Engineer the following information: F 1.i5t of tne major <ompcnents of the work; p list of tt1e product s to be incorporated into the Project; P. schedule of values which specifies estimates of the cost for each major component of the work; A schedule, )f intlcipatp,j monthly payments for the Project duration. The names and addresses of MBE firms that will participate in the Contract, along with a description of the work and dollar amount for edch firm; and substantiation, either through appropriate certifications by federal agencies or signed affidavits from the MBE firms, that such MBE firms meet the guidelines contained herein. Similar substantiation WIll be required if the Contractor is an MBE. If the responses do not clearly show hat MBE part.icipation will meet the requirements above, the bidder must clearly demonstrate, to the satisfaction of the City Engineer, that a good fal th effort has, in fact, been made to meet said requirements out that meeting such requirements is not reasonably p,'ssibJe 6 A list of subcontractors that will be working on the Project. This list may c'lntain more than one subcontractor for major components of the work if the Cuntractor has not complet.ed his evaluation df which subcontractor will p;'rform the work. TIle C:iLy Engineer reLain:; the right to approve all subcontractors that W 111 perform work on the Project. The Contractor shall obtain written approval by the City Engineer of all of its subcontractors prior to beginning work on the Project. If the City Engineer does not approve all propo5eci sllbcontractors, it may rescind the Contract award. In the event that a subcontractor previously listed and approved is sought t <) be substj tuted for or replaced during the term of the Contract, ther the City Engineer retains the right to approve any subst i tute or replacement subcontractor prior to its participation in the Project Such approval will not be given if the replacement of the subcontractor will result in an increase in the Contract price. Failure of the Contractor to comply with this provision constitutes a basis upon which to annul the Contract pursuant to Section 8-7-13; A prel Imi oa ry progress ,;chedule indicating relationships between the major component_s of the work. The final progress schedule must be 'submitted to the City Eng.lneer at the pre--const ruction conference; Section A - SP (Revised 12/15/04) Page 19 of 28 B. !)(>'umenl~at Lon required pursuant to the Special :oncerning Considerations for Contract Award ,"ontraclor '3 Field Administ.ration Staff provisions A-28 and A-29 and Execution and the 9. Dc'umentat i.O'1 d; requ red by SpecIal Provision A-35-K, if applicable. 10 . Wi thin five (5) days following bid opening, submit in letter form, information identifying type of entity and state, i.e., Texas (or other state) Corporation or Partnership, and name(s) and Title(s) of ~ndividual(s) authorized to execute contracts on behalf of said entity. A-31 Amended Policy OIl Extra Work and Change Orders Under "General Prov si, ,ns .md Requirements for Municipal Construction Contracts" B-8-5 PolicY-.211 Extra._w.o!=:.J<~)(~..~bC'lI1-.2e 9r<:lers the present text is deleted arid replaced with the followi.nq: :ont ractor acknowledges that the City has no obligat ion to pay for any extra work tor which " :hange order has not been signed by the Director of Engineering ;ervices or hi s designee The Contractor also acknowledges that the City Engineer !nay author ze change orders which do not exceed $25,000.00. The Contractor iCknowledge~ that any ch,mge c'rders in an amount in excess of $25,000.00 must also !.cipproved by tho City (:OUI1Cll A-32 Amended "Execution of Contract" Requi.n!ments Under "Ceneral PIOvlsic,ns and Requirements for Municipal Construction Contracts" B-3-5 ExecutI(')l' of CI>I1! ract eVict the tollowing: The award 01 the Cont ract may be rescinded at any time prior to the date the City Engineer del ivee a contract to the Contractor which bears the signatures of the City Manager, CilY Secret.ary, and City Attorney, or their authorized designees. Contractor has ne. cause of act ion of any kind, incl uding for breach of contract, agdinst the City, nor i:: the City obligated to perfom under the Contract, until t.he date the City Engine.:,r delivers the signed Contracts to the Contractor. A-33 Conditions of Work Each bidder canpletion obligation attend the must fanu liarize himself fully with the conditions relating to the of the Project Failure to do so will not excuse a bidder of his t~o carry out the provlsions of this Contract Contractor is reminded to Pre-Bid Meetinq referred to in Special Provision A-I. A-34 Precedence of Contract Documents In case of coni I ict In the Cont I act documents, first precedence will be given to addenda issued during the bidding phase of the Project, second precedence will he given to th., SpeC.lii] Provisions, third precedence will be given to the construe/lon pl'lllS, f)urth precedence will be given to the Standard Specif leat.ions ino t ne General Provisions will be given last precedence. In the event of a conflict between any of the Standard Specifications with any other referenced sp'""ci f icat ion:", such as the Texas Department of Public Transpor tat ion Standard Spec) f ie-ations for Highways, Streets and Bridges, ASTM 'lpecif icat ions, etc., the precedence will be given to addenda, Special Provis ions and Supph~menta] Special Provisions (if applicable), construction plans, referenced ";pecificat ions, Standard Specifications, and General Provis lOriS, 1'1 that C Ldel Section A - SP (Revised 12/15/04) Page 20 of 28 ,. ~-35 City Water Facilities: Special Requirements (NOT USED) A Vi-s-twF-,L{:ontrClct_or Orient.:ttion , -_._~.. --..--... ---- - PF-:Htf--- +n performing work --at- .:tny City w.:tter f.:tcility, the GEtfi-t'f-a€-8+ET--IB:-s 8ubcontr.:tctora, .:tnd e.:tch of their cmployee8 mU8t !etave --eFt--t-fle+r.-pt~ Cl '.r.:tlid cClrd certifying their prior .:tttend~nce a~d~-i-tH tor/ContrClctor E.:tfety Orient.:ttion ProgrClm conducted by the Ci+y w-a'-er--- -gef7frl+ment Peraonnel.-----A-- Vi8itor/Contr.:tctor S.:tfety Gficnt.:ltHffl-- ProgrClm \;ill -ge-- offered by .:tuthorized City WClter r" ~tHffte-P-*=-~-ffifl€-l.- -for thoGC pcr.:Jon:J \.Tho do not have ouch .:l c~rd, dftEI wfte---t~re-i:B- pcrform--arty-~ h'ithin Clay City \:Clter f.:tcility. FHf---a-4H4i:e-fl.a-l- --t nformCl tion re fer --EB- Attachment 1. B, - Operation of City Owned EquiplBent 'l'he- Centractor shall not start, operate, or step any pomp, motor, n .....alve, equip.eat, swit-ch, breaker, control, or any other item related to City water facility at aay time. ~ll ouch itemq must be ep€-Fat-ea-- by .:In 0f)erCl.tor or other .:luthorized mCl.intenCl.nce emrhoyee of tc fie--G-:i-t-y- Wa t e r-DepdT tme n t . ~-- -Protection of Water Quality ~ City mUDt dcli'JT~r W.:ltcr of drinking qUJ.lity to ita CUGtomerD at al-l--~;---'ffle- Contr.:tctor ahall protect the qu.:tlity of the \..:Iter +fl----Efie--j-Hb-~-~ oh.:lll coordin.:lte it::; \lOrk \/ith the City WClter 8epa-~-t~-p-I~e-E- -tfte- qU.:ll i t Y -&f-~'.:.:I ter . f}-- Conformity with AHSI/NSF StaBdard 61 A-l+----Hld-t:-eri.:t18 -aflft-. equipment uDed in the repClir, reClGaembly, -t:-rClnoportCltion, reinot.:tll.:ltion, Clnd inopection of pumpo, or Clny other itemo, \;hich could come into cont.:tct ,;ith pot.:tble u.:tter, muot conform -t-&-- ."dfleric.:tn tl.:ttionCll St.:tndJ.rdo Inatitute/N.:ttion.:tl S-aft-it.:ltion round.:tt:i-efl (1\NSr/NSFl St.:lnd.:lrd 61 .:10 deocribed in the StClnd.:trd Speci fi-eat-i-Hft5-7 Such materials include all solvcats, cleaners, lubricants, ~skcts, thread c;-"'f'auads, coatiD4Js, or hydraulic equiplli:ent. Thcse i t:ems 1IlU&t;-~be used unlcss thcy coafena with ARSI/NSF Staftdard 61 and unlcss such it--.. arc _ inspected on the site by authorized City pcrsoRRe1--i-ediatc1y prior-~-use.- ~he- ~actor sfta--:l-l- provide the Engineer \Jith copiea of ~Jritten proof --~ -l\NSI /NSF St.:tnd.:lrd 61 .:Ipprov.:tl for .:Ill m.:tteri.:tla - \<hich e+mld come into-e€ffl-taet \lith potable \J.:ttcr. E-,- Handli~ aad Disposal of Trash ~ trJ~h generClted by the Contractor or hiD employecD, DubcontrClctor3, ~ be cont.:lined .:tt.:tll timeD .:tt f.:teility ~ite. Blowing traoh ~ill not be .:tllowed. The oh.:tll keep \iOrJ( are.:to cle.:tn .:tt .:tll timeD .:Ind rcmOTJe 6a-H:-~ .:tgcnt::;, or the \J.:tter Contr.:tctor ;:111 tr.:toh c:ONTR..'il.CTQR' S ON SIn PflEI?A&-...TIOtI Section A - SP (Revised 12/15/04) Page 21 of 28 F t-Bftt-r-aeto-Br-L.sf'€"Esettrtel mU3t -weaF colored uniform over.:llla other Htafi- or.:lnge, blue, or white. Bach -...,.leyee lHlifoDll must provide company naae -and- indi.....idual r-yloycc idcntification. " - G+>R+ra+~f-----5fia-ll--fY'1'w-Hie- telephone:J -t-&r- Contr.:lctor pcraonnel. Plant telcphonos are not availablc for Contractor UGC. H- We--E-lH-fl-q h)Ur~;-w-41+-~ =7:00 l\.B.--t-e- 5:00 r.B., Hond.:lY thru Frid.:lY. f: ----Ge-ftt--E-at-~( mU:Jt -fte-t- -u:Je .:In"j - City f.:lcility rcatrooffia. Contr.:letor fIH:l-5-t--~Hle--BWfl-safl-i- t .:lry f o.c i 1 i tie:J. 1- M-l-- Contr.:lctor-- vchJcle3 mU3t-be p.:lrked o.t deaign.:lted :Jite, .:l3 Ek-:J 19nzltcd by Cl-E-y-Water Dep.:lrtment nt.:lff. 1\11 Contr.:lctor vehicle:J fffu-5-t: ---ee--- '''-l:-e-a+l--y--labcled ~:ith compo.ny no.me. No pri '.'.:lte cmployee vchlcle:J a-F-e-.:lllmled-o.t O. N. Steven" W.:ltcrTre.:ltment I'l.:lnt. 1\11 -~._._-- ---- ._----_..~-,_._~.._-_.~~_...__._-_.... pc r:Jonnel mU:Jt - --be---in comp.:lny vehicle". During ~:orking hour3, eeH-t::-f~f employee:JflHiS-tc--~ 1eo.","e the denign.:lted conatruction d-f-€-d---fiHf--\Jander ~uqh any - building:J other th.:ln for required ~:ork fH - -rls---+i-i-t-e-eto-e-e---l>-y--i='+l-cy--4Ia-E-er- Dep.:lrtment per:Jonnel during cmergency '-"-'0' ae-ufrt -t-B-1 j "" K-_ -Contr.:lctor QUo.hLic~lt:..~_ __~~~~~__~~RVISORY CONTROL 1\ND DATA llc;Q!J_ I ~I :!'.!()!L ARY--W-e-Flf- t-e---t--he- -€Bffij3uter b.:loed monitoring o.nd control ayntem mU3t- ee--p€:-r4~- Bfl-l-y4ryqu.:llified technic.:ll .:lnd aup~r","iaory peraonnel, a-s+ie-E-e-fffl-:l:fieB---B-y----fflee-Hng the- qU.:llification:J 1 thru 9 belmL Thi:J we-rk---Hte-lude:;, &tH---t:; not limited to, modifico.tiona, .:lddition:J, ch.:l.ngeo,~-sclection-s, furniohing, inot;:dling, connecting, progr.:lmrning, eu~;tomJzing, debugging, e.:llibr.:lting, or pl.:lcing in operatiBfi-- --a-l+- hlrd',larc and/or --- ::lOft~".:lre-opccified or requircd by thc::)C ::Jpecificat l:-6fl-& ~-teFttTdctor or--his- aubcontr.:lctor propoaing to pcxform thc SCl\.DA werk---ffttI-5-t;--be-- able to - dcmonatr.:lte the felleving: h .---H-e--4-s----re~rly engaged in the computer baoed monitoring dfit-t contIM -syateffi bU8ineo:J, preferably - .:10 applied to the ffiunicipa!~1' .:md ....~Jte~Jater induatry. ;:1",- ------Heh.:l::J performed ~:ork on ayatema of compar.:lblc aize, type, afit-i eomplt'7t-H:Y---a-B- r-equired in thio Contr.:lct on .:It le.:l::Jt to-Ble€---P-f+'C}-{' f'H7ject:J. +,"uHe4tas-i3e-efi-,cwtiTJely eng.:lged in the typc of \wrk opecified ft-e-!c-e-Ht-f-B-F--d-t- -le-a:s+-~ year:J . 4-o----He- employe -d Regiotered I'rofenoiono.l Engineer, a Control Sy~tem:J Engineer, or-an Electric.:ll Engincer to :Jupervioe or p-e-t-form t_he \10 (Ie required by thia ::Jpccific.:ltion3. ft"- --He-- emploY::;~-{-:Jonnel----Bfl---t-lH:-s - Project ,lho h.:lT.:e DUCCe::J3fully COHlplct-ed a -1Ilc1nuf.:lcturer ':J tr.:lining couroe in configuring afit-+--Hftp-lefflefi-tc-ing the opecific cotnputerD~ RTUS' a, and s-e-tt-waFe--itr~)':;cd for -~ Contract, Section A - SP (Revised 12/15/04) Page 22 of 28 ...,. r.; 6--- -- ---tit. m.lint-a-iA-& <1 perm.::went, fully at.lffed .lnd equipped 5+T'HCC - f-a+q++ty \.i thin 400 mile::; of the Project oite to Iltttint.lin,-- rep.lir , -~ ibr.::lte, .lnd progr.:lm the oyotem.'J Sf~~l--he-:8~ i-ft-;- ;. H+c---sha-l-~ --fHFnioh equipmer,t ~.hich io the product of one Iltttnuf.:lctITFef-t'O the fl'la-*imum pr.lct iC;1l e}{tent. Where thi.'J ia ft{-t--pr-aet-i:-eah ---a-+-l: equipment----e-f <1 given type Hill be thc f'H '~-t-t+--E>>te' m.::lnuf .lctu rer. 8- P-f i-e-r f*'-F-8:HnlanCe - d-E-t-he- O. N. Stevena W.::Iter Tre.ltment Ha-rrt'- --w-d-l lte u~;ed -----.i:-fr-- ell.:llu-Jting \..hich Contr.:lctor or StJ-bcontr,~' progrJm.'J -Efte-- nC\J \Jork for thia Project. 