Loading...
HomeMy WebLinkAboutC2006-371 - 8/18/2006 - NA CITY OF CORPUS CHRISTI RATIFICATION OF AMENDMENT NO.3 CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas hereinafter called "City", and MAVERICK ENGINEERING, hereinafter called "Engineer", agree to the following amendments to the Contract for Engineering Services for Cimarron Boulevard · Phase 1 from Saratoaa to Yorktown (Proiect No. 6261) · Phase 2 from Yorktown to Bison (Mireles) (Proiect No. 6262), as authorized and administratively amended by: I Original Contract May 17, 2005 Motion No. M2005-160 $1,359,999.00 I Amendment No. 1 December 13. 2005 Motion No. M2005-411 $73,912.00 l_ A~~ns!ment l'!c?_~.~l}ua~~4_,}006 _L Motion No. M2006-017 $401,231.00 The proposed Amendment NO.3 amends Phase 2 from Yorktown to Bison (Mireles) for the Incorporation of new centerline baseline (provided by others). The incorporation of the new data wit! revise approXimately 78 sheets (149 sheets in total package). Section 1. Scope of Services, Part A. Basic Services, Item No. 2 Design Phase Services is amended to inelude these additional Design Phase Services. The Contract's Fee is modified to include the following statement: The fee is subject to the availability of funds. The Engineer may be directed to suspend work pending receipt and appropriation of funds. A Cash Flow Invoice Schedule is required, and is included in this Ratification of Amendment No. 3 as Exhibit "A-1" The Cash Flow Invoice Schedule is to specify by month, for the duration of the Contract, as estimate of invoices to be submitted by the Engineer to the City. The Summary Of Fees is modified and IS attached as Exhibit "B". All other terms and conditions of the May 17, 2005 contract between the City and Engineer, and of any amendments to that contract, which are not specifically addressed herein shall remain in full force and effect CITY OF CORPUS CHRISTI --.... . By R~~~~~;V-"-<~~:'il''-o>( .HIc, Assistant City Manager .cs ' . D(o Date By Ron uz n, .E. 2000 SPID, Suite 100 Corpus Christi, TX 78416 (361 ) 289-1385 Office (361) 289-0712 Fax 2006-371 08/18/06 RATIFICATION AMEND. NO.3 Page 1 of 2 Maverick Engineering ;IMAI""ON 1 ~'H\AMEN[)ME NT N(, RA flFICA nON Of AMENDMENT NO.3 ......' .. ,- ENGINEERING SERVICES By f/f/c;'~ el R. Escobar, P. E. Dcfte Director of Engineering Services ArrEST By Armando Chapa, City Secret AIIPRQVED AS TO FORM , \ , A . ~t Project: Cimarron Boulevard, Phase 2 from Yorktown to Bison (Mireles) (Proiect No. 6262) Etc2~/,4MA 'USERS2\H:)M~ 'ELM~P\GEN S I REET,62' CiMARRON CUNSlJl\IH'AMENDMENT Nt 3\ RATIFICATION OF AMENDMENT NO.3 RATIFICATION AMEND. NO.3 Page 2 of 2 ,~,----,--- ( . 1'1.--,~ MAVERICK 1 V IDI ENGINEERING, INe I{'. i.. I III ! , ,.....lllt'( Il,~" t It. It. t March ] 4, 2006 Mr. 'Angel R. Escobar, P.E., R.P.L.S. Director of Engineering Services City of Corpus Christi P.O" Box 9277 Corpus Christi, fexas 78469 Re: Cimarron Boulevard Phase 2 Yorktown to Bison (Mireles) No. 6262 Mr. Escobar: Maverick Engineering Inc., (ME!) is pleased to provide our change of scope fee proposal for the incorporation of new centerline baseline (provided by others) to the Cimarron Boulevard - Phase 2 project. The incorporation of the new data wi II require that MEI revise approximately 78 sheets (149 sheets in total package). Our proposed engineering fee for this change of scope activity is $20,020.00 as identified on the attached man-hour breakdown. Please let me know if you have any questions regarding this change of scope proposal. Respectfully, MA V~ICK ENGINEERING, INC. <1 ! t, Ron Guzman, P. E. Division Manager RG/pf Attachment T:\SH 'RETARIES\ WP~ I LES\OSr -503\ESCOBAR l:rR 072505 PO Box 9094 . Corpus Christl, TX 78469 . 