CHANGE ORDER
Department of Engineering Services
City of Corpus Christi, Texas
Date February 6, 2007
006 Funding Source: 550910- 3233 - 00000- 140302
Engineering _ Contract Time: 180 Calendar Days
Marina Development Project -Phase III: Docks E, F, G, and H
Inc.
DESCRIPTION OF CHANGE ADD TYPE DEDUCT
PSC #007 $0.00 LS $20,000.00
_'alue engineering proposal from CCC Group for modification of
-ype W to Type TC power conductors on Docks E, F, G and H
PSC #010 $80,090.00 LS $0.00
Modification of landside power distribution system
TOTAL THIS CHANGE ORDER $60,090.00
Why was this change necessary? (If left off the plans and specifications, explain why.)
Dock type was not determined in the design phase. Performance specifications were provided to contractors with
.onservative power conductor layouts /types which would work in several dock types. Value engineering allowed
pricing to decrease.
2 To accommodate future projects currently being planned for the People's Street T -Head.
How can similar changes be avoided in the future?
1. Jnavoidabte with performance specifications.
2 Ongoing construction and development in the area was unknown / unplanned during the design phase.
A, JRiGINAL CONTRACT PRICE
B TOTAL CHANGE ORDERS (ino Curren:
NEv1r CONTRACT "RICE
._ . ,MOUNT OF THIS CHANGE ORDER
E_ PERCENT TOTAL CHANGE (B /A)
PREVIOUS ADDT_. TIME AUTHORIZE[;
ADDTL CONTRACT TIME THIS CHANGE ORDER
H. TOTAL ADDITIONAL CONTRACT TIME
CITY OF CORPUS CHRISTI, TEXAS
BY _
Di o of Engineering Services
APPROVED
5
ng Vpparhffient
Director of Managemenj & Budget,
uegal Department
2p07 -053
02/20/07
V12007 -056
'('C (.ro�up
$ 3,835,988.00
$ 561,837.00
$ 4,397,825.00
$ 60,090.00
14.65%
91
10
101
Change Reviewed and Recommended by:
HD hiner M,, se and Associates, Inc.
Project Engineer Date
(calendar days)
(calendar days)
(calendar days)
CONTRAC�C ro C.
Tom_' I
21491,07 BY
Date Signature G� Date
Date
4 &�
Date
f' (j t,
Date
t.4.ss
Title
Attachments Pages
1 PSC #007 1
2. PSC # 008 1
3. CCC Grou Pro osal 2
N . All I NUh I
•1'
- - -- 1C
SECI'rf'T�
FOR I.SHINER MOSELEY
AND Associ.ATEs, nvc.
Client: City of Corpus Christi
Scope Change No.: 007
PROJECT
SCOPE CHANGE
Project Name: Marina Development — Phase III
Date Submitted: 01/22/07
Project No.: 200.40190
1 ne scope o2 work includes the materials, labor, and equipment for the change to the type of cabling on
Docks E, F, G, and H as well as new junction boxes and splice terminals, with an enclosure surrounding each
junction box See Attachment No. 1 - sheets 1 through 12
i ne reason for the change is a VALUE ENGINEERING CHANGE PROPOSAL, with a total estimated
value of $40,000, which would be split equally between the City of Corpus Christi and the Contractor, CCC
("croup, Inc. ($20,000.00 each)
Requested/Required By: [p� client
❑ field conditions
lump sum $
proposal to be submitted; due date
[ ] time and expense per schedule dated
[� included in percent of construction fee
® no charge
® construction cost $ - 20,000.00 (deductive C.O.)
U construction schedule NA
U design schedule NA
❑ HDRIShiner Moseley ❑ sub - consultant
N other Contractor (CCC Group, Inc.)
Des W Work Change includes:
1. Coordination with Contractor to implement
changes, including review of submittals,
construction oversight, etc.
2. Modification to Record Drawings to reflect the
changes to the plan.
1. Purchase of materials.
2. Installation of new cabling.
3. Coordination with Engineer to implement changes
to project.
Please sign below to indicate your concurrence with this scope change and return one copy to HDR SMA so that we
may proceed with^ work -
Signed: C� / 5 X, 7
Project Manager. HDRIShiner Albselev r. Date
I- / I Signature Dat
BHT i �A
K \Projects\2004\200_40190\01 Basic Services \04BS Construction Phase \Docks E, F, G, H\09 Change Orders and Project Scope Changes\PSC_007\PSC 007.doc
j SHINER MOSELEY
AND ASSOCIATES. INC.
( Bent: Cih of Corpus Christi
PROJECT
SCOPE CHANGE
Project Name: Marina Development — Phase III
Scope Change No.: 010 Date Submitted: 02/06/07 Project No.: 200.40190
C Yacht?n-, Center project
R�questedlReganed By Z client ❑ HDR Shiner Moseley F] sub-consultant
U tell conditions ❑other
lump sum S 10.000 (amendment) Design Work Chance includes:
[ � prclposa? to he submitted: due date
Generate plans for bidding and construction.
4 Contract administration and periodic field
[ time and expense per schedule dated observations.