'f- - .!f-hc Cont-ra-e-tcflr .'JhJl1 produce -all filled out progr.:lmming I3-lftele;- f~+-H~d to - -s-flBW-- the programming ao needed and H--+JtH-F-e&,--t-e a4:i- the:Jc---Ew&- .'Jyoteffi.'J to the eJ(ioting Ci ty &::AW\-----s-ys-l:'eflL---AH-aefled-------i--&----d-fl-- example of the required fH r)gr':lfflflH-fH:J--frl-eek-s--;.ffi-4~fl--the City require.'J to be filled in dfHt--4"t-vett-----f--H- t he Ci ty---Eng ineer \.i th all eh.::mge.'J made dur ing t::-fH:--progr<lffiffl Lng pha.'Je,--'F-Be att.::lched .'Jheet io an eX.::lmple and ic-i' ftBt::----t ntcnded to- -- .'Jhow .::lll of the required oheet.'J. The Gentracto-F--w-r-+-+-fFEWHle- .::lll progr.::lfllflling blocko uoed. p f-~ r~ b -~~_I1(~~~qlJ~r~~t~i M_-l--t~l-i--REt--fer---tfH-i;- proj ect .::It the O.N. Stc-v'eno W.::lter Treatment P-l--atrt---B-fta-H be pcrfcf:Hffled uoing -.::l b.::lckhoe or h.::lnd digging due to the ftHffige-F--e-l eldatJ-fH:J--+tnderground ob.'Jtructiona. No trenching machine::; sha+t--l3e--d lu.'ed en - the proj-ect-, A~36 Other Submittal.s 1. Shot Drawing Submittal_ The Contractor shall follow ~lt lned below when processing Shop Drawing submittals: d Quantity: Contractor shall submit number required by the City to the City Engineer or his designated representative. the procedure b Reproducibles; In addition to the required copies, the Contractor shall also submit one (1) reproducible transparency for all shop drawings. Submittal Transmittal Forms: Contractor shall use the Submittal Transmittal Form attached at the end of this Section; and sequent ia lly number each t ransmi ttal form. Resubmittals must have the original submittal number with an alphabetic suffix. Contractor must identify the Contractor, the Subcontractor or supplier; pertinent Drawing sheet and detail number(s), and specifiea! ion St'ctioll number, as appropriate, on each submittal form Cont racto I . S Stdmp' Contractor must apply Contractor f s stamp, appropriately sIgned or initialed, which certifies that review, verificatJon of Products required, field dimensions, adjacent construct! on wOLk, dnd coordination of information, is all in accordance with the requirements of the Project and Contract documents ~ Schedulinq; Contractor must schedule the submittals to expedite the Project, and d(~liver to the City Engineer for approval, and coordinatt' the submission of related items. Marking: products, Contractor models, must mark nptions, each and copy to identify other data. applicable Supplement Section A - SP (Revised 12/15/04) Page 23 of 28 mdnufactLrers' ;tandd!:'d data to provide information unique to this Proiect. q Vari at ions: Contractor must identify any proposed variations from the ':ontr act do,:umellts and any Product or system limitations which mlY be detrimeot a1 I i successful performance of the completed work. r, Space Requirements; Contractor must provide adequate space for C:mt ['a.tet' and Fngineer review stamps on all submittal forms. R.,submltt ,lIs (')nt ractor must n,quired by City Engineer and nCt' previous :'ubmi t t a1 reVise and resubmit submittals as clearly identify all changes made DLstributlon ';ont cdctor must distribute copies submittals to subcontractors and suppliers subcontractors clOd suppliers to promptly report, allY lnability te comply with provisions. of reviewed and instruct thru Contractor, 2. ~c1mples; The Contractor must submit samples of finishes from the full range of manufacturers' standard colors, textures, and patterns for City EnqinpE'r . ~"e 1.'ct ion. 3. '~e_,?~,an~R~pc1il~~E~.[t When speclfled in the Technical Specifications Section, Contractor must submit three (3) copies of all shop test data, and repair report, and allan-site test data within the specified time to the City Engineer for approhv.al. ,Q.t.h.erw~~~, !:.h.E:!,elat~,ci~.3.t1iemel1t w~ll not be approved for use -)[ t e prolect A-37 Amended "Arrangement and Charge for Water Furnished by the City" R)'1' usm ~ !!{~cner.:ll Provi::;i€ffiS---aOO RcquireRlCnto for Hunicip.:lI Conotruction Contrilcto", D U5_l\_r:r~~~.:ln~_C~_fCl:~\oIfl_t~~~~iE.tl!2d by th~, .:ldd the follo~dng: '-'''I'he- 8-~T-aeffi-f-fffi:tfrt: €t'~{y Hith-,-tfie- City --E4- COrpUD Carioti' 0 W.:lter 'c~fflse-F'.'Jtion a&1 Drought -Gontingency-P-hHr----atr- .:HRCRded (the "P1<:m"l. ThiD lncludc::; implcmenting ~'-'conDer',riltion mCiloureo eot.:tl;>;lio\led for ch;:mging eonditiono ,- ---'ffteCity Enginccr Hill pro',ridc il copy of thePl.:m to Contrilctor ilt f-he- prc conotruction mce-t,.i-Fl€f-' ~ Contrilctor \;ill keep .:l copy of the {'liln on !cflt~ Proj cct' ~ throughoutconDtruction. n A...38 Worker 's COJUpensation Coveraqe for Buildinq or Construction Projects for Government Entities The reqlnrements of "NoticE to Contractors "B'" are incorporated by reference in thIS Special Provsion. A-:,39 Certificate of Oecup~cy and Final Acceptance Toc l-&t3U.:lnCC-frf-- -a- ccrtific.:lte of occupilney for ilRprO'JCHlcnta docD not conati~ Hftfrl--dcC .:pt.:mcc-eJ.-t:he improvemcnt::; under Cenerill Provioion B 8 h A-4.0 Amendment to Section B-8-6: Partial Estimates General Provlsions dnd RequIrements for Municipal Construction Contracts Section B-8-6: Partial Estimates is amended to provide that approximate estimates from which partial payments will be calculated will not include the net invoice 'Jalue 0 accef,table, non-perishable materials delivered to the Project work:;ite unless the Contractor provides the City Engineer with document :Of satisfactory to the City Engineer, that show that'the material SUpplier has been paId for the materials delivered to the Project worksite. Section A - SP (Revised 12/15/04) Page 24 of 28 r~ &-41 Ozone Advisory NOT USED f~ P-F--i-HH:-fHT -aA-4- hot mix p.:l'.' ing oper.:ltionn mU::Jt not be conductcd on d;:Iyn for Hhich an O,:OflC Jdvi::Jo-fY-Rcrs--beet+--4-ss-ued, encept for rcp;:Iirn. The City Engincer \lill fteH-fy Contr.:lctor-a~ o"onc --.llert.- If .:l dcl.:lY ouch ;:In thin in cltpericnccd, #te-- day will -~~. counted ~--a---~ d.:lY .:lnd thc Contr;:Ictor ,...ill bc ~'n:;dtcd-- a+ ~-q-ft~{.u-fH' tee t ndic.:!ted in thc propos.:!l. t' &-42 OSHA Rules & Regulations It 1.; the responsibility OSHA rides and regulations and rjobs_ of t he Contractor (s) to adhere to all applicable while performing any and all City-related projects &-43 Amended Indemnification & Hold Harmless Under "General Provisions dnd Requirements for Municipal Construction Contra.-ts" B-6-2l Indemnification & Hold Harmless, text is deleted in its entirety and the fo lowing is substituted in lieu thereof: The Contractor shall ho lei the City, its officials, employees, attorneys, and agents hnmless and shall indemnify the City, its officials, employees, alt orneys. dnd agents trom any and all damages, injury or lta.bi 1., ty what :-;oever [rom an act or omission of the contractor, or any subcont rdctor, suppl ier, materidlman, or their officials, employees, aqents, ':T ccnsultants, or any work done under the contract or in (>mnect 1 CHI hereWIth by rIe cont ractor, or any subcontractor, supplier, materialman. 0 their officials, employees, agents, or consultants. The cant [actor sha 11 hotej {he City, its officials, employees, attorneys, and agents hdrmless dnd shall indemnify the City, its officials, employees, ittorneys, and agents from any and all damages, injury, or ] abi] i ty what soever from a negl igent act or omission of the city, its orficials, t"mpLoyees, attorneys, and agents that directly or indirec:tly causes in j u r y to an empJ oyee of the contractor, or any subcontractor, suppl ierelr mat eri alman ~-44 Chaaqe Orders Should \ change o'der (s) be required by t.he engineer, Contractor shall furnl sh the enginee r a complety breakdown as to all prices charged for work of the change order {unit pr; ces, hourly rates, sub-contractor's costs and breakdowns, cost of mat'?rials and equipment, wage rates, etc_>. This breakdown informatiun sha] J be submitted by contractor as a basis for the pr j c' eft he chanqe )rde r A-45. As-Built D~sions and Dravinqs (1/')/00) (a) Contractor shall make appropriate daily measurements of facilities constructpd and keep accurate records of location (horizont?l and vertical) of all faci lities. (hI Upon completion of each facility, the Contractor shall furnish Owner with one set of direct prints, marked with red pencil, to show as-built dimensions and locations of all work constructed. As a minimum the final drawings shall include the following: Il) Horizontal and vertical substitutiollo/field changes. dimensions due to Section A - SP (Revised 12/15/04) Page 25 of 28 (;;) Ch 1Ogp:" in f'qU] pmenl and dimensions due to substitutions. () "Ndmeplate" data on all installed equipment. (4) Deletlons, addItions, and changes to scope of work. i') Any other chanqes made. A-46 Disposal of Highly Chlorinated water (7/5/00) HOT USED 'Fhe--::ont.r.:lct-fTfC---sfi.a-tl bc - rC:Jponoiblc for thc diopo:::;.:ll of \l.::ltcr uDcd for ~+*f,----d-rsinfcctic'n .:lod -l-i-tl-€--fluohing ---i-R-ttft- .::lpprovcd m.::lnncr. Cont.::lmin.::lnt::; ffi---4he -wa-t+"+,- -fta-r-F-i-etJ-~ ~ -ft i 9 h 1 c vc 1 a 0 f ch 1 0 r i nc , \d 11 be U (J c d for di::;inf.e-€E-iBft!--afl+t-~-cKcced the permi:J:::;ihle limit:::; far diGdiargc into we-tclaHBG-f:H'--€ftVHBfiff~l-ly--seftGitivc.- .:lrc.::lO. Thcae.:lre regul.::lted by numerouo ~l-€-5--5ueiT-d5--- TNHCC,E-PAr -e-t€--;-----I-t:-\lill bc the Contr.::lctor' 0 reoponDibility to comp-l-y----w-i-ffi--t-fte-----+cquircmcn8i----of .:l11 - rcgul.:ltory .:lgcncico in the diopoo.::ll of all '.hi-t-ef--B-5€B-ffi ---tchc proj eet-, Thc mcthodo of diopoD.::ll Dh.::lll be Dubmittcd to ~:+-ty-----f--e-F--apFTHw-a-h Thcrcsh.:l!l bC--ftB---Dep.::lr.:lte p.::lY for diDpoD.::ll of highly etH:tH-ln.1tcd w-a+e-r.-----{ontr.1ctor :JhCl!l not~-thc City':::; :::;.::lnitClry :::;e\/cr Dy::;tcm f.eF~-rs~ -ef---e.TRtc.lmi n.:l t -e4--wa-t~ A-47 Pre-Construction Exploratory Excavations (7/5/00) NOT USED ~.--t_e-.-iHl-Y---eefi5t:+Het-iBft---wha-tevcr on thc projcet, - Contr.::lctor OhClll eJ(C.:lO:.::lte .::lnd c)cpoac--tl-l-l---€*i-s+4:-R€rn-p-ipe-l-i-w::J of-E-fie- project thClt crooo \dthin 20 fcct of ~sed- pipeline a e-f------EfiE~ projcct --a-tt4-Contr.::lctor Dh.::lll DUr"JCY the CJtClct ~ed-l----a-Ad --OOH-~E-a-l---+ee<1t ion --tTf-- c.:lch eroo:::;i ng .:lnd potentLillyconflicting pipeline. For c'iHoti.Dg pipeli-fieS which - p.::lr.::lllc! .::lnd arc within ten feet (10') of propo:Jcd pipc!inc;'T-f>f----t:fle.-p-f&:lCct, ContrClctor Dh.::ll! cuc.i;,;atc .::lndCltpODC D.::lid eit-i+i-fl€j---pi-J3el--i-A-e-s-a-t----a---ffiill{-i-mBm-of 300 f€eE--~:. .:lnd Contr.:lctor Dh.::lll Durvcy the ~Jccur.:ltc --OOH~-E-a+-a-ftfi---vei't-iea-l--- 10c.:ltionD of :J.:lid p.::lrCll1clpipelirtcD Clt ~+"f"t ffiCllt Lmum I}-;-{- Contractor ::Jh.1l1 thcn prcparc--i.lc-rcport .:lod ::Jubmit it to Fhe City for approval indicClt~----t--fte----Bwfl-eF--B--f--F'ipcllneD CRC.:lT,;.:ltcd .::lnd :Jurvcycd~ .::lO \loll ClD the approlCim.1tc --s-tcd-t:ci-ef-;---~~r diDtClncc -~ -~ pavement centexline .::lnd e-l-evafccleftS- -B-JO--tfie- -E-ef+-e+-e?i-t-f:H7ift+J pipel-i-Re-s-.- Geft.e~-shabl-- perform -.. -Be-- -construction work OIl ~e pre-jeat uilti! all e-.ploratory c~y~tiOBs ha~~ been aade in their entirety, the results thereof apertcd -t;e-.