2000 S.P.I.D., Suite 100 · Corpus Christi, TX 78416-1141 361) 21-9-1385 . Fax (361,289-0712 . www.maverickengineering.com ..,~_~...+...,~-,,~,_ "'..~~~.. '.~' ,_"''''_''~_' "_...0'...."'- RATIFICATION AMEND. NO.3 EXHIBIT "A" Page 1 of 2 Cimarron Phase 2 Baseline Revision Change of Scope Man Hour Estimate TASK 1. Production Su 1 1 Revise Drawing. ill reftect new Baseline (approx 78 sheets) 2 Field SUPPOr1 1 1 Establish vanous prop lines along project liml' to verify correct POW -TOTAL-~STIMATE-D MAN-HOU;;1- r- TOTAL ESTIMATED FEE' GRAND TOTAL MEl PTOJeclNo 05~7-50j I.; March 2006 .......'.-.'-....'..- City Project No. 6262 o on ;;; ...J <i n. U z oc n. -.--.--,--.- MEI - CIVIL z z '" -< ~ c.:: C -< ~ '" cu 0 :t -< 0"- Z te ,.E "'" ~.e ~.e z '" ~.e 0"- V'l <r: ~, u: f:d~ 6'8 :;;: 0 u: w~ U'" <A if O<A ~fA ~~ CJ) ~.. ..J ~ 'Z '" '" 0 ~ CJ) Vl 0 -< ;.L; Z u -- u.J 18 24 40 190 ------..- r---- _. -"-_.._~-- 24 32 18 24 0 40 190 24 32 $1,890 $2,208 $0 $2,000 $8,170 $2,328 $3,424 o $0 $20,020 RA TIFICA TION AMEND. NO.3 EXHIBIT "A" Page 2 of 2 CIl\lARRON BLVD. PHASE 2 YORKTOWN TO BISON (MIRELES) City Project No. 6262 AMENDMENT NO.3 EXHIBIT 'A-1' CASH FLOW INVOICE SCHEDULE T.al Contract Value for Amendment No.3 i\nticipated August ~0()6 Invoice Amount $20.020.00 $20,020.00 RATIFICATION AMEND. NO.3 EXHIBIT "A-1" Paae 1 of 1 ':IMARRON BOULEVARD PHASE 1 ~ROM SARATOGA TO YOURKTOWN (PROJECT NO 6261 ) PHASE 2 FROM YORKTOWN TO BISON (MIRELES) (PROJECT NO 6262) SUMMARY OF FEES INITIAL CONTRACT Cimarron~d. Phase 1 (Project No. 62611 I Street Storm Water Water Wastewater Total Basic SerVlleS 1 Preli~rv Phase $24,040.29 $13,410.11 $7,791.90 $7,396.70 $52,639.00 ~I& 210,963.00 117,679.00 68,377.00 64,909.00 461,928.00 3 Bid e 5,822.02 3,247.63 1,887.03 1,791.32 12,748.00 4 Co . Phase 19,208.85 10,715.04 6,225.94 5,910.17 42,060.00 Subtotal'c Services Fees 260,034.16 145,051.78 84,281.87 80,007.19 569,375.00 I Additi~:i- ~ Pe I (Authorizedl 4,261.93 2,377.38 1,381.37 1,311.31 9,332.00 2 RO rulaition Survey 0.00 0.00 0.00 0.00 0.00 3 To hie Survey (Authorized) 4,936.94 2,753.91 1,600.15 1,518.99 10,810.00 4 Enyi menial Issues 0.00 0.00 0.00 0.00 0.00 5 Cons ctkii- Observation Services 124,244.61 69,305.90 40,269.97 38,227.52 272,048.00 6 Wan y-F'tlase 3.385.07 1,888.25 1,097.16 1,041.52 7,412.00 7 HYdr :xcavation (Authorized) 0.00 0.00 6,592.00 6,592.00 13,184.00 Tele ng Existing Sanitary Sewer Lines 8 (A~ ~edl 0.00 0.00 0.00 31,250.00 31,250.00 Subtotal ionsl Services Fees 136,828.55 76.325.45 50,940.66 79,941.34 344,036.00 I Total AuthGIzed Fee $396,862.70 $221,377.24 $135,222.53 $159,948.54 $913,411.00 I Cimarron .d, Phase 2 (Proiect No. 62621 Street Storm Water Water Wastewater Total Basic Se 1 Prell Phase $21,769.81 $9,004.82 $6,217.49 $5,500.88 $42,493.00 2 Desi hale 105,353.00 