Loading...
HomeMy WebLinkAboutC2007-087 - 4/10/2007 - ApprovedCHANGE ORDER =)epartment of Engineering Services Cite of Corpus Christi, Texas CHANGE ORDER NO: I _ PROJECT NO: 2243 Operating Department: Water Department Name of Project: Lindale /Chenoweth Drainage improvements, Phase 1, Part B Contractor: SLC Construction, L.P. CONTRACT TIME: 625 C.D. DATE: March 21, 2007 CHANGE SEE AT"I ACHED ADD DEDUCT Why was this change necessary? (If left off the plans and specifications, explain why) Additional water line work is requested by the City after the project was bid. How can similar changes be avoided in the future? Unavoidable. The poor conditions of some waterlines were unknown during the design and bid phases of the project. A. CONTRACT PRICE $ 11,300.441.39 B. TOTAL CHANGE ORDER (inc. current) $ 261.300.02 C. NEW CONTRACT PRICE $ 11.561.741.41 D. THIS CHANGE ORDER $ 26 10.12 E. PERCENT TOTAL CHANGE (B /A) 2.31% F. PREVIOUS ADDN'L TIME AUTHORIZED 14 C.D. G. ADDN'L CONTRTACT TIME THIS CHANGE ORDER-0- H. TOTAL ADDITIONAIL TIME ( CITY OF CORPUS CHRISTI, TEXAS By: 14 C.D. ' /4 f /� By: City Engineer APPROVED: ff \101,0414^ 2007 -087 04/10/07 42007 -092 5Lt ' Construction Title ect Engineer CONTRACTOR - Operating Department Capital Budget Officer Legal Department AUTMUKILL, IT OS.INCIL .....,_.,.. SFr, Add the following bid items to the contract: P -1. Mobilization /Demobilization/Bond 1 L.S. (W 515,500.00/L.S. $ 15,500.00 P -2. Sawcut Existing Asphalt - Pavement - 1,454 L.F. @ $5.04/L.F. 7,328.16 P -3. Remove Existing Asphalt - Pavement 8" Maximum 401 S.Y. ((4 $5.04 /S.Y 2,021.04 P -4. Sawcut Existing Concrete -- Sidewalk 110 L.F . @ $6.20 /L.F. 682.00 P -5. Remove Existing Concrete -- Sidewalk 162 S.F. @ $1.55 /S.F 251.10 P -6. 5" Concrete Sidewalk - 108 S.F. (a $6.20 /S.F. 669.60 P -7. Curb Ramps w /Truncated Dome - Pavers -- 54 S.F. @ S34.10 /S.F. 1,841.40 P -8. Remove Existing Curb & Gutter - 15 L.F. @ S7.75/L.F. 116.25 P -9. Concrete Curb & Gutter 15 L.F. @ S18.60 /L.F. 279.00 P -10. 4" HMAC Pavement, Type "D" - 401 S.Y. ( $31.00/S.Y 12 431.00 P -11. 12" Cement Stabilized Sand - 134 C.Y. (ii $35.65; C.Y. 4,777.10 P -12. Prime Coat @ 0.16 Gal.1S.Y. - 65 Gal. @ S5.04 /Gal 327.60 P -13. Seal Coat Entire Street Pavement Areas 2,671 S.Y. @ $5.04 /S.Y 13,461.84 P -14. Storm Water Pollution Prevention Measures - 1 L.S. $3.875.00/L.S. 3,875.00 P -1 5. 12" PVC C900 DR 18 Pipe -- 429 L.F. @ 85.25/L F. 36,572.25 P -16. 12" D.I. Pipe - 125 L.F. @- S108.89 L.F 13 611.25 P -17. 12" x 12" D.I. Cross. MJ. 1 Ea. @ $829.25/Ea 829.25 P-18. 12" x 12" D.I. Tee, MJ. 1 Ea. @ $403.00 /Ea 403.00 P -19. 12" x 10" D I. Reducer 2 Ea. @ $558.00/Ea. 1,116.00 P -20. 12" x 6" D.I. Reducer -- 1 Ea. @ $403.00 /Ea. 403.00 P -21. 6" D.I. Plug. MJ. - 1 Ea. @ $193.75/Ea. 193.75 P -22. 