-t:he-~DeeE---and---until Contracter recci~s Eagineer' s approval of ~t;-- EIJploratory CKc.:loJ.1tiBftfr--sful-l-l- - be pClid for on .::l lump Dum b.::loiD. !'my P.:lo.'cfficnt ~-r- .1DDOei.:ltcd \Ii th cJtplor.:ltory ClCCCl'J.:ltionD DhCll! be paid for .::lccording to thc CD t.::lbl i ::Jhcd lifl-E-i 1 pricc -B-f - pavcmcn t pa tching. ContrClctor Dh.::lll provide a-l-l--fl+-s--~;urvc'l-Wf~ c if ortc--fno DCp.1rCltc p.::ly) ---F€rF cJtplor.::ltory cJtcav.::ltionD. Section A - SP (Revised 12/15/04) Page 26 of 28 A-48 Overhead E1ectrica1 Wires (7/S/00) Contractor shall comply with all OSHA safety requirements with regard to proxlmlty of ':onstruction equipment beneath overhead electrical wires. There are many overhead wires crossing the construction route and along the const ru,tion r,)ute Contractor shall use all due diligence, precautions, ete., t ( ensUl e t hat adequate safety is provided for all of his employees' and operators of equipment and with regard to ensuring that no damage to existing OVerh(~dd elect! ieal wires (lr f.1(:ilities o':eurs. Contractor 5hall clordinate his work with CP&L and inform CP&L of his construction schedule with regard to said overhead lines. Some o\:E~rhead Jines are showr. in the construction plans, while others are not. It shall be the Contractor's sole responsibil i ty to provide fbr adequate satet v with regard tl overhead ines whether shown in the plans .or not. A-49 Amended "Maintenance Guaranty" (8/24/00) Under "General Pruvisions and Requirements for Municipal '::ontract s", B-~.J:.L.!1aintenance_yuaranty, add the following: Construction "The ContIactol' s guarantee is a separate, additional remedy available t< benefit the City of Corpus Christi. Neither the guarantee nor expiration of rhe guarantee period will operate to reduce, release, or reI inquish :my rjghts or remedies available to the City of Corpus Cllristi tor any claims or causes of action against the Contractor or any )ther ind1viducd or entitv." A-50 E1ectronic Bid Submitta1 The folLowing paragraph modifies Paragraph B-2-7-Preparation of Proposal, of the General Provisions: The bidder has the option of submitting a computer-generated print-out, in Lieu of, the Proposa I (SHEETS: 1 'l'BROUGR 12 OF 12), INCLUSIVE. The print-out will list all bid i.tems (including any agd1t'.ive or deductive alternates) conta1ned on Proposal Sheets (3 TBROUGB'.~( 12) _ The print-out will be ;ubstant ially in the form att:ached to the'se Contract Documents _ If the ':ontract or chooses to subm~t a print-out, the print-out shall be accompanied "y properly completecl proposal pages (1,2, 7,8,9, la, 11 and 12). [n addLtion, t.he print-out signature, after the last bid will item: contain the following statement and (<ontractor) herewith certifies that the unit prices shown on this p'rinT=out for bi.d items (including any additive or deductive Cllternates) contained in this proposal are the unit prices intended and that ts bid will be tabulated using these unit prices and no other information rom ttus print-oul - (Contractor) acknowledges and dgrees that the ToLll BTcr-Amount shown will be read as its Total Bid and further agrees that the ufficial Total Bid amount will be determined by mult:iplying the unit bid price (Column IV) shown in this print-out by the respect] ve estimated quantl ties shown in the Proposal (Column II) and then totallnq the extended amounts. (Signature) (Title) (Date) Section A - SF (Revised 12/15/04) Page 27 of 28 SUBMITTAL TRANSMITTAL FORM PROJECT GOLF COURSE IMPROVEMEN'l'S (EXISTING COURSES) -GABE LOZANO SR. GOLF CENTER; PROJECT No. 3274 otINER \: ITY I IF .:ORPUS CHR 1 ~;T I BRGINEER: Fi~ge_!.~D~! _~_~inf!! I~..!._Golf_~5?urse A!chitects CONTRACTOR- SUBMITTAL DATE SUBMITTAL NUMBER: :- APPLICABLE SPECIFICATION OR DRAWING SUBMITTAL Section A - SP (Revised 12/15/04) Page 28 of 28 1 . -- PART C FEDERAL WAGE RATES AND REQUIREMENTS ""'lIlIIIi"'.- Page 1 0[2 ,"nera PE'cislon Number TX030039 06/13/2003 TX39 upersedE",j GeneraL )ec1sion No rX020039 ! ate: TEXAS onstru,:t j ")n Type tiEAVY ".,;... ountYiLE',;I: NUECES :;AN PATRICIa iEAVY CUNSTRUCTION PROJECTS (including Sewer and Water Line ~)nstn-,,"t l'm and nrdindge Projects) Modifiedt Jon Number o Publicat ion Date 06/13/2003 UNTY (j es iI-XES SAN PATRICr) UTX20~,,'A 1)/01/1987 Rates Fringes \RPENTERS (Excl udi ng F"rm Settin'l) $ 'LOS )NCRETE F fNISHER 7.56 ;,E:CTRIC i AN n.n 2.58 BORERS "ommon itility 5.64 7.68 WER EQUIPMENT OPERATORS: ,ackhof.' "'fatal' (,rd,jer 9.21 8.72 " ,lJDERS Receive ratE' prescribed for craft performing ""ration 0 which welding is Incidental. lsted classifications needed for work not included within scope of the classifications llsted may be added after lwdrd only as provided if) the labor standards contract clauses CFR ',. ') (a) (1) (i i) , . Lhe IJsting above, the "SU" designation means that rates .::;ted under that identifier do not reflect collectively gained wage and fringe bene! i t r al.es. Other designat ions dldicate unions whose rates have been determined to be !at 1 inq WAGE DETERMINATION APPEALS PROCESS Has there been an initial deci.sion in the matter? This can exist.ing published wage determination survey underlying a wage determination http://www.wdol.l!ov/wdoJ/scafiJes/d:wisharnnrrX1Qrlvh II f') II r> {\{\j:. ~--~ Page 2 of2 I Wage dnd Hour Di Tv is on let tet ,'etting forth a position on d wage determination matter d conf()(ITlance ladditi,'nal C13sS1fication and rate) 11ling In survey related maltels, In1tial ,ontact, Including requests ["f surrunarles of survey:, should be with the Wage and Hour Regional Office for the area 1n which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey progt am. [f the response from this initial ontaet 13 not sat1sfactory, then the process described in 2.) md 3.) shOll Id be fa] Lowed. -!., WIth regarc1 to any other matter: not yet ripe for the formal f'rocess described here, initial contact should be with the Branch Construction Wage Determination~. Write to: Branch of Construct ion Walle [X>terminations Wage and Hour DiviSion U. S Department at Labor 200 Constitution Avenue, N. W Washington, D. C 20210 .... If tb' answer to the questlon In 1.) is yes, then an Interested party (those lffected by the action) can request reVlew and recons~deration from the Wage and Hour Administrator {See 29 CFR Part 1.B dnd 29 eFR Parl 7). Write to: A" Wdqe aIld HOllr Administrator U ,;. Department of Labor 200 Constltutj'n Avenue, N W. Washington, D. C. 20210 The request shaul d be ac:ompanied by a full statement of the Interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers rple'Jant to the 1 ssue. If the decision of trJe Administrator is not favorable, an lnterested party may appeal directly to the Admini-strativeR~view Board (formerly the Wage Appeals Roard). Write to: Administrative Review Board lJ. S. Department of Labor 200 Constitution Avenue, N. W. Washington, D. C. 20210 4 1Hl dt'Clsions by the Administrative Review Board are final. END OF GENERl\I, DECISION httn.ilunVUT u,,~,,1 or"r/ul(lnl/",..,:>filp"/rl'nji"h'.:lrnnfrY~O A"h )\ n)\ l'lfV'l.L. Page lof3 "nera I !>PCl sian Numb"r: TXO 3006l 02/03/2006 TX63 ,:persf'dt'd Generdl De, ISlon t~umt)!;r; TX020063 i ate: Texas onstruct Ion Type: BUIlding 'ount ies: Nueces and San PatrIe i {J C::ounties in Texas. BUILDING CONSTRUCTION PROJECTS (does not include residential lnstructLon consisting of sIngle family homes and apartments to dnd including 4 starle~) ~4cdificat Ion Number [) '1 PublIcation Date 06/] 3/2003 02/1 3/2004 OS/28/?004 12/24/)004 09/23/?OW, 01/13/2006 02/03/)OOb " .;;...,. h f'XOOO I -005 07 IO} /)00', ,J,.... Rates Fringes Brickiayer, . . 3 18.50 6,10 , L8C0278 -n(H 08/28/200' Rates Fringes ElectrIcian.... . - ':; 17.45 4.50+7% <DN006f,-002 01/01/200:, --------- - ----------------- Rates Fringes ronworker. ( . ," 16.10 4.65 PAIN0130 001 10/01/2005 Rates Fringes -linte r . $ ! 5.00 6.00 TXl981-002 03/01/1981 Rates F'ringes .arpenter . . .. $ Celllent Mason/Finisher ..._.....$ ',abore r .. ~ , .. . .. . . .. .. .. " . ~ . .. . $ Mason Tender..., .........$ Plumbers and Pipefitters (Including HVAC) '.... ......... $ Power equipment operators: Backhoe. . . . . . , . . " ...... .. $ Roofer (including Built Up, 9.96 12.50 5.56 7.14 10.05 7.84 htto://www. wdobwv /wdoJ/~-c::ltjles/d:lVl<;h:lC'.{)nfn{ h~ .tvh A 11 II /11\1\1:. Page 2 of3 Campus 1 t ran 3nci S 1 nq Ie f' I Y Truck Driver.. -, s 9.20 7.50 WELDER~ - Receive C3tlc prescJibed for craft performinq "perati,m to which ..eldinq 1: incidental. -----._- ---------- ------------------- Unlisted t.he scope 1ward onl"]l ( 79CFR l ass if 1,:a iens needed f or work not included wi thin of the CLiSS j f ieat ions I tsted may be added after as provided in the labor standards contract clauses (d) (I ( i i . ) [II the i ing abovEc, he "SU" des1gnation means that rates listed IJnder the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate 1m ions whose ates hdve been determined to be prevail nq ------------------- WAGF DETERMINAT ION APPEALS PROCESS t.e: Has there been an initral decJsion in the matter? This can an eX1s~ing published wage determination a survey underlying d wage determination a Wage and Hour Dlvision letter setting forth a position on a wag",' determinat ion matter a conformance (additional classItication dnd rate) ruling )n survey related matters. initial contact, including requests for summarIes of survey", should be with the Wage and Hour Regional Office fOl the area in which the survey was conducted because those Regional Offices have responsibility for the DaviS-Bacon survey program. If the response from this initial .:ontact lS not satiSfactory, then the process described in 2.) ~nd 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of. Construction Wage Determ.lndtions Write to: Branch of Construction Wage l~terminatlons Wage and Hour DivIs10n U. Department of Labor 200 Constltutiun'\venue, N,W, WashJngton, DC 20~)IO < If the answer to the questionlfl 1.) is yes. then an Interested party (those affected by the action) can request reVIew and reconsideration from the Wage and Hour Administrator (Spe 29 CFR Part 1.R and 29 CFR Part 7). Write to: http://www.wdol.gov/wdollscafiles/davisbaconffX63.dvb ...tI'lAI'ltvV;: Page 3 of3 Walle and HCLlT Administrat()1 Def>drtment :If LabH O( Const i: ut lor Avenu", N w. Wac'h inqt on, PC 0210 rhe request should !:',e dccompanied by a ful i statement of the lnterested party's pos tion and by ('my information (waqe payment data, project descripcioCl, area practice materlal, ote.) that the request, r cons u:le T relevant to the issue. ) ) If 1 he decisiun of the Adminl>trator is not favorable, an nterested party may appeal dlrectly to the Administrative Review Board (formerly the Waqe Appeals Board). Write to: Admlnistrat ive f:eview Board Department )f Lab'lr Dr Constiturlol Avcn\ll~, N W. Wash inqton, DC 02] 0 ,1 I All :lecislons by tre Admillist [drive Review Board are final. -----------.. --------- ----_. -- ----------- --------- E:ND Of C;SNERIL DECl;;rON httn://www wtlnJ onv/wdC\I/",..,filp"I,~",,;ch,,{'r.nrrYh'1 Aul-, AI ,~ A f"l/\,A/ .".!l"""_ AJi_REEMENT THE STATE OF TEXAS 5 COUNTY OF NUECES 5 I) '.:~"er THI. .\';PEEMEN1 i; entE'rE nto this 23RD day of MAY, 2006, by and T =', d I a( t Inc, te tT , '.rrna} Ir ( )t Jat LC r Let e ~ rdino CITY OF CORPUS CHRISTI f Uw '~oun t y of Nueces, State of t Ii 1 "J! i t tuiiuth( II eel "ity Manager, termed in the Lrn.E r 1- , , nd Golf Course Builders International, Cl 't , ,Inent :" "C:on tractor," upon these terms, 1 ) ' I t -'~ xas: jE~ra 1 n I, J j t t .ment f $1,197,453.00 by City and other rlerPI rl, ('ontrac:tor will construct and (1 rn} r verneri ::-: i~~,'~crit)E:-:d ,;-j5 f 11c)ws: GOLF COURSE IMPROVEMENTS (EXISTING COURSES) GABE LOZANO SR. GOLF CENTER - PROJECT NO. 3274 (TOTAL BASE BID: $1,197,453.00) t__ \-) f it 1 i c ""ei F r S ,wi :;ppcifications in a good and necl !':. r<rnanJ.i E: m(~jnc.e c,n G::; '.:~e::' , ifTlent S i ,n ,de PC' fi at 1 :ir ngs, 10 ;J[]ent s '\ j I'd' f, t + h t) cuneLi t 1ms set out in their rnl) ~)a u at their expense such materials, '.Ire h [' 'e l,_= , :. i r ! 'jLJ j r e eJ by the attached Contract , d ( 'PT ;eo r 1 he tit Lte job. fhe Contract Documents CjtE Dlen h;:- structions, plans and p rc>r: ( d l l! 1 d 1S I , 11 'j i IJ ~l n 1 rLap:,;, lal ~;, blueprints, and other :J t"rn in ,c, in, Paymf'rit bonds, addenda, and related V}! I j h t. hE' 'i c.:: trclc'1 f this project and are .:=> reerrerl t f qe 1 ) f 2 r !Gl eltlelel~ i I 1:1 Gl\_ :1, .. lio :..it j. ~z ! ~ J z ~ ~ z z :; :; ::J . :>l . 2 ::J . " ~. ,0 " 0 0 ~ i 0. ~ : C> "C> ~ "C> ;'Yi 0> '" ... '" ':..1 '" g ~ c i! ~5 a iiI ;:,) " j " i " " " it ~ .. i ~ < .. => co .. .. .. .. : .. . .. ... .. 0. "r iiI " ::J .. ~ ~ .. ~ :1 :l; .. ("J .. C> U -C> c- ." ~ : 0. ~ ::J ::J ~ ::J .. ... ::J .. .. :: ;; ii '" lD OJ lD '< : c: 0. ~ i ~ = lD OJ c: c: lD c: lD => => 3: .. .. .. co c C ::J ::J ~ ::J C if oil .., .., " '" !L C> .. " .. .. ~ il I ~ ~ "' ~ ~ !l; .., " ;1 )~, " i ;! ii ~ .. ::!i or ! ~ ~!~ g .. .. .. ~ :! .!!, 0; :; .. : F' .. a 0 .. " or ::J .. .. '* C- .. .. ". ::J II' " 0. .. " ii ~ 0 lil <0 ::J a ~ ~ S 3" :; .. " ;1 ~ ;1 .. a C> 0 . a " .. ~ ~ il .., g " ~ .. .. ~ a .. 