43,578.00 30,089.00 26,621.00 205,641.00 3 Bid e 5,395.19 2,231.66 1 ,540.88 1,363.28 10,531.00 4 Con ion Phase 13,659.86 5,650.24 3,901.28 3,451.63 26,663.00 Subtotal Services Fees 146,177.86 60,464.71 41,748.65 36,936.79 285,328.00 I Additional I k"vices 1 IP~ mo (Authorized) 4.652.85 1.924.59 1.328.86 1,175.70 9,082.00 ,c' ,is;' '. , JD' 0.00 o.oe 0.00 O.OJ '. . ,n ," 4, 723.5~ 1,953.84 ',349.05 1,193.56 9,220.00 4 E".I~"~ 0.00 0.00 0.00 0.00 0.00 5 Con . Observation Services 48,669.94 20,131.73 13,900.22 12,298.11 95,000.00 6 War Phase 1,805.40 746,78 515.62 456.20 3,524.00 7 Hydr cavation (Authorized) 0.00 0.00 6,592.00 6,592.00 13,184.00 Tele Existing Sanitary Sewer Lines 8 (Autholizedl 0.00 0.00 0.00 31,250,00 31,250.00 9 12-in_Waterline Reolacement 0.00 0.00 0.00 0.00 0.00 10 R'B,vm.-D"," 0.00 0.00 0.00 0.00 0.00 11 Impr to Bear Creek Ditch 0.00 0.00 0.00 0.00 0.00 Subtotal A 'onal Services Fees 59,851.73 24.756.95 23,685.76 52,965.56 161,260.00 I Total Authoilzed Fee $206,029.59 $85,221.66 $65,434.41 $89,902.35 $446,588.00 I Combined1"otal I Street Storm Water Water Wastewater Total B,," 'I 1 Preli Phase $45,810.09 $22,414.93 $14,009.40 $12,897.58 $95,132.00 2 Desi hase 316,316.00 161,257.00 98,466.00 91,530.00 667.569.00 3 Bid e 11,217.22 5,479.29 3,427.90 3,154.60 23,279.00 4 Cons ion Phase 32,868.70 16,365.28 10,127.22 9,361.79 68,723.00 Subtotal B S8fVices Fees 406,212.01 205,516.50 126,030.52 116,943.97 854,703.00 I Additional Sllrvices 1 Per I (Authorized) 8,914.78 4,301.98 2.710.23 2.487.01 18,414.00 2 ROW uilition Survey 0.00 0.00 0.00 0.00 0.00 3 To hie Survey (Authorized) 9,660,48 4.707.75 2,949.21 2,712.56 20.030.00 4 Envir ental Issues 0.00 0.00 0.00 0.00 0.00 5 Cons ion Observation Services 172,914.55 89.437.64 54,170.19 50,525.63 367,048.00 6 Warr Phase 5,190,47 2,635.03 1.612.78 1.497.71 10,936.00 7 Hydr cavation (Authorized) 0.00 0.00 13.184.00 13,184.00 26,368.00 Telev' 9 Existing Sanitary Sewer Lines B (Auth ed) 0.00 0.00 0.00 62,500.00 62,500.00 9 12-in aterline Replacement 0.00 0.00 0.00 0.00 0.00 10 Repl of Yorktown Ditch 0.00 0.00 0.00 0.00 0.00 11 Impr erds to Bear Creek Ditch 0.00 0.00 0.00 0.00 0.00 Subtotal A onal Services Fees 196,680.28 101,082.40 74,626,41 132,906.91 505,296.00 I Total Auth.edFee $602,892,29 $306,598.90 $200,656.93 $249,850.88 $1.359,99900 RATIFICATION AMEND. NO.3 EXHIBIT "B" Page 1 of 5 ~ ~IMARRON BOULEVARD PHASE 1 ~ROM SARATOGA TO YOURKTOWN (PROJECT NO. 6261) PHASE 2 FROM YORKTOWN TO BISON (MIRELES) (PROJECT NO 6262) Cimarronalvd, Phase 1 (Project No. 6261) I Basic S~ 1 Prelil!Mlarv Phase 2 Des. Phase 3 Bid PBlse 4 Co~ion Phase Subtot~ S.rvices Fees I AdditiOflal ices 1 Per I (Authorized) 2 RO u1sition Survey 3 To hie Survey (Authorized) 4 EnYiAnedal Issues 5 co. ion,. Observation Services 6 Wa Phase 7 Hvd cavation (Authorized) TeleVlllng EXisting Sanitary Sewer Lines 8 (Authllili:zed\ Subtotal iWitional Services Fees I Total AuthGIzed Fee I Cimarron.d, Phase 2 (Proiect No. 6262\ I B~SiCp~:li 'Phase 2 Desi hase 3 Bid e 4 Con tion Phase Subtotal Services Fees Additionai1 lIrvices 1 P~ Jog (Authorized) 2 . :Y"-'\'I..r . cqt.l;siF'~"1 ~-~.r:>y ~'~7- i;~oa-- phic S.jn/e}~',.:l\utn:)rizec )---.