HomeMy WebLinkAboutC2006-425 - 9/26/2006 - Approved CITY OF CORPUS CHRISTI AMENDMENT NO.5 CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas hereinafter called "City", and MAVERICK ENGINEERING, hereinafter called "Engineer", agree to the following amendments to the Contract for Engineering Services for Cimarron Boulevard · Phase 1 from Saratoaa to Yorktown (Proiect No. 6261) · Phase 2 from Yorktown to Bison (Mireles) (Proiect No. 6262), as authorized and administratively amended by: Original Contract .--Ma 17-;-20os--r Amendment No. 1--1 December 13, 2005 Amendment NO.2 I January 24, 2006 + Amendment No.3. August 18, 2006 l~endment Ng:~_'. September 21.,2006 1 Motion No. M2005-160 Motion No. M2005-411 Motion No. M2006-017 Administrative A roval Administrative A roval $1,359,999.00 $73,912.00 $412,603.00 $20,020.00 $19,161.00 }Ii' The proposed Amendment NO.5 amends Phase 1 from Saratoga to Yorktown for the Inclusion of Master Channel 27 Drainaae Improvements (Proiect No. 2263): Section 1. Scope of Services, Part A. Basic Services, Item Nos. 2, 3 and 4 are amended to include additional Design Phase, Bid Phase and Construction Phase Services; and Part B. Additional Services, Item Nos. 1-9 are amended to include these Additional Services as described in Exhibit "A" Task List. )Y The Cash Flow Invoice Schedule is modified and is attached as Exhibit "A-1." , The Summary of Fees is modified and is attached as Exhibit "B." All other terms and conditions of the May 17, 2005 contract between the City and Engineer, and of any amendments to that contract, which are not specifically addressed herein shall remain in fuN force and effect ~=:~:~~TI .ila9~. ~ Rllftald F. Massey ~ Assistant City Manager " ATTEST A""an~r~tary q'~-1J(, Ron G zman, P.E. Date Division Manager 2000 SPID, Suite 100 Corpus Christi, TX 78416 (361) 289-1385 Office (361) 289-0712 Fax i'~.\ ]l'~'ill:: 31..~L AUiHONW:.~ ~T U)ltillGI, 1>. 'd.~ll.1&M ... -00- ...Ac.. ...---. -- --- ~~('m"rt!"'~ ENGINEERING SERVICES Fund Sources: 550950-3492-00000-170578 - $1,125,457 550950-4090-00000-170578 - $13,175 550950-4250-00000-170578 - $4,392 AfllPROVED AS TO FORM 2006-425 09/26/06 1\12006-32'" Amd No ;-lAmd N) 5 doc '\laverkk Engineering ~'"";';",,",,, CIMARRON BOULEVARD PHASE 1 (#6261) CIMARRON BOULEVARD PHASE 2 (#6262) AMENDMENT NO.5 MASTER CHANNEL 27 DRAINAGE IMPROVEMENTS (#2263) EXHIBIT "A" TASK LIST A. BASIC SERVICES: 1) Project scope includes approximately 10,793 linear feet of new major storm water system improvements from Cayo del Oso to Cimarron Boulevard and approximately 4,326 linear feet of new intermediate and minor storm water system improvements, including grass-lined open channels, concrete-bottom channels, concrete-lined channels, and reinforced concrete box conduit. 2) Perform field investigation (surveying as authorized by Additional Service) as required to define specific areas of demolition and new work, and other applicable parameters required to complete the items indicated on this Task List. 3) Contact Texas One-Call System to locate existing City utilities in the field, and coordinate with appropriate City operating department. 4) Attend and participate in project kickoff and planning meetings (3 meetings) with City staff to discuss adjacent planned developments, approved channel alignment and cross-sections for final design. Gather information and perform close coordination with City staff. 5) Review available reports, record drawings, utility maps and other information provided by the City pertaining to the project area. 6) Review topographic field survey data and existing property/right-of-way (ROW)/easement boundaries (performed as Additional Services) to evaluate existing conditions. 7) Identify locations of public and private utilities and structures, and determine critical elevations for existing adjacent structures and drainage ways. 8) Perform hydrologic and hydraulic analyses for proposed storm water system using appropriate design software. 9) Identify applicable permit requirements. 10) Arrange and attend coordination meetings with affected agencies and utility owners. rl lHOMEIRachelleIGEN\Dra.nageI2263-Channf! 27IAmd No 5\EXHIBITf" Tasklistdoc - 11) Prepare construction drawings in English units on 22" x 34" sheets, to include: . Title Sheet · Project Location Map · General Notes and Testing Schedule · Estimated Quantities Summary · Existing Channel Cross-Sections · Proposed Channel Typical Sections · Demolition/Removal Summary . Existing Utility Basemaps . Baseline Alignment · Drainage Area Map · Utility Adjustments · Storm Water Plan & Profile · Storm Water Pollution Prevention Plan · Waterline Adjustment Details · Sanitary Sewer Adjustment Details · Storm Sewer Details · Traffic Control Plan · Traffic Control Details · Temporary and Permanent Erosion Control Details 12) Prepare opinion of probable construction costs including contingency amount. 13) Develop list of specification sections required for the project. 14) Provide Quality Assurance/Quality Control (QAlQC) interim review and prepare submittal for City's review depicting 90% complete development of the drawings. 