Loading...
HomeMy WebLinkAboutC2007-287 - 8/28/2007 - ApprovedCHANGE ORDER Department of Engineering Services City af C~rpus Christi, Texas CHANGE ORDER NO: 1 FUNDING SOURCE: 530210-1020-11870 CONTRACT TIME: 126 C.D. Operating Department: Enqineerinq Services DATE: Auqust 22, 2007 Name of Project: Police Department Chilled Water Plant Upqrade - Proiect No. 5190 Contractor: Weathertrol.lnc. CHANGE AS FOLLOWS: ADD 1. Remove existing air handling unit located in mechanical roam, rerr~ove Electrical and piping as required, remove duct work above floar level, remove existing variable frequency dri~e, install new variable frequency drive, install new York air hancfling unit in penthouse mechanical room, install new ductwork from unit to existing duct system at floor, install piping from existing piping to new air handling unit, insuiate new ductwork and piping, test and baiance water and air flow through unit, install Johnson controls for air handling unit, pro~ide new electricaf to new unit, start unit and verify praper operation of unit. $67,560.~0 2. Less Contingency AIlowance (Pay Item 20) Total Add. Lump Sum: $37,560.00 53021 Q-9 020-'E 1870 - $37,560.00 Why was this change necessary'? {If left off the plans and specifications, explain why} Deqartmental reauested modifications to better control humidity and quality of_air inside buildina. DEDUCT $30,OOO.QO How can similar changes be avoided in the future? Insure all work desired b De artment is included in ori inal desi n sco e. A. C~NTRACT PRICE ...............................................$ 569.~oa.ao B. TOTAL CHANGE ORDER (inc. current) ...............$ 37,560.00 C. NEW CONTRACT PRICE .....................................$ 607,06Q.00 ,. D. THIS CHANGE ORDER ........................................$ 37.5fi0.00 E. PERCENT TOTAL CHANGE (BIA} . ... .................. 6.59% Project Engineer F. PREVIOUS ADDN'L TIME AUTHORIZED ................ 90 CD G. ADDN'L CONTRACT TIME THIS CHANGE ORDER 152 CD H. TOTAL ADDITIONAL TIME ....................................... 242 CD CITY OF CORPUS CHRISTI, TEXAS By: ineer C~NTRACTOR ,~. /j By: ~~ Title: P~o~NT ~ ~ Weathertrol, Inc. ~ ~~a3~e~- l/j Operating Department ~ 3 ~ ~ ctor of Management & Budget . _ / 2007-287 ~al Department ~ ~~~~ as~zsia~ MZOa~-ZZi AFfEST. - RRlNANC3G CF1~PY~ ~ C~{TY SEp~TAFY" ~ AI~TNWtI~t. ~r ~nc~~ ~ ~ ~0 . C~ ~~ra ~ DEPARTMENT OF ENGINEERING SERVICES CHANGE ORDER SUMMARY SHEET AUGUS7 28, 2007 PROJECT: Police Department Chilled Water Plant Upgrade 2006 Project No: 5190 APPROVED: City Council on 121~ 9/06 - Motion No. M200fi-420 CONTRACTOR: Weathertrol, Inc. 4219 Baldwin Blvd. Corpus Christi, TX 78405 TOTAL C4NTRACT AMOUNT ...................... 25% Limit Amount ...................... Change Order No. 1 (08128107) ..................... Total $569,5Q0.00 142,375.00 37,560.00 37,560.00 = 6.fi0% < 25% Exhibit B Pa e1 of1 H:IHOMEILYNDASIGENIPOLICE15190 - Chiller Upgrade1C01 ExhB.doc