- 4 EnvirG nenlallssues 5 COlction Observation Services 6 War Phase 7 Hvd xcavation (Authorized) Tele ii!J EXisting Sanitary Sewer Lines 8 (AuthCllized) 9 12_ilwal9rline Replacement 10 Repl ent of Yorktown Ditch 11 Impr ants to Bear Creek Ditch Subtotal A ional Services Fees I Totai Authdlz:ed Fee I Combinectl'otal I Basic se.. 1 Preli Phase 2 Desi hase 3 Bid Pl:Mse 4 Consliiiiction Phase Subtotal Bale Services Fees I Additionai trVices 1 Perm no (Authorized) 2 ROW (luisition Survey 3 ToOOf! IDhic Survey (Authorized) 4 Envirl:lltnental Issues 5 Consllllc1ion Observation Services 6 Wa;;:&""Phase 7 Hyd;;ll'Xcavation (Authorized) Televiilng Existing Sanitary Sewer Lines 8 (Auth<llllzedl 9 12-in<IIWaterline Replacement 10 Repl<Dmeril of Yorktown Ditch 11 Improilmenls to Bear Creek Ditch Subtotal AlIiiOnal Services Fees I Total AuthatlZed Fee -~----'- SUMMARY OF FEES Street $0.00 0.00 0.00 0.00 0.00 $0.00 Street $0.00 0.00 0.00 0.00 0.00 $0.00 Street $0.00 0.00 0.00 0.00 0.00 $0.00 8tonn Water $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 000 $0.00 Stonn Water $0.00 0.00 0.00 0.00 0.00 0.00 o.or 0.00 0.00 0.00 0.00 0.00 0.00 'J DC' 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19,337.00 24,673.00 44,010.00 $44,010.00 Storm Water $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.337.00 24.673.00 44,01000 $44,01000 AMENDMENT NO.1 Water $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 000 0.00 0.00 $0.00 Water $0.00 0.00 0.00 0.00 0.00 0.00 'J.oe 0.00 0.00 0.00 0.00 0.00 0.00 14,149.00 15,753.00 0.00 29,902.00 $29,902.00 Water $0.00 0.00 0.00 0.00 000 0.00 000 0.00 0.00 0.00 0.00 000 0.00 0.00 000 0.00 0.00 0.00 0.00 0.00 14,149.00 15.753.00 0.00 29,902.00 $29,902.00 Wast_ater $0.00 0.00 0.00 0.00 0.00 $0.00 Wastewater $0.00 0.00 0.00 0.00 0.00 $0.00 Wastewater $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Total $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Total $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14,149.00 35,090.00 24,673.00 73,912.00 $73,912.00 Total $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14,149.00 35,090.00 24.673.00 73,912.00 $73,912.00 RATIFICATION AMEND. NO.3 EXHIBIT "B" Page 2 of 5 ,iMARRO~, hUUL c V ARU PHASE: ,ROM SARi\TOGA TO Y<)URkTOWN (PROJEC NO 6261) "'HASE 2 FROM YORK' OWN TO BISON (M!RELES) (PROJECT NO 62621 SUMMAR\ (JF i EE:: --"'.__._.~--- -..------ AMENDMENT NO.2 Cimarron ~d, Phase 1 (Project No. 6261) I Street Storm Water Water Wastewater Total Basic SelVllleS 1 Preli~rv Phase $0.00 $95,960.00 $0.00 $0,00 $95,960.00 ~i' 0.00 0.00 0.00 117,289.00 117,289.00 3 Bid e 000 0.00 0.00 0.00 0.00 ~ Con ion Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Services Fees 0.00 95,960.00 0.00 117,289.00 213,249.00 Additio~ces 1 Pe I (Authorized) 0.00 0.00 0.00 4,124.00 4,124.00 2 ROwacoulsition Survey 0.00 0.00 0.00 0.00 0,00 3 T~urvey (Authorized) 000 173,704.00 0.00 10,154.00 183,858.00 4 Envi ! Issues 0.00 0.00 0.00 0.00 0.00 5 Co~ Observation Services 0.00 0.00 0,00 0.00 0.00 6 Warre:t Phase 000 0.00 0.00 0.00 0,00 7 HYdFexcavation (Authorized) 000 0.00 0.00 0.00 0.00 TeleYlllln9 Existing Sanitary Sewe' Lines - . S (Arsect) 000 000 0.00 0,00 0.00 Subtotal ional Services Fees 0.00 '73.704.00 000 14,278.00 187,982.00 I T ata I Auth(M!lZed Fee $0.00 $269,664.00 $0.00 $131,567.00 $401,231.00 I Cimarron ad, Phase 2 (Project No. 6262l I Street Storm Water Water Wastewater Total Basic SElfVIIes 1 prelir8larv Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 De~ase 0.00 000 0.00 0.00 0.00 3 Bid e 0.00 000 0.00 0,00 0.00 4 cO]l]on Phase 0.00 000 0.00 0.00 0.00 Subtotal Services Fees 0.00 000 0.00 0.00 0.00 Additional I ""ices - 1 IPerml fig (AuthOrized) 0.00 000 0.00 0.00 0.00 - ,''<OW ouisiti'--n ~;; ;r-:c:v "I (V o.r)Q ., OC 0.00 0)) :Q,Jog 'lphic Seney ,Auti. .