HomeMy WebLinkAboutC2006-485 - 10/31/2006 - Approved
CHANGE ORDER
Department of Engineering Senices
City of Corpus Christi, Texas
CHANGE ORDER NO~ PROJECT NO:
7302
CONTRACT TIME: 360 C.D.
Operating Department: Was1ewater Department
DATE:
October 24,2006
Name of Project: Antelope & 'lalt Flats\rea 36"'48" Wastewater Gravity Line
Contractor: George ConstructIon, Inc.
CHANGE
ADD
DEDUCT
See <\ttached
Wh) was this change necessary" (If left off the plans and specifications, explain why)
On Doddridge.. recent cleaning and televising revealed a section of 8" sanitary sewer that has the potential for
munedlate failure. At the Howard Street bore, obstructions were encountered that required extra work for removal.
How can similar changes be avoided in the future?
! Jnav01dable Neither of the aforesaid circumstances could have been seen or anticipated in advance.
A. CONTRACT PRICE........."............... ........... ........................ $
B. TOTAL CHANGE ORDER (inc. current) ........................... $
C NEW CONTRACT PRICE .................................................. $
D. THIS CHANGE ORDER ...................................................... $
E. PERCENT TOTAL CHANGE (BfA) ...................................
F. PREVIOUS ADDN'L TIME AUTHORIZED ......................
G. ADDN'L CONTRACT TIME THIS CHA.""IGE ORDER....
H. rOTAL ADDITIO!\AL TIME ................. . ".....................
8.614.720.50
1.567 934.45
10.182.654.95
122.126.38
18.20%
180 C.D.
15 C.D.
195 C.D.
CITY OF/"CORPUS CHRISTI. TEXAS
By 1;4? ~-
, City Engineer
I
/~/.zi4b
~N~
By, ') -,. i
Title: '- c;"... J. f
.\PPROVED:
\/tj.~t"l- /~It.. '...1/ / (;/26:< It-toperating Department
4- I htJ4'vtl'- ~caPital Budget Officer
~ . kfi~
r~ -'--7"y--
-.L.;;.. " ,.. C/
lM-\""D('~--- .... ..-.--.
"'Y S,c~ 'T4.r'{
j A 11JDro...'b5L... ~Ulh\J".~
" .....~.-
Sfctir~
A TTF~I
2006-485
10/31/06
"12006-351
George ("onstruction
ADD DEDUCT
.\.
Add the following bid items to the contract:
Doddridge Point Repair
C 1. Mobilization - 1 L.S. @
$10.000.00 L.S
C2 Traffic Control 1 [ S. ill
$lS.000/LS
G3. Controlling Ground Water
[ LS @ $16,000.0(I/L.S
G4. Remove & Dispose ()fFxisting
8" Plpe ~- 2' L.F
@ $350.001 o.F.
G5. 8" PVC Samtary Se\ver
23 LF. @ $382.00/1 F
G6. 8" Sanitary Sewer
Connectiom- 2 ea. ?i2 $3S00.00 each
G 7 Cement Stahilized Backfill -
1 L.S @ $S.200.00/L.S
G8. Trench Safety -- 23 1 F.
@ $12.00/L F.
G9. Asphalt Pavement Repair ~
1 L.S @ $12,000/L.S.
G 1 n. SWPPP 1 LS. @ S 1 ,SOO.OO/L.S.
12,000.00
$ ] 0,000.00
15,000.00
16,000.00
8,050.00
8,786.00
7,000.00
5,200.00
276.00
1,500.00
B.
Total Part G
Add the following bid item to the contract:
C 16. Bore Obstruction Removal ~
] L.S @ $3~,3] 4.38!L.S
38,314.38
$83.812.00
TOT AL ADD
$122.126.38
I .PROJECT DA'j A CORPUS12005 PROJ ECTS A05C28-00 (Cl City of Corpus Chnsti - Antelope Street and Salt Flats WGIL\05-CONTRACTS
\.. G!o\"GE ORDERS\2006 in =4 Chang. Order !l,tta:hd{'l