2 5 .., ~ :1 '3 ~ .. ~ ::r n iii .. .. or 3 ~ ~ ~ ::J i :1 ~ " ~ <; .. " .. !! => "~ .. :l; ~ - g ~ ; it .. S .. ,~ .. 0 ~ .. ~ ., ii .. .. .. .. il" .. : ::J " ~ r o =-, .. ! u .. .. co 2 .. [, s, " ~ :l; ! .. => lil J ~ ' c: S" a or 0 0 ~ n o ~ ~ 'P .. .. 'i~ C -< 3 ;0 .. ~ w~ ~ .. ;;> -<C? c .. 5 0 .. :J ... g ~ 0. Ii ~ 00 co '! Jl a il " ;> ~ il " ~J Q. ~! .. ~. .. S" iii .. ii 0 " , " :J .. " 0. 0; '" 0. C> .. ~ ~ j J' ., '" ii ;i .. il 0 c- ~ $ ., 0. .. : c "' '" .. :5 5 ~ .. .. ., l(~ ., .. ~ 5 > .. .. x .. 0 ., 3 ![ ~ :; ;0 :: '" J 0. .. .. !!( n ::J " S c 0 8- i c "- ~ 0. it .. , 0. t~ ~ I i i ~t r r ~F!~r r , en 0) cn v' I i I ~! III ;., .. :.. <0 iil a S ., or ~ S" ., 3 ~ g .. ~ n I I I I I I i n1 " I r cn j ! r I ~ n n ~ :. 5" 0. il ii ,0. c:a ::J 2' i ::u i . 3 3 · ~!ii~~ l;.T :J ! \1) ~ ~t~.g .. J~!~i i~&~~ !iiil ~ ~. ! ~ ~~_r;: ~:~~5. g . ~ :i (g ~~'S~5' :~:~[ i ~: ~- !!. . ~ ~l~i~ ~.~~~~ ~ g ~ ~ i . i ~ Ki~ ~~~ ~ ~ :;- o c i 3 ii" f: ,- cn r r cn cn ~ '" ~ ~ o o .. .. ~ '" '" 0> '" ~ ~ 6 0 o 0 . ill ~~~ i '< ~ I . .. . . WN . :.. ,. hi illillil caC'OD"OO_!: gg~6-~i-<3 ~"i3"i3~~" !!~!~g,!aJ~ ~3:.i~.~~a~ ~~"~l~~~:l Ql 0 l>> 0 ID a. c.. : :i;~~~~s.. .fiDfiCJo"O:l 3!!!.i!!t:i;~~ ct.a..o..~.1It ;a. , .!" , .... ~ .. ::J !::~=~~~i' o...a.IDQ.'l:Ig~ ~ : ~ : 2 ~ it :J ~:iil"i~~~ ~i~jiJ!2.~: -Q.Clo..a.-s- 5"~~"a~;"1~ ~~:i~;~~~ "Oii"tJClii a. _:::I _.0. _ ~i5"~~! ~ ~ac!CI~ ff .~5"~::r"i _~ lU (I> CD - CD 0 ~~~~~~ ii.c..~~o.. ~~$~~" ~i~-or; g~~~~ ~~&.~& g 9: 0 9: => - ::J ~ ~ g 2' ~ I :T .. 3" ~; i~ ~ ~ g OJ .. .. ~ ~ ~ '" .. 3 .. ::t ~ ~ ~ 3 o g = '" ~ .g 0. .. o co 5' C- .. " 3 g, ~g: E' g, g Jj iil i ii ~ ~cJ ! il 0. S" ~ 0. iiI 5" .. '" ," " ~ 5" ~ r '" r r encn r '" r 0) r en :r:: {, o c: j 1!;~ ':\J!; ": fJ;: ~~i ! ~i a :to. ('l ::::: 0 f~ OJ c ~!l .g g GllII lit ;:: S- .. ::j m ;: '" m '" o i!! " ... 5 z c ~ oo~ ;;~ 1I)::Ja; !}::!,:." -'" _"II> "30 3mCD - CD 5- :> "'" ~~_. ",-g CD-CD CfJ 3 (p " ~ ~ ~S!. .,o.~ "0 g- ~ 2.""Al ., ::> [(i" =3 ~ in" ~II> crill -" D> c.." 0> CD 3I!D 00: c ;l i B' .. 11- r ~: t' .j r .- i: f " 3 ~ " ~ ~; 01 · ~ ~ i g rC> i ... ~ c .. ;i f! t" I~ !~ :. 16 .. ~ : g~-~~ .~ -g- -:+g: -') gu~~~io~~ .~;:~~~~~.~ :~~g~_5~~) i c8.~&~~f;~ ; J!g~ gJ !g~:::r9g-~~~ " 3~~3~ ~, ~~~~~~~roo 1O~-' -C~;5 ~~g~~g1l:1 ,~~~Pl~ e:lU ~ -u Q. ~ : ~ II' fi ~aJ g~ l~ R~~ ~~ ~ttI IV:; to '5 Ill) ~,,~IO ilD ill) 00 00- 00' u_~_ -1I:I-fIl D~ ~~ ~a -; " :1 :~ ~I< ~ s; c. :;"U a. 9:.: pa 0._ g ~ f- Q. =I 9: -0 g ~ ~ ~ ct ~ J ! CIf .=: .. ! 0 ~ =:;; &1 III n ~ ~u? ~~ " -. Z " , 4c ~ m~ )(- .. n " " ~ , ;[ " . o~ @ ::: ::l '" . ~ ~ .. g " ~ :~ ~Ii' i" :. l~ ;~ !~ i3! 1& l~' :~ 13 !C11 '~ :... '; 5"t1 Q,i>> ~ i: ~ -- n 0 ~ "- c c " g o " co> d ~ ~ 6 .. ~ ~ ~ ~~ Q ~ 5 n CJ ii~ o <' PI ~ I " 0 ~i " > w ~~ () " 00 " . . .D $ " ~ ~~ I ;11 .r': , '" 'n (J, rl :1 rl rl l' " i; I i: i 1:;: ... ~,~T. i, ~-f~T (1 ~m~ :}~,-- ~ c!g.~ c 2:. c g.. c Q:i" c i'&:~. ~~. i:~. ~~iD ~'._: (i~:: .~_: .-..: ~i~gg~Eg;~gl~&~ ~ a~a a%~ a~~ 35- Cu::lOCIDOCilDOCiOQ ~ ~gi~~i~gi~gi ~n5~1O~~D5~lOg~ <0 ~g.g ~gc5 ;g~ ~g~' ':) II)::'I"U ":::I U II -:J -0 Q1::J U ~ ~ . ~ m - m ~ m T~~:Tg:~g:~g=~3 \ (,4o.~ "'o.~ .o..~ "'a.~ ~~~i~~~~~.~~l J ~ ~ ; ~ ~ ~. ~ -~ : ~ -~ ~ ~m50-o3Q.;03a.o5a. ;;~iO~::JlC~:JIOS:)(I)~ ")~~a.S:g~t~a.S=i~ :~ ~~ ~~ :g --< ~ " (!. 5.. m o o 5 -J: < " 1 , . 1 " ~ .~ ,~ j :. z:z:z u..w e~~~~~~~~~~e O.........,&l.WN....O :z: ;., ~ a-g 5: "0 9:. iii " !~ ~ !2 co c =< ~ 0" eo> ~~ .s 3 l>> Q. e: ii go .5 = .::f i = ~ 3' i~ l~ Q < " 3 "0> if~ .~ l\)~ ~ ~ o .. 0> ; ~ ~ ~ ~ ~ ~ ~ ;f~1 f?;~~~~~ !!iiii~ ~ a i ~ = ! ~ ~ i ~ ~ ~ I ~ i liE rEi Il~'~ .:!.:J~.::t....~!.~i~J!. ~~.::!.~ ~-!!-.!!.?-!!..!'!.o.. ~ ~ ~ CD I i ! i I i " >< ~ !!! " -" ~ " II> -0 S '" '" ~ S' Q f.j Ii Q 3- o C 0- s- o i .. ~ " !" .. ~ ~~ .. 5' -" .. " '" '0 3 ., = S' Q f,j' Ii n ;., ~ it ii - " .. Q ~ ~. " ~ 0> , ~ = .. j- :fJ to .- .- f;; .- .- .- .- r r f;; r f;; . r '" (f) (f) (f) (f) '" (f) '" (f) '" (f) : , ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ .. ... ... ~ '" -l ~ m .. ~~ -~ ~ '2 g Iii f~ i g> ~ :=! iil . o..~l"On -I i ~ jjlD Ql> "t:a.~:: ;Jiii :i~gg . n 0 0 I ~ ~ Q - ; : "' ii: .. ~ ~ ,p...+ r- i : : : ~i~,~I~I~ H -<- l'I ... . .. ~ 0. ~ .. tT~"-a ~~i's. f33i: n Q. Q.. n in ii' ~ :,.- =r .U'U' i ~. ~. [) :5 :l m '" '" ~ 00 D 0 0 ~ ~ ~ TI ;- it ~ J? ~ ~ 5' g \.'0 U '5 l~0 ~ ~ ; Wi iit ~ ~ ~ 0.. !I! ~ ~ ~ o f1~' iiI -n " ~ :J .. . :J _ 0 :J <> iil ~. ;:i-ii5-~~~'~~~ ~~~f~'~~~~ : w i ~ ~ ~ ~ f i Ii~~ill~i ~~l~_i3.~.g> ~3~l i~ i ~i~~33= ~. ~~.~~~~ 'i ~ _.0. ~_' 0 ~ ~. 0 i c ~ ;;; ~ 'j.g g, g ~;;--~~'.~~ ~ & f ~ ;1& 'lJ, ~ '; I' ~ ~ { ~ I 0_ <<) '" ~ .. i~ :3 'F -f .. : . . ~ :J Q ~ 0 .. " "''' g g & ~ ~ : " . o <> :- ~ ~ ~ .. .. " .. !l; ~! i I , u g 'ff ~i ! t o. c: 0 ~ ~ ~l ~~ ,& i s: ;; g jl o :J g!' Fl" ~ < 5 !P " :J 0- Il' i .... " " ,. .. : ~ a. Q. gr~ :J '" ~ ~ ~ q ,...: I~ 1:1 I~ I~ !a' 5 ~ " :: 1 --->.l.--, <D N 6 ~ ~ Oi ~ q ~ -O\Jzzzzz mm,<,<,,<,<,< "ll""TlOOooo j)!!il!! ~ 0.. ...... - ..... ..... ..... m m => S- :J 5" 5" ~ j r- r- r- r- r- n0.5"5553 00 (J) ,. CD . CI . . · 0 0 0 0 0 n n OJ OJ OJ i i gg=;':r35"5 ({) ,., i i t' .~ f"... J i ~I~I[~ i ! j I rT~ II~ i I ii, I fl u' ~ ~ m ~ ~ I~ I r ~ '" ~ q "l "l ~ CI CI CI CI CI CI CI ;; .. ii' .. .. ii' ii' 3 3 3 3 3 3 3 .. " .. .. !! " " ~ ~ ~ ~ ~ ~ ~ ~ ;. ~ i.o ::; m ;c z p ~ .. ~ :. ii 0 ;;g ~' -p.- p- ~. m. !*- ~ ;. ~ lr ~nl ,_~^C;; _, ~ i i> .. rt ~ ~~.ic'nl!..\N(n io-3i'< l;:..aOJi'{{)..~~g'll.::~ o ~Q-flr~!l'!l' ~~{;.iO ~ gg.ii3:i:i DOg. ~ sggll-~:i ~i 5t. .~ ~::J.gg: .:!!. l I~ l!!.~~ a.g o !!~_ i ~~ i g Q; d r Q g t3 ....10 ~ IDe !! g g =- i ~ ~ ~ o ~ ~ .. :J .. 'U if 5' ., ~f~:~ i~"l~-o ., g 0 (; :t>~0!~ g:J . . ~ a .. - :J !!, :J '" ia I a i ~ ~ ... it s lQ ~ i ~ ~ , t .. a i- f ~ ~ .. ! .. '" ... ?,'~ iii ;;c CI m rn o ;u ii -f 5 z Q~QQQ '~t;;~~~ l i i ;.S:.'i It;; ~1rJ' ~ ": m " ~' .- J~g; '='ii 3- "'850.~:5 if< ~, ;~: ,.J~'::.f n -litg;~g -c: ~--~-~~~ 3 !!: m", '" m t\:J_~W=~W '-\ .s&>a ~g'< s !C~G ~b ?\. 113~mh:m ~i<~~~~~ 6-;~~!Q~ .9Dtmcf:m ::::!!j~:JJ5-a.;o s-= ~co ~_ ~ ~56i~'6 .-!!Z$!!!.z .1~~~.~F' ii).. 0 z -:-- !!- .z !S.ff0~-:0 ~~~'>>~7;~ og-.~wg~ S.~[~!it_ 'r;;;iW!6~5 'i~<gg.5~ 9:3ut~.,.c:l ~g~;~: ;;1 :;o'a 3 i:lI1~ ;~~~,~~ il ~~ n ~o !!.5u 5 i~ ~6 ~ ~ ~.g3~~g l~ ~ ~ ~ t:r:l.. It>-o 3 0 ~ ~ ~ ~ ~ ;Il ... I'C ... '" " z:">>"'u.:""l"l~~~;.;.;.,o ~ II ~ -<:i ~ f I ~H) ~ H I Sm .~~o .~i<<<.~ ,~ ii'~> ...,.i'." '" t~ .. C/)o~190i a:;~~~ ~ ~ l:r:r a.1:!:!~:i~ ~::Ei!:~:;- Q./i.. -[2 .::T~~ .~ii ~::Eg :<t>cn i"'~~." g}~3 ~: rII~~~ o ~ (!) ; :; l 0 (!) ~ 11 15 ;: I III I ~ I I i I I ' I I ITn'l ! I I I j ! 1 : II I I I I I i I I -..- i,lt-,- c5 o' ~ p ; ; m ~ 'lA II I I I i I I ! I i I i i i .8 lD '" a. -., E!' '" 'lil ~ ~ ~~ ~ il ~ 2 go ::E " 0 ~ * ~ m p- < . " : "'- <t> ~ '" " .. ;;l - - - I g ! I II I i i t I I II i , I I III I I ' i I I I II I r ' j t -t ~-H t 1'~I~I~I~i~I'QI'2I~ 'Q1'21'21++~ ~ 11- 1+ H I' jl t [lml!I!I; I~~ ~ ~'~I~ 'hl~ II ~ ~ '" .'!'"'~ ... ~ ~ '" '" ... ... i~~ '" ... w g '?: 0> .... <D 0 IV IV ;;: ~ ~ '" 0 ~ 21 0> <So '" 0 0 0 g g <> g <> g <> <> <> g 0 0 0 0 0 i I I ~ I "l I I 0 " -q c .. ~ i 0' " ,.. 0 0 ~ 0 ~ a 0 " c .- .- "1 oj oj ..'E. '" ..., ..., oj oj !: if ~ "1 c c 0 0 0 "1 "1 ~ "1 :,. :,. iD 0 0 < < < < Q Q Q Q Q ~ :J: :J: 3 < < .. .. . .. . . i :'1 .. 0 N .,- " ~ .. .. ~ ! .. .. CD m m i' ;i i' 0. 0. -q .,. " ii' .. Ci' a a: a: 0000 ggg~..~ [ [ [ - ~ ~ l ~ Ot .t>. (.0) ::l ~:~~ ii .- fi ~ o o 3 ~ r f ~ ::J ~ . G K~~~ gi~i o . ~ ., ~ ~ ~ :! .. .j>.. 0 I\J " ii '" ~ OJ "l ~ ~ 0 0 0 0 iD iD jjf iD 3 3 3 3 .. i ~ ! ~ ~~f1 ~~:f 333 .. CD .. ~ ~ ~ , ) ':;; r ~ r ':;; ~:~ .,. " \ ~~~~~~~~i~~~ ~':;;':;;~':;;':;;~~ :~~~~~~~ol g~~~g8~ i'>1':! t ~ ~ ~ ~' ':;; ~ , , ~t--- "~,; '""r. ~~1.~; -.' '" -~N I I I '" '" '" g; I .. .. -" '" ~ w g 0 o ~i: '" '" '" +. "': ... ~ 0 o 0 0 0 o ~ 0 0 " g g g ii__';.'; ~ g ~ ~ g ~ '" 0 '" <So ;-~'~ ile I ') a\:1 vJ j 1 c:()mm'~n! elt 'Ie t ~.~ r-' ,,-.I ( K CALENDAR DAYS "r' ,I I ~ r , 'I' :t I' n 1 v 1..-" " '11' f' (II' (:t 0 nent t 1 :t d I ,,,' J ' r L I La { 'IP rc '''38\::'S -Lgnec' ~i 4 f'a1 '::.5'11 (' npus h r j st j, Texas on the date shown (,C t j t APPROVED A~ TO LE~ FORM: , ~Vl\' 1\ ; 'l UiL L' U' '\/ Ey:\~\;. I~, '" l, ~_ ___ f\SS' ',1 t Y Zl,' j 01 I'E" T_ ATTEST: (If i.:>rporat i 0(1) (Seal Belolr,; (Note, If Person signing fOI corporatton is not President, attach CC)py of authoriza tioT: to sign) v 0 r k W 1 L t 11 n t ':0 n 0) calendar days from ~e r'l n 'JI,i 1 complete same within 150 I S t'Pl" r bou j Contractor default, ;uidat,...,cJ -Jama~lec3 as forth in the set 'U I' r en t f nds f ( r performance of the " 'r t ,1,1 t Documents as the work C~Y O,F CORPUS CHRISTI By : ~~eU.Jl.~ Ronald F. Massey, Asst. Cit of Plb] ic Works dnd Utilities I ~ '16/06 Escobar, P.E. f Engineering Services CONTRACTOR Golf Course Builders International, Inc. ./ ,-1 / 8'" ~-~ a. 8t/U J }r./., / TIt 1 : L..E.r::~A 8 \. Tv2..f=-+{Z'-{1 l \~\ ~ \" 17332 HIGHLAND RD. STE.G115 U'\dd re s) BATON ROUGE, (Ci ty) 800/646-6880 (PhCl e LA 70810 (State) (Zip) * 800/916-1941 ( Fax) reemefll e 2 j {\ 1 LCO~ .- ( ~; ""- -...~..;... AUTHOH&.a::1. If ~CIL .--.-..5i.l..i&:. Iv{ .. . ..........Q.l;;;'/J J1 , ,-T'!!IV {TL- Annual Resolutions of the Directors of Golf Course Builders International, Inc. IlESOLVED THAT: I. Approval of Fiaancial Statements The financial statements of the Corporation for the financial year ended 2005 with the report dated December 31, 2005 of the accountant thereon are hereby approved, such approval to be evidenced by the signature of both of the directors at the foot of the balance sheet fonning part of such financial statements. 2. Election of Officers The following persons are hereby elected officers of the Corporation for the next ensuing year or until their successors are elected- President Secretary Treasurer Lee A. Bilberry Lee A. Bilberrv Lee A. Bilberry RESOL VED, that the President is hereby authorized. to enter into. execute, and deliver in the name and on behalf of the Corporation., any contract, agreement. conveyance, and any other instrument that may be deemed necessary for the business of the Corporation, and that the Secretary is hereby authorized and directed to attach the corporate Seal thereto and to attest the sea] by his signature. TIle foregoing resolution is hereby consented to by the signatures of all the directors of the Corporation. DATED January I, 2006 l~d dg . Lee A. Bilberry, President i ",/ ~// ~/ '---',' a;<::J ~ ~. Bilberry, Secretary /' 7 / ;II" ~ ~ .'-"" cf' U /' /" -~ ~ ./ oli-. .I ~,._.__.~ b~ /'.,.,J 1.<"'.,,,"" .:~1AI A. Bilberry, Treasurer ".....;- c;cllf C,ourse Builders International BID PROPOSAL Golf Course Improvements _(Existing Courses) Gabs Lozano Sr. Golf Center City Project No. 3274 For the City of Corpus Christi, Texas Department of Engineering Services BIDDER: GOLF COURSE BUILDERS INTERNATIONAL INC. BID DUE: May 10, 2006 2:00 PM CST 17732 Highland Road Suite G 115 Baton Rouge, LA 70810 VOICE 800-646-6880 FAX 800-916-1941 EMAIL GCBI@aol.com ~ .~- PROPOSALFORM F () R GOLF COURSE IMPROVEMENTS (EXISTING COURSES) GABE LOZANO SR. GOLF CENTER IlFP," RTMfoNT OF EN(;INFERIN(, SERVICES (ITY 01 CORPUS CHRISTI, TEXAS Proposal Form Pagelof12 0, I} r { t 1.{..; ~} () {{:' ~l-~ l' PROPOSAL Place: MIDLAND, GEORGIA MAY 9,2006 Date: Proposal of GOLF COURSE BUILDERS INTERNATIONAL, INC a Corporation organjzed and existing under the laws of the State of DELAWARE OR a Partnership or Individual doing business as NA NA ." TO: The City of Corpus Christi, Texas Cientlemen: The undersigned hen~bv proposes to furnish all labor and materIals. tools. and necessary equipment, and to perform the work, requIred for GOLF COCJRSE IMPROVEMENTS (EXISTING COURSES)-GABE LO ANO SR. GOLF CENTER al the locations set nUl by the plans and specifications and in strict accordance wIth the contract documents for the following prices, to-wit: Proposal Form Page 2 of 12 E ::J ,........ -0 0 in E .. .. ciB ..~ ., .. .- c E= ~ ~ . ~~S ,,-0 tj~ -~ E :l1!1! ~:g~ :g ~_5 G;1iiE - g ~ ~ ~;'ifl ~ ~ ~ soE 0 0 .. .. " ~? .., ... "' C iF, => .!O ~ ~ j ~ ;8 :t E ~ ~ o il IJj lii:'5E 1:1 ~ I '" I t Ii ~ ~ ! 'D ii t-i i ! I ~ v, 1~ 1~ -tl <> c <> '" ~o c_c '6 ..Q i) .Q s: ~ ~:?-gc>>U) :tn'~ u.g~~o 1" Q~Q~~ ~: ?~ ~ii gc u~b'g::t ~ ro ~ ~ ~f~ c ~ ~o, UIIJ_ICl~~ '- L :l ~ ~ ~ Iii ,2 <.4 Cl c.>> '0 il'6 -g.f~~Ul I~ ~~~i~ _~i~;ie-~ 'O~'o.