-----t- ;J.OC 0.00 '0.00 0.00 000 .riz..::;CI 4 Envirtlinental Issues 0.00 0.00 0.00 0.00 0.00 5 Con~on Observation Services 0.00 0.00 0.00 0.00 0.00 6 Warr.BY Phase 0.00 0.00 0,00 0.00 0.00 7 Hydra Ixcavation (Authorized) 0.00 000 0.00 0.00 0.00 Televl ling Existing Sanitary Sewe' Lines 8 (Autht Itzed ) O.OU 0.00 0.00 0.00 0.00 9 12-incl (Waterline Replacement 0.00 0.00 0.00 0.00 0.00 10 Repl~ent of Yorktown Ditch 0.00 000 0.00 0.00 0.00 11 Impr~ents to Bear Creek Ditch 0.00 000 0.00 0.00 000 Subtotal ~ional Services Fees 0.00 000 0.00 0.00 0.00 I Total Authollzed Fep $0.00 $000 $0.00 $0.00 $0.00 I Combined'lotal .. I Street Storm Water Water Wastewater Total Basic Serves - 1 pr~~Phase .. $0.00 $95,96000 $0.00 $0,00 $95,960,00 2 Desi hase ..- 0.00 000 0.00 117 ,289.00 117,289.00 3 Bid e 0.00 0.00 0.00 0.00 0.00 4 ConsllllCtion Phase 0.00 000 0.00 0.00 0.00 Subtotal ~ Services Fees 0.0(1 95,96000 0.00 117,289.00 213,249.00 I '---"-'--" -.- .--- ~--- ~-- Additional Itrvicas --- 1 Per~ (AuthOrized) 0.00 000 0.00 4,124.00 4,124.00 " ROWIiCQuisition Survey 0.00 0.00 0.00 0.00 0.00 3 ToPDillPhic Survey (Authorized) 0.00 1 ?3,70400 0.00 10,154.00 183,858.00 4 Envirenentallssues 000 0.00 000 0.00 0,00 5 Cons dion Observation Services 0.00 0.00 0.00 0.00 0.00 h Wam Iy Phase 000 000 0.00 0.00 0.00 7 Hydrc :xcavation (Authorized) ,. 000 --_. - 000 0.00 0.00 0.00 Telev og Existing Sanitar! Spwe Lines -..-.- I S (Auth ~edl U.UI UOO !J.OO 0.00 000 9 12-in Waterline Replacement 000 . - 000 0.00 0.00 0.00 10 Repl Iment of Yorktown Ditch 000 000 0.00 0.00 0.00 11 Impr( ~ents to Bear Creek Ditcrl 0.00 000 0.00 0,00 0.00 Subtotal A "ional Services Fees 0.00 173,70400 0.00 14,278.00 187,982.00 Total AuthdlllZed Fee -_. $000 $269,66400 $0.00 $131,567.00 $401,23100 RATIFICATION AMEND. NO.3 EXHIBIT "B" Page 3 of 5 -"...,- ;IMARRON tJUULEvARD PHASE i 'ROM SARA TOGA TO YOURKTOWN (PROJECf NO 6261! "HASE? FROM YORK-OWN TO BISON (MIRELES) (PROJECT NO 6262) SUMM.t\R' OF "EES -..---." ----"------ AMENDMENT NO.3 Cimarron ~d. Phase 1 (Project No. 6261) I Street Storm Water Water Wastewater Total Basic SeNlles . - 1 Preli~rv Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 O~I; 0.00 0.00 0.00 0.00 0.00 3 Bid e 000 0.00 0.00 0.00 0.00 4 Con . Phase 0.00 000 0.00 0.00 0.00 Subtotal . Services Fees 000 000 0.00 0.00 0.00 I Additional.rvices 1 pe~ (Authorized) - 0.00 000 0.00 000 0.00 2 RO uisillon Survey 000 0.00 0.00 0.00 0.00 3 Top~ic Survey (Authorized) 0.00 000 0.00 0.00 0.00 4 Envi~llssues 0.00 0.00 0.00 0.00 0.00 5 C\II Ob~N"'OO S.N'~; 0.00 0.00 0.00 0.00 0.00 6 Wa Phase 0.00 0.00 0.00 0.00 0.00 7 Hvdr cavatlon (Authorized) 0.00 0.00 0.00 0.00 0.00 Tele I EXisting Sanitary Sewer Lines 8 (A~d) O.OU 000 0.00 0.00 0.00 Subtotal lonal Services Fees - 0.00 0.00 0.00 0.00 0.00 Total AuthQll!Zed Fee $0.00 $0.00 $0.00 $0.00 $0.00 Cimarron ad, Phase 2 (Project No. 62621 I Street Storm Water Water Wastewater Total Basic ServIIBs 1 PrE_PhaSe SODa $0.00 $0.00 $0.00 $0.00 2 Desi hase 5,005.00 5,005.00 5,005.00 5,005.00 20,020.00 3 Bid 0.00 0.00 0.00 0.00 0.00 4 cO[]l]on Phase 0.00 000 0.00 0.00 0.00 Subtotal Services Fees 5.005.00 5.005.00 5,005.00 5,005.00 20,020.00 I Additional ..