15) Address comments received from the City for the 90% submittal. 16) Edit City standard specification sections to fit project requirements. 17) Prepare Special Provisions, Specifications and Forms of Contracts and Bonds to include: . Title Page . Table of Contents . Notice to Bidders . Notice to Contractors - A · Notice to Contractors - B . Part A - Special Provisions · Part B - General Provisions · Part C - Federal Wage Rates and Requirements · Part S - Standard Specifications · Part T - Technical Specifications (if required) · List of Drawings · Geotechnical Report (if required) H lHOMEIRachelleIGEN\Drainage\2263-Channei 27\Amd No '''EXHIBITA.. raskLlst.doc ...... . Notice . Agreement · Proposal/Disclosure Statement · Performance Bond . Payment Bond 18) Provide Quality Assurance/Quality Control (QA/QC) final review and submit hard copy and electronic files of the final drawings and other contract documents to the City for bidding the project. 19) Update the opinIon of probable construction costs. 20) Provide Bid Phase services in accordance with the provisions of the Contract for Professional Services. 21) Provide Construction Phase services in accordance with the provisions of the Contract for Professional Services. 22) Prepare monthly progress reports for submittal to the City. B. ADDITIONAL SERVICES: PERMITTING 1) Upon receiving authorization from the City to proceed, furnish to the City engineering data and documentation necessary for all required governmental permits as needed to complete the project. 2) Prepare and submit permit applications and associated fees to the appropriate authorities as required to complete the project. DRAINAGE CRITERIA TECHNICAL GUIDE 3) Prepare abbreviated ("Cliff Notes") version of storm water design criteria as proposed by the 2005 Draft Drainage Criteria and Design Manual. 4) Attend meetings with Technical Advisory Group, Planning Commission and City Council as required to complete the project. RIGHT-Of-WAY MONUMENTATION 5) Set property pins for new drainage right-of-way. TOPOGRAPHIC SURVEY fOR DESIGN 6) Research established State submerged land boundary at MC-27 outfall in Cayo del Oso. 7) Tie-in existing drainage ditches at Airline Road. H lHOMEIRacnelleIGENlDralnage\2263-Chann', 27\kPd No,IEXHIBiTi. raskLlst doc 8) Tie-in existing drainage ditches at Rodd Field Road. 9) Tie-in existing storm sewer outfall at east end of Brooke Road. 10) Tie-in existing concrete box culvert outfall from South Fork Subdivision Unit 5 and prepare metes & bounds description for drainage easement at this location. ENVIRONMENTAL ASSESSMENTS 11) Conduct on-the-ground Archeological Survey for MC-27 outfall area (east of CR. 7B). 12) Conduct on-the-ground investigation to delineate Wetland limits for MC-27 outfall area (east of C.R. 7B) CONSTRUCTION OBSERVATION SERVICES 13) Provide construction observation services as authorized by the City. 14) Conduct daily site visits to the project site during construction. 15) Prepare daily reports and coordinate site visits with MEI office staff. 16) Provide detailed coordination with City staff during construction. 17) Coordinate construction activities with materials testing lab. WARRANTY PHASE SERVICES 18) Upon receiving authorization from the City to proceed, conduct a maintenance guaranty inspection toward the end of the one-year period after acceptance of the project. Note defects requiring contractor action to maintain, repair, fix, restore, patch, correct or replace improvement under the maintenance guaranty terms of the construction contract. Document the condition and prepare a report for the City staff of the locations and conditions requiring action. HYDRO-EXCAVATION SURVEY FOR LOCATING EXISTING UTILITIES 19) Conduct hydro-excavation survey to expose existing underground utilities at selected locations. 20) Tie-in top of conduits exposed by hydro-excavation by horizontal position and elevation. rllHOMEIRaChelle\GEN\Dralnage\2263-ChannH 27\Amd No CIEXHIBITi'.. TaskListdoc ~ C. SCHEDULE 1. Preliminary Phase Submittal Due t--- .---- i 2. Design Phase: Authorization to Proceed i 3. pesign Phase: Pre-Final Submittal Due I 4. Oesign Phase: City Comments I I 5. Design Phase: .1QO% Final Submittal Due . 6. Sid Opening 7. Construction Phase - NTP HIHClfMEIRachelleIGEN\Dralnage\2263-Channei 27\Amd No 'iIEXHIBI rp. _ faskLlst.doc ~ September 21,2006 September 25, 2006 November 30,2006 1 week from Pre-Final Submittal (Dec.7, 2006) Janua 2,2007 2 weeks of 100% Final Submittal Janua 17,2006 I 2 weeks from Bid Opening j(January 31, 2007 CIMARRON BOULEVARD PHASE 1 (#6261) CIMARRON BOULEVARD PHASE 2 (#6262) AMENDMENT NO.5 MASTER CHANNEL 27 DRAINAGE IMPROVEMENTS (#2263) EXHIBIT "A-1 " CASH FLOW INVOICE SCHEDULE Total Contract Value for Amendment No.5 $1.143.024.00 $92,639.00 $313,631.00 $220,995.00 $220,996.00 $8,847.00 $8,846.00 $27,874.00 $20,076.00 $20,076.00 $20,076.00 $20,076.00 $20,076.00 $20,076.00 $20,076.00 $20,076.00 $20,076.00 $20,076.00 $20,076.00 $28,360.00 Anticipated September 2006 Invoice Amount Anticipated October 2006 Invoice Amount Anticipated November 2006 Invoice Amount Anticipated December 2006 Invoice Amount Anticipated January 2007 Invoice Amount Anticipated February 2007 Invoice Amount Anticipated March 2007 I nvoice Amount Anticipated April 2007 Invoice Amount Anticipated May 2007 Invoice Amount Anticipated June 2007 Invoice Amount Anticipated July 2007 Invoice Amount Anticipated August 2007 Invoice Amount Anticipated September 2007 Invoice Amount Anticipated October 2007 Invoice Amount Anticipated November 2007 Invoice Amount Anticipated December 2007 Invoice Amount Anticipated January 2008 Invoice Amount Anticipated February 2008 Invoice Amount Anticipated March 2008 Invoice Amount H \HOMEIRachelleIGENIDralnage\2263-C hannei 27\Amc No S\Ext'lblt .A.