~:~:~ '::i.~&;;.~iic~ .I'~i~i!f~ 'jf..a.~~2 g'i~3~~~ c ~~~~::-oi;j ~ ~~~.!!~~~ ~ ~ ,i ; ~ ~ . i ~ I~b!i~i!~!.. i~ ~-g~~~lil~ o.'O.-E.o._D:J li~ ~~~'i~~~;" -: l i) ~ ~. ~ i ~ .~ ~ ..' ;EUJ ~i-C:E.9ca.. ;..!!~ :.....-~~. ..9~5 E~ iOc.~o.s-3 i~u j !j'2~i:~ ~~~ .Ej~~!.;:~ll. " .. ~ ~ u ~ . ~~~ ~ ~ ~ ~ . ~ i; ~ ~ "to ~ ~ I 5 ~ ; jCi€~ .c~:.2 "0 I'tI CD ii ! ~ ~ ~ Cl "f: U ci > ~ ~ ! III K ci c- a. :~[~j ~;-8~i ~~lt~~ .~~~~~ .!! .9 cl . ..!! ~~i.:~ i E "E I ! a:: !!' .2 c 0 Ii ~ ~ ~ i " ~ .. Ie L ., iii .. ci III Ii ~ !::l .. ... Ii Ii .. Ii I <> c ;; ~ '" ~ ~ J g 0. ~ Ii? -g f ~ ~ ,~ ~ f ~ ~ .. ~ '" ~ " go ~ i t: :l C ;f ~~ ~ ~ ~ ~ E 0 ~ .. .9 & ~ ~ ~ ~ 1~~g> ~ P t ~ ~ ~ ~ ." co lij U '" 2-D- ~ " ~ c ., .c 0 : x ~ 5 ~ t 0 U ~ rJ ~ ~ ~ :- ~ ~ ci ~.!! ~ ~ l ~ ; Q fl) II) ~ D ., at .e ~ ~ ~ i U ~ l! "5 c ., - ti "; It -! "~ ! ~ c ti ~ c c .. 0 li~ ~ ~ "i g ~ i Ul ~ ~ ~ 0 ..c ~ ~ c ~ .. .. .! &x. '5 .. a. ~ ~ i ~ i -~ 0 c c 'i :~!lOJ!l. ~~~cn .. iii .. .. ~ iii I: ~ ~ :? ~ ~ ~ '5i ~ ~ ;; .. ~ tJ - ~ .. .. .. .. "; U i ~ ! ;;; iii " " .. " ~ 1l ~ ..., ~1 .. - ~ ~ r::i a-' ,!: . " .. "a 0 ~ c ,5 -= -g I! ~ ~ Ul iii (f) .J " II) .! IV OJ} 'to c .. :J 0 5t- ~! III /I) t: ~c "~ ~ g' ~ "s 'g~~ ~ ~ fi ~ ~ ! 3.cD. ~ ~ "~ ! ~ ~ j ! a In :i5 ~ ! r;j ~ ~ t : ti ~ . ~ j ~ ~ - 'if " 0> . "0 ,[ i c . .. .. .c .c .. .. c :: Ii 9 ;. 1l .. ~ -g :g ~ :: -g .. M .. l;l - i: '5 ~ 3 = E u '" I! _~ .. ..: ~ ;;; ;;; ;;; ~~~~ U)U)OOOO J ....J .J ....J ~i ~ .Q : ~ i) -; - .. .!! <> .. c ~ ': o I! D ~ ~-g c .. ~ J! .l> C ; ~ ci-;; c .a ~~ ~~ i! c ~ ~ ~ ~ . 0- ~~ 'ii c :J .2 ~ .... till If) II) ..-. eEjil;illi J i 5 ~ 5 ~ ~ 5 5 ~ j:~.i~~~~~ffi ~ u ~ i ~ i i l ~ i !~:~~~~::~ !'t Nf")t")",IOCOS) ~!~~~~~~I~ .. I! .. i? 'g .!! " C N w".Ift...... eeeeeeeo 'I, I , ' i~+ I ~!"'t (/)oo(/) -' -' -' fr I J .. l' .. .. l' .. ~ ~~ .., .. <: - ~ ~ .. N 'M ~I.. isj a:mc >.i~ ~ ~ i :~~ ~~~ 000 zzz II i ~'ji~ ~_ en co .... lit ., CI) ~I~I~~} ~~fi i i i i il;,'- GGILGOGCI, ~::~~~~~. ~~!i~~~~~1 i I " lit ' I I I ' I i D .. ~ r ni <> c ",il C~ 2~ :~ .Q ;; ~ x .. c> c 'c .. 1ii ~ " DO " '6 ~ U ..f; W.! !!", ~.. Ii 'Ox .p II Ii c .. III I~ l~ lni ][ I~ Q 10 ~ x .. ~ " j " '0 DO " " ~ -0 en.. S tl:I.. l/II- C c:; c: ~ ~ ti I !! '; ~ DO (; c 11 ! (J) ~,~ : ;.!! E ~ c a ~ l' lD fa ceo 0 a a ~~ !~ 1i~ ~ fi "J t .(1) I J f '" c ~ <- l' -g .. ':;:M U ~ ~ " .D Z 3 ~ 6 ~ ~~ . .~! j '0 tit 5 ~:; a. c :: C>> .Q ~ .S 'E .. ~ ~-~ ~ u-g a DO ~ ~ ~ g a " ~ ~ ~ i ; t 3 e ! ~ :. g ~ '" c ~ ~ ,. , .. .;:- ~ "0 ~ ~ ".Dz B ~ g ~ > '0 CD ~~ ~ ff I ~ ~ : -EOCl .. .. <>. c .. a -2 f .f: ~ I:l ~ ~ ~ !. 1) -g o co ~ ~ :6 ~ .Q2~ i -~_ j S ~ ~ ~ a~ . <:- tr 0 0 ~ ~ c ~ 0, l' u ~ .;::~ ~ .!o ~ a:I: 3 g.:5 ~ ;; u . ~!o-iJ! . co i ~ ~ l' .. ~ Q). c.. c. :: .~ ~ ~ ~ ~ ~ ! ~ 2 o DO" ~ ~ g Q .2 ~ i ~j .! ~ 1'1 2 !:g :. 5 ~ ~ ::.; ~ -,<, " ~~} ~ ;~-,. "J "J (/) "J .J Ll t t,i,. ..t':; (' -' i . I i ! I I i I I I DO C : .. <- l' " c .. ~N jj . j ~! ~ t:5 ~ ~i . c:i u jq. -E !: ~ c.; 00 .2 ! .E -= . ~ ~r ~ ~ ~ o "''' .. S g 5 -g ~ ti a" : Sj · -lj ~ !~ :. g li '3 rn c ; " l' ~~ ;,;:..... ",- u ~.!! .. .D 0 3 g. ~ ~ ~ ~ III O--=: 1 ~1 ~ " .. l' .. fi Ol. ~ C :; co 0 .. 5 ~ ~ ~ ~ ~ _ '0 ~ o DO" CIt .c 0 c i3 t:: .2 2 i: i ~j ~ ~ ft e ! :g ~ 5 ii '" c : .. <- l' ~~ - ., :;,- ~ ~ ~ 3 g.~ ~ ~~ ; l:i '2 j ~ ~ ~ ~:; ~ c :; 0. .Q ~ C ,; m ~ ~-~ ~ 'tJ -g a '" ~ ~ =5 g ~~: : ;~ _ c iJ e ! ~ : ~ ~ ~ " l' ~I ~~ -0 ~..! . ~ ~ 3 ~iii ~ ~ i ~ a.~ i t.t :6 ~ = .. '.. 0. C .. ~~G ~ E gt . ~ :g "0 OJ::J ~ c5 g ~ ~ ~ : s~ ~ ~ig e 0. c . c =: 0: 0 0 0 '" .. . '" =1: . . ~ ~ N " . .. ... .. .. ... .. .. ... .. .. ~ ~ ~ l ~ ~ .; .; c; ei .; c; c;i Iii iii e z i i i i L .. c :: .. <- l' ~ Z ...... :=;::..... ~:! .D 0 .z "'- <: .. '> '0 .. .. Q.;o::: ~ .~~ ., .., .. 3 r.:: '6 .10 .E ij : ; ~ Iii i i-~ ~ ~~ tt~g o~i: I ~ j . ! rt . ..!! '5 'tJ o...f: '" ,,- -<: 00 ~ co c :: .. 0. l' -g ~ <G.,," E,... :;,- -g ~ ~ B g.~ ~ > f .~~ ~ i~ ~ ~= .. '.. 0. C .. .~ ~ ~ ~ ~.~ ~ "0 ~ o co ~ ~ :8 g o " " 13 0 CIt : 1;_ j .!! ~ ft e ~ :g ~ 5 ~ .. ~ '" " 5 1! "'.. S c ::: 11 !" 0 ",- ~ ~ -g:s .. u . .. :== )( :;,w ~d .z co_ c ., >" ll.! ~~ "0 ._ 0.. .!: u. l'l lj,:; '5 -. '~ II j ~.~ :E ~ ~ ~~~ ~ ~ ~ o ,- j! ~ ~~ tlIt ~"D ",<>.c ~ 5 ~ ~ o .. " l' '~ ., . .., .. " 2 :l c ., E ., e <>. E '" . '" <i ., ~ c " .. i c J! l E 2 ~ I :i: ... ..; . ... ii ! . E ! C " ... ii . ii E ! C N ... ii . ; E ! C o o -;!. '" ... o - o o t-' .. N ,.: ~ ;;; o o ~ '" :;t g ::! '" N ~ ;;; o 0 o 0 ~ ~ '" ~ ~ ~f;; a " 0-0 ~i~ ~i~ "'fiN ;;.;a E " u .. .. j ~ o 'D i . . . . 1 ~. ":"1';1:>. i!'::: _ e~; '2 ~ l I .' " ~"~! II , 'jI-a. <e 1f:8 I ;:~ "....'. j 1,*, l r ~ i j i t+ ~ - I u. " Iu. ;Ii ;Ii ;liH;Ii , ,-, I I ! i t.t t .'!! .'!! .'!! T s c; C C C C C .. .. .. -. .. - . ~ li i! i! i! E E E E E E E 0 0 0 0 0 .. .. .. .. .. .. .. ~ ~ ~ ~ ~ 0 0 is (5 6 is 0 ~ ~ ~ ~ ::J " <0 10 b N .. iD f, r-:...- -;J:lt~ ;lil;li ,l.j,......i......~ ,-,,__. c: .~-" 0 ;;~ 1: , l~'i::) I' h ~ .".: r... Ii c; ~ ~:, t: ..1(.~c.' ~ I.. (~ i-.J i= ':,:; Q., .~ .t:: ~i ~ , <!! lE!,\.'i ',! J 'i '" j-' " I i I. '" ,", ~ ~ ! ~it I ".1:" '" Cl.- ~l ,t - ii '1 ~ ~ I I "" ~ J::oo:.... .. I/) .. .. .. lllJ . . .. . nO-a.na. o 0 0 0 0 >..>.>.>.>. zzzzz r.oONfo~ ....- or-- ~ N ~ ~ .'!! 5 !:! fi B 10 h OJ " ~ " '" E 9 ~ ~ u ,j CD C '0 ~ II U {l i.!! -" IL .. ~ ~~i IL J: <II ci ..0 0 u f '" 5 c g 0 ii ~ .. .. ~ c .. : I- ii' i .. i~ 0 0 C a. B -, ~ " u: . ; ~ ~ .. C .>< 0 ~ .. .. Q. g> ('). _J 0 ~ .. C 0 1i ];; 0 >- .. U 11 .. ~ 0 C) ii: ii: .c .. .. '" ~ i 1 0> ;; .. .. li .. ~ C Ii. C c OJ .. ~ :: .. ell g 'C 0:: ~ . .. 0 E ~ .!;; .. .. 1i L 0 li ~ > .!! g 0 ;; E .; C) rl ::;; 1i a. 0 0 '" c ~ 0 .:l .:l ~ 0 Iii 5 0 .c u: C) !! .. 0 >- '" -l!: '" l: &. ~ JI 11 J! 00 JI li u & .., 0 u; ~ u; t~ .. c .r en E ~ ~ c 8 c .. S -g .. € .. i= 0 ... .. 0 <110 <!l o! en w U .. w oi .ci " '0 .. .ci '~i ~I I "1' t- 1;Ii ~ I I l ala '" 0 --i M '" '" Il)OOOOO ~~~~~~ ~rI;.'.'!ii," :;: 0"" ..- ~ ~ -; ~ '. ~1 g'~',,8 g g ~ g <<> 6ocici~ w ~_~~~...-r ~;;;:; a a o 0 ~g '" -'1~' + t-- a .. a w;~ + ";1";;Ii ~I~ ~~~";~~~I~~~ (~~. OOLLLL <(-<(w(/) t c c o 0 1j 1j .. .. <11<11 '0 " C C ww ! f .. .. LL u: ww a. a. 00 I J: ~ <n Ii " .. '" ." .. f;} ~ .. .. > .!! : .'!! -0 ~ ~ ~ 0 .. E ~ f ~~ .. .. ~ g ~ ~ ;,.~ = "' ~ o 0 c .. _."OeD ~ ~ -fi ~ ~ e-e-ECl'I ~ ~c;~~ n: (7jm~io .,; cin.~:c f 00<<1 g>~ -iij -0 .u C ~ u.. 5:5~o~ filii ~~o"t-o 5= ~ $.!!u.~~ 1-110 ~ ~btco oo--gcae> g5~-fl~ ~~~"C~ ~~iX.~ ~j~~~ ~~~8~ ~i~~~ dl.:l "ILIL ,..1i~ ~ cO ::~~_~ ~-56gl -:E L ",0 '5~O~tJ~.t.rr--r- ~~il~s:ollif~ .e~~~ -oa~:~:~ ~ ~ ~ G 0. t4 i; ~ ~ ~ CD ~ ! 5- (; .. .c Q. G '0 ill o i~ 1 .. Ii .. " .. CO ... 1Ii 1Ii Ii. Ii Ii i , .~ -. . - ~_.,._.- .- o e 't ~ " x ~ - .. ~ .. 0'0 ~~! ~ ~~~ .~~ o=~ ..g "O~~K C:~ .!!~ji'i:i~ :g~.o~.sC) :~&~~~~ IGEE:=jO ~~2~iii ]~:85.Q.m "C~~~:;-jJ :ggx.c:8! <IIffa.':;-C) ~cc!.c3l ~ ! ~ ~ ~ ~ n. o (!)"CI) ffi 0..;" t.i-U..~Q..c co c 'g <3 !;; '5 '0 c b I! 0 ., . 0 >< .>< - <<> ~ ~ gt OJ C ~ ! ~ ~ 13 = .g g .5 .. (1) i ~ - j . ~ i ! ~ {l,:.gj! c!l:& ~~'-~ I,) eJ .; .ri ~ C ~ ;t.!~ ;;; ~ 'il' ' lli lIi ~~, lIi lIillli lIillli lIi i:i lIi ;,' ~ ~.; r i off: ~~r '::{,i "- u, "- ...J _J J ,,%;' ~,'I' /'l' ,~;;~ i:i lIi llilli' in ~ ~llillii:iiliinin'Jinin'Jiliiliiliili ~n U ! J ~ ~ ! E ~ E E OJ OJ .. .. is is is is j LI I LI I I I l I I I I Ji iU l' m j ;~ 11 Ii i ~~ I L i: :r I 55 I- I- .. .. e ~ 00 '3 ~ "- n. l I I ! ; ~ ClCl<!lClClCl in (0 ~ r<> Co N '" ji !\ ; > ii > .. '" > >- tiCi > > g'~ ~: o o :~r -'" o '" a in N 0 "'f . i i i i ~ ~ & ~ 0.0.':0 o 0 0 ~ 00 > 5 l!' ! ~ 2 ~~.JE E o '.) ;; i i > > ~ ~ ~ ~ ~ ~ .!! ~ !I .. e (f) ;;; '" '" '" c ., " ... 0 .!! .!! .!! 0 i!! e e e c c c C I> 0 0 0 0 0 0 0 " " " a; .. ii u: u: u: ~ ~ ~ o o -'" C I> E ~ n. .. " ~ <{ co ~ Ji .. C :::; ~ o of E o I> :t ~ o .<: ...J.!! ~"! ~ ~ D. co Ii ~ ~ .2 :; o E 'C 'C 0.1> co 0~ 5.5. 5.! ~~~ 5-;S~~~ ~ l ~~ 1~ -= ~ !~ ~ : 8 ~"- I- c.~ -5.~~5-~~ 2~,g~U;fr ~ tIS c- -0"'0 QlmOllllDCI) ~ 8.'~~~~ ~Eg:l~-;; -0.--01::<<1) 4 ~~.~:~.~ .... 3.!;~&~1 :€~g-g~!~ ~.-~;~.1!.C ~'EiC~55 "S..il->>E _8~.~~tV ~i'a~~?~ =:iE~:Glci 4:..!::I<.( ~'a Q::Q~~<<D ~i~~iJ;- Z:JcZ<<D~C oc"U.a:Q = ~~~~~~~ ~o.~..c~ <n ~j(f)€>! ffi~jffi;~~ 9i.91ij.2i :; ~~5:282\"'" co _jmm--c ~ m ~'C ~ !i ~ ~ a:::o:Str~D..- 6~~5~:R_ U:2.iiO.:t:: ~.=~~5&. gli8~:6tt .,. ~ o ~ ~ I- Z w o ~i liE. ~ m_ ;..!! "" .. ",8. STA'l'EMENT OF QUALIFICATIONS Each Bldder shall be requlred to submit with their bid, a resume as qual.ificatlons experIence and ability to perform this special.ized type [ncl.uded .l.n this informatl.on shall be the names of individuals who meet the Ilial.l fi ca tl.ons to their of work. following 'rhe Contractor shall employ directly or as a Subcontractor a Superintendent for the duration of the Work, who has spent the previous 3 years of continuous experience or years in tbe prevl.ous 7 years as the head superintendent on at l.east two golf ,ourse pro Jects whose total cost, not including clubhouse or other structures, was at Least 2 0 million dollars 1n 2006 dollars fhe Contractor shall employ dl.rectly or as a subcontractor for the duration of the work two bulldozer Shapl.ng Operators who have spent the previous 5 years of ontinuous experienc~, or 7 years in the previous 10 years doing gol.f course shaping from detailed contour plans and whose work is found to be acceptabl.e to the City ~~ngineer Each shaping operator shall have worked on and completed at least 5 i1fferent golf course shaping jobs whose total cost, not including the cl.ubhouse or ther structures, was at least 2,(1 million dollars l.n 2006 dollars. References from ,reVlOUS Jobs shall be required ontraCLO.t shall has completed at ~hose cos~ was at employ dl.rectl.y or as a subcontractor least three ~olf course installatlons least $400 000 tn 2006 dollars an :l.n Irrigation Installer whc the previous five years Phe ConCTactor must l::e able to I'ead, interpret, and estimate from contour drawings; ~nd the Contractor may not expect vertical sections of cuts or fills to be provided. Bl.dders who subml t proposals Wl. thout meetl.ng the aforementioned qual.ifications shall 'lave thel.l: blds sub]ect: to dl.squal1.fication. -:ontractors ii rectl)r shall fl.ll :l.n the names and qualification of individual.s who are employee as subcontractors and will perform the following work: Failure to fill out the followl.ng forms may be grounds for disqualification. Su~rintendent l Name of Individual LEE BILBERRY fears )f contl.nUOUS 8xperience as head construction superintendent over golf COUrSE rojects 45 Name at least two (2) golf course projects where 'onstructl.on Superintendent Also list year projects otal :ost not lncludlng clubhouse or other structures: served as head were complete and Golf CourSE approximatE PROJECT NAME - - ..- YEAR COMPLETE _,..__. . ..-.-m_..___..._ _ IQIALCOST 1. DELAVEAGA SANTA CRUZ. CA 2005 $2.5 MILLION 2. RIVER RIDGE OXNARD,CA 2004 $5.5 MILLION SEE A TT ACHED RESUME Proposal Form Page 7 of 12 Shi-piD~ Qper~tors (Two are required) Name of Indiv~dual {No 1) JACK BOND Years of continuous experlence as a Golf Course Shaping Operator 25 '-lames at least five t 5) golf course projects where served as a shaping operator, state the year project completed and approXlmate total cost not including clubhouse or other structures PROJECT NAME 1. PROVIDENCE (DAVENPORT, FL.) 2. ,"OUISVILLE COUNTRY CLUB (LOUISVILLE, KY) 3. SAM SNEAD G.C. (AMHERST, VA) 4. ST. JAMES BAY CLUB (CARABELLE, FL) 5. EVERGLADES CLUB (PALM BEACH, FL) YEAR COMPLETE 2005 2004 2003 2003 2003 SEE ATTACHED RESUME TOTAL COST $3.0 MILLION $6.0 MILLION $3.5 MILLION $6.0 MILLION $7.0 MILLION Name of Individual {No 21: ROBERT W. FLINT Years of continuous experience as a Golf Course Shaping Operator: 35 Name at least flve (5) golf course projects where served as a shaping operator, state the year project completed and approximate total cost not including clubhouse or other structures YEAR COMPLETE 2004 2004 2002 2001 2000 SEE ATTACHED RESUME TOTAL cas' $2.4 MILLION $8.0 MILLION $2.2 MILLION $2.4 MILLION $4.5 MILLION 1_!.!"iar;atl<:'E !!lstfJ,ll~! Name of Individual. LEE BILBERRY Name at least three {3' golf course irrigation systems completed in the past five (5) years along with the total cost c,f the work performed: P"OJECT NAME _______ 1. PELAVEAGA (SANTA CRUZ, CAI 2. WOODLAND HILLS (COLUMBUS, GA) 3. HAMPSHIRE GREENS (SIL VERSPRING, MD) "-.