-vices 1 lPerm~ (Authorized) 0.00 0.00 000 0.00 0.00 .___n,: -"1/ AcGuisi', ,. ".,' (\ n o DC DC 0.00 OOC .n,., .H '07"" G.UL 000 ..00 0.00 0.00 4 Envirqltnentallssues 000 000 0.00 0.00 0.00 5 Consation Observation Services 0.00 000 0.00 0.00 0.00 - wafS< Phase 000 000 0.00 0.00 0.00 7 Hvdr cavation (Authorized) 000 000 0.00 0.00 0.00 TeleVllllll'l9 Existing Sanitarl Sewer lines 3 (A~d) 000 0.00 0.00 0.00 0.00 9 12-i aterline Replacement 0.00 000 0.00 0.00 0.00 10 Repl;grnent of Yorktown Ditch 0.00 000 0.00 0.00 0.00 11 ImpSen1s to Bear Creek Ditch 0.00 0.00 0.00 0.00 0.00 Subtotal A ional Services Fees 000 000 000 0.00 0.00 I Totai Auth*ed Fee $5,00500 $5.00500 $5,005.00 $5,005.00 $20,020.00 I Combined Jotal - C~,_ i Street Storm Water Water Wastewater Total Basic Serv.s . - 1 pre~Phase - $0.00 $000 $0.00 $0.00 $0.00 2 Desi hase 5.005.00 :,,00500 5,005.00 5,005.00 20,020.00 3 Bid P"e 0.00 0.00 0.00 0.00 0.00 4 ConsUflction Phase 0.00 0.00 0.00 0.00 0.00 Subtotal B8Ic Services Fees 5,00500 5,00500 5005.00 5,005.00 20,02000 I . Additionallllrvices . 1 Permaa (Authorized) 0.00 000 0.00 0.00 0.00 2 ROWI!:-quisition Survev 0.00 000 0.00 0.00 0.00 3 Top~hic Survev (Authorized) 0.00 000 0.00 0.00 0.00 4 Envirc8nental Issues 0.00 000 0.00 0.00 0.00 5 ConsUflction Observation Services 000 000 000 0.00 0.00 6 Warra Phase DOC 000 0.00 0.00 0.00 7 Hydr~cavation (AuthOrized) _.225:. 000 0.00 0.00 0.00 Telev"g Existing Sanitar; Sewe' lnes f0- B (Auth<lized) o.or: 000 000 0.00 0.00 9 12-incaWaterline Replacement 0.00 0.00 0.00 0.00 0.00 10 Repla8ment of Yorktown Ditch 0.00 000 0.00 0.00 0.00 11 Impr~ents to Bear Creek Ditch 0.00 0.00 0.00 0.00 0.00 Subtotal A_ional Services Fees 0.00 000 000 0.00 0.00 I Total Autholfi!:ed Fee $5,005.00 $5,005.00 $5,00500 $5,005.00 $20,020.00 RATIFICATION AMEND. NO.3 EXHIBIT "B" Page 4 of 5 ~ ;IMARRON HOULE\;ARD PHASt:, 1 '.ROM SARATOGA TO YOURKTOWN (PROJEC NO 62(1) PHASE 2 FROM YORKTOWN TO BISON (MIRELES) (PROJECT NO (262) SUMMAR\ OF IHoS - ----.----.- - TOTAL RESTATED FEE Cimarron tlvd, Phase 1 (Project No. 6261\ I Street Storm Water Water Wastewater Total Basic Servlillles Prelirearv Phase $24,04029 $109,370.11 $7,791.90 $7,396.70 $148,599.00 2 0'1i' 210,963.00 117,679.00 68,377.00 182,198.00 579,217.00 3 Bid 5,822.02 3,247.63 1,887.03 1,791.32 12,748.00 4 Con . Phase 19,208.85 10,715.04 6,225.94 5,910.17 42,060.00 Subtotal Services Fees 260,03416 241,011.78 84,281.87 197,296.19 782,624.00 Additionall8rvices 1 P~(AuthoriZed) 4.261.93 2,377.38 1,381.37 5,435.31 13,455.99 2 RO u18ltion Survey 0.00 0.00 000 0.00 0.00 3 To hie Survey (Authorized) 4,936.94 176.457,91 1,600.15 11,672.99 194,667.99 4 Enyirwnen&al Issues 0.00 0.00 0,00 0.00 0.00 5 Consa;tion Observation Services 124,244.61 69,305.90 40,269.97 38,227.52 272,048.00 6 WarTa-/ Phase 3,385.07 1,888.25 1,097.16 1,041.52 7,412.00 7 Hydr~cavation (Authorized) 000 0.00 6,592.00 6,592.00 13,184.00 Televla1g Existing Sanitary Sewe' lines 3 (Auth4jzed) . 