Loading...
HomeMy WebLinkAboutC2006-546 - 12/12/2006 - ApprovedCHANGE ORDER Department of Eogineering Services City of Corpus Christi, Texas CHANGF.ORDER NO~ 4 FIJNDING SOURCE: CONTRACT TIME: 120 C.D. Operating Department: Wastewater; Storm Water DATE: November 17, 2006 Name of Projec~ Airport Ditch 8" PVC; Effluent Line (7368) / Storm Sewer Extensions Group "B° (2173, 2215, 2212) Contractor: SLC Construction, LP CH.ANGE ADD DEDUCT Add the followixg items to the contract: Install 8" PVC effluent force main $244,504.00 5,200 L.F. (a7,$47.02 L.F Rework due to discrepancy between con- 28,750.00 tract dra~vings and railroad permit requirements 1 L S. ~28.750.00/I..S. TOTAL NET: $273,254.00 Why vvas t6is chan~t nece~ary? (If left off the plans and specifications, eacplain why? l.) Proactive measur~ to remove existing 8" asbestos cement line from underneath Greenwood Drive and realign a new 8" PVC effluent (ine along side Airpost Uitch. 2.) A change in ownership of the railroad after the permit was submitted created addirional requirements that t~d to be met during ~nstn~tion. How can similar c~ges bie svoided in the feture~ 1.) Proper planning at-d review of existing conditions and planned projects prior to design. 2.) This was beyond the control of the City, the consultant, or the con~ractor because the change in ownership occurred after the design phase and after the permit was already submitted and a~roved. A. CONTRACT PRICE $ 1,223,591.00 B. TOTAL CHANGE ORDER (inc. current) $ 300,504.00 C. NEW CONTRACT PRICE $ 1,524,095.00 ~ A ~~p D. THIS C~ANGE ORDER $ 273,254.00 Project Ma ager E. PERCENT TOTAL CHANGE (B/A) 24.56•k F. PREVI~US TI~E AUTHORIZED 25 C.D. G. ADDN'L CONTRACT TIME THIS CHANGE ORDER 40 C.D. H. TOTAL ADDI~i'IONAL TIME 65 C.D. CITY OF CORPUS CHR~STI, TEXAS 1 ~~b~.;,,,,~,,,.,,. AU I MUKIL~CONTRACTOR Br- ~ ~Gw- /z~~~o6~1r E~o~~-C1~ .~..~~ ~_~,: or of Enginee ' Services ~}~ j~~~ f~~~/'!~ ~ET~ tle: ~f - Csr,~..s l~„~-~s~: APPROVED: ~l<wz -r~~ Operating Department ~ ~ ~ ~ '^~''~~ ~^^^ ti~~ ~~- ~ ~Dir. of Management & Budget 2006-546 a~~ j, ~ ~ 12/12/06 ~ ~ ~1~D~partment ARNUWQQ ~ - - SI~ ,~,~,,,,'°". _ ~ - M2006-396 ~~ ~"'~"'~~ . SLC' Construction '~ ~°'' ~=~.=~+++ ~,. . ~.. ~.. . ~_ _ .,,.,. ~ a.,..,.. ~. _ ,