-1 doc ....-" ",f\RRUN bL\JLt: v.'-\RL -'HASE: ': FROM SARATOGA TO YORKTOWN (PROJECT NO 6261) Ph~SE 2 I"ROM YORKTOWN TO BISON (MIRELES) (PROJECT NO 6262) SUMMARY OF FEES INITIAL CONTRACT Cimamln Blvd, Phase1lProlec:t No. 6261\ T Street Stann Water Water -Wa~ T Qtll Basic Services 1 Preliminary Phase $24,040.29 $13,41011 $7.791.90 $7.396.70 $52,639.00 2 Desion Phase 210,963.00 117,679.00 68,37700 64,909.00 461,928.00 3 Bid Phase 5,822.02 3,247.63 1,887.03 1,791.32 12,748.00 4 Construction Phase 19,208.85 10,715.04 6,225.94 5,910.17 42,060.00 Subtotal Basic Services Fees 260,034.16 145,051.78 84,28187 80,007.19 569,375.00 Additional Services 1 Permitting (Authorized) 4,261.93 2,37738 1,381.37 1,311.31 9,332.00 2 ROW Acouisition Survev 0.00 0.00 000 0.00 0.00 3 Tooooraphic Survey (Authorized) 4,936.94 2,753.91 1,600.15 1,518.99 10,810.00 4 Environmental Issues 0.00 0.00 000 0.00 0.00 5 Construction Observation Services 124,244.61 69,305.90 40,269.97 38,227.52 272,048.00 6 Warranty Phase 3,385.07 1,88825 1,097.16 1,041.52 7,412.00 7 HYdro-Excavation IAuthorized) I 0.00 000 6,592.00 6,592.00 13,184.00 Televising Existing Sanitary Sewer lines 8 Authorized l 000 0.00 000 31,250.00 31,250.00 9 Drainaae Criteria Technicel GUide 000 000 000 0.00 0.00 Subtotal Additional Services Fees 136,82855 76,32545 50,94066 79,941.34 344,036.00 T Total Authorized Fee $396,86270 $221.37724 $135,222.53 $159,948.54 $913,411.00 I Cimamln Blvd, Phase 2 (Prolect No. 62621 I Street Stann Water Water Wae..._ter Total Basic Services 1 Preliminarv Phase $21,769.81 $9,004.82 $6,217.49 $5,500.88 $42,493.00 2 DeSKIn Phase i 105,353.00 43,578.00 30,089.00 26,621.00 205,641.00 3 Bid Phase 5,395.19 2,231.66 1,540.88 1,363.28 10,531.00 4 Construction Phase 13,659.86 5,650.24 3,901.28 3,451.63 26,663.00 Subtotal Basic Services Fees 146,17786 60,46471 41,748.65 36,936.79 285,328.00 ; Additional Services 1 Permitting (AuthoriZed) 4,652.85 1,924.59 1,328.86 1,175.70 9,082.00 2 ROW Acauisition Survev 000 0.00 0.00 0.00 0.00 3 TClDOaraphic Survey (Authorized) 4,72355 1,95384 1,349.05 1,193.56 9,220.00 4 Environmental Issues 000 000 0.00 0.00 0.00 5 Construction Observation Services 48,669.94 20,131.73 13,900.22 12,298.11 95,000.00 6 WalTllntv Phase 1,805.40 746.78 515.62 456.20 3,524.00 7 Hvdro-Excavation (Authorized) 000 0.00 6,592.00 6,592.00 13,184.00 Televising Existing Sanitary Sewer lines , 8 Authorized ) 0.00' 0.00 0.00 31,250.00 31,250.00 9 12-inch Waterline Replacement 0.00 0.00 0.00 0.00 0.00 10 Replacement of Yor1<town Ditch 0.00 0.00 0.00 0.00 0.00 11 Improvements to Bear Creek Ditch 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees 59,85173 24,756.95 23,685.76 52,965.56 161,260.00 T Total Authorized Fee $206,029.59 $85,221.66 $65,434.41 $89,902.35 $446,588.00 T Combined Total I Street r Water r Total Basic Services 1 Preliminarv Phase $45,810.09 $22,414.93 $14,009.40 $12,897.58 $95,132.00 2 Desion Phase 316,316.00 161,257.00 98,466.00 91,530.00 667,569,00 3 Bid Phase 11,217.22 5,479.29 3,427.90 3,154.60 23,279.00 4 Construction Phase 32,868.70 16,365.28 10,127.22 9,361.79 68,723.00 Subtotal Basic Services Fees 406,212.01 205,516.50 126,030.52 116,943.97 854,703.00 I Additional Services 1 Permitting (Authorized) 8,914.78 4,301.98 2,710.23 2,487.01 18,414.00 2 ROW Acauisition Survey 000 000 0.00 0.00 0.00 3 TOPOllraDhic Survey IAuthorlzed\ 9,660.48 4,707.75 2,949.21 2,712.56 20,030.00 4 Environmental Issues 0.00 0.00 0.00 0.00 0.00 5 Construction Observalion Services 172,914.55 89,437.64 54,170.19 50,525.63 367,048.00 6 WalTllntv Phase 5,190.47 2,635.03 1,612.78 1,497.71 10,936.00 7 Hvdro-Excavation (Authorized) 0.00 0.00 13,184.00 13,184.00 26,368.00 Televising Existing Sanitary Sewer Lines ! 8 Authorized) 0.00 0.00 0.00 62,500.00 62,500.00 9 Drainaae Criteria Tech nic:el Guide 0.00 0.00 0.00 0.00 0.00 9 12-inch Waterline Replacement 0.00 0.00 0.00 0.00 0.00 10 ReDi8cement of Yorktown Di1ch 0.00 0.00 0.00 0.00 0.00 11 Improvements to Bear Creek Ditch 000 000 0.00 0.00 0.00 Subtotal Additional Services Fees 196,680.28 101,082.40 74,626.41 132,906.91 505,296.00 I Total Authorized Fee $602,89229 $306,598.90 $200,656.93 $249,850.88 $1,359,999.00 ."