000 0.00 0,00 31,250.00 31,250.00 Subtotal ~onal Services Fees - 136,82855 250.029.44 50.940.65 94,219.34 532,017.98 I Total Auth_ed Fee $396,86271 $491,04122 $135,222.52 $291,515,53 $1,314,641,98 I Cimarron ad, Phase 2 (Project No, 62621 ! Street Storm Water Water Wastewater Total Basic Servfllps , p",~""';e $21,769.81 $9,00482 $6,217.49 $5,500.88 $42,493.00 2 Desi hase 110,358.00 48,583.00 35,094.00 31,626.00 225,661.00 3 Bid e 5,395.19 2,231.66 , ,540.88 1,363.28 10,531.01 4 Cons ion Phase 13,659.86 5,650.24 3,901.28 3,451.63 26,663.01 Subtotal B Services Fees 151,182.86 65,469.72 46,753.65 41,941.79 305,348.02 I Additional avices 1 IPermiW1g (Authorized) 4.652,85 1.924.59 1,328.86 1,175.70 9,082.00 ~~+;~\hJ ~q~isif' ',n C', ]r'.'~-:y__ '-~'1 'l'r' c, a' 0.00 0,00 ------t ~ . 34!J.05 j :' pogAphlc S", c,'y ',Aut! jIlZf:::iJ} -t, 723.j~- , .,,53,84 1,193.56 9,220.00 4 EnvirQllnental Issues 0.00 000 000 0.00 0,00 5 Cons lion Observation Services 48,669.94 20,13173 13,900.22 12,298.11 95,000.00 6 Warr Phase 1 ,805.40 746.78 515.62 456.20 3,524.00 7 Hydn cavation (Authorized) 000 000 6,592.00 6,592.00 13,184.00 Telev 19 Existing Sanitary Sewer l ;nes 3 (Aut~) U.OCJ U.OO 0.00 31,250.00 31,250.00 9 12-in alerline Replacement 0.00 0,00 14,149.00 0.00 14,149.00 10 Repl..-nent of Yorktown Ditch 0,00 19,337.00 15,753.00 0.00 35,090.00 11 Impr~ents to Bear Creek Ditch 0.00 24,673.00 0.00 0.00 24,673.00 Subtotal A_ional Services Fees -- 59,85174 68.766.94 53,587 75 52,965.57 235,112,00 I -- Total Auth*ed Fee -_.- $211.034.60 $134,236.66 $100,34140 $94,907.36 $540,520.02 I Combined 'fetal ._-,_._' I -- Street Storm Water Water Wastewater Total BaSIC ServicIJs . - Prelin1ll<trv Phase $45,81010 $118,374.93 $14.009.39 $12,897.58 $191,092.00 2 Desiallf'hase 321,321.00 166,262.00 103,47100 213,824.00 804,878.00 3 Bid PllIBe 11,217.21 5,4 79.29 3,42791 3,154.60 23,279.01 4 Const8;:tion Phase 32,868.71 16,365.28 10,127.22 9,361.80 68,723.01 Subtotal B<lIIC Services Fees $411,21702 $306,48150 $131,03552 $239,237.98 $1,087,972.02 I ,-- -_.- Additiona~es 1 Perm' Authorized) - 8.g1478 4,30197 2.71023 6,611.01 22,537.99 2 ROW'aquisition Survey 000 0.00 000 0.00 0.00 3 Topo.,hic Survey (Authorized) 9,660.49 '78,41175 <',94920 12,866.55 203,887.99 4 EnvirQ !l1ental Issues 0.00 0,00 000 0.00 0.00 S Const ction Observation Servlce~ 172.91455 89,437.63 54,17019 50,525.63 367,048.00 'i Warra y Phase 5,19047 2.635,03 ',61278 1,497.72 10.936.00 7 Hydro ixcavation (AuthOrized) 0.00 000 1"- 18400 13,184.00 26,368.00 -, Televi hg Existing Sanitar/ Sewe _'ne~ d (AU~) U.UCi lJ.OO CiOO 62.500.00 62,500.00 9 12-in alerline Replacement 000 0.00 14.149.00 0.00 14,149.00 10 Repl~ent of Yorktown Ditch 000 19,337.00 15,75300 0.00 35,090.00 11 Im~ents to Bear Creek Ditch 000 24,673.00 0.00 0.00 24,673.00 Subtotal 'onal Services Fees 196,68029 318,796.38 104,52840 147.184.91 767,189.98 I Total Authollired Fee $607,897.31 $fi25,277.88 $235.563.92 $386.422.89 $1.855,162.00 --- RATIFICATION AMEND. NO.3 EXHIBIT "B" Page 5 of 5 ~ g%~~ ::r = Chnsti ~ CITY OF CORPUS CHRISTI DISCLOSURE OF INTERESTS City of Corpus Christl Ordinance 1 7112. as dmended, requires all persons or firms seeking to do business with the City to provide the following Informatlo' Every ::]uestlon must be answered If the question is not applicable, answer with "NiA FIRM NAME. Maverick Enaineerina STREET: 2000 S P I. D. Suite 100 CITY: Corpus Christi, TX FIRM is: 1 Corporation __L-; PartnershiP. 