12" Gate Valve w /Box - 5 Ea. @ S2,092.50/Ea. 10,462.50 ADD DEDUCT i .PROJECTS CC ,2003W03054 -01 (C) C,ty of C C- Liudale Subdivision - Design PhaseA05- CONTRACTS & CHANGE ORDERS12007 3 5 ('hange Order I Attach.doc P -23. 12" x 45 Degree Bend D.I. 20 Ea. Ea `441.75 Ea. 8,835.00 P -24. 12 "" x 22.E Degree Bend. D.I. 2 Ea. @ $441.754 a. 883.50 P -25. 6" x 45 Degree Bend. 1/1. - 2 Ea. @ $232.50/Ea. 465.00 P -26. Cut & Plug 10" Waterline - 6 Ea. @ $968.75/Ea. 5,812.50 P -27. Cut & Plug 6" Waterline 7 Ea. @, $705.25/Ea. 4,936.75 P -28. Great Fill 10" Line - 121 L.F. @ $10.85/L.F 1,312.85 P -29. Remove 10" C.I. Pipe - 60 L.F. @ $11.63/1,.F. 697.80 P -30. Remove 6" C.I. Pipe - 70 L.F. @ $11.63/1. F. 814.10 P -31. Remove /Salvage Existing Fire Hydrant 1 Ea. @ $271.25/Ea. 271.25 P -32. Fire Hydrant Assembly - 1 Ea. $3,565.00/Ea. 3,565.00 P -33. 12" Wet Connection - 1 Ea. @ $4,185.00/Ea. 4,1 85.00 P -34. 10" Wet Connection - 2 Ea. @ $3,100.00 /Ea. 6,200.00 P -35. 6" Wet Connection - 1 Ea. @ $1.472.50/Ea. 1,472.50 P -36. 1" Service Line Connection - 4 Ea. @ $2,170.00 /Ea. 8,680.00 P -37. Trench Protection System - 554 L.F. @ $1.55 /L .F. 858.70 P -38. Traffic Control 1 L.S. @ $11,625.00/L.S. 11,625.00 P -39. DBL 4" Solid Yellow CL. Thermoplastic - 323 L.F. @ $2.711 F. 875.33 P -40. White Crosswalk Markings, Thermoplastic - 302 S.F. @ $6.20/S.F. 1,872.40 P -41. 24" Solid White Stop Bar. Thermoplastic - 72 S.F. $12.40/S. F. 892.80 P -42. Type I -C Raised Pavement Markers - 16 Ea. @ $12.40 /Ea. 198.40 B -40. Fire Hydrant Relocation 1 Ea. @ $7.742.75/Ea. 7,742.75 B. Add the following quantities to the bid items: B -2. 8" PVC Waterline - 892 L.F. @ $79.63/L.F. 71,029.96 1 ,PROJECTS CC\2003 \A03054 -0I (C) City of C C-Lndale Subdivision- Design Phase \05 - CONTRACTS & CHANGE ORDERS\2007 3 5 Change (Mier 1 Attach dm B - 8 " Gate \a\\e- 5 Ea. (u $1. '37.60/E1 5,688.00 B -19. 8" x 6" Reducer 1 Ea. (a), $227.52 Ea. 227.52 B -28. 8" x 6" Cross - 4 Ea. (L $497.70 Ea. 1,990.80 B -34. Fire Hydrant Assembly - 3 Ea. @ $3,412.80/Ea. 10,238.40 B -35. Trench Safety Plan - 892 L F. (d? $1.421. 1,266.64 C. Delete the following quantities from the bid items: B -6. 6" D.I. Waterline -- 125 L.F. (c $83.90/1_ .F. 10,487.50 B -14. 6" Plug -- 2 Ea. Iw $184.86/Ea. 369.72 B -18. 6" Gate Valve — 5 Ea. $711 00 /Ea. 3,555.00 B -23. 6" MJ Any .Angle Bend 14 Ea. $284.40/Ea 3,981.60 B -27, 6" x 6" Tee - 1 Ea. A. $284.40/Ea 284.40 B -29. 6" x 6" Cross - 3 Ea. ( $426.60/Ea. 1,279.80 B -32. 6" x 6" Tapping Sleeve &. Valve 2 Ea. (it?, $4,266.00/Ea. 8,532.00 Subtotal NET ADD $289,790.04 $28,490.02 $261,300.02 J \PROJECTS CC\2003 A03054 -01 IC i +.'ity of C C -i indale Subdivision - Design Phase \05-CONTRACTS & CHANGE ORDERS \2007 3 5 Change Order #' Attach. do