._-~.._.,--,- - A.MENDMENT NO 5 EXHIBIT "B" Page 1 of 7 ,,.,.... _;1'~lAKRUN b\,"Ui..Lv,A,KL "'HAS!: FROM SAR/lTOGA TO YORKTOWN (PROJECT NO 6261) Pi-<ASE 2 FROM YORKTOWN TO BISON (MIRELES) (PROJECT NO 6262) SUMMARY OF FEES AMENDMENT NO.1 Clmarron Blvd, Phlle 1 IProlect No. 6261} T Street Storm Water Walllr Wa.tAWlltAr Total Basic Services 1 Preliminary Phase $0,00 $0,00 $0,00 $0,00 $0,00 2 Desion Phase 0,00 0,00 0,00 0,00 0,00 3 Bid Phase 0,00 000 000 0,00 0,00 4 Construction Phase 0,00 000 000 0,00 0,00 Subtotal Basic Services Fees -l-- 000 000 000 0,00 0,00 Additional Services --+- 1 Permitting (Authorized" i 000, 0,00 000 0,00 0,00 2 ROW ACQuisition Survey -r 0,00 0,00 0,00 0,00 0,00 3 Tooooraphic Survey (Authorized) 0,00 0,00 0,00 0,00 0,00 4 Environmental Issues 0,00 0,00 0,00 0,00 0,00 5 Construction Observation Services 0,00 0,00 0,00 0,00 0,00 6 Warranty Phase 0,00 0,00 0,00 0.00 0,00 7 Hydro-Excavation (Authorized) 0,00 0,00 0,00 0,00 0,00 Televising Existing Sanitary Sewer Lines , 8 Authorized) 0,00 0,00 0,00 0,00 0,00 9 DraTr\8Oe Criteria Technical Guide 000 0,00 0,00 0,00 0,00 Subtotal Additional Services Fees 000 000 0,00 0,00 0,00 I Total Authorized Fee $000 $000 $000 $0,00 $0,00 I Clmarron Blvd, Phase 2 IProlect No. 6262\ T Street Storm Watar Water Wasta_ter Total Basic Services 1 Preliminary Phase $0,00 $0,00 $000 $0,00 $0,00 2 Desion Phase 0,00 0,00 0,00 0.00 0,00 3 Bid Phase 000 0,00 0,00 0,00 0,00 4 Construction Phase 0,00 0,00 0,00 0,00 0,00 Subtotal Basic Services Fees 000 000 0,00 0,00 0,00 Additional Services 1 Permittina (Authorized) 0,00 0,00 0,00 0,00 0,00 2 ROW ACQuiSition Survev 0,00 0,00 0,00 0,00 0,00 3 Toooaraphic Survey (Authorized\ 0,00 0,00 0,00 0,00 0.00 4 Environmental Issues 0,00 0,00 0,00 0,00 0,00 5 Construction Observation Services 0,00 0,00 0,00 0,00 0,00 6 Warranty Phase 0,00 0,00 0,00 0,00 0,00 7 HYdro-Excavation (Authorized) 000 0,00 0,00 0,00 0,00 Televising Existing Sanitary Sewer Lines B Authorized) 0,00 0,00 0,00 0.00 0,00 9 12-inch Waterline Replacement 0,00 0,00 14,149,00 0,00 14,149.00 10 Replacement of Yorktown Ditch 0,00 19,33700 15,753,00 0.00 35,090.00 11 Improvements to Bear Creek Ditch 000 24,673,00 0,00 0.00 24,673,00 Subtotal Additional Services Fees 000 44,010,00 29,902,00 0,00 73,912,00 T Total Authorized Fee $000 $44,010.00 $29,902.00 $0.00 $73,912.00 I Combined Total T Street Storm Water Water Wastewater Total Basic Services - 1 Preliminary Phase $0.00 $0,00 $0.00 $0,00 $0.00 2 Desion Phase 0.00 0,00 0,00 0.00 0.00 3 Bid Phase 0,00 0,00 0,00 0.00 0.00 4 Construction Phase 0,00 0,00 0,00 0.00 0,00 Subtotal Basic Services Fees 0,00 0.00 0.00 0.00 0.00 I Additional Services 1 Permittina (Authorized) 0,00 0.00 0.00 0.00 0.00 2 ROW Acauisition Survey 0,00 0,00 0,00 0,00 0,00 3 TooooraDhic Survev (Authorized) 0,00 0.00 0,00 0.00 0,00 4 Environmental Issues 0,00 0,00 0,00 0,00 0,00 5 Construction Observation Services 0,00 0,00 0.00 0,00 0,00 6 Warrantv Phase 0.00 0,00 0,00 0,00 0.00 7 HYdro-excavation (Authorized) 0,00 000 0.00 0,00 0.00 Televising Existing Sanitary Sewer Lines B Authorized ) 0.00 0,00 0,00 0,00 0.00 9 Drainaoe Criteria Technical Guide 0,00 000 0,00 0,00 0,00 9 12-inch Waterline Replacement 0,00 0,00 14,149,00 0,00 14,149,00 10 Reiii8cement of Yorktown Ditch 0,00 19,337,00 15,75300 0,00 35,090,00 11 ImDrovements to Bear Creek Ditch 0,00 24,673.00 0,00 0,00 24,673.00 Sub1Xltal Additional Services Fees 0,00 44,010,00 29,902,00 0,00 73,912,00 I !Total Authorized Fee --.,-..-.- $0,00 $44,010.00 $29,902,00 $0,00 $73,912,00 AMENDMENT NC 5 EXHIBIT "B" Page 2 of7 .......... "IARROrv t!'.vLc.AkL. PHASE FROM SARATOGA TO YORKTOWN (PROJECT NO 6261) PrASE 2 FROM YORKTOWN TO BISON (MIRELES) (PROJECT NO 6262) SUMMARY OF FEES -- T AMENDMENT NO.2 Clmarron Blvd, Phue 1 (Protect No. 62611 I T Street Storm Wat8r W..r W~r Total Basic Services 1 Preliminary Phase T $0.00 $95,960.00 $0.00 $0.00 $95,960.00 2 Desian Phase I 11,372.00 0.00 0.00 117,289.00 128,661.00 3 Bid Phase ! 0.00 0.00 0.00 0.00 0.00 4 Construction Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Services Fees , 11,372.00 95,960.00 0.00 117,289.00 224,621.00 I I Additional Services -+ 1 Permittina (Authorized) 0.00 0.00 000 4,124.00 4,124.00 2 ROW ACQuisition Survev I 0.00 0.00 0.00 0.00 0.00 3 Toooaraphic Survey (Authorized) +- 0.00 173.704 00 0.00 10,154.00 183,858.00 4 Environmental Issues 0.00 000 0.00 0.00 0.00 5 Construction Observalion Services 000 0.00 0.00 0.00 0.00 6 Warranty Phase i 0.00 0.00 0.00 0.00 0.00 7 Hvdro-Excavation (Authorized) 000 0.00 000 0.00 0.00 Televising Existing Sanitary Sewer lines 8 Authorized) 0.00 0.00 0.00 0.00 0.00 9 Drainllae Criteria Technical Guide 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees 0.00 173,704.00 0.00 14,278.00 187,982.00 T Total Authorized Fee $11,372.00 $269,664.00 $0.00 $131,567.00 $412,603.00 I Clm.rron Blvd, Phase 2 (ProIect No. 62621 T Street Storm Water Water Wut8water Total Basic Services 1 Preliminary Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 Desian Phase 000 0.00 0.00 0.00 0.00 3 Bid Phase 000 0.00 0.00 0.00 0.00 4 Construction Phase 000 000 0.00 0.00 0.00 Subtotal Basic Services Fees 0.00 000 0.00 0.00 0.00 T Additional Services 1 Permittina(Authorized) 0.00 000 0.00 0.00 0.00 2 ROW ACQuisition Survey 0.00 0.00 0.00 0.00 0.00 3 Toooaraohic Survey (Authorized) 0.00 0.00 0.00 0.00 0.00 4 Environmentatlssues 000 000 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 6 Warranty Phase 000 0.00 0.00 0.00 0.00 7 Hlldro-Excavation (Authorized) 000 000 0.00 0.00 0.00 Televising Existing Sanitary Sewer Lines i 8 Authorized) 000 0.00 0.00 0.00 0.00 9 12-inch Waterline Replacement 0.00 0.00 0.00 0.00 0.00 10 RePlacement of Yorktown Ditch 0.00 0.00 0.00 0.00 0.00 11 Improvements to Bear Creek Ditch 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees 000 0.00 0.00 0.00 0.00 I Total Authorized Fee $0.00 $0.00 $0.00 $0.00 $0.00 I Combined Total I Street Storm Water Wlter WutAWlt8r Total Basic Services 1 Preliminary Phase $0.00 $95,960.00 $0.00 $0.00 $95,960.00 2 Desion Phase .