-....- "---.-----------.------ -----"-.-- _...~---._._._--_.- YEAR COMPLETE 2004 2002 2001 SEE ATTACHED RESUME TOTAL COST $500,000.00 $750,000.00 $1 ,000,000.00 l'r ,.>plisa i Form ,1 The undersigned hereby declares that he has visited the site and has .::areful1y examined the plans T specifications and contract documents relating to the ,,'.)rk covered by his bid or bids T that he agrees to do the work, and that no .presentations made by the City are ~n any sense a warranty but are mere estimates for the guidance of the Contractor Upon notification of award of contract, we will within ten (10) calendar days execute the formal contract and will deliver a Performance Bond (as required) r the faithful performance of this contract and a Payment Bond (as required) to ,"sure payment for all labor and materials. The bid bond attached to this proposal, . n the amount of 5% of the highest amount bid, is to become the property of the City Corpus Chrlstl ~n the event the contract and bonds are not executed wi thin the ue above set forth as liquidated damages for the delay and additional work caused areby ~norlty/Mlnority BuSlness Enterprise Participation: The apparent low icier shall, wi thln five days of receipt of bids, submit to the City Engineer, in J..tlng the names and addresses of MBE firms participating in the contract and a description of the work to be performed and its dollar value for bid evaluation rpose Number of Signed Sets of Documents: The contract and all bonds will be ~pared 1n not less than four counterpart (original signed) sets. Time of Completion: The undersigned agrees to complete the work within _!_calendar days for the entire project, from the date designated by a work Order. Each Phase and assoclated thln the number of calendar days or f}f the phases are provided on the contract ,ase A - Holes 10 through 18 closed All Greens renovations and sprigging for holes 10 .- 18 must be complete within the first 19 calendar days of this phase. '['he remainder of the work on holes 10 -. 18 and the practice range must be completed. (Additive Alternate No. 2 and ltems G.10, G.1!, L.5 and 1.6 of Alternate 4 are ncluded in this phase.) sprlgging of the Project shall dates allocated below. Detailed drawings as lndicated below: From Day one* 123 Calendar Days be completed descriptions ta~t of the phase is delineated by the Notice to Proceed. Completion shall be ;.e.; on satisfactory work, completed in accordance with the plans, specifications, ~her contract documents and accepted by the City. From Day 30* ase B Holes 1 through 9 closed AI] Greens renovations and sprigging for holes 1 -- 9 must be complete WIthin the first 19 calendar days of this phase he remainder of the work on holes 1 9 and the practice range must be completed. (Additive Alternates No.1 and items G.1 through G.9 of No 4 Additive Alternate are ~ncluded in this phase.) 120 Calendar Days nase C . Parking Lot Construction ~1 landscaping and work in the parking lot must :t>e completed. Temporary parking must be provided throughout the construction period for patrons utilizing he open portions of the facility. Additive Alternate 3 1S included in this phase. 75 Calendar Days Proposal Form 9 of 12 "Stcu-:t of the Phases B and C commences 30 calendar days after the beginning of the contJ;act period as delineated by the Notice to Proceed. Completion shall be based on satisfactory work, completed in accordance with the plans, specifications, and other contract documents and accepted by the City Days A1location for Raln: The Contractor shall anticipate the following number of work days lost due to rain in determining the contract schedule and for each phase and associated sprigging of the contract, A rain day ~s defined as any day in which the amount of rain measured by the Nat1.onal Weather Services at the Power Street Stormwater Pump Station is 0 . 50 1.nch or greater, No extension of time will be considered until the expected numbeJ: of rain days has been exceeded and the Engineer has agreed that the status of constructi on was such that there was an impact detrimental to the constructioIl schedule January 3 Days May 4 Days September 7 Days February 3 Days June 4 Days October 4 Days March 2 Days July 3 Days November j Days April "3 Days August 4 Days December 3 Days l'hlS project ~s essent1ally d s detailed elsewhere in total time allotted shall :tescribed above, a construction contract for the contract documents. be independent of damages a period of 150 Damages for assessed for Calendar Days, exceeding the each phase, as 'r'he Contractor shall ..,ri tten notice from bngineer") to proceed. .::ommence work the Director within ten (IO) of Engineering calendar days after receipt of Services or designee {"Ci tj For each calendar day that any work remains incomplete after the time specified il: Lhe Contract for completion of the work for each phase and associated sprigging anc ilie tota t contract duration, or after such time period as extended pursuant to othex provisions of this Contract, $1000.00 per calendar day will be assessed against thE ContractoJ: as liquidated damages. Said liquidated damages are not imposed as c penal ty but, as an estlmate of the damages that the City will sustain from delay ir. complet:ion of the work, which damages by their nature are not capable of preciSE proof The Director of Eng:ineering Serv:ices (City Engineer) may withhold and deduct from monies otherw:ise due the Contractor from the monthly pay estimate the amount of ll.quidated damages due the C:ity, The underslgned further declares that he will provide all necessary tool.~ od apparatus, do a11 the work and furnish all materials and do everything requirec to carry out the aboVE mentioned work covered by this proposal, in strict accordanCE Wlth thE Gontract documents and the requirements pertaining thereto, for the sum ox sums above set forth ReceJ.pt of the followlng addenda is acknowledged (addenda number) :. ~ .:tt 3 (SEAL IF BIDDER IS a Corporation I Respectfully submitted: Y"<',',' T','" > .." Heme ity.~ ~ ":~~;>,( By (SIGN URE-14___~./ r' Address: ~'~II(~HL/~. ;' lU c~-;i,.J,~ r F (P.O. Box} (Street) i' '~J~" .:)N f~(;1 t)(:', '. L ^ '. '/081 (1 Telephone: NOTE: Do not detach bid from other papers. "ilJ in with ink and submit complete with attached papers. fCity) (State) 800.646..6880 fZip) (Revised August 2000) Proposal Form Page 10 of 12 P_}L3_,M~.-'r,_B 0 N D STATE OF TEXAS 5 COUNTY OF NUECES ~? THAT Golf Course Builders Par i sh I ,( i ,c; 1 ,1 nil, h ( rei n a t t' r ,~ompam._ . ('(: rT"r Jt Hi j cJ I L " QrnectiCl1.t _'_',--~.'-'-'-- , d S , l>~ I It a ~ t r 1 ] d "s I cJ III in a f . t : i j" i t '1) ,!:lJ/ln at' Hid natt'tl 11' attci::l ed Ui' C t dC', '. n t NINETY-SEVEN THOUSAND, ( $1 , 197 , 453 . 00) Dr) L LJ, ;< S r 'eE' ( t, Ttx,ls. t rJ Bond No. 30BCSEA7600 KNOW ALL BY THESE PRESENTS: Intenational, Inc. of EAST BATON ROUGE 'aIled "Pri ncipa:!", and Hartford Fire Insurance 10 crqanized under the laws of the State IthorizeJ to do business in the State of ty", In helcl and firmly bound unto the i pal 1 Vlrat Lcn ,f Nueces County, Texas, mtc 1 per::;ons, firms and corporations 1 prose Ition of the work referred to in pen a sum of ONE MILLION, ONE HUNDRED HUNDRED FIFTY-THREE AND NO/lOa the United States, to be paid in which urn well and truly to be exec-ut s, administrators and b th se presents: THIS OBLIGATION IS SUCH THAT: Whereas, the ,rain '(lfltract with the City of Corpus daj..MAY , 20~, a opy of which is hereto r [e' f J t Y'I'" :-0 stn ction of: l~' \tlE' : r, i t, ,;'".:='-.I " v, es ( r-: 1- "I (-1 THE cipa st 1, iched CONDITION OF nfEr i it tu ted t tie ,~3RD , o d iTld::k j F:3 r t i ymen' hei 1 l y, f- t'ITl J GOLF COURSE IMPROVEMENTS (EXISTING COURSES) GABE LOZANO SR, GOLF CENTER - PROJECT NO. 3274 (TOTAL BASE BID: $1,197,453.00) ymen' a irnan ~; rk Pl0VL iCdtt n moc] l f ipal all upply t,ej f r sal 1 t ion )11 C fill h '. shall faithfully perform its duties pt~rs>)ns, firms, subcontractors, lnq labor and material in the i'l sa i dm tract and any and all ntract that may hereinafter be the ~;unty is hereby expressly 'lO; nth rwise to remain in full NOW, THEREFORE, mal<.' pr ompr p, i' 0 rat (s Hi U C :.c;ecut ( f t tie w au1 h, i ieJ moii 1'~ f n ( , e f w' ! i ( ed I h nth 1 'b f t he pi q t 'e'H f ! ~ t PROVIDED FURTHER" t: d 1 le 'sh j 1 (~ !l N\ i'ief:: ')' Fne at -3d 1 s re' "ge, eT ~:; 1:: t tj tract, 0 r 1 :. Ie if i (.; t ! OIl S r J w ng~;, Fct 1! ~ obI La t or or such ang'o, e:< tE :'\S 1 n he c r f rd t, ,) ,) t hE "i( rk ,ny IF; I dlt 1 n lie filed upon this bond, , Te><d':: ,d UEe ni 'e lv'pd hereby stipulates that no ; t ,'rat 1 11 r addi t Ion to the terms of the perf tmed thereunder, or the plans, accompanying the same shall in anywise ond, ana it does hereby waive notice of Ime, alteration r addition to the terms 'w(,r f: to be performed thereunder. t ] ) j ;ymenl BonU ;'age! f rli :I( ! d :~, q:v n me" 1 er , 's" v :;tatJte.c Of T"Xd" thE t1c:quirements of Article 5160, and ther applicable statutes of the I I 'rlnt ", 11 abUT" an.] "Material", as used 'is h" filled 1 n sa id Article. d ra )f T, a ,e> >:~ 1 Tt; "--r a, ' irinc nn vi I n e 1"'1 he 'J: :i. oen' p,,~ reo " s ,?ncd dg"n t den t r N ecp,c; c 1.;-./:)11 he: ".by des i qnatec:J by the Surety herein as Ollrl' i te ,;"hem any requisite notices may be rocess may be had in matters arising ided b Art. 7.19-1, Vernon's Texas :: r ~ (_ t t ",s 11 '31J1i't :od 11 ,c: Cf ) . e IN WITNESS WHEREOF t i '" i I, 1 umenl whit ') h,; 1] he el. erW'J in t 19lna j June (lil IS executed in ~ copies, each this the 6th day of PRINCIPAL (0 Course I>uil ders Internat ionaI, Inc. By; "'---;r-'---- /f / /.1 ,/ ~ ,v< <..7 t-' -c:>L. /7 \ ")?-E..S\ bE-hit ~€. t f-:>\ (~. ~'.Zt?-~ I, r r 1 r tam" , r 1 j' e \ :T~:i:: -", - ~ ," e:retary ! ',,~' k <?\- " ''? < ---, ...,.. '-' L.,J../ ~ ,) \ \... \" -~.- ~. J::::.:::! ~lrt Namp', /:S".& 7 / ( SURETY / t~/ Hartford Fire Insurance Company , '" ;:.-~ / / -~,! ~~ '/, f6"CP'~ / -- ,';1 ':f; ney-] fl f-,let C .,....,/ iooepll Fiorini, .1 IT~:"-'i- Name \, The Resident Agent of the Surety in Nueces Countv, Texas, for delivery of notice and service of process is: Agency: Contact Person: Address: <"etch AssoctHtes lrsurance ___.L,_th c hele 1 Rll ym "( \ hox 280 - ~._.."._..._~ -_.. ------~- -"-..--- '-"__'__'_.__'___M._~_ 'orpus 'hristi, 'IX K463 Phone Number: 3bI.883.3801J Ex;. F/', F. '. ate of G/O 'nE~' t H( flU 1" P dat t tactl FdYlTI<?nt BUflj F,l of ~' ~,.,.,. p ~__R_J[_g_ J~ MAN C __~__ BON D STATE OF TEXAS cOUNTY OF NUECES'? THAT Golf Course Builders ,International, Inc. of EAST BATON ROUGE all ed "p r in c i pa 1 ", and Hartford Fire Insurance ,n cr'jdri zed under the laws of the State Ithcr I ej to do business in the State of t y", Ur held and firmly bound unto the J pal (' q)crat Lon of Nueces County, Texas, e penal sum of ONE MILLION, ONE HUNDRED _ FOtlB. HUNDRED FIFTY-THREE AND NO/lOO f 11 rnone~, f the Uni t ed States, to be paid in lymerl t which sum well and truly to be he] t exec:uto's, administrators and 'I, t I l'Ti Y b these presents: 1 sr, , )mpan~ ",3 s, .1',' J1 I h' rei rlcl'=-t '.~' '. C,"1I1' (ticut cill' {l J L h "I, i a t J L 1 +--l1 fI S 1 C ' :)1; in-:d ( 1" [ 1 t ~INE'1'Y-SEVEN_ THOUSAND '___ ($1,197,453.00) [[.loiS, 1 il tIn ,~J E ~j 'es3C THE lci pc. st , ,chPCJ ){ Sf 1 r ,j 1 J (~ ~ ~,~ t Bond No. 30BCSEA7600 KNOW ALL BY THESE PRESENTS: OBLIGATION IS SUCH THAT: Whereas, the on t. ract wi th the City of Corpus opy of which is hereto f t the onstr ction of: , ,.1 in tlAAY , 20__~, a CONDITION OF i r L 2.3RD. THIS GOLF COURSE IMPROVEMENTS (EXISTING COURSES) GABE LOZANO SR. GOLF CENTER - PROJECT NO. 3274 (TOTAL BASE BID: $1,197,453.00) PROVIDED FURTHER e h! i, ! !'ll ~ n 1 r f: (1 \t d t i ~o i 'n id rd' t- :' l"i NOW THEREFORE, t p C'lpa 1 ha It fa i t hfully perform said work '1ce01 j,: c>. w! H:" t.l n spec l f i rations rmd contract documents, udin, ,clV -hdnile c<<i~n j [ s, i]uaranties, and if the principal <) 1 e [11 ld-::pl ( d de f e,'t 5' due to faulty materials and! or <maIlS i t lEf'eII" 1 t hi: i per l,xj of one ( ) year from the date of le t i r a lie er t a I' Lmp L,vemen Lei by the City, then this qac i r;hl '1, -h l'.,ise ernaln In full force and effect. ::-: Arid T j ge, Y 'fa t . if c r __::t ] su'h !ie r ~, ......., ..",,*. r- r d' d -j S! =-E~ t ell," ,t r-!