HomeMy WebLinkAboutC2006-234 - 6/6/2006 - Approved
CHANGE ORDER
Department of Engineering Services
City of Corpus Christi, Texas
CHANGE ORDER NO ~. FUNDING SOURCE 550910-3359-00000-140565 CONTRACT TIME: 425 CD.
Operating Department EnQlneerinq Services ___ DATE June 6, 2006
Name of Project Cefe F. Valenzuela landfill Site Development Proiect 2 - Proiect No. 5038
Contractor: lonqhorn Excavators, inc.
CHANGE AS FOllOWS:
Reconstruct approximately 3,500 If of County Road 20 from FM 2444 to Cefe
Valenzuela CR 20 storm water culvert crossing as a 24-foot wide asphalt roadway
as per specifications and plans per attached unit quantities TOTAL
ADD
DEDUCT
$389,86280
Why was this change necessary? (If left off the plans and specifications, explain why)
County Road 20 has only a 3 to 4-inch base that cannot support truck traffic. County declined to reconstruct the
roadway, but approved the proposed design if performed by the City.
How can similar changes be avoided in the future? Execute interlocal agreement with other governmental
lurisdlctions in advance of bidding.
A CONTRACT PRICE
B TOTAL CHANGE ORDER (inc. current)
C NEW CONTRACT PRICE
o THIS CHANGE ORDER
E PERCENT TOTAL CHANGE (B/A)
F PREVIOUS ADDN'l TIME AUTHORIZED.
G ADDN'l CONTRACT TIME THIS CHANGE ORDER
H. TOTAL ADDITIONAL TIME.
CITY Op-:CORPUS CHRISTI, TEXAS
$ 14,875,294.00
.~ 1.112.255.33 ~
$ 15,987,549.33 r) ;II ' .
. $ 389,862.80 ~ 'I.
7.48 % . Project 'Engineer
o CD
o CD
o CD
CONTRA
By:
~
~/lltJ6
By: r
Tite~/J; C e. PR .,,<,'1111,,;/
I
APPROVED --2--~__ (.,. it l Operating Department
,/tqlL f ~tLLIl(j) ,./ ~~(/5irector of Management & Budget
___~~.~__ Legal Department
"
I .! L~.~_..c:1~. "U I MUt(lLL.
1I~ l'.ouNC'l.__~M
.._-./a--r
~fCItT Atv t t I~
i'!~~l
(-~-~ "; /' . .
t/ .A '-
,.. -..--" .........,~~
,I'-~.;....{lo. ',:, , j
2006-234
06/06/06
M2006- PO
Longhorn Excavator"
Page 1 of 2
,.....,,"".....
Change Order No 7
Unit Quantities
Description
Excavation of approximately 8" of existing asphalt and base material
2 Haul base and asphalt to stock pile near new landfill cell
3 Excavate remaining sub-grade dirt and haul to stock pile
near Channel 'C
4 Place one foot i 1) select fillm roadway subgrade
5 Place 15" crushed limestone base In roadway
6 Install 3500 If of asphalt 24' wide - 3" thick
Allowance to seed disturbed areas
8 Provide necessary traffic control during construction
9 Borrow Pit Preparation
10 Mobilization/demobilization -- two additional haul trucks
No work IS included within the FM 2444 TXDOT nght of way
No stripping or pavement markings are Included
No cost is included In event of utility conflicts,
........c".,..;_' ^"
~ Unit Price Amount
1987 cy $3,00 $5,961.00
1987 cy $3,50 $6,954.50
6642 cy $3.50 $23,247.00
3629 cy $6.00 $21,774.00
7962 tons $20.40 $162,424.80
9333 sy $16.50 $153,994.50
LS $3,007.00
1 LS $5,000,00
1 LS $3,500.00
1 LS $4.000.00
Total $389,862.80
Page 2 of 2