- 11,372.00 0.00 0.00 117,289.00 128,661,00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Construction Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Services Fees 11.372.00 95.96000 0.00 117.289.00 224.621.00 I Additional Services 1 Permittina (Authorized) 0.00 0.00 0.00 4,124.00 4.124.00 2 ROW ACQuisition Survey 0.00 000 0.00 0.00 0.00 , 3 TODOCIraDhic Survey (Authorized) 0.00 173,704.00 0.00 10,154.00 183,858.00 , 4 Environmental Issues 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 000 0.00 0.00 0.00 0.00 6 Warranty Phase 0.00 000 0.00 0.00 0.00 7 HYdro-Excavation (Authorized) 0.00 0.00 0.00 0.00 0.00 Televising Existing Sanitary Sewer lines 8 Authorized) 000 0.00 000 0.00 0.00 9 Drainaae Criteria Technical Guide 0.00 0.00 0.00 0.00 0.00 9 12-inch Waterline Replacement 000 0.00 0.00 0.00 0.00 10 ReoIacement of Yorktown Ditch 000 0.00 0.00 0.00 0.00 11 Improvements to Bear Creek Ditch 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees 000 173,704.00 0.00 14,278.00 187,982.00 I Total Authorized Fee _.._..__--1-. $11.37200 $269,664.00 $0.00 $131,567.00 $412.603.00 AMENDMENT NO 5 EXHIBIT "B" Page 3 017 ~. r' K,",\~'I" ~.> 'HASt: FRUM SAf<.A T)GA TOy'ORKTOWN (PROJECT NO 6261) PrASE 2 FROM YORK10WN TO BISON (MIRELES! (PROJECT NO 6262) SUMMARY OF FEES ~ ---r AMENDMENT NO.3 , Cimarron Blvd, Phase 1 {Prolect No. 62611 I Street Storm W.t.r Wat8r W..te....ter Total Basic Services =E. 1 Preliminarv Phase $0.00 so 00 $0.00 $0.00 SO.OO 2 Desion Phase 000 000 0.00 0.00 0.00 3 Bid Phase I 0.00 000 000 0.00 0.00 4 Construction Phase i 0.00 0.00 000 0.00 0.00 Subtatel Basic Services Fees ! 000 0.00 0.00 0.00 0.00 I I Additional Services I 1 Permittina {Authorizedi ----r 0.00 0.00 0.00 0.00 0.00 2 ROW Acauisition Survey 0.00 0.00 000 0.00 0.00 3 Toooaraohic Survey (Authorized) 0.00 0.00 0.00 0.00 0.00 4 Environmental Issues 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 6 Warranty Phase 0.00 0.00 0.00 0.00 0.00 7 HYdro-Excavation (Authorized) 0.00 0.00 0.00 0.00 0.00 Televising Existing Saritary Sewer Lines 8 (Authorized) 0.00 0.00 0.00 0.00 0.00 9 Drainage Criteria Technical Guide -+- 0.00 0.00 000 0.00 0.00 Subtotal Additional Services Fees 000 0.00 0.00 0.00 0.00 I Total Authorized Fee $000 $0.00 $000 $0.00 $0.00 I Cimarron Blvd, Pha.e 2 (Prolect No. 62621 I Street S r Water r Total Basic Services 1 Preliminary Phase SO.OO $0.00 $0.00 $0.00 $0.00 2 Desian Phase 5,005.00 5,005.00 5,005.00 5,005.00 20,020.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Construction Phase 000 0.00 0.00 0.00 0.00 Subtotal Basic Services Fees 5,005.00 5,00500 5,005.00 5,005.00 20,020.00 Additional Services 1 Permittil1Q (Authorized) 0.00 0.00 0.00 0.00 0.00 2 ROW Acauisition Survey 0.00 000 0.00 0.00 0.00 3 Toooaraohic Survey (Authorized) 0.00 0.00 000 0.00 0.00 4 Environmental Issues 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 6 Warranty Phase 000 0.00 0.00 0.00 0.00 7 Hydro-Excavation (Authorized) 0.00 000 0.00 0.00 0.00 Televising Existing Sanitary Sewer Lines I 8 Authorized) 0.00 0.00 0.00 0.00 0.00 9 12-inch Waterline Replacement 0.00 0.00 0.00 0.00 0.00 10 ReDlacement of Yorktown Ditch 0.00 000 0.00 0.00 0.00 11 Improvements to Bear Creek Ditch 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees 0.00 0.00 0.00 0.00 0.00 I - Total Authorized Fee $5,005.00 $5.005.00 $5,005.00 $5,005.00 $20.020.00 Combined Total I Street Stnrm w."r Water W..t.water ~tal Basic Services 1 Preliminarv Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 Desion Phase 5,005.00 5,005.00 5,005.00 5,005.00 20,020.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Construction Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Services Fees 5,005.00 5,005.00 5,005.00 5,005.00 20,020.00 I Additional Services 1 Permittina (Authorized) 0.00 0.00 0.00 0.00 0.00 2 ROW Acauisition Survev 0.00 0.00 0.00 0.00 0.00 3 Toooaraohic Survey (Authorizedl 0.00 0.00 0.00 0.00 0.00 4 Environmental Issues I 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 0.00 000 0.00 0.00 0.00 6 Warranty Phase 0.00 0.00 0.00 0.00 0.00 7 HYdro-Excavation (Authorized) 0.00 0.00 0.00 0.00 0.00 Televising Existing Sanitary Sewer Lines 8 IIAuthorized) 0.00 000 0.00 0.00 0.00 9 Drainaae Criteria Technical Guide 0.00 0.00 0.00 0.00 0.00 9 12-inch Waterline Reol8oement 0.00 0.00 0.00 0.00 0.00 10 Reolacement of Yorktown Ditch 