~::' 1 d }! t;:,) 'd c k )[] 'IJ il]:' I )[ q t n HilE, , if" S1 n : a 't , lfl'y' l 'q action be filed on this bond, ~ . T~=--):;<d llue relved he eby stipulates that no t atH n :r addi tion to the terms of the i)E:,rfuLme i thereunder, or the plans, accompanying th0 same shall in anywise nd, .Hi it does hereby waive notice of me, alLerat on r addition to the terms t () b(' r>' r fo nned t. hereunder. urman.:e tL)nd Fje 1 f i J f[' t h 1: S ,~ t :l :><; and ~ t a )f T' >{ quirements of Article 5160, ther appli 'able statutes of the e tie UJ ], :3 n it1 nt Ii hy if' lnd t ed b'; the Surety herein as " 'c~ n' , j, . ~\; C~C'(- t v rl ani requ i site notices may be r ., re roc Tlay be held in matters arising u 1 "3 I t t2lr- ! L f s I ded ,LI,y t 7 9-1 Vernon , s Texas , ,. , t s j ncfC } t -~ . e IN WITNESS WHEREOF tit 1 !! ~ whi h 1 1 t', d,em,' i cHi ;el "b rumen I i ,c; executed in ~ copies, each t 1 glr:d L, th is the 6th day of ~.~,-, PRINCIPAL if Course Builders International, Inc. ..::-~.( _,I 6/ C- ?/~ ~7 I <, \. /--' i B i~ ! r ( ! ' t ^ Namt' '~ L';e.. ~, F~ s, 1'Jttel ATTE~> '-, .'../ ~ . '.. ~ ..........."..-- -"""'-'T lo.- Spc ('pt ary ,'" ,,,--- ~/u ,C- 7' / L '-, E. A \'J, L fer t, '1 ,Pr}.t Namp: SURETY lel rt ford Fi H' I nsurance Company /./ .,' , '.:f:/ , B\ . , ) . - Josepl'> :Morini !I,t t().J:c11ey- i n ~~;, // L' / .' ;' / Joseph Fiorini, Jr. 'F: t Name\ The Resipent Agent of the Surety in Nueces County, Texas, for de~iV'ery'o:f notice and service of process is: Agency: Veet, h \ A socj,~trc ["""Lince Contact Person: chael RhyT!' Address: H' PUX \28 L9IL(~,:hY ~LL":. 784t Phone Number: ~~883.~ . ::5 (D 'dte 0, '1/0.; J Ec Tn'IIII 'fl' mll t lor L":I.1 \ f ,.ontr tl r i HLinCf-; Hi 'n<:J ~. I -...... F)C)\\'r=F~ ()F' l\:rl'()RN~yT THE HARTFORD HARTFORD PLAZA HARTFORD, CONNECTICUT 06115 Twin City Fire Insurance Company D Hartford Insurance Company of Illinois D Hartford Insurance Company of the Midwest D Hartford Insurance Company of the Southeast D Hartford Fire insurance Company Hartford Casuaity Insurance Corrpany Hartford Accloent and Indemnity i;Ompany Hartford Underwriters Insurance Company ",''OW AL Pf::RSONS B" T HE~,E PRESENTS 1 f-IAT the hartford Fire Insurance Company, Hartford Accident and Indemnity t7lpa I' and Hartfnr[j "nderw'lters irsuriu,ce COml)any;Urporations duly organized under the laws of the State of Connecticut; Hartford ',Ural ,.' ::ompany of IlImOIS 3 corporatlun duly organized under the laws of the State of Illinois; Hartford Casualty Insurance Company, (I, Ire !nsUlHn,p COn/lia!!'1 ard H!rtforcjlnsurance ::ompan} of the Midwest corporations duly organized under the laws of the ',late,,jlana an" hat1fordnsurBlye impany' f the Southeast. a corporation duly organized under the laws of the State of Florida; "aving the" home officen Hartford C Jnn"ctlcu! ihf-;reina'1p' collectively referred to as the "Companies") do hereby make, constitute and 3000i[" to the 8!'!Qun! of unlimited ion K Kawamoto TesSie Ram,<eur /OSel)fl Fronni Jr, Shet/a 0 Hansen, Jeffrey A Chandler, Alexandria N, Gardner of Alexandna, VA then true and lawfui Attorney(s),in-Fact, eClch in their separate capacity if more than one IS named above, to sign its name as surety(ies) only as delineated above by 0, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written ,nstruments In the nature thereof, on behalf of the Companies in their bUSiness of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing "r guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed bv law, in Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on September 12th, 2000, ,he Companies have caused these presents to be Signed by its Assistant Vice President and its corporate seals to be hereto affixed, duly attested by its ASSistant Secretary Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby ,namt)lguously affirm that they are and Will be bound by any mechanically applied signatures applied to this Power of Attorney, ~''''~~ f:~:' \Of:1I.7~"'hl ~\~).~-,~,~,,~_,,~<'Ll.l~ ~'-,~~':Y PJ Q. ~' /~// \,,'i') \ I ' \, j '- \" James J, Mercier, Assistant Vice President "au ,fA Bergenholtz'\sslstant Secretary STAn OF CONNECTICUT} ';:::. COUNTY OF HARTFORD Dn this 24th day of January, 2003, before me personally came James J, Mercier, to me known, who being by me duly sworn, did depose and say: that (s)he resides In the County of Hartford, State of Connecticut; that (s)he is the Assistant Vice President of the Companies, the corporations described in and which executed the above instrument; that (s)he knows the seals of the said corporations; that the seals affixed to the said Instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that (s)he Signed hislher name thereto by like authority 'I , ."/ ~@; tl~ ;/ ..l;':cj,; , Nora M. SLranko Notary Public CERTIFICATE My Commission Expires March 11,2001 Hartford the underSigned, ASSistant Vice PreSident of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and ':orrec! copy of the Power of Attorney executed by said Companies, which is still in full force effective as of -r;, .^ &> r 0L,^'" '- G) 200 b Signed and sealed at the City of Hartford Af:."'~~ i4~~' 1;{'~)i=! "-,\ t1l7~ If! \">'~'~'" ."....~""..: ~"-~,l. """fJ~t';:.~~ ~.~ ...0--~"!.'~ ~ i 11.~"H.4~;\;\ li \.~ i!i * !:i ~al . ',\ Z1I7?J1/i ?,~ H,9 ,.............$' ,;'0-- ~... -~:~, ~7 ~~'~>r-.. Yves Cantin, Assistant Vice President CITY OF CORPUS CHRISTI OSPARTMENT OF ENGINEERING SERVICES P.o. BOX 9277 CORPUS CHRISTI, TEXAS 78469-9277 RB~ Certification of Power of Attorney for Performance and Payment Bonds b 1.0 S Golf C~nter, ]'roj f 3274 Project Name/No.; Go'l.f COl.lraa Imp1:'ovementll, Gll ~ z;a.no T. HartforQ Fire Insurance company Suret.y Company: Gentlemen: L hereby certify that the facsimile power Josevh Fiorini, Jr. .for Golf Cour$~ Bul1den Intenultional (Contractor), a copy of which is attached to this certificate, is a true and correct copy of the original power of attorney on file in the records of the surety company in its home office, has not been amended or abridged, is still in full force and effect, and said designated agent is currently in good standing with the surety. In the event of cancellation of this pOwer of attorney, the city of Corpus Christi shall be notified in writing by certified mail within seven (7) days thereof at the fo~lowing addr~ss, Scott A. Shapiro (name of Officer of surety), of attorney submitted by (Attorney-In-Fa~t) City of Corpus Christi Department of Engineering Servic~s Attn: Contract Administrator P.O Box 9277 Corpus Christi, Texas 78469-9277 Signed this _ ~ day of June y..(r.M . . 2. O.....2L- . '" I " /;.......- <-j ~ Name: Scott A. Shapiro .~""'- Title: R~gional Vi~~ Pre5id~nt Sworn and subscribed to before me on this 20~ U::day ~~__' 8IWtIr J. HII. NaIIIy NIle HIrtDId Quty ....tA~ld Mr Ql... . lID 1....Apdl1. 2008 \ itA 1/ " J~"-{' N~tary ~l[c, State of j ;/~1l'--"~~~ My Commission Bxp.res: {Revised 9/03) ATTACHMENT 1 10Ft -'"'!P CITY OF CORPUS CHRISTI DISCLOSURE OF INTERESTS City of Corpus Christi Ordinance 17112, as amended, requires all persons or firms seeking to do business with the City to provide the following information. Every question must be answered. Ifthe question is not applicable, answer with "NA". FIRM NAME GOLF COURSE BUILDERS INTERNATIONAL,INC. STREET:17332 HIGHLAND RD. SUITE G115CITV.RATON ROIIGF_ZIP: 70810 FIRM is: I. Corporation X 2. PartnershipNA__ 3. Sole OwnerNA 4. Association NA 5. OtherNA__ DISCLOSURE QUESTIONS If additional space is necessary. please use the reverse side of this page or attach separate sheet. 1. State the names of each "employee" of the City of Corpus Christi having an "ownership interest" constituting 30/0 or more of the ownership in the above named "firm". '\ame Job Title and City Department (if known) NA NA 2. State the names of each "official" of the City of Corpus Christi having an "ownership interest" constituting 30/0 or more of the ownership in the above named "firm". Name Title NA NA 3 State the names of each board member" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm". "lame Board. Commission or Committee NA NA lState the names of each employee or officer of a "consultant" for the City of Corpus Christi who worked on any matter related to the subject of this contract and has an "ownership interest" constituting 30/0 or more of the ownership in the above Ilamed 'firm". "'ame Consultant NA NA CERTIFICATE I ('ertify that all information provided is true and correct as of the date of this statement, that I have not knowingly withheld disclosure of any information requested; and that supplemental statements will be promptly submitted to the City of Corpus Christi, Texas as changes occnr. Certifying Person:LEE A. BILBERRY Title:PRESIDENT (Type or Print) ./ Si.na'nre nC Certifyin. p.,,~ "",P.# / __ Date:MA Y 9, 2006 Proposal Form Page 11 of 12 '....,... ..",.. DEFINITIONS a. "Board Member". A member of any board, commission or committee appointed by the City Council of the City of Corpus Christi, Texas. b. "Employee", Any person employed by the City of Corpus Christi, Texas, either on a full or part time basis, but not as an independent contractor. c. "Firm". Any entity operated for economic gain, whether professional, industrial or commercial and whether established to produce or deal with a product or service, including but not limited to, entities operated in the form of sole proprietorship, as self- employed person, partnership, corporation, joint stock company, joint venture, receivership or trust and entities which, for purposes of taxation, are treated as non-profit organizations. d. "Official". The Mayor, members of the City Council, City Manager, Deputy City Manager, Assistant City Managers, Department and Division Heads and Municipal Court Judges of the City of Corpus Christi, Texas, e. "Ownership Interest" Legal or equitable interest, whether actually or constructively held, in a firm, including when such interest is held through an agent, trust, estate or holding entity. "Constructively held" refers to holding or control established through voting trusts, proxies or special terms of venture or partnership agreements. f. "Consultant", Any person or firm, such as engineers and architects, hired by the City of Corpus Christi for the purpose of professional consultation and recommendation. Proposal !"orm Page ] 2 of 12 IACORD --..--.-.-- CERTIFI'CA TE OF LIABILITY INSURANCE T DATE (MMIOD/YYYYI -----...r-..-..--~t'M 06/06/2006 PRODUCER 706) 562-0155 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION BROOKE INSURANCE AND FINANCIAL SERVICES ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR p 0 BOX 9323 AL TER THE COVERAGE AFFORDED BY THE POLICIES BELOW. 3408 UNIVERSITY AVE. SUITE A Columbus GA 31908 ! INSURERS AFFORDING COVERAGE NAIC# --.-....- .-------.--.,- -~ -- '---" j JiSUR.ER.A SCOTTSDALE INSURED / INSURANCE GOLF COURSE BUILDERS INTERNATIONAL, / i ,f,SURER B SAFECO 17732 HIGHLAND RD j INSURER c. ESSEX SUITE GllS i INSURER D BATON ROUG& LA 70810- i INSURER E COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HA',E BEEN ISSUED T::: THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT. TERM CR CONDlTlor~ OF i\N" CO'HRACT OR OTHER DOCUMENT '.\11TH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, 'HE INSURANCE AFFORDED BY THE POLICIES DESCRIBE[I HEREIN is SUB.iECT T ", -'LL T'"'E TERMS EXCLUSIONS AND CONDITIONS OF SUCH POLICIES AGGREGAr" LIMITS SH=JWN MAY HAVE BEEN REDUCED BY PAID CLA:r>'1S INSR ~~?'~ I I POLIC!~,EFFECTIVE POLICY EXPIRATION LTR IN RD TYPE OF INSURANCE I POLIC) NUMBER DATE MMlDD/YY) DATE (MMlDD/YY1 LIMITS AI X I GENERAL LIABILITY .; T::LS:222307 ! 03/05/2006 03/05/2007 EACH OCCURRENCE $ 71,000,000 f----, / ~~~~~H9E~~~Ji~nce\ : _~ ! CjMERC'L'ENERAL L'BI $ 50,000 ~__~:AI~^' M"['" [!] iR1 W ( / MED EXP (Anv one personl $ 5,000 PERSONAL & ADV INJURY $ 1,000,000 _'-..__'_'m_" - ___.m..~ _0_. V2,OOO,OOO i / GENERAL AGGREGATE $ .-- '-~--'-',-,,- t_,ENL AGGREGi~:' fE llMll APPL,ES ':)~R PRODUCTS ~ COMP/OP AGG $ 2,000,000 X i POl.lcyr-l jf&i [llU,; , i I ( / / NOWND B' X ' / 'n-CE-11370o-1 ! 