[ included in percent of construction tee
[_ no charge
construction cost ^1 S 60.000 (additional C.0.! Construction Work Change includes:
Installation of new power distribution system
(conduits, conductors, enclosures, transformer
'l-
Ic tra�1 pads, etc.)
construction schedule .Xdd 0- rem) days to ( ontract
[_ design schedu c ti -1
i'lea.w .sign beio,,l to indicate your concurrence with this scope change and return one copy to HDR SMA so that we
mall ,proceed 1A ittt the work
Signed az /C-) /`' 7
Pr!,iecl Manager, HDR Shiner Mosele- Date
Angel E. Escobar, R Directgr_oi_ 1✓n ineerin
Signature Date
S Wr / &` /
190 \U1 Ii ;I, ,ern i t •,4B- _t m P ase'Dock. i , !', t; H \Oy Change Orders and Project Scope Changes\PSC_010\PSC 010 -
a, dside Povei Mods doc
CCC GROUP, INIC.
C0RPI S d HRISTI REGIONAL OF'FI( 1
6364 HO PKINS. CORMS CHRISTI, TX 78409
361!284 -5155 F'AV 361'289 -1404
February ' 2. 2007
C av o f Corpus Christi
1201 Leopard Street
Corpus Christi. Texas78469
Visit our ivehsite at:
www.eccgrogpine.com
Reference Corpus Christi Marina Development Project Phase III (Docks E, F, G and H)
Project No. 329?
Additional Sanitary Sewer Piping, Water Line Piping, Electrical and Telephone Utilities
for Future Development
Attention Brent Moore, 1' 11
Gentlemen:
CCC group.. Inc. is pleased to present our proposal for the above referenced additional work. CCC Group Inc
will provide all necessary supervision, labor, equipment and materials for this work. This proposal is based on
the following scope of work-
Scopc of Work
L Core drill ( 3) holes through the existing bulkhead for the new utilities.
2. Excavate and backfill pipe trench as required for the new sanitary and water lines.
3. Supply and install approximately 50' of additional sanitary sewer piping as per the plans and
specification,_ 110' of sanitary sewer piping is included in Change Order # 4.
4. Supply and install approximately 20' of water line as per the plans and specifications.
5. Excavate and backfill electrical trench as required for the new electrical and telephone conduits as per
the plans and specifications.
6. Supply and install electrical and telephone conduits as the plans and specifications.
7. Supply and install new 0' x 6' pier supported transformer foundation as per the plans and specifications.
8. Demolition of'sidewalk and masonry wall as needed to install new conduits.
9. Repair asphalt roadway and sidewalks where required for the utilities.
10 The roadway crossings will be made at night.
I ` We hax e not included the new telephone pedestal.
CORPORATE OFFICE:
F ;; BCk 20MK 5797 DIE�TRICH RD :-f P. FNTC100, r 7822 035
2 �r661 X25' =A't 210166' -0�60
1�i7A -W, 1641%
CCC GROUP, INC.
(ORPI S ('HRISTI RE LION_ kL OFFI( +
6364 HOPKINS. CORPUS CHRIS "IT. 7'X 78409
361!289 -5155 FAX::361 1289 -1404
Visit our iwehsite at:
www.cccgroupinc.com
We propose a Lump Sum Price of)$ 80,090.00 or this additional work. We also propose a contract
completion date extension of 10 Days. P ease note the following breakdown of this price.
1 t , "Telephone = $ 10,873.00 og yA f g n�6,
!r. Water/ Sewer Piping - •� $ 6,867.00 C>wTrk
C . Power - Bulkhead to Lift Station _ -43' Z�Z
$ 25,502.00
Power - New Transformer to Lift Station = $ 27,200.00 fAAFJNA
3 Power - Existing Transformer to Lift Station $ 9,648.00 --- WASTEWATE.
The bid breakdown is provided for evaluation purposes and does not constitute an offer to perform the
individual elements of work for the amounts shown nor should these amounts be construed as "take out"
prices.
Ii you have anv que,:tions or should you require any additional information, please contact our office at (361)
y
Respectfull4 Submitted
Michael t>wens
Project Manager
CORPORATE OFFICE:
F i BC)- 20035C 5797 D=T ?;CH RD 31lr, ANTOIND Ty_ 7822` C35�
2',')/661 425' 74 , 2'Jt6F F760
Department of Engineering Services
Change Order Summary Sheet
February 20, 2007
PROJECT: Corpus Christi Marina Development Project (Docks E, F, G & H)
Project No: 3297
APPROVED City Council on 3/28/06 - Motion No. M2006 -097
CONTRACTOR: CCC Group, Inc.
6364 Hopkins
Corpus Christi, TX 78409
TOTAL CONTRAC'r AMOUNT _......_ _
2.1?% Limit Amount
Change Order No. 1 (6/19/061 .. .......
Change Order No. 2 (Council 6127/06, M2006- 185).... ......
Change Order No. 3 (Council)
Change Order No. 4 (12/18/06) .. .........
Change Order No. 5 (Council). _
Change Order No. 6 (Council).
Total.. .
$3,835,988.00
958,997.00
0.00
316,134.00
34,315.00
11,500.00
139,798.00
60,090.00
561,837.00= 14.65% < 25%
EXHIBIT "B"
Page 1 of 1