0.00 0.00 0.00 0.00 0.00 11 Improvements to Bear Creek Ditch 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees 0.00 0.00 0.00 0.00 0.00 , I ITotal Authorized Fee $5.00500 $5,005.00 $5.00500 $5,005.00 $20,020.00 AMENDMENT NO 5 EXHIBIT "B" Page 4 of 7 ,MARRUN B"lJ~t;vARL "HASE FROM SARA.TOGA TO YORKTOWN (PROJECT NO 6261) PHASE 2 FROM YORKTOWN TO BISON (MIRELES) (PROJECT NO 6262) SUMMARY OF FEES ~- -- AMENDMENT NO.4 Clmarron Blvd, Phase 1TPrOlKt No. 6261) I Street Storm W_tar Wa_ W-stewAtar Total Basic Services 1 Preliminarv Phase $0.00 $0.00 $000 $0.00 $0.00 2 Desian Phase 1.872.25 1.872.25 1,872.25 1,872.25 7,489.00 3 Bid Phase 0.00 0.00 000 0.00 0.00 4 Construction Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Services Fees 1,872.25 1,872.25 1,872.25 1,872.25 7,489.00 I Additional Services i 1 Permittina (Authorized) 0.00 0.00 0.00 0.00 0.00 2 ROW Acauisition Survey' 2,918.00 2,918.00 2,91800 2,918.00 11,672.00 3 Toooaraohic SurviiiTAuthorizedl 000 000 0.00 0.00 0.00 4 Environmental Issues 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 000 0.00 0.00 0.00 0.00 6 Warrantv Phase 0.00 0.00 0.00 0.00 0.00 7 Hvdro-Excavation (Authonzed) 000 0.00 0.00 0.00 0.00 ITelevising Existing Sanitary Sewer Lines 8 I (Authorized) 0.00 0.00 0.00 0.00 0.00 9 IDrainaae Criteria Technical Guide 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees 2,918.00 2,918.00 2,918.00 2,918.00 11,672.00 I Total Authorized Fee $4,79025 $4,79025 $4,790.25 $4,790.25 $19,161.00 I Cimarron Blvd, Phase 2 IProiect No. 62621 I Basic Services 1 Preliminarv Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 Desion Phase 0.00 0.00 0.00 0.00 0.00 3 Bid Phase 000 0.00 0.00 0.00 0.00 4 Construction Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Services Fees 0.00 0.00 0.00 0.00 0.00 I Additional Services 1 Permittina (Authorized)' 0.00 0.00 000 0.00 0.00 2 ROW Acauisition Survey 0.00 0.00 0.00 0.00 0.00 3 Tooooraohic Survev (Au1horized) 0.00 0.00 0.00 0.00 0.00 4 Environmental Issues 0.00 000 0.00 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 6 Warrantv Phase 0.00 0.00 0.00 0.00 0.00 7 Hvdro-Excavation (Authorized) 0.00 0.00 0.00 0.00 0.00 :Televising Existing Sanitary Sewer Lines 8 IIAuthorized) 0.00 0.00 0.00 0.00 0.00 9 12-inch Waterline Reolacement 0.00 0.00 0.00 0.00 0,00 10 Iffeplacement of Yorktown Ditch 0.00 0.00 0.00 0.00 0.00 11 Improvements to Bear Creek Ditch 0.00 000 0.00 0.00 0.00 Subtotal Additional Services Fees 000 0.00 0.00 0.00 0.00 I Total Authorized Fee SO.OO $0.00 $0.00 SO.OO $0.00 I Combined Total I Basic Services 1 Preliminarv Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 Desian Phase 1,872.25 1,872.25 1,872.25 1,872.25 7,489.00 3 Bid Phase 0.00 000 0.00 0.00 0,00 4 Construction Phase 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Services Fees 1,872.25 1,872.25 1,872.25 1,872.25 7,489.00 Additional Services 1 Permittina CAu1horized\ 0.00 0.00 0.00 0.00 0,00 2 ROW Acauisition Survev 2,91800 2,918.00 2.918.00 2,918.00 11,672.00 3 Toooareohic Survey (Authorizedl 0.00 0.00 0.00 0.00 0.00 4 Environmental Issues 0.00 0.00 000 0.00 0.00 5 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 6 Warrantv Phase 0.00 0.00 0.00 0.00 0.00 7 Hvdro-Excavation (Authorized) 0.00 000 0.00 0.00 0.00 Televising Existing Sanitary Sewer Lines I 8 I Authorized) I 0.00 0.00 0.00 0.00 0.00 9 Drainage Criteria Technical Guide 000 0.00 0.00 0.00 0.00 9 12-inch Waterline ReDlacement 0.00 0.00 0.00 0.00 0.00 10 Reolacement of Yorktown Ditch 0.00 0.00 0.00 0.00 0.00 11 Improvements to Bear Creek Ditch 000 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees 2,91800 2,91800 2,918.00 2,918.00 11,672.00 r Total Authorized Fee $4,790.25 $4,790.25 $4,790.25 $4,790.25 $19,161.00 AMENDMENT NO 5 EXHIBIT "B" Page 5 of 7 ,)ARRON tj('ULeVARL "HASE FROM SARA TOGA TO YORKTOWN (PROJECT NO 6261) P,'ASE 2 FROM YORKTOWN TO BISON (MIRELES) (PROJECT NO 6262) SUMMARY ')F FEES AMENDMENT NO,S - MASTER CHANNEL 27 INo. 2263) Cimlrron Blvd, Phl.e 1 IProlect No. 62611 I Street Storm Water Wa.r W..te....ter Total Basic Services 1 Preliminarv Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 Desion Phase 000 662,986.00 000 0.00 662,986.00 3 Bid Phase 0.00 17,693.00 0.00 0.00 17,693.00 4 Construction Phase 0.00 53,962.00 0.00 0.00 53,962.00 Subtotal Basic Services Fees 000 734,641.00 000 0.00 734,641.00 I Additional Services 1 Permitting (Authorized\ 000 48,510.00 0.00 0.00 48,510.00 2 ROW ACQuisition Survey 0.00 13,529.00 0.00 0.00 13,529.00 3 ToooaraDhic Survey (Authorized) 0.00 33,134.00 0.00 0.00 33,134.00 4 Environmental Issues 0.00 17,807.00 0.00 0.00 17,807.00 5 Construction Observation Services 0.00 214,826.00 0.00 0.00 214,826.00 6 Warrantv Phase 0.00 8,284.00 0.00 0.00 8,284.00 7 Hvdro-Excavation (Authorized! 