03/05/2006103/05/2007 _ AuTOMOBILE LiABll fry " ! ~ COMBINED SINGLE LIMIT $ V 1,000,000 ,~-i "NY ~UTC lEa accident) teL OWNEl ~l / I BODILY INJURY "---1 (Per person) $ I X j SCHEDULE_ A,. IS ~ HIRED AUT-S I I BODIL Y INJURY ~j NON-OWNE:" (Per accldenl) $ , 1S j / PROPERTY DAMAGE ---..-------...- '" I s j , i (Per accident) I , ! $ GARAGE L1ABIL,ry AUTO ONLY- EA ACCIDENT 'NY TC / / OTHER THAN EA ACC $ i , I I AUTO ONL Y: AGG $ CI X ~ESSlUMBRELLA LIABILITY'; 1 CELB6606DC ! 06/06/2006 03/05/2007 EACH OCCURRENCE $ ,/ 2,000,000 , r-r (' 2,000,000 , ~_: C1CCliF' L.. __! Cl h!M~ MA[IL ,.' AGGREGATE $ $ DEDUCTlBLf / / $ i i RETENTION $ 0 i , $ rWORKERS C~ENSAT10N AND COVERED ELSEWHERE ! I ( T / / I WC STATU- I 10TH- TORY LIMITS ER EMPLOYERS' UABIL/TY I ANY PROPRIETORlPARTNERiEXECUTI 'E E.L. EACH ACCIDENT $ OFFICERiMEMBER EXCi. UDEC" ! I / E.L. DISEASE - EA EMPLOYEE $ If yes, descnbe under i , SPECIAL PRoVISiONS belo,," E.L. DISEASE - POLICY LIMIT $ OTHER ! I I / / i I i I I / / I / / / / DESCRIPTION OF O!"IRATIONS/LOCATIONSNEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS V' :II.A.!. "GABS LOZANO GOLF COURSE IMPROVEMENTS" ILA.2. "THE CITY OF CORPUS CHRISTI IS NAMED AS ADDITIONAL INSURED ON ALL GENERAL LIABILITY AND ALL AUTO LIABILITY POLICIES" CERTIFICA TE ( ) LDER CANCELLATION CITY OF CORPUS CHRISTI SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRA/ON DATE THEREOF, THE ISSUING INSURER WlI.L ENDEAVOR TO MAIL ~ DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT POSE NO OBUGATION OR LIABILITY OF ANY KIND UPON THE ENGI_BRING SERVICES 1/ ATTN: CONTRACT ADMINISTRATOR P.O. BOX 9277 CO CHRISTI TX 78469- ACORD 25 (20011&18) ~,~. INS025 (0108)_05 EECT RONIC LASER FORMS INC ' (800)327,0545 Page 1 of 2 r- IMPORTANT :f the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement on this ;ertlficate does not confer nghtf, to the certificate holder in lieu of such endorsement(s). f SUBROGATION IS WAIVED subject to the terms and conditions of the policy, certain pOlicies may require an endorsement A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement( s 1. DISCLAIMER The Certificate of Insurance or the reverse side of this form does not constitute a contract between the issuing nsurer(s) authorized representative or produce: and the certificate holder, nor does it affirmatively or negatively amend. extend or alter the coverage afforded b) the policies listed thereon. ACORD 25 (2001") _n..o fNS025 (0108).05 Page 2 of 2 ~ CERTIFICATE OF LIABILITY INSURANCE I DATE (MMJODNYYY) TM 0611412006 PROO~ JItlone: (225) 27~'\471 F...= 225-273-1478 TlIS CERTlFlCATE IS ISSUED AS A MATTER OF ftFORMAll0N EMPLareesINSURANCEREPRESENTAT~S ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE P08O)(4OO15 HOLDER. THIS CERTlFICAn: DOES NOT AMeND, EXTEND OR BATOIllROUGE LA 70835 ALn:R BY I'U"I MJ I INSURERS AFFORDING COVERAGE NAIC# - - -- 1::;-:.- ~exas l\IIutuallnsurance Company Ir-ISUREO -- ------ ------- GOLF COURSE BUILDERS INTERNATIONAL v P.O. BOX 1903 - - - ---- -- f-- -- EUSTIS FL 32727 I INS~ER_g_ - -------~ -~ -- --- ----- INSURER D ---- --~ .-- INSU RER E COV THE ~ INSURANCE LISTED BELOW HAVE BEEN ISSUED TO TIE INSURED NllMED A8O\IE FOR THE POLICYPERIOO INDICATED, 1II000000STANDIHG I'NV RE NT TERM OR CONOlTlOfl OF AM'( CONlRACT OR OTHER DOClMENT WITH RESPECT TO WHICH THIS CERTFlCATE MAY BE ISSUED OR MAY p.~~ THE INSURANCE AFFORDED BY Tl-tE POlICES DESCRIBED HERE'" IS SUBJECT TO AlL THE 1ERMS, EXCLUSIONS AND CO"l)1TI0NS OF SUCH POliCIES. AGGREGATE LIMITS SHOW! MAY HAVE BEEN REDUCED BY PAID ClAIMS ~I='--'-'------ -- --- ----- -- T -~-~._---_.._-' POLICY NUMBER POUCY EFFEC'T1IIE POUCY EXPIRA"JIOf/ UMITS L1R" TYPE OF INSURANCE DATE~- DAlE IMMlDD."tVI I r~l UABlUIT I EACH OCCURRENCE S ~MMERGIAl GENE;.~l _IABILTI lloWAGE TO RENTED -~ , F'RBl1SEiS tEa_) $ _ L_ C;, "'N'S MADE __ J OC:lIP I MED. EX? IAny DOe pe..on~ $ -- PERSONAl & ADV INJURY $ --- -- c=--- GENERAL AGGR~TE -' . --- GEN'L AGGREGATE l-"'IT APPL>ES "ER PROOUCT&-COMPIOP AGG. S -- , ---, PRO- -I LOC -. , POLICY JECT AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT - (Ea accidenl) S ANY AUTC - ~--- - ------.--- At.. OWNED AUroS BOOIL Y INJURY .-- (P.... person] S SCHEDt.lED AUTOS ,-- "- HIRED AU ros BOOI. Y INJURY -- CP- accident) $ NON-OWNED AUIT'S ~-- -~ I !----- --- ---- --. -- ------- PROPERlY DAMAGE S (Per ao::idanl) GARAGE lJABlLrTY AUTO ONLY - EAACCIDENT $ !-----. I AN" AU T',' OTHER lliAN EA ACC $ t-'1 A1ITO ONL V: AGG $ . EXCESS! UMBREl.1.A WASILHY EACH OCCURRENCE $ ---, t-] 'OlAIMS _Of .- '_. i OCCUF AGGREGAlE S -- S _.~- ,.,~ -1 OBJUCTI8l.E s RETENTION S I S WOR~ COMPENSA1'1ON AND / ! I , 06109/07 I '!'fC STATU- I : 0'l>EIl oj 001169424 06I09J06 TOR'f UMfm EMP LIABI.ITY A lAIfTc.~M~amve / E.L EACH ACCIDENT S 100,000 Y EL DISEASE-EA EMPLOYEE $ 100,000 I QH.,. EJCI:UJOED' I I l~"'.' ~\II'Ide( i i EL lllSEASE..fOLICY LlMrr S 500,000 8~CINS be_ I OTHeft: ! I I I I I I DESCRIf!'nON OF OPERATIONSILOCATIONSIVEHICLESJEXCLUSIONS ADDED BY ENDORSEMENT' SPECIAL PROVISIONS PROJECT NAME ; GOLF COURSE IlIPROVEMENTS J GABE LOZANO SR GOLF CENTER PROJECT #I: 3274 ..; CERTlFWA TE HOLDER CANCELl.ATION SHOUUD NN OF THE ..-sO\IE DESCRIBED I'OUClES BE CANCEllED BEFORE THE EJa>1RATlON DATI: THEREOF, THE ISSUIIG INSURER WILL ENDEAVOR TO MAIL 30 0"''1'5 WIlITTEIt NOTlCf' TO THE CERTlRCATE HOLDER NNotEO TO THE LEFT. BUT F.....URE TO City of ~ Christi I Ill) SO SHALL IMPOSE NO OBUGATlON OR LIA8ILIlY OF AN( IQND UPON THE INSLflER, I1'S EnG~lervlces 1/ AGENTS OR REPRESENTATlVES. P.O. Box AUTHORIZED REPRESENTATIVE ~tJJJ CorpuS Christi TX 78469 JdtJ AtientlOll: CONTRACT ADMINISTRATOR I ACORD II (2101108) Certificate#- 16053 e ACORD CORPORATION 1988 ld evg:90 90 9 ~ unr r-- IMPORTANT If the certificate holder IS an ADDITIONAL I NSURED, the policy(ies) must be endorsed. A statement on ttllS certificate does 'lot confer rights to the certificate holder In lieu of such endorsement(s). If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement A statement on this certificate does not confer rights to the certificate holder in lieu of suer endorsement(s) DISCLAIMER The Certificate of Insurance on the reverse side of this form does not constitute a contract between the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon. ACORD 25-1 (2001108) Certificate #16053 8d 699:90 90 9 ~ unr ---.-..-- ~_._--- COMMERC1AL GENB~ LIABILITY THIS ENDORSEMENT CHANGES nm POLICY - PLEASE RRAD IT C'AREFUl'",LY /ADDmONAL INSURED - oWNERS, LESsEES OR CONTRACTORSi(FORM B) This endorsement modifies insurance prbvided under the following: '1/ COMMERCIAL GENERAL LIAB1LITY COVERAGE PART SCHEDUUE N-.. of Par.on or Or9ani..~iont City of Corpus Chr1$t~ ~partment of Engine~ring ServiceS ATTN~ Contract Admdnistra~or P.O. Box 9277 Corpus Cbxist1, Te~s 78469-~277 v (If no entry appears above, information requ1r~ to complete this endorsement will be shawn in the Declaration as applicable to thisiendorsement.) WHO IS AN INSURED (Section II) 19 amended to include as an 1nsurl!ld the person or organiza~ion shown in the Schedule, but only with r&spect to liability arising out of ~YOUr Work- for that insured by or for you. Named Insured: Gt 0 I t Policy Number, -U5 Co ur.s~ ~Ltlld~.J rrlr"J"Ot1J 1a..~a.3DI V . Rndor~@ttlent : (fp.~ I (l. ao&; ./ Eft~tiv~ Date ot This Rep~~t~i Vi!: Tit.le (Print.ed): co AO 10 11 85 ATTACHMENT 2 1 OF 2 f? '-----..- .-- '-"'..--- TR 99 OlD This endors.ment modifies in.uronce pr~ided under the following, ( V ADDITIONAL IlNSlJRED '\/ BOSDmss .AUTo <lARAg TRuCXZRs CO OK FORM GI: FOtuI GJr FORM Thi~ endorsement change. the POlicy eff ctive on the inception date of the l~cy unless another date is indicated elow: Endorsement Effective 0& !Dfp/~O()&; I Pdlicy NUmber O~ - c.G. -113 lof"- I /' ~a_. d Insured ~6l t Co,^rse 6~; ld~d ! rt,JW\ The provisions and exclusions that apply eo LIABILITY COVERAGE also apply to this endorsement City of Corpus Christi Dept. of Engineering Se~icea Attn: Contract Administ~ator P.o. Box 9277 Corpus Christi, TX 78469-9277 (Enter Name and Address of Additi~~ rnaured.) ~s an insured, but only with respect to . legal rel!lponSibility for acts or omissions of a person for whom Liabilit~ Coverage is afforded under this policy The addi t.ionaJ. inaure4 is not required to RaY for any premiums stated in the policy or earned from the policy. Any return prelUium and any diVidend, if appliCable, declared by us shall be paid do you. You are authorized to act, for the adcUtional insured in all matters pertaining to this insurance. We will mail tne ac:1ditioDaJ. iD.811red not~ce of cwy cancellation of this policy. If the cancellation is by us, we will give ten days nocice to the .ddition.~ inaur.d. The additiOnal ineur.d will retain any righ~ of recovery as a claimant under this policy. FORK Tl!l 99 01B - Al)DITZONAL DfBOlmJ) Tax.. 8taDdard AUl:aJDob.i.J.e BDdor.....ut praacrtbed Mar~ 18, 1'92 .A1TACllMENT 2 2 OF 2 a .~ COMMERClAL GENERAL t.IABILITY THIS ENDORSEMENT CHANGES THE POLICY - PLEAsE: READ IT CAREF'ULLY , TEXAS CHANGES - AMENDMENT OF ,/ CANCELLA nON PROVISIQNS OR COVERAGE CHANGE This endorsement modifies lnsuranCe ptovided under the following: v COMMERCIAL GENERAL LIABILITY CO~RAGE PART LIQUOR LIABILITY COVERAGE PART OWNERs AND CONTRACTORS PROTECTI[' LIABILXn COVERAGE PAAT POLLUTION LIABILITY COVERAGE PAR PRODUCTS/COMPLETED OPERATIONS LI ILITY COVERAGE PART RAILROAD PROTECTIVE LIABILITY COVERAGE PART In the event of cancellat ion or material change that reduces Or restricts the insurance afforded by ~is Coverage Part, we agree to mail prior written notice of CancellaUion or material change to: Schedul~ Name: SEE BELOW 2 Addres B : SEE BELOW Number of days advance notice: 'ltHIRTY ( 30) / City of Corpus Christi Dept. of Engineering Services Attn: Contract Administrator P.O. Box 9277 Corpus Christi, TX 78469-9277 Named Insured: r; 0 If' Policy Number:___ CL~ CO\A(.s~ e,^;lck1~ TJ-V^J;CMJ V \~a~3l)1 ( 0Ctt/00/200{g /' Effective Date of This Endorsement: Author~~~preB~e; .) '/~ -- L/ ~~ . Name (Printed), 1241v1d CI.V~/ j '~~A- ; Title (Printed): CO030S (~~.85) ATTACHMENT 3 1 OP 3 '0 - -_._-'-~--"----- TE02O:2A /'<f CANCELLAnON PROVISIoN OR COvERAGE CHANGE ENDORSEMENT This endOrsement modifies 10surance proviqed under the fOllowing: ~. B178JJn88 AU'l"C CO'fatAas FORK a18la ~. I'OD TR1)'CEfts ~s 1'0101 This endoreement changes the policy effective on the incepticm elate of the policy unless another date i8 indicated below: Bndorsement Effective Policy Number D').-CG.../ v-/ v ol -\- Co~(.se w id k5 'TJv 11 J\t 4 lfamed Insured THIRTY (30) days before thi. policy is cancelled or materially changed to reduce or restrict coverage we ~11 mail notice o~ the cancellation or change to: SEE BEI.ow gaR BKI.ow (Rnter Name d11d lc1d.ress) j' City of Corpus Christi Dept. of Engineering Serv~cee Attn: Contract Administrator ./ P.o. Box 9277 Corpus Christi, TX 78.69~9J77 .; Title (Printed): 1'0_ 'nI 0 2 O~.A. - CUICJrLLA'l"IOIr paansx01I OR ~ CBAJIQ. ~ ~_8 8tAIP".n AD~11. rdoa:8-.at P~.ca:1.hed .~.Z' 1. 1" ATIACRMBNT 3 2 OP 3 \, IICD:BRS CXDIPBHSAnQ1f A1ID BHPL0D:2S ItnBnrrY :mstJ'DlfC:I:POIi.1:CY we 42 06 Ol. (Ed. 7 -8"} TEXAs NO"l"ICE OF MATKRIAL CIWIGB EJiIDOR.SBMBIilT This ec.dersemeot applies only to the insUZ'aD:Ce pxov:i.ded by the poJ.iay bec:au.seTexas is shawD in "item 3.A. of tbe Information Page. In the eVl8nt: of canael.a~ion or otb.e:I: materi~ chaDgeof the pol.icy. we wi.l.l mai.l advance notice to tbe person or organization named i~ !:he Schedule. The number of days advance noti ce is shown in the Schedule. This endar:S8h!!Dt shall not qJex:ate directly or inttirect1y to benefi.t auyone not. named in the scheclule. ScheduJ.e 1. Number of days advance notice: 3-0 2. Notice will be mailed to: City of Carpus Ch%ist:i lJepartment. o.f BagiDeeri.ng s erv:ices Attn: Cootract Admini.stratm: P.O. Box 9277 Corpus Christi, TX 7B469-~2?7 I v' nds eu~-.ent ch.anges the policy to wldch it is att:acbed aDd. is effective op. the date is.u.ed WIIle.s othendse- n-a:-ated. {The i.Ji:fo~tiClll bel.~ is requ:lred OD.l.y when this eatJors__t: .is i ell'U8d "BJ1bsequeDt to ~atiOD ~ the policy.) Bndorsemellt Bffect:.i..ve (,/8/0(0 / Policy ~o. / ~rseMent -No~ #I:J.. Insured lJe,t ~ fJ~ 000 I \fo'14-;z..~ . to Countersigned By: (!rd. 7-84) Name r:E.'rint~l: Tit.le (Printedl: In.suranc~ ~ "b4 I S. tiC 42 06 0:1. OS " , A'ITACHMENT 3 - 30F3 Zd eGO:~~ 90 ~~ unr