3 Sole Owner 5 ')ther ZIP: 78416 4. Association DISCLOSURE QUESTIONS If additional space is necessary, please use the reverse side of this page or attach separate sheet. 1 state the names of each employee of the City of Corpus Christi having an ownership interest constituting 3% or more of the ownership in the above named firm. Name Job Title and City Department (if known) N/A 2 State the names of each official of the City of Corpus Christi having an ownership interest constituting 3% or more of the ownership in the above named firm. Name T't1e N/A 3 State the names of each board member of the City of Corpus Christi having an ownership interest censtituting 3% or more of the ownership in the above named firm. Name Board. Commission or Committee N/A 4 State the names of each employee or officer of a consultant for the City of Corpus Christi who worked on any matter related to the subject of this contract and has an ownership interest constituting 3% or more of the ownership in the above named firm Name Consultant N/A CERTIFICATE I certify that all Information provloed IS true and correct as of the date of this statement, that I have not knowingly withheld disclosure of any Information requested and that supplemental statements will be promptly submitted to the City of Corpus Christ. Texas as C'langes OCCur Certifying Person Signature of Certifying Person Title Division Manaaer Date: 8 . ~. 0," EXHIBIT "e" Page 1 of 2 -....,., DEFINITIONS cJ Board Member A member of any board commission or committee appointed by the City Council of the City of Corpus Christi. Texas t Employee Any person empioyed by the City of Corpus Christi, Texas, either on a full or part time basis, but not as an independent contractor Firm, Any entity operated for economic gain, whether professional, Industrial or commercial and whether established to produce or deal with a product or service, including but not limited to, entities operated in the form of sole proprietorship, as self-employed person, partnership, corporation'd"Oint stock company, joint venture, receivership or trust and entities which, for purposes of taxation, are treate as non-profit organizations. Official The Mayor, members of the City Council, City Manager, Deputy City Manager, Assistant City Managers, Department and DIVision Heads and Municipal Court Judges of the City of Corpus Christi, Texas. c Ec OwnerShip Interest. Legal or eqUitable interest, whether actually or constructively held, in a firm, including when such interest is helc througll an agent, trust, estate or holding entity. Constructively held refers to holding or control established through /Oting trusts, proxies or special terms of venture or partnership agreements. Consultant Any person or firm, sucn as engineers and architects, hired by the City of Corpus Christi for the purpose of professiol'al consultation and recommendation EXHIBIT "e" Page 2 of 2 .....~