0.00 17,566.00 13,17500 4,392.00 35,133.00 elevising Existing San itary Sewer lines 8 Authorized) 0.00 000 0.00 0.00 0.00 9 Drainaoe Criteria Technical Guide 000 37,160.00 0.00 0.00 37,160.00 Subtotal Additional Services Fees 000 390,816.00 13,175.00 4,392.00 408,383.00 I Total Authorized Fee $0 00 $1.125.457.00 $13,175.00 $4,392.00 $1,143,024.00 I Clmarron Blvd, Phase 2 IProIect No. 6262) I Basic Services 1 Preliminarv Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 Desion Phase 000 0.00 0.00 0.00 0.00 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 4 Construction Phase 000 0.00 0.00 0.00 0.00 Subtotal Basic Services Fees 0.00 000 0.00 0.00 0.00 I Additional Services 1 Perrnittino (Authorized) 000 0.00 0.00 0.00 0.00 2 ROW Acauisition Survey 000 000 0.00 0.00 0.00 3 Tooooraohic Survey (Authorized) 0.00 000 0.00 0.00 0.00 4 Environmental Issues 000 000 0.00 0.00 0.00 5 Construction Observation Services 000 0.00 0.00 0.00 0.00 6 Warrantv Phase 0.00 0.00 0.00 0.00 0.00 7 Hvdro-Excavation (Authorized)- 0.00 0.00 0.00 0.00 0.00 Televising Existing Sanitlry Sewer lines 8 Authorizedl 0.00 0.00 0.00 0.00 0.00 9 12-inch Waterline Replacement 000 0.00 0.00 0.00 0.00 10 Replacement of Yorktown Ditch 000 000 000 0.00 0.00 11 Imorovements to Bear Cleek Ditch 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees 000 0.00 0.00 0.00 0.00 I Total Authorized Fee $0.00 $0.00 $0.00 $0.00 $0.00 I Combined Total I Basic Services 1 Preliminarv Phase $0.00 $0.00 $0.00 $0.00 $0.00 2 Desion Phase 0.00 662,986.00 0.00 0.00 662,986.00 3 Bid Phase 0.00 17,693.00 0.00 0.00 17,693.00 4 Construction Phase 0.00 53,962.00 0.00 0.00 53,962.00 Subtotal Basic Services Fees 0.00 734,64100 0.00 0.00 734,641.00 I Additional Services 1 Perrnitlina (Authorized! 0.00 48,510.00 0.00 0.00 48,510.00 2 ROW Acauisition Survey 000 13,529.00 0.00 0.00 13,529.00 3 Tooooraohic Survey (Authorized) 000 33,134.00 0.00 0.00 33,134.00 4 Environmental Issues 000 17,807.00 0.00 0.00 17,807.00 5 Construction Observation Services 0.00 214,826.00 0.00 0.00 214,826.00 6 Warranty Phase 0.00 8,284.00 0.00 0.00 8,284.00 7 Hvdro-Excavation (Authorized) 0.00 17,566.00 13,175.00 4,392.00 35,133.00 elevising Existing Sanitary Sewer Lines 8 Authorized) 0.00 0.00 0.00 0.00 0.00 9 Drainage Criteria Technical Guide 0.00 37,160.00 0.00 0.00 37,160.00 9 12-inch Waterline Replacement 000 0.00 0.00 0.00 0.00 10 Reol8cement of Yorktown Ditch 000 0.00 0.00 0.00 0.00 11 Improvements to Bear Creek Ditch 0.00 0.00 000 0.00 0.00 Subtotal Additional Services Fees 0.00 390,81600 13,175.00 4,392.00 408,383.00 I ! Total Authorized Fee $0.00 $1,125,457.00 $13,175.00 $4,392.00 $1,143,024.00 AMENDMENT NO 5 EXHIBIT "B" Page 6 of 7 ,1ARROI\ tj, .0Lt,"ARL "'HASt: FROM SARA TOGA TO YORKTOWN (pROJECT NO 5261) PHASE 2 FROM YORKTOWN TO BISON (MIRELES) (PROJECT NO 6262) SUMMARY OF FEES i TOTAL RESTATED FEE Clmarron Blvd, Phase 1 (Prolect No. 6261) I Street Sto"" w....r W.ater W.stew.t"r Total Basic Services 1 Preliminarv Phase $24,040,29 $109,370,11 $7,791.90 $7,396,70 $148,599.00 2 Design Phase 224,207.25 $762,537.25 70,249.25 164,070.25 1,261,064.00 3 Bid Phase - 5,622.02 $20,940.63 1,687.03 1,791.32 30,441.00 4 Construction Phase 19,206.85 $64,677.04 6,225,94 5,910.17 96,022.00 I Subtotal Basic Services Fees 273,27841 977,525.03 86,154.12 199,168,44 1,536,126.00 : I + iAdditional Services 1 Permittina (Authorized) 4,261.93 50,88738 1,38137 5,435.31 61,965.99 2 ROW ACQuisition Survey 2,918.00 16,447.00 2,918.00 2,918.00 25,201.00 3 Tooooraohic Survev (Authorized) 4,936,94 209,591.91 1,600.15 11,672.99 227,601.99 ! 4 Environmental Issues 0.00 17,607.00 0,00 0.00 17,607.00 I 5 Construction Observation Services 124,244,61 284,131.90 40,269.97 36,227.52 466,674.00 ! 6 Warrantv Phase 3,365.07 10,172.25 1,097,16 1,041.52 15,696.00 , 7 Hydro-Excavation (Authorized) 0.00 17,566.00 19,767.00 10,984,00 48,317.00 Televising Existing Sanitary Sewer Lines 8 Authorized) -- 0,00 0.00 0.00 31,250.00 31,250.00 9 Drainage Criteria Techmcal Guide 0.00 37,160.00 000 0.00 37,160.00 Subtotal Additional Services Fees 139.746.55 643.763.44 67,033.65 101,529.34 952,072.96 . i ITotal Authorized Fee $413,024.96 $1,621,26647 $153,16777 $300,697.76 $2,466,198.98 I IClmarron Blvd, Phase 2lProlttct No, 6262) i I Street Storm W.t..r Watlr Wastewater Total I Basic Services : 1 Preliminarv Phase $21.769,81 $9,004.62 $6,21749 $5,500.66 $42,493.00 2 Design Phase 110,358.00 48,563.00 35,094.00 31,626.00 225,661.00 3 Bid Phase 5,395.19 2,231,66 1,54088 1,363.26 10,531.01 4 Construction Phase 13,659.66 5,650.24 3,90128 3,451.63 26,663.01 Subtotal Basic Services Fees 151,18286 65,46972 46,753.65 41,941.79 305,348.02 Additional Services -- 1 Permittina (Authorized) 4,652.85 1,924,59 1,328.66 1,175.70 9,082.00 2 ROW ACQuisition Survev 0,00 0,00 0.00 0.00 0.00 3 Tooooraohic Survev (Authorized) 4.723,55 1,953.64 1,349.05 1,193.56 9,220.00 4 Environmental Issues 0.00 0.00 0.00 0.00 0.00 5 Construction Observation Services 46,669.94 20,131.73 13,900.22 12,296.11 95,000.00 6 Warrantv Phase 1,805.40 746.78 515.62 456.20 3,524.00 7 Hvdro-Excavation (Authorized) 000 000 6,592.00 6,592.00 13,184.00 Televising Existing Sanitary Sewer Lines 8 Authorized) 0,00 0,00 000 31,250,00 31,250.00 9 12-inch Waterline ReDlacement 0,00 0.00 14,149,00 0.00 14,149.00 10 ReDlacement of Yorktown Ditch 0,00 19,337.00 15,753.00 0.00 35,090.00 11 Imorovements to Bear Creek Ditch 0,00 24,673.00 0.00 0.00 24,673.00 Subtotal Additional Services Fees 59,651.74 66,766.94 53,58775 52,965,57 235,172.00 I Total Authorized Fee I $211,034.60 $134,236.66 $100,34140 $94,907.36 $540,520.02 I Combined Total - Street Stnrm W.ter W...r Wastewater Total Basic Services 1 Preliminarv Phase $45,810.10 $116,374.93 $14,009.39 $12,697.58 $191,092.00 2 Desion Phase 334,565.25 831,120.25 105,343.25 215,696.25 1,466,725.00 3 Bid Phase 11,217.21 23,172.29 3,427.91 3,154.60 40,972.01 4 Construction Phase 32,668,71 70,327.28 10,127.22 9,361.80 122,685.01 Subtotal Basic Services Fees $424,461.27 $1,042,994,75 $132,907.77 $241,110.23 $1,641,474.02 I I Additional Services 1 Permitting (Authorized\ 8,914.78 52,611.97 2,710,23 6,611.01 71,047.99 2 ROW ACQuisition Survey 2,916.00 16,447.00 2,916.00 2,916.00 25.201.00 3 Tooooraohic Survey (Authorized) 9,660.49 211,545,75 2,949.20 12,666,55 237,021.99 4 Environmental Issues 0.00 17,807.00 0.00 0.00 17,807.00 5 Construction Observation Services 172,914.55 304,263.63 54,170.19 50,525.63 561,674.00 6 Warrantv Phase 5,190.47 10,919.03 1,612.76 1,497.72 19,220.00 7 Hydro-Excavation (Authorizedi 000 17.566.00 26,359.00 17,576.00 61,501.00 [Televising Existing Sanitary Sewer Lines 8 Authorized) I 0.00 0.00 0.00 62,500.00 62,500.00 9 IDrainage Criteria Technical Guide 0.00 37,160,00 0.00 0.00 37,160.00 9 12-inch Waterline Reolaaement 0.00 0.00 14,149,00 0.00 14,149.00 10 ReDlacement of Yorktown Ditch 0.00 19,337.00 15,753.00 0.00 35,090.00 11 Improvements to Bear Creek Ditch 0.00 24,673.00 0.00 0.00 24,673.00 Subtotal Additional Services Fees 199,596.29 712,530.38 120,621.40 154,494.91 1,167,244.98 I Total Authorized Fee $624,059.56 $1,755,525 13 $253,529.17 $395,605.14 $3,026,719.00 AMENDMENT NC EXHIBIT "B" Page 7 of 7 ~."~~ 1"1 Chnsti CITY OF CORPUS CHRISTI DISCLOSURE OF INTERESTS ~~ City of Corpus Christi Ordinance 17112, as amended, requires all persons or firms seeking to do business with the City to proville the following information. Every question must be answered If the question is not applicable, answer with 'N/A" FIRM _ME: Maverick Enaineenna, Inc. STREEr: 2000 SPID, Suite 100 CITY: FIRM ita: 1 Corporation~ 2 Partnership_ S Other Corpus Christi. TX 3 Sole Owner_ ZIP: 78416 4. Association_ DISCLOSURE QUESTIONS If addititnal space is necessary, please use the reverse side of this page or attach separate sheet. 1. SlBte the names of each employee of the City of Corpus Christi having an ownership interest constituting 31L or more of the ownership in the above named firm. Neme Job Title and City Department (if known) N/A 2. _te the names of each official of the City of Corpus Christi having an ownership interest constituting 3% Of more of the ownership in the above named firm. Neme Title N/A 3. _te the names of each board member of the City of Corpus Christi having an ownership interest ~stituting 3% or more of the ownership in the above named firm. NIlme Board, Commission or Committee N/A 4. _te the names of each employee or officer of a consultant for the City of Corpus Christi who worked on _ matter related to the subject of this contract and has an ownership interest constituting 3% or more of tilt ownership in the above named firm. Name Consultant N/A CERTIFICATE I certify that all information provided is true and correct as of the date of this statement, that I have not knowingly withhektdisclosure of any information requested and that supplemental statements will be promptly submitted to the City of Corpus Christi. Texas as changes occur. Certifyi"ll Person, Ron Guzman; P.E. f2 -/-_ Signatl..lE of Certifying Person: t2 _ I Title: Division Manaaer Q.-ZO.06 Date: EXHIBIT "C" Page 1 of 2 .- a DEFINITIONS IJPard Member. A member of any board, commission or committee appointed by the City Council of the City of cerpus Christi, Texas. 6t\ployee. Any person employed by the City of Corpus Christi, Texas, either on a full or part time basis, but not as aI'I independent contractor. F~. Any entity operated for economic gain, whether professional, industrial or commercial and whether elltabJished tq produ.ce or deal with a product or service, incl~ding but nqt lim!t~d to, entities operat~d. in the form ofsole propnetorshlp, as self-employed person, partnership, corporation, JOint stock company, Jomt venture, reeivership or trust and entities which, for purposes of taxation, are treated as non-profit organizations. Official. The Mayor, members of the City Council, City Manager! Deputy Ci!y Manager, Assistant City Managers, IJtpartment and Division Heads and Municipal Court Judges or the City of Corpus Christi, Texas. Ow. nership Interest. Legal or equitable interest, whether actually or constructively held, in a firm, including when such interest is held through an agent, trust, estate or holding entity. Constructively held refers to holaing or cOntrol established througli voting frusts, proxies or special terms of venture or partnership agreements. Censultant. Any person or firm, such as engineers and architects, hired by the City of Corpus Christi for the pUrpose of professional consultation and recommendation b c d e EXHIBIT "e" Page 2 of 2